=== page 1 === Department of the Air Force Military Construction Program Fiscal Year (FY) 2027 Budget Estimates Justification Data Submitted to Congress Apr 2026 1 === page 2 === THIS PAGE INTENTIONALLY LEFT BLANK 2 === page 3 === DEPARTMENT OF THE AIR FORCE MILITARY CONSTRUCTION PROGRAM FISCAL YEAR 2027 TABLE OF CONTENTS General PAGE NUMBER Table of Contents ....................................................................................... 3 Discretionary and Mandatory Funding ................................................... 4 Program Summary ..................................................................................... 6 Military Construction State Summary (List of Projects) .............................................................. 7 New Mission / Current Mission Exhibit ...................................................10 Installation Index...................................................................................... 12 Special Program Considerations Statements ......................................... 13 Congressional Reporting Requirements................................................. 14 Appropriation Sought For Previously Authorized Projects ................. 15 Appropriation Language ......................................................................... 16 Projects Inside the United States............................................................. 17 Projects Outside the United States.........................................................314 Design........................................................................................................349 Unspecified Minor Military Construction.............................................352 Research and Development (RDT&E) Request……………………....356 Host Nation Funded Construction Table of Contents ................................................................................... 369 Program Summary ................................................................................. 371 Installation Index.................................................................................... 373 Military Construction Projects .............................................................374 Unaccompanied Housing Privatization ..........................................................398 3 === page 4 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING PROGRAM FISCAL YEAR 2027 TABLE OF CONTENTS Family Housing PAGE NUMBER Table of Contents .......................................................................................415 Program Summary ..................................................................................... 418 Legislative Language ................................................................................. 433 New Construction....................................................................................... 438 Construction Improvements .................................................................... 453 Design........................................................................................................... 482 Operations, Utilities and Maintenance Summary.................................... 488 Operations.................................................................................................... 497 Utilities.......................................................................................................... 506 Maintenance................................................................................................. 509 Maintenance and Repair Over $35K per Unit.......................................... 512 General Flag Officers' Quarters Over $50K per Unit ............................. 515 Reimbursable Program................................................................................ 518 Leasing............................................................................................................521 Family Housing Privatization ..................................................................... 528 Foreign Currency Exchange Data .............................................................. 538 4 === page 5 === Tab - DISCRETIONARY & MANDATORY FUNDING === page 6 === FY 2027 Summary Discretionary and Mandatory Funding ($000K) Discretionary Military Construction, Air Force Mandatory Military Construction, Air Force Total FY 2025 FY 2026 FY 2027 $3,187,126 $3,946,273 $10,601,180 $0 $965,100 $0 $3,187,126 $4,911,373 $10,601,180 MANDATORY FUNDING JUSTIFICATION: The FY 2027 request for Military Construction includes $10,601,180 thousand of discretionary and $0 thousand of mandatory (reconciliation) for a total of $10,601,180 thousand. The FY 2026 amount for Military Construction includes $3,946,273 thousand of discretionary and $965,100 thousand of mandatory (reconciliation) for a total of $4,911,373 thousand. The FY 2025 amount for Military Construction includes $3,187,126 thousand of discretionary and $0 thousand of mandatory (reconciliation) for a total of $3,187,126 thousand. 5 === page 7 === Tab - PROGRAM SUMMARY === page 8 === DEPARTMENT OF THE AIR FORCE MILITARY CONSTRUCTION AND MILITARY FAMILY HOUSING FISCAL YEAR 2027 PROGRAM SUMMARY Authorization Appropriation Request Request ($000s) ($000s) Military Construction Baseline Major Construction *9,674,150 Unspecified Minor Construction (10 USC 2805) Design (10 USC 2807) Total Military Construction *9,674,150 7,794,758 315,810 2,490,612 10,601,180 Mandatory Funding Grand Total Military Construction *9,674,150 102,100 10,601,180 24,104 193,064 24,104 193,064 25,854 243,022 Military Family Housing New Construction Construction Improvements Design Subtotal 217,168 Operations, Utilities and Maintenance Operations Utilities Maintenance 320,607 108,981 51,097 160,529 Privatization Leasing Subtotal Total Military Family Housing Grand Total Air Force 40,627 5,523 366,757 217,168 609,779 9,891,318 11,210,959 * The Department requests an adjustment to its Baseline Major Construction Authorization, requesting an increase of $5,224,450,000 for a total Baseline Major Construction Authorization Request of $14,898,600,000. The request for FY 27 Major Construction Appropriations remains unchanged. The authorization sum reflects the total project authorization and authorization of appropriations required for two projects, the Fighter Town Recapitalization at Joint Base Elmendorf-Richardson ($6,964,000,000) and the F-47 operational test at Nellis Air Force Base ($1,057,200,000). These sums represent the full Construction cost for these projects at their respective sites. Full project authorization, and incremental funding, will allow the Department to better leverage the authorities (Other Transaction Authority and Progressive Design Build) provided in the National Defense Authorization Act of Fiscal Year 2026 for these projects. Supporting DD Form 1391s, reflecting the adjusted request for these two projects, is provided. 6 === page 9 === Tab - STATE SUMMARY === page 10 === DEPARTMENT OF THE AIR FORCE MILITARY CONSTRUCTION PROGRAM FISCAL YEAR 2027 INDEX - INSIDE THE US (DOLLARS IN THOUSANDS) STATE ALABAMA ALASKA INSTALLATION Redstone Arsenal Eielson PROJECT Space Force Operational Facility USSPACECOM HQ, Inc Redstone Aresenal TOTAL: ALABAMA TOTAL: JPARC Range Operations Center Eielson TOTAL: 91,000 91,000 91,000 91,000 JB-Elmendorf-Richardson Fighter Town Recapitalization Joint Integrated Test and Training Center, Inc JB Elmendorf-Richardson TOTAL: ALASKA TOTAL: 2,066,050 2,066,050 2,157,050 2,066,050 42,000 2,108,050 2,199,050 ARIZONA Davis Monthan Hangar/Aircraft Maintenance Unit, Inc ARKANSAS Little Rock Child Development Center CALIFORNIA Beale Multi-Domain Operations Complex, Inc COLORADO Schriever Space Force Operational Facility FLORIDA Cape Canaveral Base Support Warehouse Command Facility Communications Plant Warehouse Launch Support Facility LRS Vehicle Maintenance Facility Security Forces Operations Facility Davis Monthan TOTAL: ARIZONA TOTAL: - 15,000 15,000 15,000 Little Rock TOTAL: ARKANSAS TOTAL: 27,000 27,000 27,000 27,000 27,000 27,000 Beale TOTAL: CALIFORNIA TOTAL: - 126,000 126,000 126,000 Schriever TOTAL: COLORADO TOTAL: 250,000 250,000 250,000 250,000 250,000 250,000 Cape Canaveral TOTAL: 64,000 85,000 48,400 84,000 80,400 48,000 409,800 64,000 85,000 48,400 84,000 80,400 48,000 409,800 Eglin TOTAL: 87,800 87,800 - Tyndall TOTAL: FLORIDA TOTAL: 160,000 160,000 657,600 160,000 160,000 569,800 - 3,600 3,600 3,600 Columbus TOTAL: MISSISSIPPI TOTAL: 11,800 11,800 11,800 11,800 11,800 11,800 Whiteman TOTAL: MISSOURI TOTAL: 89,000 80,000 169,000 169,000 89,000 80,000 169,000 169,000 Malmstrom TOTAL: MONTANA TOTAL: 290,000 1,100,000 1,390,000 1,390,000 43,500 95,000 138,500 138,500 Nellis TOTAL: NEVADA TOTAL: 730,700 730,700 730,700 730,700 730,700 730,700 Cannon TOTAL: - 10,000 10,000 Kirtland TOTAL: NEW MEXICO TOTAL: 250,000 250,000 250,000 250,000 250,000 260,000 Grand Forks TOTAL: 250,000 250,000 250,000 250,000 124,000 124,000 Eglin JADC2 and ABMS Test Facility Tyndall AFCEC RDT&E Facilities and Gate HAWAII Maui Secure Integration Support Lab w/Land Acquisition, CTC Maui TOTAL: HAWAII TOTAL: MISSISSIPPI Columbus T-7A Allied Support MISSOURI Whiteman B-21 Field Training Detachment, B152 B-21 Weapons Loader Trainer MONTANA Malmstrom Sentinel Land Acquisition, Inc Sentinel Operations & Mx Complex, Inc NEVADA Nellis F-47 Operational Test NEW MEXICO Cannon Dormitory, Inc Kirtland Space Force Operational Facility Grand Forks Space Force Operational Facility Minot Sentinel Consolidated Vehicle Mx Complex NORTH DAKOTA AUTHORIZATION APPROPRIATION REQUEST REQUEST 250,000 250,000 450,000 1,800,000 700,000 2,050,000 700,000 2,050,000 7 === page 11 === Sentinel Security Forces Operations Complex Minot TOTAL: NORTH DAKOTA TOTAL: 108,000 232,000 482,000 108,000 232,000 482,000 112,000 112,000 112,000 OKLAHOMA Tinker Bomber Agile Common Hangar, Inc Tinker TOTAL: OKLAHOMA TOTAL: - OREGON Geographically Separated Homeland Defense OTHR With Land Acquisition, Inc Geographically Separated TOTAL: OREGON TOTAL: - 33,650 33,650 33,650 TEXAS Dyess B-21 Flight Simulator Facility B-21 LO Corrosion Cntrl Fac/RFF, Inc B-21 Utilities Site Improvements Electric 63,000 300,000 23,000 386,000 63,000 74,000 23,000 160,000 UTAH Dyess TOTAL: Goodfellow Pipeline Sudent Dormitory, Inc Goodfellow TOTAL: - 12,000 12,000 JBSA-Ft Sam Houston METC - Barracks/Ships/Dorms #1, Inc JBSA-Ft Sam Houston TOTAL: - 308,000 308,000 JBSA-Lackland MWD Large Capacity Kennel 91 Cyber Operations Center 180,000 96,000 276,000 662,000 180,000 96,000 276,000 756,000 - 100,000 72,000 172,000 172,000 JB Langley-Eustis TOTAL: VIRGINIA TOTAL: 49,000 49,000 49,000 49,000 49,000 49,000 F E Warren TOTAL: WYOMING TOTAL: 171,000 171,000 171,000 461,158 171,000 632,158 632,158 INSIDE THE US TOTAL: 9,057,150 7,433,658 Hill JBSA-Lackland TOTAL: TEXAS TOTAL: F-35 Maintenance Facility, Phase 1, Inc T-7A Depot Maintenance Complex, Inc VIRGINIA JB Langley-Eustis Fuel System Maintenance Dock WYOMING F E Warren GBSD Utility Corridor, Inc Sentinel Operations Group Facility Hill TOTAL: UTAH TOTAL: 8 === page 12 === DEPARTMENT OF THE AIR FORCE MILITARY CONSTRUCTION PROGRAM FISCAL YEAR 2027 INDEX - OUTSIDE THE US (DOLLARS IN THOUSANDS) STATE DJIBOUTI INSTALLATION Chabelley PROJECT Chabelley Power Plant and Primary Dist FEDERATED STATES OF MICRONESIA Yap International Airport PDI: Runway Extension, Inc JAPAN Kadena Theater Strategic Communications Hub SPAIN Moron Combat Aircraft Parking Apron WAKE ISLAND Wake Island WORLDWIDE UNSPECIFIED Chabelley TOTAL: DJIBOUTI TOTAL: AUTHORIZATION APPROPRIATION REQUEST REQUEST 27,000 27,000 27,000 27,000 27,000 27,000 - 27,000 27,000 27,000 Kadena TOTAL: JAPAN TOTAL: 99,000 99,000 99,000 99,000 99,000 99,000 Moron TOTAL: SPAIN TOTAL: 156,000 156,000 156,000 75,500 75,500 75,500 PDI: Aircraft Parking Apron (Wake) Phase 1, Inc Wake Island TOTAL: WAKE ISLAND TOTAL: 335,000 335,000 335,000 129,000 129,000 129,000 Design Unspecified Minor Military Construction WORLDWIDE UNSPECIFIED TOTAL: - 2,490,612 315,810 2,806,422 Yap International Airport TOTAL: FEDERATED STATES OF MICRONESIA TOTAL: OUTSIDE THE US TOTAL: INSIDE THE US TOTAL: FY 2027 TOTAL: 617,000 9,057,150 9,674,150 3,163,922 7,437,258 10,601,180 9 === page 13 === Tab - NEW / CURRENT MISSION === page 14 === DEPARTMENT OF THE AIR FORCE MILITARY CONSTRUCTION PROGRAM FISCAL YEAR 2027 NEW AND CURRENT MISSION DEFINITIONS OF NEW AND CURRENT MISSION NEW MISSION PROJECTS – New mission projects all support new and additional programs or initiatives that do not revitalize the existing physical plant. These projects support the deployment and bed-down of new weapons systems: new or additional aircraft, missile and space projects; new equipment, e.g. radar, communication, computer satellite tracking and electronic security. CURRENT MISSION PROJECTS – These projects revitalize the existing facility plant by replacing or upgrading existing facilities and alleviating long-standing deficiencies not generated by new missions or equipment. Included are projects to improve the quality of life, upgrade the workplace, enhance productivity and achieve compliance with environmental, health and safety standards. FY 2027 Appropriation Request ($000) NEW MISSION 4,345,858 CURRENT MISSION 3,448,900 DESIGN 2,490,612 MINOR CONSTRUCTION TOTAL: 315,810 10,601,180 10 === page 15 === # DEPARTMENT OF THE AIR FORCE MILITARY CONSTRUCTION PROGRAM FISCAL YEAR 2027 INDEX - CURRENT/NEW MISSION BREAKOUT (DOLLARS IN THOUSANDS) STATE/COUNTRY ALABAMA ALABAMA ALASKA ALASKA ARIZONA ARKANSAS CALIFORNIA COLORADO DJIBOUTI FEDERATED STATES OF MICRONESIA FLORIDA FLORIDA FLORIDA FLORIDA FLORIDA FLORIDA FLORIDA HAWAII JAPAN NEW MEXICO NEW MEXICO NORTH DAKOTA OKLAHOMA SPAIN TEXAS TEXAS TEXAS TEXAS VIRGINIA WAKE ISLAND INSTALLATION Redstone Arsenal Redstone Arsenal Eielson JB-Elmendorf-Richardson Davis-Monthan Little Rock Beale Schriever Chabelley PROJECT Space Force Operational Facility USSPACECOM HQ, Inc JPARC Range Operations Center Joint Integrated Test and Training Ctr, Inc Hangar/Aircraft Maintenance Unit, Inc Child Development Center Multi-Domain Operations Complex, Inc Space Force Operational Facility Chabelley Power Plant and Primary Dist Yap International Airport PDI: Runway Extension, Inc Cape Canaveral Cape Canaveral Cape Canaveral Cape Canaveral Cape Canaveral Cape Canaveral Tyndall Maui Kadena Cannon Kirtland Grand Forks Tinker Moron Goodfellow JBSA-Ft Sam Houston JBSA-Lackland JBSA-Lackland JB Langley-Eustis Wake Island STATE/COUNTRY ALASKA MISSISSIPPI MISSOURI MISSOURI MONTANA MONTANA NEVADA NORTH DAKOTA NORTH DAKOTA OREGON TEXAS TEXAS TEXAS UTAH UTAH WYOMING WYOMING WORLDWIDE UNSPECIFIED WORLDWIDE UNSPECIFIED APPROPRIATION REQUEST 250,000 450,000 91,000 42,000 15,000 27,000 126,000 250,000 27,000 TYPE CM CM CM CM CM CM CM CM CM 27,000 CM Consolidated Launch Support Facility 2 Consolidated Shop & Laboratory Facility 1 Consolidated Storage & Warehouse Facility 1 Consolidated Storage & Warehouse Facility 2 Launch Support Facility LRS Vehicle Maintenance Facility AFCEC RDT&E Facilities and Gate Secure Integration Support Lab W/ Land Acq, CTC Theater Strategic Communications Hub Dormitory, Inc Space Force Operational Facility Space Force Operational Facility Bomber Agile Common Hangar, Inc Combat Aircraft Parking Apron Pipeline Student Dormitory, Inc METC - Barracks/Ships/Dorms #1, Inc Military Working Dog Large Capacity Kennel 91 Cyber Operations Center Fuel System Maintenance Dock PDI: Aircraft Parking Apron (Wake) Ph 1, Inc Current Mission TOTAL 85,000 48,000 64,000 48,400 84,000 80,400 160,000 3,600 99,000 10,000 250,000 250,000 112,000 75,500 12,000 308,000 180,000 96,000 49,000 129,000 3,448,900 CM CM CM CM CM CM CM CM CM CM CM CM CM CM CM CM CM CM CM CM INSTALLATION JB Elmendorf-Richardson Columbus Whiteman Whiteman Malmstrom Malmstrom Nellis Minot Minot Geograhically Separated Dyess Dyess Dyess Hill Hill FE Warren FE Warren PROJECT Fighter Town Recapitalization T-7A Allied Support B-21 Field Training Detachment, B152 B-21 Weapons Loader Trainer Sentinel Land Acquisition, Inc Sentinel Operations & Mx Complex, Inc F-47 Operational Test Sentinel Consolidated Vehicle Mx Complex Sentinel Security Forces Operations Complex Homeland Defense OTHR With Land Acquisition, Inc B-21 Flight Simulator Facility B-21 LO Corrosion Cntrl Fac/RFF, Inc B-21 Utilities Site Improvements Electric F-35 Maintenance Facility, Phase 1, Inc T-7A Depot Maintenance Complex, Inc GBSD Utility Corridor, Inc Sentinel Operations Group Facility New Mission TOTAL: APPROPRIATION REQUEST 2,066,050 11,800 89,000 80,000 43,500 95,000 730,700 124,000 108,000 33,650 63,000 74,000 23,000 100,000 72,000 461,158 171,000 4,345,858 Various Locations Various Locations Design Unspecified Minor Military Construction Central Program TOTAL: Active AF Program TOTAL: 2,490,612 315,810 2,806,422 10,601,180 TYPE NM NM NM NM NM NM NM NM NM NM NM NM NM NM NM NM NM Design UMMC # 11 === page 16 === Tab - INSTALLATIONS === page 17 === DEPARTMENT OF THE AIR FORCE MILITARY CONSTRUCTION PROGRAM FISCAL YEAR 2027 INSTALLATION INDEX INSTALLATION REDSTONE ARSENAL EIELSON JB-ELMENDORF-RICHARDSON DAVIS-MONTAN LITTLE ROCK BEALE SCHRIEVER CHABELLEY COMMAND VARIOUS PACAF PACAF ACC AMC ACC USSF USAFE YAP INTERNATIONAL AIRPORT PACAF CAPE CANAVERAL TYNDALL MAUI KADENA COLUMBUS WHITEMAN MALMSTROM NELLIS CANNON KIRTLAND GRAND FORKS MINOT TINKER GEOGRAPHICALLY SEPARATED MORON DYESS GOODFELLOW JB-SAN ANTONIO HILL JB LANGLEY-EUSTIS WAKE ISLAND FE WARREN USSF ACC AFGSC PACAF AETC AFGSC AFGSC ACC AFSOC AFGSC ACC AFGSC AFMC ACC USAFE AFGSC AETC AETC AFMC ACC PACAF AFGSC STATE/COUNTRY ALABAMA ALASKA ALASKA ARIZONA ARKANSAS CALIFORNIA COLORADO DJIBOUTI FEDERATED STATES OF MICRONESIA FLORIDA FLORIDA HAWAII JAPAN MISSISSIPPI MISSOURI MONTANA NEVADA NEW MEXICO NEW MEXICO NORTH DAKOTA NORTH DAKOTA OKLAHOMA OREGON SPAIN TEXAS TEXAS TEXAS UTAH VIRGINIA WAKE ISLAND WYOMING PAGE 17 35 44 62 70 75 83 314 320 91 117 126 328 131 136 145 162 175 183 191 199 215 224 336 232 250 258 280 295 340 300 ACC – AIR COMBAT COMMAND AETC – AIR EDUCATION AND TRAINING COMMAND AFGSC – AIR FORCE GLOBAL STRIKE COMMND AFMC – AIR FORCE MATERIEL COMMAND AFSOC – AIR FORCE SPECIAL OPERATIONS COMMAND AMC – AIR MOBILITY COMMAND PACAF – PACIFIC AIR FORCES USAFE – UNITED STATES FORCES – EUROPE USSF – UNITED STATES SPACE FORCE 12 === page 18 === Tab - SPECIAL PROGRAM CONSIDERATIONS === page 19 === DEPARTMENT OF THE AIR FORCE MILITARY CONSTRUCTION PROGRAM FISCAL YEAR 2027 SPECIAL PROGRAM CONSIDERATIONS ECONOMIC CONSIDERATIONS An economic evaluation has been accomplished for all projects costing over 9 million dollars where viable options existed and the results are addressed in the individual DD Forms 1391. DESIGN FOR ACCESSIBILITY OF PHYSICALLY HANDICAPPED PERSONNEL In accordance with Public Law 90-480 provisions for physically handicapped personnel will be provided for, where appropriate, in the design of facilities included in this program. ENVIRONMENTAL STATEMENT In accordance with Section 102(2)(c) of the National Environmental Policy Act of 1969 (PL 91190), the environmental impact analysis process (EIAP) has been completed or is actively underway for all projects in the Air Force FY 2024 Military Construction Program. EVALUATION OF FLOOD PLAINS AND WETLANDS All projects in the program have been evaluated for compliance with Executive Orders 11988 Flood Plain Management and 11990 Protection of Wetlands and the Flood Plain Management Guidelines of U.S. Water Resources Council. Projects have been sited to avoid or reduce the risk of flood loss; minimize the impact of floods on human safety, health and welfare; preserve and enhance the natural and beneficial values of wetlands; and minimize the destruction, loss or degradation of wetlands. 13 === page 20 === DEPARTMENT OF THE AIR FORCE MILITARY CONSTRUCTION PROGRAM FISCAL YEAR 2027 CONGRESSIONAL REPORTING REQUIREMENTS 1. STATEMENTS ON NATO ELIGIBILITY These are in response to the requirement in the FY 1988 Senate Appropriations Committee Report, 100-200, page 13, and are included in the appropriate project justification. 2. NEW AND CURRENT MISSION ACTIVITIES The FY 1989 Senate Appropriations Committee Report, 100-380, pages 10 and 11, identified a requirement to include an exhibit in the budget justification books that displayed required projects in two separate categories: New Mission and Current Mission. The CM (current mission) or NM (new mission) designation, which follows the project on the listing at page 10, identifies each project as new or current mission. Additionally, each justification in Block 11 of the DD Form 1391 indicates whether the project supports a new or current mission. 3. REAL PROPERTY ADMINISTRATION The FY 1977 House Appropriations Committee Report, 104-591, page 11, requested the Department to provide the real property maintenance backlog at all installations for which there is a requested construction project. Each DD Form 1390 reflects this information in block 12. In addition, the report requested all troop housing requests to show all real property maintenance conducted in the past two years and all future requirements for unaccompanied housing at that installation. Each DD Form 1391 for troop housing reflects this information in block 11. 4. METRIC CONVERSION The FY 1999 House Appropriation Committee Report, 105-578, page 11, requested the Department to ensure that any Form 1390/1391, which is presented as justification in metric measurement, shall include parenthetically the English measurement. Each DD Form 1391 reflects the metric and English equivalent in block 11. 14 === page 21 === Tab -APPROPRIATION LANGUAGE === page 22 === DEPARTMENT OF THE AIR FORCE MILITARY CONSTRUCTION PROGRAM FISCAL YEAR 2027 APPROPRIATION SOUGHT FOR PREVIOUSLY AUTHORIZED PROJECTS APPROPRIATIONS SOUGHT FOR FY2025 AUTHORIZATIONS In the FY2027 President’s Budget, the Department is requesting appropriation in the amount of $1,172.8 million total for eight projects that were authorized in the National Defense Authorization Act for Fiscal Year 2025 (P.L. 118-159). The Aircraft Parking Apon at Wake Island, the F-35 Maintenance Facility, Phase 1 and at Hill Air Force Base, GBSD Utility Corridor at F.E. Warren Air Force Base, the Homeland Defense OTHR w/Land Acquisition at a Geographically Separated Unit (GSU), the Joint Integrated Test and Training Center at Joint Base Elmendorf-Richardson Air Force Base, the METC – Barracks/Ships/Dorms at JBSA-Fort Sam Houston, the Runway Extension at Yap International Airport and the T-7A Depot Maintenance Complex at Hill Air Force Base were authorized and the Department is requesting the amounts be appropriated as specified in this budget estimate. APPROPRIATIONS SOUGHT FOR FY2026 AUTHORIZATIONS In the FY2027 President’s Budget, the Department is requesting appropriation in the amount of $275.0 million total for five projects that were authorized in the National Defense Authorization Act for Fiscal Year 2026 (P.L 119-75). The Bomber Agile Common Hangar at Tinker Air Force Base, the Dormitory at Cannon Air Force Base, the Hangar/Aircraft Maintenance Unit at DavisMonthan Air Force Base, the Multi-Domain Operations Complex at Beale Air Force Base and the Pipeline Student Dormitory at Goodfellow Air Force Base were authorized and the Department is requesting the amounts be appropriated as specified in this budget estimate. 15 === page 23 === DEPARTMENT OF THE AIR FORCE MILITARY CONSTRUCTION PROGRAM FISCAL YEAR 2027 APPROPRIATION LANGUAGE FY2027 MILITARY CONSTRUCTION AIR FORCE For acquisition, construction, installation and equipment of temporary or permanent public works, military installations, facilities, and real property of the Air Force as currently authorized by law, $10,601,180 to remain available until September 30, 2031: Provided that, of this amount, not to exceed $2,490,612 shall be available for study, planning, design, and architect and engineer services, as authorized by law, unless the Secretary of the Air Force determines that additional obligations are necessary for such purposes and notifies the Committees on Appropriations of both Houses of Congress of his determination and the reason therefor. 16 === page 24 === Tab - INSIDE THE UNITED STATES === page 25 === 1. COMPONENT 2. DATE (YYYYMMDD) FY 2027 BBBBBB MILITARY CONSTRUCTION PROGRAM AIR FORCE 3. INSTALLATION AND LOCATION 4. COMMAND REDSTONE ARSENAL, ALABAMA US ARMY INSTALLATION MANAGEMENT COMMAND 6. PERSONNEL (1) PERMANENT (2) STUDENTS 20260326 5. AREA CONTRUCTION COST INDEX 0.86 D (3) SUPPORTED OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN 30-Sep-25 a. AS OF b. END FY (4) TOTAL 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7. INVENTORY DATA ($000) 0.00 0.00 0.00 2,050,000.00 0.00 0.00 0.00 2,050,000.00 a. TOTAL ACREAGE b. INVENTORY TOTAL AS OF 15-May-25 c. AUTHORIZATION NOT YET IN INVENTORY d. AUTHORIZATION REQUESTED IN THIS PROGRAM e. AUTHORIZATION INCLUDED IN FOLLOWING PROGRAM f. PLANNED IN NEXT THREE PROGRAM YEARS g. REMAINING DEFICIENCY h. GRAND TOTAL 8. PROJECTS REQUESTED IN THIS PROGRAM (3) SCOPE b. COST ($000) (1) START (2) COMPLETE 141-456 Space Force Operational Facility 17,090 SM 250,000 FEB-2027 AUG-2027 USSPACECOM HQ 71,725 SM 450,000 MAY-2026 MAY-2027 a. CATEGORY (2) PROJECT TITLE (1) CODE 610-284 c. DESIGN STATUS 9. FUTURE PROJECTS 610-284 USSPACECOM HQ (71,725 SM/$1,350,000) 10.MISSION OR MAJOR FUNCTIONS Redstone Arsenal is a US Army facility managed by the Army. It is not AF Real Property. USSPACECOM plans, executes, and integrates military space power into multi-domain global operations in order to deter aggression, defend national interests, and when necessary, defeat threats. The Combatant Command is responsible for conducting space operations, sensor management, satellite communications management, and trans-regional missile defense. USSPACECOM is responsible for maintaining space superiority and ensuring the security of the U.S. and allied interests. The USSPACECOM unique mission demands a purpose-built Command and Control Facility (C2F) providing the backbone of a space weapons system domain enabling a secure, resilient and robust 24/7 operational C2F vital to national security and global stability. 11. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES Mission functions currently operate out of various temporary and leased facilities at several locations within Colorado Springs, CO. Joint warfighter space domain awareness and operational demands are stretching the existing temporary headquarters beyond their capacities. The antiquated facility systems result in high risk to mission. DD FORM 1390, JUL 1999 17 PREVIOUS EDITION IS OBSOLETE. === page 26 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA SPACE FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE REDSTONE ARSENAL, ALABAMA SPACE FORCE OPERATIONS FACILITY 5. PROGRAM ELEMENT 6. CATEGORY CODE 91211S 141-456 7. PROJECT NUMBER USSF270001 8. PROJECT COST ($000) 250,000 9. COST ESTIMATES ITEM UM QUANTITY UNIT COST COST($000) PRIMARY FACILITIES 188,382 INTELLIGENCE, SURVEILLANCE AND RECONNAISSA SM 17,090 10,434 (178,317) (141-456) ICD 705 PREMIUM LS (6,965) CYBERSECURITY OF FACILITY RELATED CONTROL LS (3,100) SUPPORTING FACILITIES 12,109 UTILITIES LS (3,000) SITE PREPARATION LS (750) ROADS, SIDEWALKS, AND PARKING LS (2,000) SITE IMPROVEMENTS LS (750) COMMUNICATIONS LS (500) GENERATOR KW 5,000 800 (4,000) PASSIVE FORCE PROTECTION MEASURES LS (50) SECURITY FENCING LS (59) PRIVATIZED UTILITIES SERVICE AND CONNECTION LS (1,000) 200,491 SUBTOTAL CONTINGENCY (5.00%) 10,025 TOTAL CONTRACT COST 210,516 SUPERVISION, INSPECTION AND OVERHEAD (6.50%) 13,684 DESIGN/BUILD - DESIGN COST (10.00% OF 20,049 SUBTOTAL) 5,261 CONSTRUCTION SECURITY SURVILLANCE 249,510 TOTAL REQUEST 250,000 TOTAL REQUEST (ROUNDED) EQUIPMENT FROM OTHER APPROPRIATIONS (NON-ADD) (150,000) 10. DESCRIPTION OF PROPOSED CONSTRUCTION Construct a three-story Space Operations Facility (SOF)with reinforced concrete foundation, steel structure, clad with precast concrete panels and a low slope membrane roof. Sensitive and/or Special Access Program spaces shall comply with the Intelligence Community Directive 705 criteria and standards. Construction includes a perimeter fence surrounding the Space Operations Facility to provide Protection Level 2 (PL2). Project will include all supporting facilities such as site improvements, pavements, communications, utilities, and protection level 2 fencing necessary to provide a complete and useable facility. This project is authorized a generator, per AFI 32-1062. Facility will be designed as permanent construction in accordance with Department of War Unified Facilities Criteria 1-200-01. This project will comply with Department of War antiterrorism/force protection requirements per Unified Facilities Criteria 4-010-01. This project intends to leverage the authorities granted in the FY 2026 National Defense Authorization Act to take advantage of private sector innovative design and construction methods. It will use a combination of Other Transactional Authority (OTA), Progressive Design-Build (PDB), and other execution methods to innovate in delivery, reduce construction timelines, and lifecycle costs. OTA/PDB execution will capitalize on the construction industry's expertise and innovation. DD FORM 1391, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 18 === page 27 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA SPACE FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE REDSTONE ARSENAL, ALABAMA SPACE FORCE OPERATIONS FACILITY 5. PROGRAM ELEMENT 6. CATEGORY CODE 91211S 141-456 7. PROJECT NUMBER 8. PROJECT COST ($000) USSF270001 250,000 The execution strategy is intentionally non-prescriptive to empower industry partners to innovate and propose the most effective technical solution to meet the defined needs. Air Conditioning: 1400 Tons 11. REQ: 17,090 SM ADQT: 0 SUBSTD: 0 PROJECT: Construct Space Operations Facility. REQUIREMENT: A highly classified and secured contiguous area to enable National Reconnaissance Organization (NRO) and United States Space Force (USSF) emergent missions including Air Moving Target Indicator, Ground Moving Target Indicator, and Proliferated Warfighter Space Architecture. Workspaces will house intelligence analysis and production for new and expanded all-source means, enabling near-real time capabilities and missions unique to United States Space Force. Facility will support the intelligence needs of the Defense Intelligence Enterprise and the United States Space Force as well as other joint warfighters, policymakers and acquisition professionals, through analysis or application. Mission is responsible for Intelligence, Surveillance and Reconnaissance (ISR) for the United States Space Force, providing actionable and time-sensitive intelligence for space domain operations including detection, characterization and targeting adversary space capabilities. The Space Operations Facility must be constructed to meet Protection Level 2 requirements. To ensure reliable operations, the Space Operations Facility will have multiple active power and cooling distribution paths and redundant components to meet the fault-tolerant facility "Tier IV" standard as defined by The Uptime Institute. The Space Operations Facility will include ICD 705 compliant construction spaces to meet all mission separation and collaboration requirements. A 500-person auditorium is required for secure briefings and conferences. The Space Operations Facility will also include a dining area to support 24/7 operations. Adequate parking will be constructed for the Space Operations Facility. CURRENT SITUATION: This is a new mission beddown for United States Space Force on Schriever Space Force Base. Schriever does not have the physical space to accommodate new analysts and information technology requirements to accomplish its expanded national security mission. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 19 === page 28 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA SPACE FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE REDSTONE ARSENAL, ALABAMA SPACE FORCE OPERATIONS FACILITY 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 8. PROJECT COST ($000) 91211S 141-456 USSF270001 250,000 IMPACT IF NOT PROVIDED: The emerging missions will be late to need and will begin operations in facilities which do not meet the resiliency requirements of Tier IV facilities. The Space Force will miss an opportunity to disperse and replicate to increase survivability of the mission. ADDITIONAL: This design shall conform to criteria established in the Air Force Corporate Facilities Standards (AFCFS), the Installation Facilities Standards (IFS), but will not employ a standard facility design because there is no AF standard facility design for this project and there is no applicable standard design from Air Force Civil Engineer Center. Sustainable principles, to include life-cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with Unified Facility Criteria 1-200-02. This includes preparation of a life-cycle cost analysis for energy consuming systems, renewable energy generating systems, or when life-cycle cost effective is selected as the reason any requirement of Unified Facility Criteria 1-200-02 is partially compliant or not applicable. Project not in flood plain: This project will not be sited within or partly within the 100-year flood plain. In accordance with IDP: Facility will be sited in accordance with the Installation Development Plan and within a compatible land use area. The construction growth offset for this requirement is 183,955 square feet. US Army Garrison - Redstone Arsenal Director of Public Works SPACE FORCE OPERATIONS FACILITY: 17,090 SM = 183,955 Square Feet; JOINT USE CERTIFICATION: Mission Requirements, operational considerations, and location are incompatible with use by other components. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 20 === page 29 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA SPACE FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE REDSTONE ARSENAL, ALABAMA SPACE FORCE OPERATIONS FACILITY 5. PROGRAM ELEMENT 12. 6. CATEGORY CODE 7. PROJECT NUMBER 8. PROJECT COST ($000) 91211S 141-456 USSF270001 SUPPLEMENTAL DATA: A. Estimated Execution Data: (1) Acquisition Strategy: Design-Build (2) Design Data (a) Design or Request for Proposal(RFP) Started: (b) Percent of Design Completed as of SEP 2025: (c) Percent of Design Completed as of JAN 2026: (d) Design or RFP Complete: (e) Total Design Cost ($000): (f) Energy Study and/or Life Cycle Cost Analysis (g) Standard or Definitive Design Used? (3) Construction Data: (a) Contract Award: (b) Construction Start: (c) Construction Complete: 250,000 AUG/2026 0% 0% AUG/2027 20,000 YES NO JUL/2027 NOV/2028 NOV/2032 B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) Communications / Data Uninterruptable Power Supply Electronic Security System Physical Security Furniture, Fixtures, & Equipme DD FORM 1391C, JUL 1999 3410 3080 3080 3080 3410 PREVIOUS EDITION IS OBSOLETE 2031 2031 2031 2031 2031 110,000 10,000 5,000 5,000 20,000 PAGE NO. 21 === page 30 === MILCON Work-in-Place (WIP) Curve – Automated Spend Plan Project Information Project Title Installation Program Year (FY) Project # Space Force Operational Facility REDSTONE ARSENAL 2027 USSF270001 Financial Inputs & Derived Amounts ($000) Programmed Amount (PA) SIOH Rate Contingency Rate SIOH Amount Contingency Amount Construction (PA less SIOH & Cont) Total Increments Key Dates (Calculated) Begin Date (FY Start) Award Date (Assumed) Complete Date (Award + POP; set to 1st of month) Award Month (1st of month) Complete Month (1st of month) Period of Performance Funding & Obligation Increments ($000) Increment 1 Increment 2 Increment 3 Increment Total Funding Outlay Curve Controls (Adjust if needed) Outlay Curve Steepness (k) Normalized Logistic Base (t=0) Normalized Logistic Top (t=1) Total Outlay ($000) (assumed = PA) 250,000 6.5% 5.0% 16,250 12,500 221,250 3 Oct 1, 2026 Jul 1, 2027 Jan 1, 2032 Jul 1, 2027 Jan 1, 2032 1650 Amount ($000) 250,000 0 0 Funding Date Jan 1, 2027 250,000 Check vs PA Obligation Date Jul 1, 2027 0 8.0 0.01798621 0.98201379 250,000 22 === page 31 === Monthly Cash Flow (Automated from Spend Plan) Month Oct 2026 Nov 2026 Dec 2026 Jan 2027 Feb 2027 Mar 2027 Apr 2027 May 2027 Jun 2027 Jul 2027 Aug 2027 Sep 2027 Oct 2027 Nov 2027 Dec 2027 Jan 2028 Feb 2028 Mar 2028 Apr 2028 May 2028 Jun 2028 Jul 2028 Aug 2028 Sep 2028 Oct 2028 Nov 2028 Dec 2028 Jan 2029 Feb 2029 Mar 2029 Apr 2029 May 2029 TOTAL Funding ($000) 0 0 0 250,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 250,000 Obligation ($000) 0 0 0 0 0 0 0 0 0 250,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 250,000 Outlay ($000) #N/A Cumulative Funding Cumulative Obligation Cumulative Outlay 0 0 0 0 0 0 0 0 0 0 0 0 0 250,000 0 0 0 250,000 0 0 0 250,000 0 0 0 250,000 0 0 0 250,000 0 0 0 250,000 0 0 #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A 23 === page 32 === May 2029 Apr 2029 Mar 2029 Feb 2029 100,000 Jan 2029 150,000 Dec 2028 Nov 2028 Oct 2028 Sep 2028 Aug 2028 Jul 2028 Jun 2028 May 2028 Apr 2028 Mar 2028 Feb 2028 Jan 2028 Dec 2027 Nov 2027 Oct 2027 Sep 2027 Aug 2027 ' Jul 2027 j Jun 2027 May 2027 Apr 2027 200,000 Mar 2027 250,000 Feb 2027 Project: Program Year: Jan 2027 0 Dec 2026 Nov 2026 Oct 2026 Cumulative WIP Curve Space Force Operational Facility 2027 Cumulative Funding vs Obligation vs Outlay 300,000 ' Cumulative Funding Cumulative Obligation Cumulative Outlay 50,000 j 24 === page 33 === 1. COMPONENT AIR FORCE 3. INSTALLATION AND LOCATION REDSTONE ARSENAL ALABAMA 5. PROGRAM ELEMENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA MARCH 2026 4. PROJECT TITLE: HEADQUARTERS UNITED STATES SPACE COMMAND, COMMAND AND CONTROL FACILITY 6. CATEGORY CODE 91211F 7. PROJECT NUMBER 610-284 ITEM 8. PROJECT COST ($000) USSP270001 9. COST ESTIMATES U/M PRIMARY FACILITIES COMMAND & CONTROL FACILITY/JOINT OPERATIONS SM CENTER (610-284) DATA CENTER & CENTRAL UTILITY PLANT (891-024) SM VISITOR CONTROL CENTER (730-832) SM SHIPPING/RECEIVING FACILITY (441-100) SM ICD 705 PREMIUM LS RADIOFREQ & ELECTROMAGNETIC PULSE SHIELDING LS ANTITERRORISM FORCE PROTECTION LS CYBERSECURITY OF FACILITY-RELATED CONTROL SYS LS AUTH:1,800,000 APPR: 450,000 QUANTITY UNIT COST COST($000) 1,156,835 61,250 14,011 (858,174) 7,312 4,036 (29,511) 668 2,495 6,797 6,370 (4,540) (15,893) (63,279) (158,196) (22,702) (4,540) 362,948 (33,097) (41,999) (62,697) (70,918) (13,570) (131,456) (8,811) 1,519,383 75,969 1,595,352 39,882 103,698 SUPPORTING FACILITIES SITE PREPARATION LS UTILITIES LS ROADWAYS, SIDEWALKS, AND PARKING LS PASSIVE FORCE PROTECTION LS COMMUNICATIONS LS GENERATOR/INFRASTRUCTURE RESILENCY LS PRIVATIZED UTILITY CONNECTION FEE LS SUBTOTAL CONTINGENCY (5.0%) TOTAL CONTRACT COST CONSTRUCTION SECURITY SURVEILLANCE (2.5%) SUPERVISION, INSPECTION AND OVERHEAD (6.5%) PROGRESSIVE DESIGN/BUILD - DESIGN COST (4.0% OF 60,775 SUBTOTAL) TOTAL REQUEST 1,799,707 TOTAL REQUEST (ROUNDED) 1,800,000 EQUIPMENT FROM OTHER APPROPRIATIONS (NON-ADD) 2,221,115 10. DESCRIPTION OF PROPOSED CONSTRUCTION: This project will leverage authorities granted in the FY 2026 National Defense Authorization Act to take advantage of the private sectors innovative design and construction methods by using Other Transaction Authority (OTA) and a progressive design-build (PDB) solicitation and execution methods. OTA/PDB execution will capitalize on the construction industry’s expertise to reduce cost/schedule risks. 25 === page 34 === 1. COMPONENT AIR FORCE 3. INSTALLATION AND LOCATION REDSTONE ARSENAL ALABAMA 5. PROGRAM ELEMENT 91211F 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA MARCH 2026 4. PROJECT TITLE: HEADQUARTERS UNITED STATES SPACE COMMAND, COMMAND AND CONTROL FACILITY 6. CATEGORY CODE 610-284 7. PROJECT NUMBER USSP270001 8. PROJECT COST ($000) AUTH:1,800,000 APPR: 450,000 OTA/PDB execution is intentionally non-prescriptive to empower industry partners to innovate and propose the most effective technical solution to meet the defined needs. As a result, estimated facility scope quantities are subject to change as the design is refined. This approach will deliver a new multi-facility campus at Redstone Arsenal, AL to accommodate the USSPACECOM mission. It is anticipated the campus will include a main Command & Control Facility housing the Command staff and operations centers, a visitor control center, a data center, a central utility plant, and a shipping & receiving building. The Command & Control facility will include a Command Suite, Joint Operations Center, functional operational cells, auditorium, cafeteria and a fitness room. Approximately 80% of the facility space will be constructed and accredited secure space complying with Intelligence Community Directive 705 criteria and standards, to include radio frequency shielding, electromagnetic pulse shielding, to ensure critical planning and operational functions maintain operational security. A central utility plant will include backup generators and uninterrupted power supplies, redundant cooling, and redundant Information Technology server rooms. The project will include all utilities, site improvements, landscaping, parking, and necessary supporting work for a complete and usable facility. This facility is authorized a backup generator by Air Force Manual, 32-1062. Facilities will be designed as permanent construction in accordance with the Department of War Unified Facilities Criteria 1-200-01, General Building requirements. This project will comply with Department of War antiterrorism/force protection requirements per Unified Facility Criteria 4-010-01. Estimated Air Conditioning: 4500 Tons 11. REQ: 71,725 SM ADQT: 0 SM SUBSTD: 0 SM PROJECT: Headquarters United States Space Command, Command and Command Facility REQUIREMENT: The USSPACECOM unique mission demands a purpose-built Command and Control Facility (C2F) providing the backbone of a space weapons system domain enabling a secure, resilient and robust 24/7 operational C2F vital to national security and global stability. USSPACECOM is tasked to execute United States Code Title 10 responsibilities and Unified Command Plan (UCP) missions to defend and secure the space domain against continuing and immediate threats to the nation, our allies and partners. Joint warfighter success depends on space dominance. USSPACECOM plans, executes, and integrates military space power into multi-domain global operations in order to deter aggression, defend national interests, and when necessary, defeat threats. The Combatant Command is responsible for conducting space operations, sensor management, satellite communications management, and trans-regional missile defense. USSPACECOM is responsible for maintaining space superiority and ensuring the security of the U.S. and allied interests. 26 === page 35 === 1. COMPONENT FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE 3. INSTALLATION AND LOCATION REDSTONE ARSENAL ALABAMA 5. PROGRAM ELEMENT 91211F 2. DATE MARCH 2026 4. PROJECT TITLE: HEADQUARTERS UNITED STATES SPACE COMMAND, COMMAND AND CONTROL FACILITY 6. CATEGORY CODE 610-284 7. PROJECT NUMBER USSP270001 8. PROJECT COST ($000) AUTH:1,800,000 APPR: 450,000 Redstone Arsenal has been designated as the location for the Headquarters USSPACECOM C2F. The C2F will combine functions and personnel of USSPACECOM in one location facilitating integrated mission planning, exercising, and execution, resulting in organizational efficiency, and unified command and control of the space domain. The facilities will house 1,800 Commander-directed staff and include secure space for the required C2 operations centers meeting security and operational survivability & endurability requirements. Compliance with Intelligence Community Directive 705 requires adherence to extensive and detailed construction standards. This includes robust perimeter walls, ceilings, and floors designed to prevent forced entry or acoustic eavesdropping, as well as radio frequency shielding to block electronic eavesdropping. In addition, comprehensive alarm and monitoring systems are mandatory to detect unauthorized access. A visitor control center, located at the perimeter of the C2F campus, is necessary to provide access control and screening with dedicated badging and processing of individuals in a detached unclassified building. The C2F will include a Joint Operations Center (JOC) serving as the nerve center for the USSPACECOM mission: to conduct operations in, from, and to space to deter conflict, and if necessary, defeat aggression, deliver space combat power for the Joint/Combined force, and defend U.S. vital interests with allies and partners. The JOC integrates data from a wide array of sources, including multiple operation centers, military services, and national agencies to provide the USSPACECOM commander with critical command and control capabilities. Redundancy within the JOC will enable continuity of operations through the continuum of conflict. The USSPACECOM C2F is not just a building, it is a foundational weapon system. Multinational collaboration and commercial integration will be leveraged within the C2F to mesh and optimize the full force of intelligence, cooperation, and technology to defend and maintain space dominance. Other operational cells included in the C2F providing support and information to the JOC include the Joint Intelligence Operations Center, Joint Cyber Center, Theater Network Control Center, and the Joint Logistics Operations Center. A Battle Cab directly off the JOC floor providing the Commander and key staff with secure immediate access to operational information and decisionmaking tools will be integral to the C2F. A dedicated data center supporting the C2F will provide a secure and reliable backbone of modern Information Technology infrastructure, including servers, storage devices and networking equipment. A central utility plant supporting critical infrastructure, including redundant and resilient electrical power and HVAC systems with back-up generators and uninterruptable power supplies, meeting UFC 4-141-03 standards, will be implemented to support a fault-tolerant no fail 24/7/365 USSPACECOM mission. On-site fuel storage supporting the central utility plant will be furnished enabling C2F resilience during crisis. Facilitating C2F survivability, the most critical spaces will be electromagnetic pulse (EMP) shielded. EMP shielding requires extensive construction standards in accordance with MIL-STD-188-125 providing continuous conductive barriers to attenuate high-altitude electromagnetic pulses. Key requirements include robust continuous steel walls, floors and ceilings, fully welded 27 === page 36 === 1. COMPONENT FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE 3. INSTALLATION AND LOCATION REDSTONE ARSENAL ALABAMA 5. PROGRAM ELEMENT 91211F 2. DATE MARCH 2026 4. PROJECT TITLE: HEADQUARTERS UNITED STATES SPACE COMMAND, COMMAND AND CONTROL FACILITY 6. CATEGORY CODE 610-284 7. PROJECT NUMBER USSP270001 8. PROJECT COST ($000) AUTH:1,800,000 APPR: 450,000 seams, protected points of entry for power, data, and ventilation, grounding and bonding for surge dissipation. The C2F will integrate a range of administrative and mission support functions, including administrative office space to accommodate the staff as well as adequate multipurpose meeting and collaboration spaces, including a Command auditorium. In addition, a shipping & receiving building will provide logistical and facility operations spaces to include a facility maintenance operations center, loading and receiving, and storage spaces. A dining space offering meal services and a fitness area for warfighter readiness is also included within the C2F. CURRENT SITUATION: USSPACECOM was created in 2019 combining disparate missions and functions from all branches of the armed services and several agencies. UCP mission functions currently operate out of various temporary and leased facilities at several locations within Colorado Springs, CO. Joint warfighter space domain awareness and operational demands are stretching the existing temporary headquarters beyond their capacities. The antiquated facility systems result in high risk to mission. Lack of power and HVAC infrastructure directly limit the expansion of IT systems and new capabilities and deny the ability to achieve resilient, redundant and enduring operations. Lack of optimized, integrated secure spaces at the proper classification levels directly interferes with the timely exchange of internal and external partner and ally information. This ad hoc temporary organization is inefficient, cumbersome, and adversely impacts the cohesive command and control imperative for the USSPACECOM mission. In addition, operating out of offinstallation, leased facilities presents security vulnerability risks. This project implements the final USSPACECOM basing action decision at Redstone Arsenal and incorporates requirements to provide an advanced warfighting capability. IMPACT IF NOT PROVIDED: USSPACECOM command, control, and mission operations will degrade with increased vulnerabilities to missions, facilities, personnel, and the Nation. USSPACECOM will lack the speed, resiliency and accuracy demanded by the Joint Force to execute its unique mission. Without a purpose-built C2F, USSPACECOM’s space dominance will be outpaced in the ever-changing complex nature of global conflict. Critical existing facility infrastructure and data center limitations are strangling the Joint Operation Center’s (JOC) ability to expand capabilities and personnel. Capabilities have been pushed off-floor or forced non-redundant postures to absorb the most critical requirements into a JOC not designed or built for global space C2. USSPACECOM’s ability to fully integrate allies and partners in joint training exercises, further enable integration of a multi-mission sensors with commercial and non-traditional sensors, educate Joint Warfighters in the application of comprehensive space power, and facilitate diversity of thought by leveraging our Joint workforce to increase lethality as Joint-minded space professionals will stagnant within the confines of the current footprint. Existing, purpose built & equipped space for these functions does not exist. Space global threats to the 28 === page 37 === 1. COMPONENT FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE 3. INSTALLATION AND LOCATION REDSTONE ARSENAL ALABAMA 5. PROGRAM ELEMENT 91211F 2. DATE MARCH 2026 4. PROJECT TITLE: HEADQUARTERS UNITED STATES SPACE COMMAND, COMMAND AND CONTROL FACILITY 6. CATEGORY CODE 610-284 7. PROJECT NUMBER 8. PROJECT COST ($000) USSP270001 AUTH:1,800,000 APPR: 450,000 nation require a secure, efficient, and decisive response and a unified command and control infrastructure is critical in accomplishing the requirement. The Joint Force will not have a single-site government owned facility which meets mission requirements and will continue to incur high-cost leased facilities that do not fully meet mission needs. ADDITIONAL: This project will meet the criteria/scope in Department of the Air Force Manual 321084, Standard Facility Requirements. This design shall conform to criteria established in the Air Force Corporate Facilities Standards (AFCFS), the Installation Facilities Standards, but will not employ a standard facility design because there is no AF standard facility design for this project and there is no applicable standard design from Air Force Civil Engineer Center. All reasonable alternatives were considered during the development of this project. New construction is the only viable option to meet this requirement. Sustainable principles, to include life-cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with Unified Facility Criteria 1-200-02, High Performance and Sustainable Building Requirements. This includes preparation of a life-cycle cost analysis for energy consuming systems, renewable energy generating systems, whenever life-cycle cost effective is selected as the reason any requirement of Unified Facility Criteria 1-200-02 is partially compliant or not applicable. This project does not fall within or partly within the 100-year flood plain. The facility is sited in accordance with the Installation Development Plan and is within a compatible land use area. Supporting facilities exceed 25% of the primary facilities total due to extensive site preparation, security requirements, and robust infrastructure resiliency requirements. No construction growth offset is required for this project. US Army Garrison - Redstone Arsenal Director of Public Works: Space Operations Facility: SM = 61,250 Square Feet: 659,289 Data Center & Central Utility Plant: SM = 7,312 Square Feet: 78,706 Visitor Control Center: SM = 668 Square Feet: 7,190 Shipping/Receiving Facility: SM = 2,495 Square Feet: 26,856 JOINT USE CERTIFICATION: Mission Requirements, operational considerations, and location are incompatible with use by other components. 29 === page 38 === 1. COMPONENT FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE 3. INSTALLATION AND LOCATION REDSTONE ARSENAL ALABAMA 5. PROGRAM ELEMENT 12. MARCH 2026 4. PROJECT TITLE: HEADQUARTERS UNITED STATES SPACE COMMAND, COMMAND AND CONTROL FACILITY 6. CATEGORY CODE 91211F 2. DATE 610-284 7. PROJECT NUMBER USSP270001 SUPPLEMENTAL DATA: 8. PROJECT COST ($000) AUTH:1,800,000 APPR: 450,000 A. Estimated Execution Data: (1) Acquisition Strategy: Other Transaction Authority/Progressive Design-Build (2) Design Data: (a) Design, Request for Proposal (RFP) or OTA Challenge Statement 1 Start: MAR/2026 (b) Percentage of Design Completed as of Sep 2025: 0% (c) Percentage of Design Completed as of Sep 2026: 10% (d) Design, RFP Complete or OTA Phase 1 Award: MAY/2026 (e) Total Design Cost or Cost to award Construction OTA Phase II ($000): $57,000 (f) Energy Study and/or Life Cycle Analysis: YES (g) Standard or definitive design used? NO (3) Construction Data: (a) Contract Construction OTA Phase II Award: (b) Construction Start: (c) Construction Complete: NOV/2026 MAY/2027 SEP/2032 B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) Furniture Fixtures & Equipment 3080 FUTURE YEAR 70,015 Site Security Manpower 3400 FUTURE YEAR 18,000 C4IT Eqpmt & Systems (includes UPS) 3080 FUTURE YEAR 2,118,100 Security Related Equipment 3080 FUTURE YEAR 15,000 C. Authorization and Appropriation Summary: Authorization Auth of Approp Appropriation $(000) $(000) $(000) FY2027 Budget Request 1,800,000 450,000 450,000 Future Request 0 1,350,000 1,350,000 Total 1,800,000 1,800,000 * Incremental construction phasing and funding strategy to be driven by OTA/PDB construction contractor’s overall construction strategy. 30 === page 39 === MILCON Work-in-Progress (WIP) Curve – USSPACECOM HQ Project Information Project Title Installation Program Year (FY) Project # USSPACECOM HQ RedStone Arsenal 2027 110161 Financial Inputs & Derived Amounts ($000) Programmed Amount (PA) SIOH Rate Contingency Rate SIOH Amount Contingency Amount Construction (PA less SIOH & Cont) Total Increments Key Dates (Calculated) Begin Date (FY Start) Award Date (Assumed) Complete Date (Award + 1100d; set to 1st of month) Period of Performance Measured in Days 1,800,000 6.5% 5.0% 117,000 90,000 1,593,000 4 Oct 1, 2026 Apr 1, 2027 Mar 1, 2032 1825 Funding & Obligation Increments ($000) Increment1 Increment2 Increment3 Increment4 Increment Total Funding Amount ($000) 450,000 600,000 375,000 375,000 Funding Date Jan 1, 2027 Oct 1, 2027 Oct 1, 2028 Oct 1, 2029 1,800,000 Check vs PA Obligation Date Apr 1, 2027 Jan 1, 2028 Jan 1, 2029 Jan 1, 2030 0 Outlay Curve Controls (Adjust if needed) Outlay Curve Steepness (k) Outlay Curve Shift (Months) Normalized Logistic Base (t=0) Normalized Logistic Top (t=1) Total Outlay ($000) (assumed = PA) 8.0 0.0 0.01798621 0.98201379 1,800,000 31 === page 40 === Monthly Cash Flow (Automated from Spend Plan) Month Oct 2026 Nov 2026 Dec 2026 Jan 2027 Feb 2027 Mar 2027 Apr 2027 May 2027 Jun 2027 Jul 2027 Aug 2027 Sep 2027 Oct 2027 Nov 2027 Dec 2027 Jan 2028 Feb 2028 Mar 2028 Apr 2028 May 2028 Jun 2028 Jul 2028 Aug 2028 Sep 2028 Oct 2028 Nov 2028 Dec 2028 Jan 2029 Feb 2029 Mar 2029 Apr 2029 May 2029 Jun 2029 Jul 2029 Aug 2029 Sep 2029 Oct 2029 Nov 2029 Dec 2029 Jan 2030 Feb 2030 Mar 2030 Apr 2030 May 2030 Jun 2030 Jul 2030 Aug 2030 Sep 2030 Oct 2030 Nov 2030 Dec 2030 Jan 2031 Feb 2031 Mar 2031 Apr 2031 May 2031 Jun 2031 Jul 2031 Funding ($000) Obligation ($000) 0 0 0 0 0 0 450,000 0 0 0 0 0 0 450,000 0 0 0 0 0 0 0 0 0 0 600,000 0 0 0 0 0 0 600,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 375,000 0 0 0 0 0 0 375,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 375,000 0 0 0 0 0 0 375,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Outlay ($000) Cumulative FundingCumulative Obligation Cumulative Outlay 0 0 0 0 0 0 0 0 0 0 0 0 0 450,000 0 0 0 450,000 0 0 0 450,000 0 0 4,692 450,000 450,000 4,692 5,332 450,000 450,000 10,024 6,054 450,000 450,000 16,078 6,869 450,000 450,000 22,947 7,785 450,000 450,000 30,732 8,814 450,000 450,000 39,546 9,966 1,050,000 450,000 49,512 11,253 1,050,000 450,000 60,765 12,686 1,050,000 450,000 73,451 14,274 1,050,000 1,050,000 87,725 16,030 1,050,000 1,050,000 103,755 17,959 1,050,000 1,050,000 121,714 20,070 1,050,000 1,050,000 141,784 22,364 1,050,000 1,050,000 164,148 24,841 1,050,000 1,050,000 188,988 27,494 1,050,000 1,050,000 216,482 30,311 1,050,000 1,050,000 246,794 33,273 1,050,000 1,050,000 280,066 36,350 1,425,000 1,050,000 316,417 39,507 1,425,000 1,050,000 355,924 42,696 1,425,000 1,050,000 398,620 45,862 1,425,000 1,425,000 444,481 48,941 1,425,000 1,425,000 493,423 51,863 1,425,000 1,425,000 545,286 54,555 1,425,000 1,425,000 599,841 56,941 1,425,000 1,425,000 656,782 58,951 1,425,000 1,425,000 715,734 60,521 1,425,000 1,425,000 776,255 61,598 1,425,000 1,425,000 837,853 62,147 1,425,000 1,425,000 900,000 62,147 1,800,000 1,425,000 962,147 61,598 1,800,000 1,425,000 1,023,745 60,521 1,800,000 1,425,000 1,084,266 58,951 1,800,000 1,800,000 1,143,218 56,941 1,800,000 1,800,000 1,200,159 54,555 1,800,000 1,800,000 1,254,714 51,863 1,800,000 1,800,000 1,306,577 48,941 1,800,000 1,800,000 1,355,519 45,862 1,800,000 1,800,000 1,401,380 42,696 1,800,000 1,800,000 1,444,076 39,507 1,800,000 1,800,000 1,483,583 36,350 1,800,000 1,800,000 1,519,934 33,273 1,800,000 1,800,000 1,553,206 30,311 1,800,000 1,800,000 1,583,518 27,494 1,800,000 1,800,000 1,611,012 24,841 1,800,000 1,800,000 1,635,852 22,364 1,800,000 1,800,000 1,658,216 20,070 1,800,000 1,800,000 1,678,286 17,959 1,800,000 1,800,000 1,696,245 16,030 1,800,000 1,800,000 1,712,275 14,274 1,800,000 1,800,000 1,726,549 12,686 1,800,000 1,800,000 1,739,235 32 === page 41 === Aug 2031 Sep 2031 Oct 2031 Nov 2031 Dec 2031 Jan 2032 Feb 2032 Mar 2032 TOTAL 0 0 0 0 0 0 0 0 1,800,000 0 0 0 0 0 0 0 0 1,800,000 11,253 9,966 8,814 7,785 6,869 6,054 5,332 4,692 1,800,000 1,800,000 1,800,000 1,800,000 1,800,000 1,800,000 1,800,000 1,800,000 1,800,000 1,800,000 1,800,000 1,800,000 1,800,000 1,800,000 1,800,000 1,800,000 1,800,000 1,800,000 1,800,000 1,750,488 1,760,454 1,769,268 1,777,053 1,783,922 1,789,976 1,795,308 1,800,000 1,800,000 33 === page 42 === Oct 2026 Nov 2026 Dec 2026 Jan 2027 Feb 2027 Mar 2027 Apr 2027 May 2027 Jun 2027 Jul 2027 Aug 2027 Sep 2027 Oct 2027 Nov 2027 Dec 2027 Jan 2028 Feb 2028 Mar 2028 Apr 2028 May 2028 Jun 2028 Jul 2028 Aug 2028 Sep 2028 Oct 2028 Nov 2028 Dec 2028 Jan 2029 Feb 2029 Mar 2029 Apr 2029 May 2029 Jun 2029 Jul 2029 Aug 2029 Sep 2029 Oct 2029 Nov 2029 Dec 2029 Jan 2030 Feb 2030 Mar 2030 Apr 2030 May 2030 Jun 2030 Jul 2030 Aug 2030 Sep 2030 Oct 2030 Nov 2030 Dec 2030 Jan 2031 Feb 2031 Mar 2031 Apr 2031 May 2031 Jun 2031 Jul 2031 Aug 2031 Sep 2031 Oct 2031 Nov 2031 Dec 2031 Jan 2032 Feb 2032 Mar 2032 Cumulative WIP Curve Project: Program Year: USSPACECOM HQ 2027 Cumulative Funding vs Obligation vs Outlay 2,000,000 1,800,000 1,600,000 1,400,000 1,200,000 1,000,000 800,000 600,000 400,000 200,000 0 Cumulative Funding Cumulative Obligation Cumulative Outlay 34 === page 43 === 1. COMPONENT 2. DATE (YYYYMMDD) FY 2027 BBBBBB MILITARY CONSTRUCTION PROGRAM AIR FORCE 3. INSTALLATION AND LOCATION 4. COMMAND EIELSON AFB, ALASKA PACAF 6. PERSONNEL (1) PERMANENT 20260326 5. AREA CONTRUCTION COST INDEX 2.67 (2) STUDENTS (3) SUPPORTED (4) TOTAL OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN a. AS OF 30-Sep-24 281 3,000 611 0 1 0 119 618 336 4,966 b. END FY 30-Sep-31 281 3,000 615 0 1 0 119 618 336 4,970 7. INVENTORY DATA ($000) 101,470.81 19,897,618.00 0.00 91,000.00 0.00 0.00 0.00 19,988,618.00 a. TOTAL ACREAGE b. INVENTORY TOTAL AS OF 29-Jul-25 c. AUTHORIZATION NOT YET IN INVENTORY d. AUTHORIZATION REQUESTED IN THIS PROGRAM e. AUTHORIZATION INCLUDED IN FOLLOWING PROGRAM f. PLANNED IN NEXT THREE PROGRAM YEARS g. REMAINING DEFICIENCY h. GRAND TOTAL 8. PROJECTS REQUESTED IN THIS PROGRAM (1) CODE a. CATEGORY (2) PROJECT TITLE 141-753 JPARC Range Operation Center (3) SCOPE b. COST ($000) (1) START c. DESIGN STATUS (2) COMPLETE 3,522 SM 91,000 11/22 7/26 9. FUTURE PROJECTS None. R&M Unfunded Requirements: N/A. 10.MISSION OR MAJOR FUNCTIONS The 354th Fighter Wing is the host unit at Eielson Air Force Base and is assigned to 11th Air Force, headquartered at Elmendorf Air Force Base near Anchorage. Eleventh Air Force falls under Pacific Air Forces, which is headquartered at Hickam Air Force Base, Hawaii. The wing supports operations, maintenance, mission support, and medical group functions and is host to ten tenant units. To execute the National Defense Strategy and support the objectives of United States Indo-Pacific Command (USINDOPACOM), PACAF must be agile, resilient, lethal, and revolutionary. As the Air Component, PACAF will integrate joint force air, space, and cyberspace capabilities to safeguard a free and open Indo-Pacific. 11. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES N/A DD FORM 1390, JUL 1999 35 PREVIOUS EDITION IS OBSOLETE. === page 44 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA MAR 2026 AIR FORCE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE EIELSON AIR FORCE BASE ALASKA JPARC RANGE OPERATIONS CENTER 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211F 141-753 FTQW083001 8. PROJECT COST ($000) 91,000 9. COST ESTIMATES ITEM UM QUANTITY UNIT COST COST($000) PRIMARY FACILITIES 55,829 SQUADRON OPERATIONS (141-753) SM 3,522 14,337 (50,497) ICD 705 PREMIUM LS (5,082) CYBERSECURITY OF FACILITY-RELATED CONTROL SYS LS (250) SUPPORTING FACILITIES 19,168 SITE PREPARATION LS (4,276) SITE IMPROVEMENTS LS (2,226) UTILITIES LS (5,313) ROADS, SIDEWALKS, AND PARKING LS (3,282) COMMUNICATIONS LS (1,021) GENERATOR KW 300 3,589 (1,077) SOIL REMEDIATION LS (1,973) 74,997 SUBTOTAL CONTINGENCY (5.00%) 3,750 TOTAL CONTRACT COST 78,747 SUPERVISION, INSPECTION AND OVERHEAD (7.30%) 5,749 CONSTRUCTION SECURITY SURVEILLANCE 6,812 TOTAL REQUEST 91,308 TOTAL REQUEST (ROUNDED) 91,000 EQUIPMENT FROM OTHER APPROPRIATIONS (NON-ADD) (8,386) 10. DESCRIPTION OF PROPOSED CONSTRUCTION Construct a new facility across Flight Line Avenue from building 1151 in support of the Alaska Red Flag mission, including all air operations major combat training in a joint, multinational, multi-domain, and unconventional environment against a 21st century near-peer competitors. The facility will consist of administrative space, building support space, and secure workspace for mission critical activities. The facility shall be a multi-story structure with a non-frost susceptible foundation system. Work includes but is not limited to construction of a facility with conventional shallow concrete foundation system, steel structure and framing, and seismically designed with special concentrically braced frames. The building exterior will feature Eielson Air Force Base Installation Facility Standards compliant metal siding panels, and a compatible membrane lowslope roof system. Standing seam metal roofing shall be where visible from the ground. The facility will be air conditioned and supported by base wide district utilities for steam, water/sewer, and electricity. Soils remediation is required to mitigate, transport, and dispose of hazardous soils off site. Infrastructure and facility design should be compatible with applicable Department of War, Air Force, and base design standards. Work to include all subgrade and subbase work, drainage, foundation, and facility assembly. In addition, local materials and construction techniques shall be used where cost effective. Facilities will be designed as permanent construction in accordance with Department of War Unified Facilities Criteria 1-200-01, General Building requirements. This project will comply with Department of War antiterrorism/ force protection requirements per Unified Facilities Criteria 4-010-01. Air Conditioning: 85 Tons DD FORM 1391, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 36 === page 45 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA MAR 2026 AIR FORCE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE EIELSON AIR FORCE BASE ALASKA JPARC RANGE OPERATIONS CENTER 5. PROGRAM ELEMENT 7. PROJECT NUMBER 6. CATEGORY CODE 91211F 11. REQ: 3,522 SM 141-753 ADQT: FTQW083001 0 8. PROJECT COST ($000) SUBSTD: 91,000 4,465 SM PROJECT: Provides a dedicated range operations center for training missions in the Joint Pacific Alaska Range Complex (JPARC)and administrative space for the 354th Range Squadron. REQUIREMENT: Provide a new facility to adequately house range operations supporting Joint Multi-national training exercises (RED FLAG - Alaska) in the Joint Pacific Alaska Range Complex, specifically the Oklahoma, Blair, and Yukon Military Operating Areas. The facility must be able to allow integrated, multi-domain mission planning, execution, mission capture, and debrief. Additional workspaces will allow adequate support for RED FLAG-Alaska, and other high-end training events; providing for full spectrum venue aimed at 5th Gen, campaign-level training. The project will provide adequate space for Red and Blue force planning cells, Opposing Forces, White Force, and 5th Gen participants to operate in a single facility. Facility must include secured spaces in accordance with Intelligence Community Directive 705, Intelligence Community Standard 705-1, Intelligence Community Tech Spec-for Intelligence Community Directive/ Intelligence Community Standard, and associated Unified Facility Criteria. A Site Security Manager or Accrediting Official shall be part of this project design and construction, and the project shall cover costs for escorting, and/or construction surveillance technicians/personnel during construction. Facility will support all unit flight training tasks including planning, briefing, administration, and critique of combat crews. Construction of road pavement, parking lots and sidewalks is required to support the year-round facility personnel. CURRENT SITUATION: Currently Eielson Air Force Base does not have the facilities to fully support Red Flag Alaska planned exercises with over 1,400 visiting personnel and participants. It is incapable of carrying out the Joint Pacific Alaska Range Complex's 2025 goal of becoming a 5th Generation Training Center of Excellence. The existing facility lacks the capacity and capability to plan, execute, and capture required mission data for 5th Gen combat training. Its size hinders planning, executing, and debriefing of Red Flag-Alaska exercises, and multi-domain, live and Synthetic 5th Gen operations. There is inadequate space for required offices, video teleconference/main briefing auditorium, and secured rooms. Additionally, reaching full exercise capability would require specialized mission planning and control rooms with communication connections and equipment for both Red and Blue force planning cells. Current exercise participants must share space which requires occupants' workspaces and brief/debrief rooms to be relinquished whenever Red Flag Alaska operations take place. Temporary Duty personnel are frequently required to stand in hallways and aisles during briefings and introductory meetings. In addition, personnel currently work out of converted closets, trailers, and corridors in the existing facility. There is no room for expansion nor the ability to provide separate classified needs associated with the fighter units, tankers, Intelligence, Surveillance, and Reconnaissance, Special Operations forces, Air Operations Center cells, Ground Control Intercept, and DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 37 === page 46 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA MAR 2026 AIR FORCE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE EIELSON AIR FORCE BASE ALASKA JPARC RANGE OPERATIONS CENTER 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211F 141-753 FTQW083001 8. PROJECT COST ($000) 91,000 Live-Synthetic liaisons. The Fifth Gen and Contested-Degraded operations require integrated, simultaneous, multiple-level security operations with real-time multilevel security instrumentation systems to ensure accuracy and fidelity of training. Those aspects will be impossible with existing structures. Optimal success of training will continue to fall short as growth and needed enhancements cannot be incorporated. By building a second facility to provide the needed functions not currently fitting inside of building 1151, Eielson will be better able to meet the needs associated with the mission of conducting 5th Gen training operations across all domains and spectrums. IMPACT IF NOT PROVIDED: Red Flag Alaska exercises will be impeded in their ability to provide complete training to visiting pilots, air crews, and support personnel. Exercise participants will continue to be forced to use less than adequate space for mission planning, debriefs, and exercise in-briefs and out-briefs. Opposing Forces, White Force, and 5th Gen participants will continue to work in separate buildings, which is not ideal. Red Flag Alaska will be unable to carry out Joint Pacific Alaska Range Complex 2025 goal of 5th Generation Training Center of Excellence. The training value of Red Flag Alaska will diminish due to inadequate workspace and there will be a loss of effectiveness for planning, executing, and debriefing for Red Flag Alaska. Without the project, over 300 personnel will have unsatisfactory working conditions. The inadequate requirement of secure workspace is a security concern as mission critical activities are performed in an unsuitable environment. This facility is vital to supporting Red Flag Alaska and will directly limit scope of training exercise if not constructed. ADDITIONAL: This project meets applicable criteria/scope specified in Department of the Air Force Manual 32-1084, Standard Facility Requirements. This design shall conform to criteria established in the Air Force Corporate Facilities Standards, the Installation Facilities Standards, but will not employ a standard facility design because there is no Air Force standard facility design for this project, and there is no applicable standard design from Air Force Civil Engineer Center All reasonable alternatives were considered during the development of this project to include status quo, renovation, and new construction. An approved Economic Analysis determined new construction as the only viable option to meet this requirement. Sustainable principles, to include life-cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with Unified Facilities Criteria 1-200-02, High Performance and Sustainable Building Requirements. This includes preparation of a life-cycle cost analysis for energy consuming systems, renewable energy generating systems, or whenever life-cycle cost effective is selected as the reason any requirement of Unified Facilities Criteria 1-200-02 is partially compliant or not applicable. The project falls within the 100-year floodplain. The risk will be mitigated by constructing the facility and any flood-susceptible utilities above the 100-year flood level. This is a non-mission critical facility. The facility and any flood-susceptible utilities will be constructed a minimum of two feet above the 100-year flood elevation. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 38 === page 47 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA MAR 2026 AIR FORCE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE EIELSON AIR FORCE BASE ALASKA JPARC RANGE OPERATIONS CENTER 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211F 141-753 FTQW083001 8. PROJECT COST ($000) 91,000 Facility is sited in accordance with the Installation Development Plan and is within a compatible land use area. Supporting Facilities exceed 25% of the Primary Facilities total due to This project falls within the 100-year flood plain. The risk is managed by the Chena Dam Control Project which mitigates the greatest flooding risk to the site. This is a non-mission critical facility. The construction growth offset for this requirement is 37909 square feet. 354 Fighter Wing Base Civil Engineer: (907) 377-5213 SQUADRON OPERATIONS: 3,522 SM = 37,909 Square Feet; JOINT USE CERTIFICATION: This facility can be used by other components on an "as available" basis; however, the scope of the project is based on Air Force requirements. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 39 === page 48 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA MAR 2026 AIR FORCE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE EIELSON AIR FORCE BASE ALASKA JPARC RANGE OPERATIONS CENTER 5. PROGRAM ELEMENT 7. PROJECT NUMBER 12. 6. CATEGORY CODE 8. PROJECT COST ($000) 91211F 141-753 FTQW083001 SUPPLEMENTAL DATA: A. Estimated Execution Data: (1) Acquisition Strategy: Design-Bid-Build (2) Design Data (a) Design or Request for Proposal(RFP) Started: (b) Percent of Design Completed as of SEP 2025: (c) Percent of Design Completed as of JAN 2026: (d) Design or RFP Complete: (e) Total Design Cost ($000): (f) Energy Study and/or Life Cycle Cost Analysis (g) Standard or Definitive Design Used? (3) Construction Data: (a) Contract Award: (b) Construction Start: (c) Construction Complete: 91,000 NOV/2022 35% 65% JUL/2026 11,375 YES NO JAN/2027 APR/2027 FEB/2029 B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) UPS Systems Furniture, Fixtures, & Equipme DD FORM 1391C, JUL 1999 O&M O&M PREVIOUS EDITION IS OBSOLETE 2022 2022 5,620 2,766 PAGE NO. 40 === page 49 === Spend Plan Project Title: Installation: Program Year Project # CAO: I 9.0% I 5.0% I Schedule Award Complete POP Months I I 91,000 iI Fund 1-Oct-26 31-Jan-27 J 30-Jun-29 1 2 3 4 5 6 7 8 78,670 8,190 410 4,141 207 9 30-Apr-27 30-Jun-29 780 26.0 I Chart Begin 1st Increment 2nd Increment 3rd Increment 4th Increment 5th Increment End Total Instructions and Notes This spreadsheet is designed to help the user develop a WIP Curve for inclusion with a project 1391. The user only needs to know the project cost and schedule. Edit The Green Fields ONLY Eielson AFB, AK 2027 FTQW0830001 Financials PA ($000) Initial Contract SIOH SIOH / Month Other (Contingency) Other / Month 4-Sep-25 JPARC Range Operations Center Obligate 10 11 Fund mmm-yr 30-Apr-27 Oct-26 Jan-27 30-Jun-29 Jun-29 Obligate mmm-yr Months 1528 Apr-27 26 0 0 0 0 Jun-29 0 26 Enter the Project Title, Location, and Project number Enter the Date this WIP Curve is being updated Enter the Project PA Enter the SIOH required by the agent (6.5% for USACE FY24 and beyond) Enter the contingency percentage plus other amounts withheld by the Agent Enter the projected project Award Date ( usually 1 Apr of the Execution FY) Enter the Project Complete Date (Usually Award plus ~1000 days, use the 1st of a month) Enter the Chart Begin Date ( first day of the Program Year: 1-Oct-XX) ( Use "Short Date" format.) Enter the Dates anticipate to receive each increment of funding (usually January of the Program year, and Oct for subsequent increments) Enter the Dates anticipated to Award the contract ( usually 1 Apr of the Program year and obligate increments (usually 1 Oct for increments after initial award.) Enter the Value of each increment (If the project is less than $250M enter the PA as 1st Increment) l Increment 91,000 91,000 91,000 Obligate 78,670 78,670 78,670 SIOH 8,190 8,190 8,190 Other 4,141 4,141 4,141 41 === page 50 === Spend Plan CAO: Project Title: Installation: Program Year Project # 04-Sep-25 JPARC Range Operations Center Notes Eielson AFB, AK 2027 FTQW0830001 Assumes initial appropriation is enacted by Note 1: Congress OCT FY 2027. Assumes funds are available for obligation by May 1 of the execution year and by May 1 Note 2: for subsequent years. All Cost in thousands Chart Begin Oct-26 Month Oct-26 Nov-26 Dec-26 Jan-27 Feb-27 Mar-27 Apr-27 May-27 Jun-27 Jul-27 Aug-27 Sep-27 Oct-27 Nov-27 Dec-27 Jan-28 Feb-28 Mar-28 Apr-28 May-28 Jun-28 Jul-28 Aug-28 Sep-28 Oct-28 Nov-28 Dec-28 Jan-29 Feb-29 Mar-29 Apr-29 May-29 Jun-29 FUNDING (note 1) Enacted 91,000 - OBLIGATION (note 2-3) OUTLAYS (note 4-5) Cumulative Obligated Cumulative 91,000 91,000 91,000 91,000 91,000 91,000 91,000 91,000 91,000 91,000 91,000 91,000 91,000 91,000 91,000 91,000 91,000 91,000 91,000 91,000 91,000 91,000 91,000 91,000 91,000 91,000 91,000 91,000 91,000 91,000 78,670 617 617 617 617 617 617 617 617 617 617 617 617 617 617 617 617 617 617 617 617 - 78,670 79,286 79,903 80,519 81,136 81,752 82,369 82,985 83,602 84,218 84,835 85,451 86,068 86,684 87,301 87,917 88,534 89,150 89,767 90,383 91,000 91,000 91,000 91,000 91,000 91,000 91,000 Monthly Cumulative 13,650 2,000 2,200 2,420 2,662 2,928 3,221 3,543 3,897 4,287 4,716 5,188 5,707 5,707 5,136 4,622 4,160 3,744 2,995 2,396 1,917 1,534 1,109 887 374 13,650 15,650 17,850 20,270 22,932 25,860 29,081 32,624 36,521 40,808 45,524 50,712 56,419 62,126 67,262 71,884 76,044 79,788 82,783 85,179 87,096 88,630 89,739 90,626 91,000 Assumes ALL project funds (contract, SIOH, contingency, etc) are obligated NLT 6 Note 3: months prior to project end Assumes contract award in MAY 27 and contract completion JUL 30; duration 38 Note 4 months. Assumes Agent will retain 1% of project Note 5 obligations for a final payment 42 === page 51 === JPARC Range Operations Center, Eielson AFB, AK $100,000 $90,000 -------------- $80,000 I ,, I $60,000 , ,,, ,,, ,,, $50,000 $40,000 I I $30,000 ,,, ,,, ,,, $20,000 . I $10,000 ,,, , ,,, ,,, ,,, ----~---~------ . -- - - - ,/ I I Jun-29 May-… Apr-29 Mar-29 Feb-29 Jan-29 Dec-28 Nov-28 Oct-28 Sep-28 Aug-28 Jul-28 Jun-28 Apr-28 Mar-28 Feb-28 Jan-28 Dec-27 Nov-27 Oct-27 Sep-27 Aug-27 Jul-27 Jun-27 May-… Apr-27 Mar-27 Feb-27 Jan-27 Dec-26 Nov-26 May-… I I $0 Oct-26 Dollars in (000) $70,000 ,,, ,,, ,,, 43 === page 52 === 1. COMPONENT 2. DATE (YYYYMMDD) FY 2027 BBBBBB MILITARY CONSTRUCTION PROGRAM AIR FORCE 3. INSTALLATION AND LOCATION 4. COMMAND JOINT BASE ELMENDORF-RICHARDSON, ALASKA PACIFIC AIR FORCES 6. PERSONNEL (1) PERMANENT 20260326 5. AREA CONTRUCTION COST INDEX 2.31 (2) STUDENTS (3) SUPPORTED OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN (4) TOTAL a. AS OF 30-Sep-25 790 4,770 2,237 0 1 0 335 1,618 288 10,039 b. END FY 30-Sep-30 790 4,771 2,263 0 1 0 335 1,618 288 10,066 7. INVENTORY DATA ($000) 78,691.00 37,865,064.00 355,000.00 6,964,000.00 0.00 0.00 445,000.00 45,629,064.00 a. TOTAL ACREAGE b. INVENTORY TOTAL AS OF 30-Sep-25 c. AUTHORIZATION NOT YET IN INVENTORY d. AUTHORIZATION REQUESTED IN THIS PROGRAM e. AUTHORIZATION INCLUDED IN FOLLOWING PROGRAM f. PLANNED IN NEXT THREE PROGRAM YEARS g. REMAINING DEFICIENCY h. GRAND TOTAL 8. PROJECTS REQUESTED IN THIS PROGRAM (3) SCOPE b. COST ($000) (1) START (2) COMPLETE 211-111 Fighter Town Recapitalization 49,694SM 2,066,050 03/2026 09/2026 171-212 Joint Integrated Test and Training Ctr, Inc 13,920SM 42,000 06/2023 05/2026 (1) CODE a. CATEGORY (2) PROJECT TITLE c. DESIGN STATUS 9. FUTURE PROJECTS 171-212 Joint Integrated Test and Training Ctr, Inc (13,920SM/$35,000) 211-111 Fighter Town Recapitalization (49,694SM/$4,897,950) 10.MISSION OR MAJOR FUNCTIONS Joint Base Elmendorf-Richardson is home to the 3rd Wing, Headquarters Alaskan Command, Headquarters United States Army Alaska, Alaskan North American Aerospace Defense Command Region, and 11th Air Force. Its mission provides air supremacy, surveillance, worldwide airlift, and agile combat support forces to project global power and global reach and training and readiness oversight responsibilities for Army Force Generation in Alaska. It is host to an operations group with squadrons of E-3B, C-17, F-22A and C-12 aircraft, as well as 15 tenant units including the Air Force Reserve's 477th Fighter Group, among others. 11. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES None DD FORM 1390, JUL 1999 44 PREVIOUS EDITION IS OBSOLETE. === page 53 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE JOINT BASE ELMENDORF-RICHARDSON ALASKA FIGHTER TOWN RECAPITALIZATION 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211F 211-111 ACC278002 8. PROJECT COST ($000) AUTH: 6,964,000 APPR: 2,066,050 9. COST ESTIMATES ITEM UM QUANTITY UNIT COST COST($000) PRIMARY FACILITIES 4,110,407 HANGAR, MAINTENANCE (211-111) SM 49,694 22,243 (1,105,344) SHOP, CONVENTIONAL MUNITIONS (216-642) SM 5,318 23,936 (127,292) ROAD (851-147) SM 101,376 293 (29,703) ELECTRIC SUBSTATION (813-231) KV 24,000 1,942 (46,608) TELECOMMUNICATIONS FACILITY (131-111) SM 226 18,071 (4,084) POL - PETROLEUM OPERATIONS BUILDING (121-111) SM 768 23,402 (17,973) OPERATING STORAGE TANK, PETROLEUM, JET FUE L 1,907,848 2.64 (5,037) (124-135) Total from Continuation page(s) (2,774,366) SUPPORTING FACILITIES 1,726,845 UTILITIES LS (635,338) SITE PREPARATION LS (269,685) PAVEMENTS LS (489,155) SITE IMPROVEMENTS LS (226,133) COMMUNICATIONS LS (54,123) DEMOLITION LS (5,136) GENERATOR LS (2,275) ENVIROMENTAL REMEDIATION LS (45,000) SUBTOTAL 5,837,252 CONTINGENCY (5.00%) 291,863 TOTAL CONTRACT COST 6,129,115 SUPERVISION, INSPECTION AND OVERHEAD (7.30%) 447,425 DESIGN/BUILD - DESIGN COST (4.00% OF SUBTOTAL) 233,490 CONSTRUCTION SECURITY SURVEILANCE 154,337 TOTAL REQUEST 6,964,367 TOTAL REQUEST (ROUNDED) 6,964,000 EQUIPMENT FROM OTHER APPROPRIATIONS (NON-ADD) (142,164) 10. DESCRIPTION OF PROPOSED CONSTRUCTION This project intends to leverage the authorities granted in the FY26 National Defense Authorization Act to take advantage of private sector innovative design and construction methods. It will use a combination of Other Transaction Authority (OTA), Progressive Design-Build (PDB), and other execution methods to innovate in delivery, reduce construction timelines, and lifecycle costs. OTA/PDB execution will capitalize on the construction industry's expertise and innovation while avoiding costly and time-consuming federal contracting regulatory burdens. The execution strategy is intentionally non-prescriptive to empower industry partners to innovate and propose the most effective technical solution to meet the defined needs. Using this approach, the cost estimate will continue to be refined and will differ from the original government estimate due to the early and ongoing involvement of industry experts. This collaborative approach allows for a more detailed and realistic cost to be developed as the design progresses and facilities are constructed. This project provided a multi-facility recapitalization of the fighter area of DD FORM 1391, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 45 === page 54 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE JOINT BASE ELMENDORF-RICHARDSON ALASKA FIGHTER TOWN RECAPITALIZATION 5. PROGRAM ELEMENT 7. PROJECT NUMBER 6. CATEGORY CODE 91211F 211-111 9. COST ESTIMATES (CONTINUED) ACC278002 ITEM PRIMARY FACILITIES (CONTINUED) FLIGHT SIMULATOR TRAINING (171-212) SHOP, TACTICAL MISSILE, GLIDE WEAPON MAINT (212-213) STORAGE MAGAZINE ABOVE GROUND TYPE A, B, & (422-258) STORAGE IGLOO (422-264) TELECOMMUNICATIONS FACILITY (131-111) DORMITORY AIRMAN PERMANENT PARTY/PCS-STUDE (721-312) ADD FIELD TRAINING FACILITY (171-618) ALTER FIELD TRAINING FACILITY (171-618) SQUADRON OPERATIONS (141-753) SHOP, AIRCRAFT MAINTENANCE, ORGANIZATIONAL (211-154) APRON (113-321) TAXIWAY (112-211) SHOULDER, PAVED (116-642) FUEL SYSTEM MAINTENANCE DOCK (211-179) AIRCRAFT CORROSION CONTROL (211-159) SHOP, NON-DESTRUCTIVE INSPECTION (211-153) AIRCRAFT SUPPORT EQUIPMENT SHOP/STORAGE FA (218-712) SHOP, SURVIVAL EQUIPMENT (218-852) FIRE STATION (730-142) AIRMAN DINING HALLS (722-351) WAREHOUSE SUPPLY AND EQUIPMENT BASE (442-758) SHOP, JET ENGINE INSPECTION AND MAINTENANC (211-157) SHOP, WEAPONS AND RELEASE SYSTEMS (215-552) SHOP, AIRCRAFT GENERAL PURPOSE (211-152) MUNITIONS LOAD CREW TRAINING (171-875) POWER CHECK (116-664) RANGE, SMALL ARMS, INDOOR (171-475) COMBAT ARMS TRAINING MAINTENANCE BUILDING (171-476) ICD 705 PREMIUM CYBERSECURITY OF FACILITY-RELATED CONTROL SYS 8. PROJECT COST ($000) AUTH: 6,964,000 APPR: 2,066,050 UNIT COST COST ($000) 3,568 4,572 24,420 26,289 (87,131) (120,193) SM 2,195 14,879 (32,659) SM SM SM 742 20 18,953 19,268 12,745 15,050 (14,297) (255) (285,243) SM SM SM SM 1,561 112 8,472 5,928 24,703 14,746 32,943 15,369 (38,561) (1,652) (279,093) (91,107) SM SM SM SM SM SM SM 210,984 7,525 55,073 2,843 4,241 53 5,572 2,444 2,239 1,550 31,178 40,884 50,668 18,321 (515,645) (16,848) (85,363) (88,639) (173,389) (2,685) (102,085) SM SM SM SM SM 1,372 1,181 524 7,603 1,115 18,899 30,972 51,718 28,482 33,548 (25,929) (36,578) (27,100) (216,549) (37,406) SM SM SM SM SM SM 2,230 1,249 1,254 2,508 3,223 1,734 27,606 31,278 31,221 5,570 29,941 31,941 (61,561) (39,066) (39,151) (13,970) (96,500) (55,386) Total (119,927) (70,398) 2,774,366 UM QUANTITY SM SM LS LS Elmendorf Air Force Base. The campus will include aircraft hangars; corrosion control facilities; squadron and other operations facilities; airfield pavements (e.g., taxiways, aprons, shoulders, and specialized pads); maintenance shops for DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 46 === page 55 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE JOINT BASE ELMENDORF-RICHARDSON ALASKA FIGHTER TOWN RECAPITALIZATION 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211F 211-111 ACC278002 8. PROJECT COST ($000) AUTH: 6,964,000 APPR: 2,066,050 inspection, testing, repair, and safe handling of aircraft and equipment; munitions complex storage and maintenance; housing for unaccompanied permanent party airmen; training for various mission- and support-related functions (e.g., simulators, field training, small arms, munitions); petroleum operations; and support facilities for visitor control, dining, shipping and receiving, supply and warehousing, and firefighting. As the campus design develops, it is likely that some existing facilities will be modified or demolished as determined to be most advantageous to the government. In addition to the Primary Facilities, the project will include all Supporting Facilities needed for complete and usable facilities. These will include site preparation and improvements, extensive utilities (electrical, water, HVAC, pumps, lighting, etc.), roadways, parking, sidewalks, communication systems, and backup generators as authorized by Air Force Manual 32-1062. As the campus design develops, additional Support Facilities made be identified and included in this project as determined to be most advantageous to the government. Facilities will be designed as permanent construction in accordance with the Department of War Unified Facilities Criteria 1-200-01, General Building requirements. This project will comply with Department of War antiterrorism/force protection requirements per Unified Facility Criteria 4-01001. 11. REQ: 49,694 SM ADQT: 0 SUBSTD: 0 PROJECT: Fighter Town Recapitalization REQUIREMENT: The recapitalization of fighter town at Joint Base Elmendorf-Richardson requires unique purpose-built facilities to meet the unique needs of the fighter mission and operations. This project is a complete campus approach to recapitalizing the fighter area to ensure all required facilities will be available and synchronized with the mission-driven equipment procurement, movement of personnel, and logistical chain needed. A more detailed description of individual facilities planned is described in the accompanied DD1391C for this project. CURRENT SITUATION: Existing airfield facilities are unable to support the recapitalization of the fighter area. A new site has been selected to expand the current airfield to support this program. This project is required to construct airfield pavements for this program. IMPACT IF NOT PROVIDED: This location has been identified by the Secretary of the Air Force (SECAF) as an operational location for more fighters. Without this project, this location will not meet the United States Air Force Operational Imperatives, nor the lines of effort mandated by Secretary of the Air Force. Additionally, this location will also not meet National Defense Strategy Requirements. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 47 === page 56 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE JOINT BASE ELMENDORF-RICHARDSON ALASKA FIGHTER TOWN RECAPITALIZATION 5. PROGRAM ELEMENT 7. PROJECT NUMBER 6. CATEGORY CODE 8. PROJECT COST ($000) AUTH: 6,964,000 91211F 211-111 ACC278002 APPR: 2,066,050 ADDITIONAL: This project meets the criteria/scope in Department of the Air Force Manual 321084, Standard Facility Requirements. This design shall conform to criteria established in the Air Force Corporate Facilities Standards, the Installation Facilities Standards, but will not employ a standard facility design because there is no Air Force standard facility design for this project and there is no applicable standard design from Air Force Civil Engineer Center. All reasonable alternatives were considered during the development of this project. New construction is the only viable option to meet this requirement. Sustainable principles, to include life-cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with Unified Facility Criteria 1-200-02, High Performance and Sustainable Building Requirements. This includes preparation of a life-cycle cost analysis for energy consuming systems, renewable energy generating systems, whenever life-cycle cost effective is selected as the reason any requirement of Unified Facility Criteria 1-200-02 is partially compliant or not applicable. This project does not fall within or partly within the 100-year flood plain. The facility is sited in accordance with the Installation Development Plan and is within a compatible land use area. Supporting facilities exceed 25% of the primary facilities total due to extensive site preparation, utilities, and dispersed infrastructure requirements. 673rd Air Base Wing, Base Civil Engineer: (907) 552-3007 Maintenance Hangar: SM = 49,694, SF = 534,902 Conventional Munitions Shop: SM = 5,318, SF = 57,247 Road: SM = 101,376, SF = 1,091,202 Airfield Lighting Vault: SM = 226, SF = 2,428 Petroleum Pumphouse: SM = 768, SF = 8,267 Operating Storage Tank, Jet Fuel: L = 1,907,848, Gal = 504,000 Flight Simulator Training, SM = 3,568, SF = 38,401 Shop, Tactical Missile, Glide Weapon Maintenance: SM = 4,572, SF = 49,213 Storage Magazine Above Ground Type: SM = 2,195, SF = 23,625 Storage Igloo: SM = 742, SF = 7,983 Telecommunications Facility: SM = 20, SF = 220 Dormitory Airman Permanent Party: SM = 18,953, SF = 204,006 Field Training Facility Add: SM = 1,561, SF = 16,805 Field Training Facility Alter: SM = 112, SF = 1,201 Squadron Operations: SM = 8,472, SF = 91,192 Aircraft Maintenance Organizational Shop: SM = 5,928, SF = 63,808 Apron: SM = 210,984, SF = 2,271,013 Taxiway: SM = 7,525, SF = 81,001 Shoulders Paved: SM = 55,073, SF = 592,799 Fuel System Maintenance Dock: SM = 2,843, SF = 30,600 Aircraft Corrosion Control: SM = 4,241, SF = 45,648 Nondestructive Inspection Laboratory: SM = 53, SF = 568 Aircraft Support Equipment Shop/Storage Facility: SM = 5,572, SF = 59,972 Survival Equipment Shop: SM = 1,372, SF = 14,764 DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 48 === page 57 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE JOINT BASE ELMENDORF-RICHARDSON ALASKA FIGHTER TOWN RECAPITALIZATION 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211F 211-111 ACC278002 8. PROJECT COST ($000) AUTH: 6,964,000 APPR: 2,066,050 Fire Station: SM = 1,181, SF = 12,710 Airman Dining Halls: SM = 524, SF = 5,645 Warehouse Supply And Equipment Base: SM = 7,603, SF = 81,840 Jet Engine Inspection And Maintenance Shop: SM = 1,115, SF = 12,000 Weapons Release Systems Shop: SM = 2,230, SF = 23,999 Aircraft General Purpose Shop: SM = 1,249, SF = 13,446 Munitions Load Crew Training: SM = 1,254, SF = 13,498 Power Check Pad: SM =2,508, SF = 26,996 Range, Small Arms, Indoor: SM = 3,223, SF = 34,694 Combat Arms Training Maintenance Building: SM = 1,734, SF = 18,665 JOINT USE CERTIFICATION: Mission Requirements, operational considerations, and location are incompatible with use by other components. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 49 === page 58 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE JOINT BASE ELMENDORF-RICHARDSON ALASKA FIGHTER TOWN RECAPITALIZATION 5. PROGRAM ELEMENT 7. PROJECT NUMBER 12. 6. CATEGORY CODE 8. PROJECT COST ($000) AUTH: 6,964,000 91211F 211-111 ACC278002 APPR: 2,066,050 SUPPLEMENTAL DATA: A. Estimated Execution Data: (1) Acquisition Strategy: Progressive Design-Build (PDB) (2) Design Data (a) Design, RFP, or PDB Challenge Statement 1 Started: MAR/2026 (b) Percent of Design Completed as of SEP 2025: 0% (c) Percent of Design Completed as of JAN 2026: 10% (d) Design, RFP Complete, or PD-B Phase I Award: SEP/2026 (e) Total Design Cost or Cost to Award PDB COnstruction 635,740 Phase I ($000): (f) Energy Study and/or Life Cycle Cost Analysis YES (g) Standard or Definitive Design Used? NO (3) Construction Data: (a) Contract PDB Construction Phase II Award: SEP/2027 DEC/2027 (b) Construction Start: (c) Construction Complete: DEC/2035 B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) Furniture, Fixtures, & Equipment C4IT Eqpmt & Systems (includes UPS) Security Related Equipment FUTURE YEAR FUTURE YEAR FUTURE YEAR 3080 3080 3080 34,000 52,000 56,164 C. Authorization and Appropriation Summary: FY2027 BUDGET REQUEST FUTURE REQUEST Total DD FORM 1391C, JUL 1999 Authorization $(000) 6,964,000 0 6,964,000 Auth of Approp $(000) 2,066,050 4,897,950 PREVIOUS EDITION IS OBSOLETE Appropriation $(000) 2,066,050 4,897,950 6,964,000 PAGE NO. 50 === page 59 === 1. COMPONENT FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE 3. INSTALLATION AND LOCATION 4. JOINT BASE ELMENDORF-RICHARDSON ALASKA 5. PROGRAM ELEMENT 6. 91211F CATEGORY CODE 2. DATE MARCH 2026 PROJECT TITLE: FIGHTER TOWN RECAPITALIZATION 7. PROJECT NUMBER 211-111 ACC278002 8. PROJECT COST ($000) AUTH:6,964,000 APPR:2,066,050 DESCRIPTION OF PRIMARY FACILITIES FTR - CONVENTIONAL MUNITIONS COMPLEX This facility is designed as a Conventional Munitions Maintenance Shop to maintain, assemble, test, and repair munitions, featuring one secure and three non-secure explosives maintenance bays, administrative space, and support areas. FTR - PUBLIC TRAFFIC ROUTE REALIGNMENT This effort realigns an existing public road to route traffic away from the airfield and munitions area, featuring approximately 4 miles of a multi-lane road and new non-signalized intersections designed to improve traffic flow. FTR - INFRASTRUCTURE & UTILITIES This effort provides essential infrastructure and utilities for a new development, including a new primary unit electric substation, a new airfield lighting vault, and a petroleum pumphouse with fuel storage tanks. FTR - FLIGHT SIMULATOR This facility provides a synthetic combat environment for high-end flight training, featuring 12 simulator bays with associated briefing rooms, support equipment areas, and staff offices. FTR – PGM Relocation This facility provides a Precision Guided Munitions (PGM) maintenance shop for inspecting, testing, and assembling tactical missiles and guided weapons, including six maintenance work bays, three Above Ground Magazines (AGMs), and three Earth Covered Magazines (ECMs). FTR - DORMITORY This facility provides a dormitory to house 320 unaccompanied enlisted airmen, addressing the existing on-base housing deficit. FTR – ADAL Field Training Detachment (FTD) This facility provides an addition and small renovation to the existing Field Training Detachment (FTD) facility, creating maintenance training space with classrooms, interactive workstations, and mock-ups. 51 === page 60 === 1. COMPONENT FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE 3. INSTALLATION AND LOCATION 4. JOINT BASE ELMENDORF-RICHARDSON ALASKA 5. PROGRAM ELEMENT 91211F 6. CATEGORY CODE 211-111 2. DATE MARCH 2026 PROJECT TITLE: FIGHTER TOWN RECAPITALIZATION 7. PROJECT NUMBER ACC278002 8. PROJECT COST ($000) AUTH:6,964,000 APPR:2,066,050 FTR - OPERATIONS and GENERATION HANGAR This facility combines a six-bay maintenance hangar with squadron operations and fighter generation squadron spaces, designed for both scheduled and unscheduled aircraft maintenance for an operational squadron. FTR - SQUADRON 1-1 FLOWTHROUGH HANGARS This facility provides two 9-bay flowthrough hangars designed to protect aircraft and meet generation rates for an operational squadron. FTR - SQUADRON 1-1 AIRFIELD PAVEMENTS This facility provides an aircraft parking apron and associated taxiways for an operational squadron, encompassing over 100,000 SM of aircraft parking apron space in addition to connecting taxiways and paved shoulders. FTR - FUEL CELL MAINTENANCE This facility provides a 2-bay Fuel Cell maintenance hangar with associated shop space for fuel system maintenance, including systems for ventilation, fume sensing, and fire extinguishing. FTR - LOW OBSERVABLE AIRCRAFT STRUCTURAL MAINTENANCE This facility includes a 2-bay Low Observable maintenance hangar for aircraft paint stripping and repainting, along with shop space for aircraft structural maintenance and nondestructive inspection (NDI). FTR - SQUADRON 1-2 OPERATIONS & GENERATION HANGAR This facility provides a combined six-bay maintenance hangar with squadron operations and fighter generation squadron spaces to support an operational squadron with scheduled and unscheduled maintenance. FTR - SQUADRON 1-2 FLOWTHROUGH HANGARS This facility consists of two 9-bay flowthrough hangars to provide weather protection for aircraft and support the generation rates of an operational squadron. FTR - SQUADRON 1-2 AIRFIELD PAVEMENTS This facility provides essential airfield pavements for an operational squadron, including aircraft parking apron and its associated taxiways. 52 === page 61 === 1. COMPONENT FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE 3. INSTALLATION AND LOCATION 4. JOINT BASE ELMENDORF-RICHARDSON ALASKA 5. PROGRAM ELEMENT 91211F 6. CATEGORY CODE 211-111 2. DATE MARCH 2026 PROJECT TITLE: FIGHTER TOWN RECAPITALIZATION 7. PROJECT NUMBER ACC278002 8. PROJECT COST ($000) AUTH:6,964,000 APPR:2,066,050 FTR – AGE Mx Shop This facility provides a shop for Aerospace Ground Equipment (AGE) maintenance, including maintenance stalls and a wash rack, along with covered and open storage areas and a fuel fillstand. FTR - AFE/SERE/AERO PHYSIOLOGY This facility provides space for the storage, care, and issue of Aircrew Flight Equipment (AFE) and Survival Evasion Resistance and Escape (SERE) equipment, also including support and training areas for Aero Physiology. FTR - AFE PARACHUTE SHOP This Aircrew Flight Equipment (AFE) shop is designed for parachute maintenance, repair, and storage, featuring space for inspection, packing, washing, and drying. FTR - FIRE STATION This facility provides a satellite 3-bay fire station to provide emergency response for aircraft rescue, structural firefighting, and medical services to the recapitalization area. FTR - SATELLITE DINING FACILITY This facility provides a small satellite dining facility to serve personnel in the recapitalization area, featuring areas for food storage, preparation, serving, and dining. FTR - AIRCRAFT PARTS STORE This aircraft parts store is a warehouse facility designed for the storage of materials and mobility kits for the supported aircraft, including spaces for receiving, issue, and inspection activities. FTR - AME & ENGINE STORAGE This facility provides storage space for Alternate Mission Equipment (AME) and spare aircraft engines to support the recapitalization area. FTR - EGRESS SHOP This facility provides an Egress Shop for the maintenance and storage of offequipment egress components for fighter aircraft, including shop space, tool storage, and administrative areas. 53 === page 62 === 1. COMPONENT FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE 3. INSTALLATION AND LOCATION 4. JOINT BASE ELMENDORF-RICHARDSON ALASKA 5. PROGRAM ELEMENT 91211F 6. CATEGORY CODE 2. DATE MARCH 2026 PROJECT TITLE: FIGHTER TOWN RECAPITALIZATION 7. PROJECT NUMBER 211-111 ACC278002 8. PROJECT COST ($000) AUTH:6,964,000 APPR:2,066,050 FTR - WEAPONS LOAD TRAINER This facility is designed to provide training space for weapons loading crews, featuring an aircraft hangar bay for practical training and classrooms for academic instruction. FTR - TRIM PAD This facility provides an airfield pad for power check testing of aircraft engines to support fighter aircraft, including supporting site improvements, utilities, and lighting. FTR - COMBAT ARMS TRAINING & MAINTENANCE This facility provides a small arms range and training space for military personnel, including areas for classroom instruction, weapons maintenance, and a secure weapons and ammunition storage vault. 54 === page 63 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA MAR 2026 AIR FORCE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE JOINT BASE ELMENDORF-RICHARDSON ALASKA JOINT INTEGRATED TEST AND TRAINING CTR,INC 3 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211F 171-212 FXSB263002 8. PROJECT COST ($000) AUTH: 0 APPR: 42,000 9. COST ESTIMATES ITEM UM QUANTITY UNIT COST COST($000) PRIMARY FACILITIES 238,722 FLIGHT SIMULATOR TRAINING (171-212) SM 13,970 15,704 (219,383) ICD 705 PREMIUM LS (18,339) CYBERSECURITY OF FACILITY-RELATED CONTROL SYS LS (1,000) SUPPORTING FACILITIES 72,891 UTILITIES LS (14,764) SITE PREPARATION LS (2,026) ROADS, SIDEWALKS, AND PARKING LS (5,746) SITE IMPROVEMENTS LS (2,906) COMMUNICATIONS LS (3,346) GENERATOR KW 8,250 2,112 (17,422) ELECTRICAL SUBSTATION LS (25,681) PRIVATIZED UTILITIES SERVICE AND CONNECTION LS (1,000) SUBTOTAL 311,613 CONTINGENCY (5.00%) 15,581 TOTAL CONTRACT COST 327,194 SUPERVISION, INSPECTION AND OVERHEAD (7.30%) 23,885 POST CONSTRUCTION AWARD SERVICES 4,299 TOTAL REQUEST 355,378 TOTAL REQUEST (ROUNDED) 355,000 EQUIPMENT FROM OTHER APPROPRIATIONS (NON-ADD) (36,855) 10. DESCRIPTION OF PROPOSED CONSTRUCTION Construct a two-story flight simulator training facility with reinforced concrete foundations, structural steel frame, insulated steel panel and masonry walls, and membrane roof in a cold weather region. Functional areas containing simulator spaces, mission support spaces, secure and non-secure operational space, nonsecure administrative space, building entrance with security check-in and general support spaces for handling of secure information. Provide controlled space that meets Intelligence Community Directive 705 standards. The primary facility consists of structure and foundations; exterior envelope; elevator conveyance systems; electrical/mechanical service and distribution components and systems; fire alarm and suppression systems; information technology, communications, cyber security and security systems infrastructure. Interior space includes rigid grid access floor systems, interior partitions and ceilings, power, lighting, plumbing, environmental control and communications and finishes. Heating, ventilation, and air conditioning systems will be self-contained systems. Provide a building management system compatible with the central system currently used by Joint Base Elmendorf-Richardson. The primary facility includes comprehensive interior design. Utilities include water, wastewater, stormwater, natural gas, communication, and electrical (may include new substation duct banks, conductors and pedestals if required in final design). Site infrastructure includes primary electrical service to the site, water, sewer, gas, and telecommunications pathways. Install dieselpowered backup generators with day tanks and secondary containment. Utilities will be installed underground and overhead. Connect to privatized natural gas utility. Air condition of 400 Tons will be provided, and process cooling of 1,000 Tons will DD FORM 1391, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 55 === page 64 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA MAR 2026 AIR FORCE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE JOINT BASE ELMENDORF-RICHARDSON ALASKA JOINT INTEGRATED TEST AND TRAINING CTR,INC 3 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211F 171-212 FXSB263002 8. PROJECT COST ($000) AUTH: 0 APPR: 42,000 be provided. Facilities will be designed as permanent construction in accordance with Department of War Unified Facilities Criteria 1-200-01, General Building requirements. This project will comply with Department of War antiterrorism/force protection requirements per Unified Facilities Criteria 4-010-01. Air Conditioning: 1,400 Tons 11. REQ: 13,970 SM ADQT: 0 SUBSTD: 0 PROJECT: Joint Integrated Test and Training Center REQUIREMENT: The Center's design will facilitate warfighters to engage in face-to-face mission planning, briefing, execution supervision, and debriefing at the highest tactical and operational levels, commonly seen at the Air Force Weapons School, Exercise Red Flag, and Exercise Neptune large force exercise and integration events. Depending on the maturation of Live, Virtual, Constructive technology, this facility should enable integration of virtual/constructive tracks on the Joint Pacific Alaska Range Complex when desiring to increase threat density through constructive air and surface entities, as well as integrating man-in-the-loop synthetic-inject-to-live simulator cockpits into the live-fly environment. Additionally, while the current technology readiness of distributed synthetic training networks is inadequate for high-fidelity test and training, the center's design will incorporate and enable possible future distributed operations (e.g., secure video teleconferences). This is not a tenant or supported service requirement. CURRENT SITUATION: The United States Joint Forces do not have a government-owned facility/capability to allow warfighters to exercise high-end, test-level, integrated training and tactics development in a virtual environment. The live-fly environment currently does not permit the highest levels of joint integration due to inaccurate replication (i.e., real-life all-domain adversaries), airspace constraints, and operational security concerns. As stated by both Commander, Pacific Air Forces, and A3, Headquarters Air Force, the only place to achieve adequate replication in an unconstrained synthetic environment, while not revealing fragile blue capabilities to the enemy, is in the Joint Integrated Test and Training Center. IMPACT IF NOT PROVIDED: There will be no single-site location for the entire "Night-One" joint and combined forces to accurately train for the peer fight while adhering to operational security principles, protecting fragile capabilities, and observing airspace restrictions. The Joint Force will not have a single-site government owned facility and will continue to be beholden to high-cost proprietary contractor facilities that do not fully meet mission needs. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 56 === page 65 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA MAR 2026 AIR FORCE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE JOINT BASE ELMENDORF-RICHARDSON ALASKA JOINT INTEGRATED TEST AND TRAINING CTR,INC 3 5. PROGRAM ELEMENT 7. PROJECT NUMBER 6. CATEGORY CODE 8. PROJECT COST ($000) 91211F 171-212 FXSB263002 AUTH: 0 APPR: 42,000 ADDITIONAL: This project meets applicable criteria/scope specified in Department of the Air Force Manual 32-1084, Standard Facility Requirements. This design shall conform to criteria established in the Air Force Corporate Facilities Standards, the Installation Facilities Standards, but will not employ a standard facility design because there is no Air Force standard facility design for this project, and there is no applicable standard design from Air Force Civil Engineer Center. All reasonable alternatives were considered during the development of this project to include status quo and new construction. New construction is the only viable option to meet this requirement. A formal economic analysis is in progress. Sustainable principles, to include life-cycle cost- effective practices, will be integrated into the design, development, and construction of the project in accordance with Unified Facility Criteria 1-200-02, High Performance and Sustainable Building Requirements. This includes preparation of a life-cycle cost analysis for energy consuming systems, renewable energy generating systems, whenever life-cycle cost effective is selected as the reason any requirement of Unified Facility Criteria 1-200-02 is partially compliant or not applicable. This project does not fall within or partly within the 100-year flood plain. Facility is sited in accordance with the Installation Development Plan and is within a compatible land use area. The construction growth offset for this requirement is 150,372 square feet. The cost estimate for this project varies from the DoW Facilities Pricing Guide due to details identified during the Planning Charrette, the design process, and the application of parametric cost estimating tools. The Pricing Guide does not provide pricing for this type of facility and does address the weather-related requirements of construction in Alaska. 673rd Air Base Wing, Base Civil Engineer: (907) 552-3007. Flight Simulator Training: 13,970 square meters = 150,372 square feet. JOINT USE CERTIFICATION: This facility can be used by other components on an "as available" basis; however, the scope of the project is based on Air Force requirements. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 57 === page 66 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA MAR 2026 AIR FORCE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE JOINT BASE ELMENDORF-RICHARDSON ALASKA JOINT INTEGRATED TEST AND TRAINING CTR,INC 3 5. PROGRAM ELEMENT 7. PROJECT NUMBER 12. 6. CATEGORY CODE 8. PROJECT COST ($000) 91211F 171-212 FXSB263002 AUTH: 0 SUPPLEMENTAL DATA: A. Estimated Execution Data: (1) Acquisition Strategy: Design-Bid-Build (2) Design Data (a) Design or Request for Proposal(RFP) Started: (b) Percent of Design Completed as of SEP 2025: (c) Percent of Design Completed as of JAN 2026: (d) Design or RFP Complete: (e) Total Design Cost ($000): (f) Energy Study and/or Life Cycle Cost Analysis (g) Standard or Definitive Design Used? (3) Construction Data: (a) Contract Award: (b) Construction Start: (c) Construction Complete: APPR: 42,000 MAY/2023 100% 100% OCT/2024 22,410 YES NO JUL/2025 NOV/2025 NOV/2029 B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) Furniture & Equipment Construction Security Surveill 3080 3080 2027 2025 26,213 10,642 Auth of Approp $(000) 126,000 152,000 42,000 35,000 355,000 Appropriation $(000) 126,000 152,000 42,000 35,000 355,000 C. Authorization and Appropriation Summary: FY 2025 Enacted FY 2026 Enacted FY 2027 Budget Request Future Request Total DD FORM 1391C, JUL 1999 Authorization $(000) 355,000 0 0 0 355,000 PREVIOUS EDITION IS OBSOLETE PAGE NO. 58 === page 67 === Spend Plan Project Title: Installation: Program Year Project # CAO: Joint Integrated Test and Training Center, Inc 355,000 i~ I 7.3% 5.0% ~ Schedule Award Complete POP Months - ~ 312,631 25,915 576 16,454 366 I I 29-Jul-25 ~ 1-Nov-29 1556 51.0 Fund ,, 1-Oct-24 1-Jan-25 1-Oct-25 1-Oct-26 1-Oct-27 I J 1-Nov-29 29-Jul-25 1-Feb-26 1-Feb-27 1-Feb-28 Oct-24 Jan-25 Oct-25 Oct-26 Oct-27 1-Nov-29 Nov-29 1 Enter the Project Title, Location, and Project number Enter the Date this WIP Curve is being updated Enter the Project PA Enter the SIOH required by the agent (6.5% for USACE FY24 and beyond) Enter the contingency percentage plus other amounts withheld by the Agent Enter the projected project Award Date ( usually 1 Apr of the Execution FY) Enter the Project Complete Date (Usually Award plus ~1000 days, use the 1st of a month) Enter the Chart Begin Date ( first day of the Program Year: 1-Oct-XX) ( Use "Short Date" format.) 9 Enter the Dates anticipate to receive each increment of funding (usually January of the Program year, and Oct for subsequent increments) Enter the Dates anticipated to Award the contract ( usually 1 Apr of the Program year and obligate increments (usually 1 Oct for increments after initial award.) Enter the Value of each increment (If the project is less than $250M enter the PA as 1st Increment) 11 Fund mmm-yr Obligate 1 2 3 4 5 6 7 8 10 ~ I Chart Begin 1st Increment 2nd Increment 3rd Increment 4th Increment 5th Increment End Total Instructions and Notes This spreadsheet is designed to help the user develop a WIP Curve for inclusion with a project 1391. The user only needs to know the project cost and schedule. Edit The Green Fields ONLY JB Elmendorf-Richardson, Alaska 2025 FXSB263002 Financials PA ($000) Initial Contract SIOH SIOH / Month Other (Contingency) Other / Month 26-Aug-25 Obligate mmm-yr Months Jul-25 Feb-26 Feb-27 Feb-28 Nov-29 0 7 12 12 21 0 0 52 Increment H 126,000 152,000 42,000 35,000 355,000 Obligate 110,962 133,859 36,987 30,823 312,631 SIOH 9,198 11,096 3,066 2,555 25,915 Other 5,840 7,045 1,947 1,622 16,454 59 === page 68 === Spend Plan CAO: 26-Aug-25 Joint Integrated Test and Training Center, Inc Project Title: Installation: Program Year Project # Notes JB Elmendorf-Richardson, Alaska 2025 FXSB263002 Assumes initial appropriation is enacted by Note 1: Congress Jan FY 2025. Assumes funds are available for obligation by 31 January of the execution year and by 31 Note 2: October for subsequent years. All Cost in thousands Chart Begin Oct-24 Month Oct-24 Nov-24 Dec-24 Jan-25 Feb-25 Mar-25 Apr-25 May-25 Jun-25 Jul-25 Aug-25 Sep-25 Oct-25 Nov-25 Dec-25 Jan-26 Feb-26 Mar-26 Apr-26 May-26 Jun-26 Jul-26 Aug-26 Sep-26 Oct-26 Nov-26 Dec-26 Jan-27 Feb-27 Mar-27 Apr-27 May-27 Jun-27 Jul-27 Aug-27 Sep-27 Oct-27 Nov-27 Dec-27 Jan-28 Feb-28 Mar-28 Apr-28 May-28 Jun-28 Jul-28 Aug-28 Sep-28 Oct-28 Nov-28 Dec-28 Jan-29 Feb-29 Mar-29 Apr-29 May-29 Jun-29 Jul-29 Aug-29 Sep-29 Oct-29 Nov-29 FUNDING (note 1) Enacted 126,000 152,000 42,000 35,000 - OBLIGATION (note 2-3) Cumulative Obligated Cumulative 126,000 126,000 126,000 126,000 126,000 126,000 126,000 126,000 126,000 278,000 278,000 278,000 278,000 278,000 278,000 278,000 278,000 278,000 278,000 278,000 278,000 320,000 320,000 320,000 320,000 320,000 320,000 320,000 320,000 320,000 320,000 320,000 320,000 355,000 355,000 355,000 355,000 355,000 355,000 355,000 355,000 355,000 355,000 355,000 355,000 355,000 355,000 355,000 355,000 355,000 355,000 355,000 355,000 355,000 355,000 355,000 355,000 355,000 355,000 110,962 942 942 942 942 942 942 134,800 942 942 942 942 942 942 942 942 942 942 942 37,929 942 942 942 942 942 942 942 942 942 942 942 31,764 942 942 942 942 942 942 942 942 942 942 942 942 942 942 - 110,962 111,903 112,845 113,787 114,728 115,670 116,611 251,411 252,353 253,295 254,236 255,178 256,119 257,061 258,002 258,944 259,885 260,827 261,768 299,697 300,639 301,580 302,522 303,463 304,405 305,346 306,288 307,230 308,171 309,113 310,054 341,818 342,760 343,702 344,643 345,585 346,526 347,468 348,409 349,351 350,292 351,234 352,175 353,117 354,058 355,000 355,000 355,000 355,000 355,000 355,000 355,000 355,000 OUTLAYS (note 4-5) Monthly Cumulative 69,206 4,000 4,000 4,400 4,840 5,324 5,856 6,442 7,086 8,086 8,586 9,086 9,586 10,086 10,586 10,586 10,586 11,586 12,586 12,586 12,586 12,586 11,327 10,194 9,175 8,258 7,432 6,689 6,020 5,418 4,876 4,388 3,949 3,554 3,199 2,879 2,191 1,972 1,775 1,598 1,438 1,294 1,165 1,049 944 850 765 689 620 558 462 69,206 73,206 77,206 81,606 86,446 91,770 97,626 104,068 111,154 119,240 127,826 136,912 146,498 156,584 167,170 177,756 188,342 199,928 212,514 225,100 237,686 250,272 261,599 271,793 280,968 289,226 296,658 303,347 309,367 314,785 319,661 324,049 327,998 331,552 334,751 337,630 339,821 341,793 343,568 345,166 346,604 347,898 349,063 350,112 351,056 351,906 352,671 353,360 353,980 354,538 355,000 Assumes ALL project funds (contract, SIOH, contingency, etc) are obligated NLT 6 months Note 3: prior to project end Assumes contract award in July 2025 and contract completion November 2029; Note 4 duration 51 months. Assumes Agent will retain 1% of project Note 5 obligations for a final payment 60 === page 69 === Joint Integrated Test and Training Center, Inc, JB Elmendorf-Richardson, Alaska - I $350,000 I ' $250,000 -- ,--, ~ I $200,000 I I I $150,000 -- I -' • I I -- -- ,' ,, , - - - - - Funding - Obligation , ;, - - Outlays I I I I I I I 1 1 I I I I I I I I ' I I I T I I I I I I 1 I I I I I I I I I I I I I I I 1 I I I I I I T ,---, Oct-29 I Jul-29 1 Oct-28 I Jul-28 I Apr-28 I Oct-27 I Jul-27 T Apr-27 I Jan-27 I Oct-26 I Jul-26 f Jul-25 I Apr-25 I Jan-25 I Apr-26 I J I Jan-26 I I - Oct-25 $50,000 I Apr-29 $100,000 , , _, , , , ,, ~ Jan-29 I , , , , , , I , , , ~ , I -- -- --- - - I Oct-24 Dollars in (000) $300,000 - -- , - - $0 ---__ };, -r , , -- -- tr Jan-28 $400,000 61 === page 70 === 1. COMPONENT 2. DATE {YYYYMMDD} 2027 FY AIR FORCE MILITARY CONSTRUCTION PROGRAM 3. INSTALLATION AND LOCATION 4. COMMAND DAVIS-MONTHAN AIR FORCE BASE, ARIZONA AIR COMBAT COMMAND 30-SEP-24 b. END FY 5. AREA CONTRUCTION COST INDEX 0.89 (1) PERMANENT (2) STUDENTS (3) SUPPORTED OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN 6. PERSONNEL a. AS OF 20260326 (4) TOTAL 1,068 6,144 1,679 58 78 0 29 1,248 704 11,008 1,064 6,339 1,665 58 78 0 29 373 704 10,310 7. INVENTORY DATA ($000} 41,264 3,688,374.00 174,000.00 0.00 0.00 0.00 0.00 3,862,374.00 a. TOTAL ACREAGE b. INVENTORY TOTAL AS OF 30-SEP-25 c. AUTHORIZATION NOT VET IN INVENTORY d. AUTHORIZATION REQUESTED IN THIS PROGRAM e. AUTHORIZATION INCLUDED IN FOLLOWING PROGRAM f. PLANNED IN NEXT THREE PROGRAM YEARS g. REMAINING DEFICIENCY h. GRAND TOTAL 8. PROJECTS REQUESTED IN THIS PROGRAM a. CATEGORY (2) PROJECT TITLE (1) CODE 211-111 (3) SCOPE Hangar/Aircraft Maintenance Unit, Inc 4,442 SM b. COST ($000) 15,000 c. DESIGN STATUS (1) START (2) COMPLETE 10/24 10/25 9. FUTURE PROJECTS None 10. MISSION OR MAJOR FUNCTIONS Davis-Monthan currently hosts Headquarters 12th Air Force; a wing with two fighter training squadrons responsible for training all A-10 aircrews; a combat-coded A-10 fighter squadron, two EC-130 electronic combat squadrons, Combat Search and Rescue, a tactical air control wing; an Air Force Reserve HH-60 rescue squadron; and Air Force Material Command’s Aerospace Maintenance and Regeneration Center. Provides major support to the Tucson Sector Headquarters, Customs and Border Protection. 11. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES N/A DD FORM 1390, JUL 1999 PREVIOUS EDITION IS OBSOLETE. 62 Adobe Professional 8.0 === page 71 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MAR 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE DAVIS-MONTHAN AIR FORCE BASE ARIZONA HANGAR/AIRCRAFT MAINTENANCE UNIT, INC 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211F 211-111 FBNV263001 8. PROJECT COST ($000) AUTH: 0 APPR: 15,000 9. COST ESTIMATES ITEM UM QUANTITY UNIT COST COST($000) PRIMARY FACILITIES 88,579 HANGAR MAINTENANCE (211-111) SM 4,442 9,100 (40,422) SHOP, AIRCRAFT MAINTENANCE, ORGANIZATIONAL SM 5,037 7,400 (37,274) (211-154) FLEET SERVICE TERMINAL (141-785) SM 209 7,400 (1,547) APRON (113-321) SM 12,000 570 (6,840) OVERHEAD PROTECTION (145-921) SM 402 1,500 (603) CYBERSECURITY OF FACILITY-RELATED CONTROL SYS LS (1,893) SUPPORTING FACILITIES 23,115 UTILITIES LS (2,800) SITE PREPARATION LS (1,680) ROADS, SIDEWALKS, AND PARKING LS (2,500) SITE IMPROVEMENTS LS (5,700) COMMUNICATIONS LS (260) DEMOLITION SM (2,650) 4,732 GENERATOR KW (575) 500 PASSIVE FORCE PROTECTION MEASURES LS (400) ARIZONA TRANSACTION PRIVILEGE TAX LS (6,550) SUBTOTAL 111,693 CONTINGENCY (5.00%) 5,585 TOTAL CONTRACT COST 117,278 SUPERVISION, INSPECTION AND OVERHEAD (6.50%) 7,623 TOTAL REQUEST 124,901 TOTAL REQUEST (ROUNDED) 125,000 EQUIPMENT FROM OTHER APPROPRIATIONS (NON-ADD) (2,650) 10. DESCRIPTION OF PROPOSED CONSTRUCTION Construct a five-bay aircraft hangar with concrete foundation and floor slab, steel high bay, standing seam metal roof, cranes, motorized hangar doors and tracks, fire alarm and suppression system to include water storage tanks, and all necessary support. The facility will include all required spaces for an aircraft maintenance unit, including administrative areas, Mission Axillary Tank Systems (MATS), tool room, supply/bench stock area, storage, shop areas, emergency shower and eyewash stations, locker areas with showers, break area, circulation and administrative support spaces. Facility will also include a fleet service terminal for the transient alert function, which will be displaced by the construction. Project also includes overhead covered storage space for mobility barn and maintenance squadron, and airfield pavements to provide hangar access for aircraft. Airfield pavement work will include clearing, excavation, placement of base material and concrete pavement, asphalt shoulders, airfield markings, storm water retention, storm drainage, lighting and all other necessary support and be integrated into new airfield apron. This facility will include a 500kW generator to support the maintenance operations center which is authorized by Air Force Manual 32-1062. The project will demolish Building 4809 (4,523 Square Meter) and Building 4826 (209 Square Meter). The project will include all supporting facilities such as utilities, communications, other pavements such as parking and DD FORM 1391, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 63 === page 72 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MAR 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE DAVIS-MONTHAN AIR FORCE BASE ARIZONA HANGAR/AIRCRAFT MAINTENANCE UNIT, INC 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211F 211-111 FBNV263001 8. PROJECT COST ($000) AUTH: 0 APPR: 15,000 sidewalks, passive force protection measures, and site improvements necessary to provide a complete and useable facility. Facilities will be designed as permanent construction in accordance with Department of War Unified Facilities Criteria 1-200-01. This project will comply with Department of War antiterrorism/force protection requirements per Unified Facilities Criteria 4-010-01. Air Conditioning: 120 Tons 11. REQ: 4,442 SM ADQT: 0 SUBSTD: 4,732 SM PROJECT: Construct 5-Bay Hangar/Aircraft Maintenance Unit REQUIREMENT: Adequate facility properly sized and configured for a five-bay aircraft hangar, an Aircraft Maintenance Unit to support CV-22 aircraft and maintenance unit, and fleet service terminal for transient alert operations. Hangar space is authorized to conduct recurring maintenance and inspection of the fleet as well as provide protection from the elements. Development of the special operations mobility capacity supports primary mission of insertion, extraction, and re-supply of unconventional warfare forces and equipment into hostile or enemy-controlled territory using airland or airdrop procedures. Fleet service terminal space is required for transient alert to replace the existing facility, which sits within the intended footprint of the new facility. This is an Air Force Special Operations Command tenant requirement. CURRENT SITUATION: Davis-Monthan AFB will be adding a new Air Force Special Operations Command Wing as the A-10 units retire. No facilities currently exist at Davis-Monthan that can accommodate the new CV-22 maintenance operations requirement. Additionally, there is little flight line space available to house an additional hangar. Therefore, one of the existing A-10 hangars (Building 4809) and the transient alert facility (Building 4826) must be demolished in order to provide a clear site for the new facility. Operational space to accommodate the displaced transient alert function will be included within the new facility. Other remaining hangars and back shops will be repurposed for existing HH-60s as well as incoming EC-37Bs and OA-1Ks. IMPACT IF NOT PROVIDED: Without this facility, the unit will be delayed in bedding down. Aircraft will remain at their currently assigned locations at Cannon AFB. This hinders the standup of a complete Special Operations Wing that can rapidly plan and execute specialized and contingency operations in support of national priorities. In the absence of a full complement of aircraft, the unit will experience a loss of synergy without the ability to fly and train together. In particular, it creates a deficit in the primary weapon system providing specialized aerospace mobility to complement the Special Operations Wing's other core missions of close air support, intelligence, surveillance and reconnaissance operations, and agile combat DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 64 === page 73 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MAR 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE DAVIS-MONTHAN AIR FORCE BASE ARIZONA HANGAR/AIRCRAFT MAINTENANCE UNIT, INC 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211F 211-111 FBNV263001 8. PROJECT COST ($000) AUTH: 0 APPR: 15,000 support. ADDITIONAL: This project meets the criteria/scope in Department of the Air Force Manual 321084, Standard Facility Requirements. This design shall conform to criteria established in the Air Force Corporate Facilities Standards, the Installation Facilities Standards, but will not employ a standard facility design because there is no Air Force standard facility design for this project, and there is no applicable standard design from United States Army Corps of Engineers. All reasonable alternatives were considered during the development of this project to include status quo, add/alter, and new construction. New construction is the only viable option to meet this requirement. A formal economic analysis waiver has been approved. Sustainable principles, to include life-cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with Unified Facility Criteria 1-200-02. This includes preparation of a life-cycle cost analysis for energy consuming systems, renewable energy generating systems, whenever life-cycle cost effective is selected as the reason any requirement of Unified Facility Criteria 1-200-02 is partially compliant or not applicable. This project does not fall within or partly within the 100-year flood plain. Facility is sited in accordance with the Installation Development Plan and is within a compatible land use area. The construction growth offset for this requirement is 53,346 Square Feet. Supporting facilities cost exceeds 25% of the primary facilities cost due to the additional cost of state taxes required by the State of Arizona. 355 Wing Base Civil Engineer: (520) 228-3401 Hangar Maintenance: 4,442 SM = 47,813 Square Feet; Shop, Aircraft Maintenance, Organizational: 5,037 SM = 54,218 Square Feet; Fleet Service Terminal: 209 SM = 2,250 Square Feet; Overhead Protection: 402 SM = 4,327 Square Feet; Demolition: 4,732 SM = 50,935 Square Feet. JOINT USE CERTIFICATION: This facility can be used by other components on an "as available" basis; however, the scope of the project is based on Air Force requirements. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 65 === page 74 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MAR 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE DAVIS-MONTHAN AIR FORCE BASE ARIZONA HANGAR/AIRCRAFT MAINTENANCE UNIT, INC 5. PROGRAM ELEMENT 7. PROJECT NUMBER 12. 6. CATEGORY CODE 8. PROJECT COST ($000) 91211F 211-111 FBNV263001 AUTH: 0 SUPPLEMENTAL DATA: A. Estimated Execution Data: (1) Acquisition Strategy: Design-Bid-Build (2) Design Data (a) Design or Request for Proposal(RFP) Started: (b) Percent of Design Completed as of SEP 2025: (c) Percent of Design Completed as of JAN 2026: (d) Design or RFP Complete: (e) Total Design Cost ($000): (f) Energy Study and/or Life Cycle Cost Analysis (g) Standard or Definitive Design Used? (3) Construction Data: (a) Contract Award: (b) Construction Start: (c) Construction Complete: APPR: 15,000 OCT/2024 35% 100% JAN/2026 11,250 YES NO SEP/2026 NOV/2026 AUG/2028 B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) Collateral Equipment C4I Equipment 3080 3080 2028 2028 2,200 450 Auth of Approp $(000) 110,000 15,000 Appropriation $(000) 110,000 15,000 125,000 C. Authorization and Appropriation Summary: FY 2026 ENACTED FY 2027 BUDGET REQUEST Total DD FORM 1391C, JUL 1999 Authorization $(000) 125,000 0 125,000 PREVIOUS EDITION IS OBSOLETE PAGE NO. 66 === page 75 === MILCON Work-in-Place (WIP) Curve – Automated Spend Plan Project Information Project Title Installation Program Year (FY) Project # HANGAR/AIRCRAFT MAINTENANCE UNIT, Inc Davis Monthan 2027 FBNV263001 Financial Inputs & Derived Amounts ($000) Programmed Amount (PA) SIOH Rate Contingency Rate SIOH Amount Contingency Amount Construction (PA less SIOH & Cont) Total Increments 125,000 6.5% 5.0% 8,125 6,250 110,625 3 Key Dates (Calculated) Begin Date (FY Start) Award Date (Assumed) Complete Date (Award + POP; set to 1st of month) Award Month (1st of month) Complete Month (1st of month) Period of Performance Oct 1, 2026 Sep 1, 2027 Aug 1, 2029 Sep 1, 2027 Aug 1, 2029 700 Funding & Obligation Increments ($000) Increment Amount ($000) Funding Date Jan 1, 2027 Oct 1, 2027 Increment 1 Increment 2 Increment 3 110,000 15,000 0 Total Funding 125,000 Check vs PA Obligation Date Apr 1, 2027 Jan 1, 2028 0 Outlay Curve Controls (Adjust if needed) Outlay Curve Steepness (k) Normalized Logistic Base (t=0) Normalized Logistic Top (t=1) Total Outlay ($000) (assumed = PA) 8.0 0.01798621 0.98201379 125,000 67 === page 76 === Monthly Cash Flow (Automated from Spend Plan) Month Oct 2026 Nov 2026 Dec 2026 Jan 2027 Feb 2027 Mar 2027 Apr 2027 May 2027 Jun 2027 Jul 2027 Aug 2027 Sep 2027 Oct 2027 Nov 2027 Dec 2027 Jan 2028 Feb 2028 Mar 2028 Apr 2028 May 2028 Jun 2028 Jul 2028 Aug 2028 Sep 2028 Oct 2028 Nov 2028 Dec 2028 Jan 2029 Feb 2029 Mar 2029 Apr 2029 May 2029 TOTAL Funding ($000) 0 0 0 110,000 0 0 0 0 0 0 0 0 15,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 125,000 Obligation ($000) 0 0 0 0 0 0 110,000 0 0 0 0 0 0 0 0 15,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 125,000 Outlay ($000) 0 0 0 0 0 0 0 0 0 0 0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Cumulative Funding Cumulative Obligation Cumulative Outlay 0 0 0 0 0 0 0 0 0 110,000 0 0 110,000 0 0 110,000 0 0 110,000 110,000 0 110,000 110,000 0 110,000 110,000 0 110,000 110,000 0 110,000 110,000 0 110,000 110,000 #N/A 125,000 110,000 #N/A 125,000 110,000 #N/A 125,000 110,000 #N/A 125,000 125,000 #N/A 125,000 125,000 #N/A 125,000 125,000 #N/A 125,000 125,000 #N/A 125,000 125,000 #N/A 125,000 125,000 #N/A 125,000 125,000 #N/A 125,000 125,000 #N/A 125,000 125,000 #N/A 125,000 125,000 #N/A 125,000 125,000 #N/A 125,000 125,000 #N/A 125,000 125,000 #N/A 125,000 125,000 #N/A 125,000 125,000 #N/A 125,000 125,000 #N/A 125,000 125,000 #N/A #N/A 68 === page 77 === Jan 2027 Feb 2029 May 2029 Apr 2029 Mar 2029 40,000 Jan 2029 60,000 Dec 2028 Nov 2028 Oct 2028 Sep 2028 Aug 2028 Jul 2028 Jun 2028 May 2028 Apr 2028 Mar 2028 Feb 2028 Jan 2028 Dec 2027 Nov 2027 Oct 2027 Sep 2027 Aug 2027 Jul 2027 Jun 2027 I May 2027 120,000 Apr 2027 0 Mar 2027 100,000 Feb 2027 Project: Program Year: Dec 2026 Nov 2026 Oct 2026 Cumulative WIP Curve HANGAR/AIRCRAFT MAINTENANCE UNIT, Inc 2027 140,000 Cumulative Funding vs Obligation vs Outlay , 80,000 Cumulative Funding Cumulative Obligation Cumulative Outlay 20,000 j 69 === page 78 === 1. COMPONENT 2. DATE (YYYYMMDD) FY 2027 AIR FORCE MILITARY CONSTRUCTION PROGRAM 3. INSTALLATION AND LOCATION 20260326 4. COMMAND LITTLE ROCK AIR FORCE BASE, ARKANSAS 5. AREA CONTRUCTION COST INDEX AIR MOBILITY COMMAND 0.83 6. PERSONNEL (1) PERMANENT (2) STUDENTS (3) SUPPORTED OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN (4) TOTAL a. AS OF 30-Sep-25 397 2,892 579 325 236 9.00 280 1,248 241 6,207 b. END FY 30-Sep-30 397 2,892 582 317 252 0 274 1,243 242 6,199 7. INVENTORY DATA ($000) 6,721 3,770,232.00 0.00 27,000.00 0.00 0.00 69,000.00 3,866,232.00 a. TOTAL ACREAGE b. INVENTORY TOTAL AS OF 30-Sep-25 c. AUTHORIZATION NOT YET IN INVENTORY d. AUTHORIZATION REQUESTED IN THIS PROGRAM e. AUTHORIZATION INCLUDED IN FOLLOWING PROGRAM f. PLANNED IN NEXT THREE PROGRAM YEARS g. REMAINING DEFICIENCY h. GRAND TOTAL 8. PROJECTS REQUESTED IN THIS PROGRAM a. CATEGORY (1) CODE 740-884 (2) PROJECT TITLE Child Development Center (3) SCOPE c. DESIGN STATUS b. COST ($000) 3,310 SM 27,000 (1) START (2) COMPLETE 04/25 12/26 9. FUTURE PROJECTS None. 10. MISSION OR MAJOR FUNCTIONS Little Rock Air Force Base is home to two airlift wings with six C-130 squadrons conducting operations and training. The installation is the sole Department of War C-130 training base, Air National Guard C-130 airlift wing, Air Combat Command weapons squadron, and Air Force Reserve Command aerial port squadron. Air Education and Training Command's 714th Training Squadron is the focal point for all C-130 formal training functions and manages 1,200 C-130H/J students annually. 11. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES None. DD FORM 1390, JUL 1999 PREVIOUS EDITION IS OBSOLETE. 70 === page 79 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA MARCH 2026 AIR FORCE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE LITTLE ROCK AIR FORCE BASE ARKANSAS CHILD DEVELOPMENT CENTER 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211F 740-884 8. PROJECT COST ($000) NKAK233000 27,000 9. COST ESTIMATES ITEM UM QUANTITY UNIT COST COST($000) PRIMARY FACILITIES 20,093 CHILD DEVELOPMENT CENTER (740-884) SM 3,310 5,995 (19,843) CYBERSECURITY OF FACILITY-RELATED CONTROL SYS LS (250) SUPPORTING FACILITIES 3,827 UTILITIES LS (51) SITE PREPARATION LS (323) ROADS, SIDEWALKS, AND PARKING LS (244) SITE IMPROVEMENTS LS (464) DEMOLITION SM 2,570 951 (2,445) PRIVATIZED UTILITIES SERVICE AND CONNECTION LS (300) SUBTOTAL 23,920 1,196 CONTINGENCY (5.00%) TOTAL CONTRACT COST 25,116 SUPERVISION, INSPECTION AND OVERHEAD (6.50%) 1,633 TOTAL REQUEST 26,749 TOTAL REQUEST (ROUNDED) 27,000 EQUIPMENT FROM OTHER APPROPRIATIONS (NON-ADD) (1,000) 10. DESCRIPTION OF PROPOSED CONSTRUCTION This project will construct a new Child Development Center facility with steelframed structure, concrete slab and foundation system, masonry block/brick exterior walls, insulated metal roof system, fire/lightning suppression systems, HVAC, electrical, and plumbing systems. The project will demolish buildings B1990 (2,396 SM), B1991 (23 SM), B1988 (151 SM) (Total: 2,570 SM), and playground (1 EA). The project includes all utilities, site improvements, pavements, detection/protection features, security enhancements and other supporting work necessary to make a complete and useable facility. Facility will be designed as permanent construction in accordance with Department of War Unified Facilities Criteria 1-200-01. This project will comply with Department of War antiterrorism/ force protection requirements per Unified Facilities Criteria 4-010-01. Air Conditioning: 89 Tons 11. REQ: 3,310 SM ADQT: 0 SUBSTD: 2,570 SM PROJECT: Construct new Child Development Center. REQUIREMENT: Little Rock Air Force Base requires a Child Development center to meet the installation's demands. A need exists for a new facility that is adequately configured for daytime care and child development activities. The space will support approximately 230 dependent children. All facility spaces will meet design criteria as described in Facilities Criteria 4-740-14F and Unified Facilities Criteria 3-101-01, for criteria and guidelines related to design and development of a Child Development Center. This is not a tenant or supported service requirement. DD FORM 1391, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 71 === page 80 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA MARCH 2026 AIR FORCE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE LITTLE ROCK AIR FORCE BASE ARKANSAS CHILD DEVELOPMENT CENTER 5. PROGRAM ELEMENT 7. PROJECT NUMBER 6. CATEGORY CODE 8. PROJECT COST ($000) 91211F 740-884 NKAK233000 27,000 CURRENT SITUATION: The existing Child Development Center, B-1990, is the primary childcare facility on base for children 0-5 years old. The original facility was built in 1972, several additions and modifications have occurred since original construction. Several guideline deficiencies exist related to: Air Force Instruction 34-144, Unified Facilities Criteria 3-101-01, Facilities Criteria 4-740-14F, National Fire Protection Association 101, and International Fire Code 2018. Site conditions allow water intrusion into building at floor level during heavy rain, temporary containment procedures and high level of maintenance are needed to remove infiltrated water. Indoor air quality issues have developed from high moisture levels in conditioned spaces leading to airborne contaminates, requiring high levels of remediation. The current site is overdeveloped with poor circulation leaving few economical options for modifications, additions, or improvement. The Department of War ensures that Child Development Center facilities and staff are held to the highest standards, and the provision of on base childcare will reduce stress and distractions of Airmen, allowing focus on mission goals. IMPACT IF NOT PROVIDED: Current facility hinders program effectiveness, administration efficiency, child development and activities, and increases demand on maintenance personnel and cost demand. Military members will be forced to utilize off-base childcare providers, which will require increased commuting and increase cost of living demand. Offbase childcare is not tailored to accommodate exercises or mission needs. These items will impact mission readiness and morale. ADDITIONAL: This project meets the criteria/scope in Department of the Air Force Manual 32-1084, Standard Facility Requirements. This design shall conform to criteria established in the Air Force Corporate Facilities Standards, the Installation Facilities Standards, and shall employ the standard facility design for Air Force Child Development Centers. This project will comply with all applicable Unified Facilities Criteria guidelines, and Air Force Instruction 34-144 - Child and Youth Programs requirements. In addition, local materials and construction techniques shall be used where cost effective. Sustainable principles, to include life-cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with Unified Facility Criteria 1-200-02. This includes preparation of a life-cycle cost analysis for energy consuming systems, renewable energy generating systems, whenever life-cycle cost effective is selected as the reason any requirement of Unified Facility Criteria 1-200-02 is partially compliant or not applicable. This project does not fall within or partly within the 100-year flood plain. Facility is sited in accordance with the Installation Development Plan and is within a compatible land use area. The construction growth offset for this requirement is 7,966 square feet. 19 AW Base Civil Engineer: (501) 987-3322 DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 72 === page 81 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA MARCH 2026 AIR FORCE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE LITTLE ROCK AIR FORCE BASE ARKANSAS CHILD DEVELOPMENT CENTER 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211F 740-884 NKAK233000 8. PROJECT COST ($000) 27,000 Child Development Center: 3,310 SM = 35,629 Square Feet; Demolition: 2,570 SM = 27,663 Square Feet. JOINT USE CERTIFICATION: This facility can be used by other components on an "as available" basis; however, the scope of the project is based on Air Force requirements. Facility Condition Index: 70 DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 73 === page 82 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA MARCH 2026 AIR FORCE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE LITTLE ROCK AIR FORCE BASE ARKANSAS CHILD DEVELOPMENT CENTER 5. PROGRAM ELEMENT 7. PROJECT NUMBER 12. 6. CATEGORY CODE 8. PROJECT COST ($000) 91211F 740-884 NKAK233000 SUPPLEMENTAL DATA: A. Estimated Execution Data: (1) Acquisition Strategy: Design-Bid-Build (2) Design Data (a) Design or Request for Proposal(RFP) Started: (b) Percent of Design Completed as of SEP 2025: (c) Percent of Design Completed as of JAN 2026: (d) Design or RFP Complete: (e) Total Design Cost ($000): (f) Energy Study and/or Life Cycle Cost Analysis (g) Standard or Definitive Design Used? (3) Construction Data: (a) Contract Award: (b) Construction Start: (c) Construction Complete: 27,000 APR/2025 15% 35% DEC/2026 2,700 YES YES JUN/2027 NOV/2027 MAY/2029 B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) Communications/Data Furniture, Fixtures, and Equip DD FORM 1391C, JUL 1999 3400 3080 PREVIOUS EDITION IS OBSOLETE 2028 2028 200 800 PAGE NO. 74 === page 83 === 1. COMPONENT FY AIR FORCE 2027 2. DATE (Y Y Y Y MMDD) MILITARY CONSTRUCTION PROGRAM 3. INSTALLATION AND LOCATION 4. COMMAND Beale AFB, California AIR COMBAT COMMAND 20260325 5. AREA CONTRUCTION COST INDEX 1.26 6. PERSONNEL (1) PERMANENT (2) STUDENTS (3) SUPPORTED OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN a. AS OF 30 Sep 25 b. END FY (4) TOTAL 600 3,012 658 0 0 0 228 1,119 164 5,781 488 2,328 612 0 0 0 228 1,115 164 4,935 7. INVENTORY DATA ($000) 22,813 7,636,825.00 0.00 0.00 0.00 0.00 0.00 7,636,825.00 a. TOTAL ACREAGE b. INVENTORY TOTAL AS OF 21 Sep 25 c. AUTHORIZATION NOT YET IN INVENTORY d. AUTHORIZATION REQUESTED IN THIS PROGRAM e. AUTHORIZATION INCLUDED IN FOLLOWING PROGRAM f. PLANNED IN NEXT THREE PROGRAM YEARS g. REMAINING DEFICIENCY h. GRAND TOTAL 8. PROJ ECTS REQUESTED IN THIS PROGRAM a. CATEGORY (1) CODE (2) PROJ ECT TITLE (3) SCOPE 141-753 Multi-Domain Operations Complex, Inc 7,205 b. COST ($000) 126,000 c. DESIGN STATUS (1) START (2) COMPLETE 01/23 11/24 9. FUTURE PROJ ECTS None 10. MISSION OR MAJ OR FUNCTIONS Beale Air Force Base is home to the only high-altitude Intelligence, Surveillance, and Reconnaissance (ISR) Wing in the Air Force that provides decision advantage and combat power worldwide to meet the nation’s call. With the high-tempo and essential mission Beale Air Force Base provides to the Air Combat Command and combatant commanders, it is important to have the tools and personnel necessary to meet the specific and essential requirements in a timely and safe manner. The requirement is to execute United States Air Force (USAF) Priority: Restore Readiness and CSAF (Chief of Staff of the Air Force) Focus Area: Enhance Multi-Domain Command and Control (C2) to increase weapons system lethality. The Multi-Domain Operations Complex provides full-spectrum C2 readiness and optimizes worldwide manned high-altitude reconnaissance and multi-domain. The Multi-Domain Operations Complex will provide space for the high-altitude ISR mission planning cell, which has grown by 117 personnel, space to implement emerging technologies (artificial intelligence, multi-domain operations, 5th Generation) and will integrate current ISR platforms, sensor maintenance, and flight operations, improving high-altitude recon. 11. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES N/A DD FORM 1390, JUL 1999 PREVIOUS EDITION IS OBSOLETE. 75 Adobe Professional 8.0 === page 84 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE BEALE AIR FORCE BASE CALIFORNIA MULTI-DOMAIN OPERATIONS COMPLEX 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211F 141-753 BAEY202004 8. PROJECT COST ($000) AUTH: 0 APPR: 126,000 9. COST ESTIMATES ITEM UM QUANTITY UNIT COST COST($000) PRIMARY FACILITIES 116,899 SQUADRON OPERATIONS (141-753) SM 7,205 8,885 (64,016) LARGE AIRCRAFT MAINTENANCE DOCK (211-173) SM 4,671 8,885 (41,502) APRON (113-321) SM 2,716 3,270 (8,881) CYBERSECURITY OF FACILITY-RELATED CONTROL SYS LS (2,500) SUPPORTING FACILITIES 11,255 UTILITIES LS (3,002) SITE PREPARATION LS (3,908) SITE IMPROVEMENTS LS (431) COMMUNICATIONS LS (205) DEMOLITION SM 4,281 530 (2,269) GENERATOR KW 1,000 1,367 (1,367) PASSIVE FORCE PROTECTION MEASURES LS (73) SUBTOTAL 128,155 CONTINGENCY (5.00%) 6,408 TOTAL CONTRACT COST 134,563 SUPERVISION, INSPECTION AND OVERHEAD (6.50%) 8,747 DESIGN/BUILD - DESIGN COST (4.00% OF SUBTOTAL) 5,126 TOTAL REQUEST 148,436 TOTAL REQUEST (ROUNDED) 148,000 EQUIPMENT FROM OTHER APPROPRIATIONS (NON-ADD) (1,500) 10. DESCRIPTION OF PROPOSED CONSTRUCTION Construct a two-story facility to consolidate aircraft maintenance, training, and operational/mission planning for the high-altitude intelligence, surveillance, and reconnaissance mission. The new facility will be a single building with multiple functions which include two separate large aircraft maintenance docks and multiple squadron operations for the three squadrons that will occupy the center portion of the building. Construction will include spread footing, slab on grade foundation, metal decking second floor, split face masonry, and standing seam metal roof. The entire facility shall be fire protected. The facility will include an elevator, an auditorium, open and closed office spaces, break rooms, sensor maintenance areas, lockers and showers, controlled space, a data processing center with raised flooring, and building support area. The facility will also include a 1,000KW Generator with Automatic Transfer Switch. The generator is authorized by Air Force Manual 32-1062. The facility must be able to withstand seismic effects as prescribed in applicable codes and design guides. This project will demolish Building 1044 (2,044 SM), Building 1045 (2,007 SM), Building 1046 (167 SM), and Building 1006 (63 SM) for a total of 4,281 SM. The project will also demolish approximately 160 linear feet of jet blast deflectors behind Building 1044 and 1045. The project includes all utilities, site improvements, new apron, pavements, detection and protection features, security enhancements and other supporting work necessary to make a complete and useable facility. Facilities will be designed as permanent construction in accordance with Department of War Unified Facilities Criteria 1-200-01, General Building Requirements. This project will comply with Department of War antiterrorism/force protection requirements per Unified DD FORM 1391, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 76 === page 85 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE BEALE AIR FORCE BASE CALIFORNIA MULTI-DOMAIN OPERATIONS COMPLEX 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211F 141-753 BAEY202004 8. PROJECT COST ($000) AUTH: 0 APPR: 126,000 Facilities Criteria 4-010-01. Air Conditioning: 175 Tons 11. REQ: 7,205 SM ADQT: 0 SUBSTD: 4,281 SM PROJECT: Multi-Domain Operations Complex REQUIREMENT: Beale Air Force Base is home to the only high-altitude Intelligence, Surveillance, and Reconnaissance Wing in the Air Force that provides decision advantage and combat power worldwide to meet the nation's call. With the high-tempo and essential mission Beale Air Force Base provides to the Air Combat Command and combatant commanders, it is important to have the tools and personnel necessary to meet the specific and essential requirements in a timely and safe manner. The Multi-Domain Operations Complex provides full-spectrum Command and Control readiness and optimizes worldwide manned high-altitude reconnaissance and multidomain. The Multi-Domain Operations Complex will provide space for the highaltitude Intelligence, Surveillance, and Reconnaissance mission planning cell, which has grown by 117 personnel, space to implement emerging technologies (artificial intelligence, multi-domain operations, 5th Generation) and will integrate current Intelligence, Surveillance, and Reconnaissance platforms, sensor maintenance, and flight operations, improving high-altitude reconnaissance operational efficiency. This project allows for the implementation of next generation high altitude reconnaissance sensors and for the addition of theater wide Command and Control functions to high-altitude aircraft. This project is required to divest ~72% of Building 1086, a cornerstone of Beale's long-range facility strategy, and to provide a purpose-built facility, complete with information technology architecture, power, and building systems required to support current and future mission requirements. This is not a tenant or supported service requirement. CURRENT SITUATION: Building 1086 was designed and constructed in an ad-hoc fashion beginning in 1959. It is severely degraded, with a building condition index of 70 and has documented Fire Safety Deficiencies due to no mass notification and lack of fire suppression. Building 1086 also has multiple Risk Assessment Codes in regards to electrical issues, egress noncompliance, and asbestos. This facility does not have the structural or infrastructural capabilities to support emerging technologies and their associated power and cooling requirements. Readiness for the mission is impeded due to separation of maintenance (Building 1086) and training & operations (Building 1025). A demolition and renovation project for portions of the building is funded for Building 1086 in the Facilities, Sustainment, and Restoration Program for Fiscal Year 2027. These aging facilities supporting the high-altitude Intelligence, Surveillance, and Reconnaissance program at Beale are designed for the 1960's era and cannot meet mission needs. Beale Air Force Base is DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 77 === page 86 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE BEALE AIR FORCE BASE CALIFORNIA MULTI-DOMAIN OPERATIONS COMPLEX 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211F 141-753 BAEY202004 8. PROJECT COST ($000) AUTH: 0 APPR: 126,000 the only base delivering globally integrated intelligence, surveillance, and reconnaissance in support of National Defense Objectives. IMPACT IF NOT PROVIDED: The Air Force will be unable to support the modernization of the 1960's Cold War era infrastructure and the incorporation of next generation technologies will be further delayed. Geographically dispersed functions will continue to cause inefficiencies in daily operations. Personnel in Building 1086 will continue to work in an unhealthy, unsafe environment with numerous Fire Safety Deficiencies and Risk Assessment Codes. ADDITIONAL: This project meets the applicable criteria/scope specified in Department of the Air Force Manual 32-1084, Standard Facility Requirements and Beale Facility Strategy Plan. This design shall conform to criteria established in the Air Force Corporate Facilities Standards, the Installation Facilities Standards, but will not employ a standard facility design because there is no Air Force standard facility design for this project, and there is no applicable standard design from United States Army Corps of Engineers. A preliminary analysis of reasonable alternatives evaluating status quo, addition/alteration and new construction was accomplished. This analysis indicated construction is the most cost-effective alternative which meets mission requirements. A formal economic analysis was completed and approved. Sustainable principles, to include life-cycle costeffective practices, will be integrated into the design, development, and construction of the project in accordance with Unified Facilities Criteria 1-20002. This includes the preparation of a life-cycle cost analysis for energy consuming systems, renewable energy generating systems, or when life cycle cost effective is selected as the reason any requirement of Unified Facilities Criteria 1-200-02 is partially compliant or not applicable. This project does not fall within or partly within a 100-year flood plain. Facility is sited in accordance with the Installation Development Plan and is within a compatible land use area. The construction growth offset for this requirement is 81,752 square feet. 9th Reconnaissance Wing Base Civil Engineer: (530) 634-2943 SQUADRON OPERATIONS: 7,205 SM = 77,554 Square Feet; LARGE AIRCRAFT MAINTENANCE DOCK: 4,671 SM = 50,278 Square Feet; APRON: 2,716 SM = 29,235 Square Feet; DEMOLITION: 4,281 SM = 46,080 Square Feet. JOINT USE CERTIFICATION: This facility can be used by other components on an "as available" basis; however, the scope of the project is based on Air Force requirements. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 78 === page 87 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE BEALE AIR FORCE BASE CALIFORNIA MULTI-DOMAIN OPERATIONS COMPLEX 5. PROGRAM ELEMENT 7. PROJECT NUMBER 12. 6. CATEGORY CODE 8. PROJECT COST ($000) 91211F 141-753 BAEY202004 AUTH: 0 SUPPLEMENTAL DATA: A. Estimated Execution Data: (1) Acquisition Strategy: Design-Build (2) Design Data (a) Design or Request for Proposal(RFP) Started: (b) Percent of Design Completed as of SEP 2025: (c) Percent of Design Completed as of JAN 2026: (d) Design or RFP Complete: (e) Total Design Cost ($000): (f) Energy Study and/or Life Cycle Cost Analysis (g) Standard or Definitive Design Used? (3) Construction Data: (a) Contract Award: (b) Construction Start: (c) Construction Complete: APPR: 126,000 JAN/2023 100% 100% NOV/2024 6,484 YES NO MAR/2027 OCT/2027 AUG/2029 B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) Furniture Fixtures and Equipme Communications Equipment Data Processing Equipment 3400 3400 3080 2027 2027 2027 250 20 1,230 Auth of Approp $(000) Appropriation $(000) 0 22,000 126,000 148,000 C. Authorization and Appropriation Summary: FY2025 Budget Request FY2026 Budget Request FY2027 Budget Request Total DD FORM 1391C, JUL 1999 Authorization $(000) 148,000 0 0 148,000 PREVIOUS EDITION IS OBSOLETE 55,000 0 126,000 181,000 PAGE NO. 79 === page 88 === Spend Plan Project Title: Installation: Program Year Project # CAO: Instructions and Notes This spreadsheet is designed to help the user develop a WIP Curve for inclusion with a project 1391. The user only needs to know the project cost and schedule. Edit The Green Fields ONLY Beale AFB, CA 2027 BAEY202004 Financials PA ($000) Initial Contract SIOH I SIOH / Month Other (Contingency) I Other / Month I 6.5% I 5.0% I Schedule Award Complete POP Months I I I Chart Begin 1st Increment 2nd Increment 3rd Increment 4th Increment 5th Increment End Total 25-Mar-26 Multi-Domain Operations Complex, Inc tI Fund 1-Oct-26 1-Jan-27 1-Oct-27 t 1-Aug-29 148,000 131,461 9,620 418 6,919 301 1-Mar-27 1-Aug-29 884 29.0 Enter the Project Title, Location, and Project number Enter the Date this WIP Curve is being updated Enter the Project PA Enter the SIOH required by the agent (6.5% for USACE FY24 and beyond) Enter the contingency percentage plus other amounts withheld by the Agent Enter the projected project Award Date ( usually 1 Apr of the Execution FY) Enter the Project Complete Date (Usually Award plus ~1000 days, use the 1st of a month) Enter the Chart Begin Date ( first day of the Program Year: 1-Oct-XX) ( Use "Short Date" format.) 9 Enter the Dates anticipate to receive each increment of funding (usually January of the Program year, and Oct for subsequent increments) Enter the Dates anticipated to Award the contract ( usually 1 Apr of the Program year and obligate increments (usually 1 Oct for increments after initial award.) 10 11 Fund mmm-yr Obligate 1-Oct-26 Oct-26 1-Mar-27 Jan-27 1-Oct-27 Oct-27 I • 1-Aug-29 1 2 3 4 5 6 7 8 Aug-29 Enter the Value of each increment (If the project is less than $250M enter the PA as 1st Increment) I Obligate mmm-yr Months 0 Mar-27 7 Oct-27 22 0 0 0 Aug-29 0 29 I Increment + 22,000 126,000 148,000 Obligate 19,542 111,920 131,461 SIOH 1,430 8,190 9,620 Other 1,029 5,891 6,919 80 === page 89 === Spend Plan CAO: Project Title: Installation: Program Year Project # 25-Mar-26 Multi-Domain Operations Complex, Inc Notes Beale AFB, CA 2027 BAEY202004 Assumes initial appropriation is enacted by Note 1: Congress Jan FY 2026. Assumes funds are available for obligation by 31 January of the execution year and by 31 Note 2: October for subsequent years. All Cost in thousands Chart Begin Oct-26 Month Oct-26 Nov-26 Dec-26 Jan-27 Feb-27 Mar-27 Apr-27 May-27 Jun-27 Jul-27 Aug-27 Sep-27 Oct-27 Nov-27 Dec-27 Jan-28 Feb-28 Mar-28 Apr-28 May-28 Jun-28 Jul-28 Aug-28 Sep-28 Oct-28 Nov-28 Dec-28 Jan-29 Feb-29 Mar-29 Apr-29 May-29 Jun-29 Jul-29 Aug-29 FUNDING (note 1) Enacted 22,000 126,000 - OBLIGATION (note 2-3) Cumulative Obligated Cumulative 22,000 22,000 22,000 22,000 22,000 22,000 22,000 22,000 22,000 148,000 148,000 148,000 148,000 148,000 148,000 148,000 148,000 148,000 148,000 148,000 148,000 148,000 148,000 148,000 148,000 148,000 148,000 148,000 148,000 148,000 148,000 148,000 19,542 719 719 719 719 719 719 112,639 719 719 719 719 719 719 719 719 719 719 719 719 719 719 719 719 - 19,542 20,261 20,980 21,699 22,418 23,137 23,856 136,495 137,214 137,933 138,652 139,371 140,090 140,809 141,528 142,247 142,966 143,685 144,405 145,124 145,843 146,562 147,281 148,000 148,000 148,000 148,000 148,000 148,000 148,000 OUTLAYS (note 4-5) Monthly Cumulative 271 271 271 454 733 1,138 1,702 2,449 3,391 4,520 5,799 7,159 8,506 9,727 10,705 11,338 11,557 11,338 10,705 9,727 8,506 7,159 5,799 4,520 3,391 2,449 1,702 1,138 733 845 271 541 812 1,265 1,998 3,136 4,837 7,286 10,678 15,198 20,997 28,156 36,662 46,389 57,094 68,431 79,989 91,327 102,031 111,758 120,264 127,423 133,222 137,743 141,134 143,583 145,284 146,422 147,155 147,155 147,155 147,155 Assumes ALL project funds (contract, SIOH, contingency, etc) are obligated NLT 6 Note 3: months prior to project end Assumes contract award in Mar 2027 and contract completion Aug 2029; duration 29 Note 4 months. Assumes Agent will retain 1% of project Note 5 obligations for a final payment 148,000 81 === page 90 === Multi-Domain Operations Complex, Beale AFB, CA $160,000 --. .. -----,, --,, ,, ,, $140,000 ,, Dollars in (000) $120,000 $100,000 , ,, , ,, ,, I I I I $80,000 I I I I $60,000 I I I I $40,000 $20,000 $0 I I -· ,, I ,,,' _l _____ ...... ,, , I I - Funding - Obligation -- Outlays 82 === page 91 === 1. COMPONENT 2. DATE (YYYYMMDD) FY 2027 BBBBBB MILITARY CONSTRUCTION PROGRAM SPACE FORCE 3. INSTALLATION AND LOCATION 4. COMMAND SCHRIEVER SPACE FORCE BASE, COLORADO SPACE COMMAND 6. PERSONNEL (1) PERMANENT 20260323 5. AREA CONTRUCTION COST INDEX 1.07 (2) STUDENTS (3) SUPPORTED OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN a. AS OF 11-Mar-25 b. END FY (4) TOTAL 486 1,766 1,589 0 0 0 331 496 1,031 5,699 473 1,799 1,593 0 0 0 325 487 1,024 5,701 7. INVENTORY DATA ($000) 3,842.15 2,622,564.81 0.00 250,000.00 84,000.00 0.00 0.00 2,956,564.81 a. TOTAL ACREAGE b. INVENTORY TOTAL AS OF 15-May-25 c. AUTHORIZATION NOT YET IN INVENTORY d. AUTHORIZATION REQUESTED IN THIS PROGRAM e. AUTHORIZATION INCLUDED IN FOLLOWING PROGRAM f. PLANNED IN NEXT THREE PROGRAM YEARS g. REMAINING DEFICIENCY h. GRAND TOTAL 8. PROJECTS REQUESTED IN THIS PROGRAM (1) CODE a. CATEGORY (2) PROJECT TITLE 141-456 Space Force Operations Facility (3) SCOPE b. COST ($000) (1) START c. DESIGN STATUS (2) COMPLETE 17,090 SM 250,000 AUG-2026 AUG-2027 9. FUTURE PROJECTS N/A R&M Unfunded Requirements: N/A 10.MISSION OR MAJOR FUNCTIONS Schriever Space Force Base is home to the 50th Mission Support Group and many mission partners to include the Missile Defense Agency (MDA) and National Space Defense Center (NSDC). The 50th SCS operates, maintains and defends the national space enterprise, Team Schriever and warfighters' most critical missions through cyberspace. The unit delivers superior space mission cyber defense and maintenance capabilities. The 50th CE squadron maintains $1.2 billion in real property, ensuring suitable infrastructure and uninterrupted utilities in support of Department of War misisons. The installation supports services for national navigation, weather, communications and surveillance satellite missions assigned to Schriever SFB and 12 worldwide sites. 11. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES Outstanding Pollution and Safety Deficiencies ($000): N/A DD FORM 1390, JUL 1999 83 90 PREVIOUS EDITION IS OBSOLETE. === page 92 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA SPACE FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE SCHRIEVER SPACE FORCE BASE COLORADO SPACE FORCE OPERATIONS FACILITY 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211S 141-456 USSF270004 8. PROJECT COST ($000) 250,000 9. COST ESTIMATES ITEM UM QUANTITY UNIT COST COST($000) PRIMARY FACILITIES 188,382 INTELLIGENCE, SURVEILLANCE AND RECONNAISSA SM 17,090 10,434 (178,317) (141-456) ICD 705 PREMIUM LS (6,965) CYBERSECURITY OF FACILITY RELATED CONTROL LS (3,100) SUPPORTING FACILITIES 12,109 UTILITIES LS (3,000) SITE PREPARATION LS (750) ROADS, SIDEWALKS, AND PARKING LS (2,000) SITE IMPROVEMENTS LS (750) COMMUNICATIONS LS (500) GENERATOR KW 5,000 800 (4,000) PASSIVE FORCE PROTECTION MEASURES LS (50) SECURITY FENCING LS (59) PRIVATIZED UTILITIES SERVICE AND CONNECTION LS (1,000) 200,491 SUBTOTAL CONTINGENCY (5.00%) 10,025 TOTAL CONTRACT COST 210,516 SUPERVISION, INSPECTION AND OVERHEAD (6.50%) 13,684 DESIGN/BUILD - DESIGN COST (10.00% OF 20,049 SUBTOTAL) 5,261 CONSTRUCTION SECURITY SURVILLANCE 249,510 TOTAL REQUEST 250,000 TOTAL REQUEST (ROUNDED) EQUIPMENT FROM OTHER APPROPRIATIONS (NON-ADD) (150,000) 10. DESCRIPTION OF PROPOSED CONSTRUCTION Construct a three-story Space Operations Facility (SOF)with reinforced concrete foundation, steel structure, clad with precast concrete panels and a low slope membrane roof. Sensitive and/or Special Access Program spaces shall comply with the Intelligence Community Directive 705 criteria and standards. Construction includes a perimeter fence surrounding the Space Operations Facility to provide Protection Level 2 (PL2). Project will include all supporting facilities such as site improvements, pavements, communications, utilities, and protection level 2 fencing necessary to provide a complete and useable facility. This project is authorized a generator, per AFI 32-1062. Facility will be designed as permanent construction in accordance with Department of War Unified Facilities Criteria 1-200-01. This project will comply with Department of War antiterrorism/force protection requirements per Unified Facilities Criteria 4-010-01. This project intends to leverage the authorities granted in the FY 2026 National Defense Authorization Act to take advantage of private sector innovative design and construction methods. It will use a combination of Other Transactional Authority (OTA), Progressive Design-Build (PDB), and other execution methods to innovate in delivery, reduce construction timelines, and lifecycle costs. OTA/PDB execution will capitalize on the construction industry's expertise and innovation. DD FORM 1391, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 84 91 === page 93 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA SPACE FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE SCHRIEVER SPACE FORCE BASE COLORADO SPACE FORCE OPERATIONS FACILITY 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211S 141-456 8. PROJECT COST ($000) USSF270004 250,000 The execution strategy is intentionally non-prescriptive to empower industry partners to innovate and propose the most effective technical solution to meet the defined needs. Air Conditioning: 1400 Tons 11. REQ: 17,090 SM ADQT: 0 SUBSTD: 0 PROJECT: Construct Space Operations Facility. REQUIREMENT: A highly classified and secured contiguous area to enable National Reconnaissance Organization (NRO) and United States Space Force (USSF) emergent missions including Air Moving Target Indicator, Ground Moving Target Indicator, and Proliferated Warfighter Space Architecture. Workspaces will house intelligence analysis and production for new and expanded all-source means, enabling near-real time capabilities and missions unique to United States Space Force. Facility will support the intelligence needs of the Defense Intelligence Enterprise and the United States Space Force as well as other joint warfighters, policymakers and acquisition professionals, through analysis or application. Mission is responsible for Intelligence, Surveillance and Reconnaissance (ISR) for the United States Space Force, providing actionable and time-sensitive intelligence for space domain operations including detection, characterization and targeting adversary space capabilities. The Space Operations Facility must be constructed to meet Protection Level 2 requirements. To ensure reliable operations, the Space Operations Facility will have multiple active power and cooling distribution paths and redundant components to meet the fault-tolerant facility "Tier IV" standard as defined by The Uptime Institute. The Space Operations Facility will include ICD 705 compliant construction spaces to meet all mission separation and collaboration requirements. A 500-person auditorium is required for secure briefings and conferences. The Space Operations Facility will also include a dining area to support 24/7 operations. Adequate parking will be constructed for the Space Operations Facility. CURRENT SITUATION: Schriever does not have the physical space to accommodate new analysts and information technology requirements to accomplish its expanded national security mission. Per Air Force Manual 32-1084 "Facility Requirements", this is the requirement for the new mission and future growth current situation. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 85 === page 94 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA SPACE FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE SCHRIEVER SPACE FORCE BASE COLORADO SPACE FORCE OPERATIONS FACILITY 5. PROGRAM ELEMENT 7. PROJECT NUMBER 6. CATEGORY CODE 8. PROJECT COST ($000) 91211S 141-456 USSF270004 250,000 IMPACT IF NOT PROVIDED: The emerging missions will be late to need and will begin operations in facilities which do not meet the resiliency requirements of Tier IV facilities. The Space Force will miss an opportunity to disperse and replicate to increase survivability of the mission. ADDITIONAL: This design shall conform to criteria established in the Air Force Corporate Facilities Standards (AFCFS), the Installation Facilities Standards (IFS), but will not employ a standard facility design because there is no AF standard facility design for this project and there is no applicable standard design from Air Force Civil Engineer Center. Sustainable principles, to include life-cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with Unified Facility Criteria 1-200-02. This includes preparation of a life-cycle cost analysis for energy consuming systems, renewable energy generating systems, or when life-cycle cost effective is selected as the reason any requirement of Unified Facility Criteria 1-200-02 is partially compliant or not applicable. Project not in flood plain: This project will not be sited within or partly within the 100-year flood plain. In accordance with IDP: Facility will be sited in accordance with the Installation Development Plan and within a compatible land use area. The construction growth offset for this requirement is 183,955 square feet. 50th Base Civil Engineer: (719) 567-4200 SPACE FORCE OPERATIONS FACILITY: 17,090 SM = 183,955 Square Feet; JOINT USE CERTIFICATION: Mission Requirements, operational considerations, and location are incompatible with use by other components. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 86 === page 95 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA SPACE FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE SCHRIEVER SPACE FORCE BASE COLORADO SPACE FORCE OPERATIONS FACILITY 5. PROGRAM ELEMENT 7. PROJECT NUMBER 12. 6. CATEGORY CODE 8. PROJECT COST ($000) 91211S 141-456 USSF270004 SUPPLEMENTAL DATA: A. Estimated Execution Data: (1) Acquisition Strategy: Design-Build (2) Design Data (a) Design or Request for Proposal(RFP) Started: (b) Percent of Design Completed as of SEP 2025: (c) Percent of Design Completed as of JAN 2026: (d) Design or RFP Complete: (e) Total Design Cost ($000): (f) Energy Study and/or Life Cycle Cost Analysis (g) Standard or Definitive Design Used? (3) Construction Data: (a) Contract Award: (b) Construction Start: (c) Construction Complete: 250,000 AUG/2026 0% 0% AUG/2027 20,043 YES NO JUL/2027 NOV/2028 NOV/2032 B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) Communications / Data Uninterruptable Power Supply Electronic Security System Physical Security Furniture, Fixtures, & Equipme DD FORM 1391C, JUL 1999 3410 3080 3080 3080 3410 PREVIOUS EDITION IS OBSOLETE 2031 2031 2031 2031 2031 110,000 10,000 5,000 5,000 20,000 PAGE NO. 87 === page 96 === MILCON Work-in-Place (WIP) Curve – Automated Spend Plan Project Information Project Title Installation Program Year (FY) Project # Space Force Operational Facility Schriever 2027 USSF270004 Financial Inputs & Derived Amounts ($000) Programmed Amount (PA) SIOH Rate Contingency Rate SIOH Amount Contingency Amount Construction (PA less SIOH & Cont) Total Increments 250,000 6.5% 5.0% 16,250 12,500 221,250 3 Key Dates (Calculated) Begin Date (FY Start) Award Date (Assumed) Complete Date (Award + POP; set to 1st of month) Award Month (1st of month) Complete Month (1st of month) Period of Performance Oct 1, 2026 May 1, 2028 Nov 1, 2032 May 1, 2028 Nov 1, 2032 1660 Funding & Obligation Increments ($000) Increment Amount ($000) Funding Date Jan 1, 2027 Increment 1 Increment 2 Increment 3 250,000 0 0 Total Funding 250,000 Check vs PA Obligation Date Apr 1, 2027 0 Outlay Curve Controls (Adjust if needed) Outlay Curve Steepness (k) Normalized Logistic Base (t=0) Normalized Logistic Top (t=1) Total Outlay ($000) (assumed = PA) 8.0 0.01798621 0.98201379 250,000 88 === page 97 === Monthly Cash Flow (Automated from Spend Plan) Month Oct 2026 Nov 2026 Dec 2026 Jan 2027 Feb 2027 Mar 2027 Apr 2027 May 2027 Jun 2027 Jul 2027 Aug 2027 Sep 2027 Oct 2027 Nov 2027 Dec 2027 Jan 2028 Feb 2028 Mar 2028 Apr 2028 May 2028 Jun 2028 Jul 2028 Aug 2028 Sep 2028 Oct 2028 Nov 2028 Dec 2028 Jan 2029 Feb 2029 Mar 2029 Apr 2029 May 2029 TOTAL Funding ($000) 0 0 0 250,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 250,000 Obligation ($000) 0 0 0 0 0 0 250,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 250,000 Outlay ($000) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Cumulative Funding Cumulative Obligation Cumulative Outlay 0 0 0 0 0 0 0 0 0 250,000 0 0 250,000 0 0 250,000 0 0 250,000 250,000 0 250,000 250,000 0 250,000 250,000 0 250,000 250,000 0 250,000 250,000 0 250,000 250,000 0 250,000 250,000 0 250,000 250,000 0 250,000 250,000 0 250,000 250,000 0 250,000 250,000 0 250,000 250,000 0 250,000 250,000 0 250,000 250,000 #N/A 250,000 250,000 #N/A 250,000 250,000 #N/A 250,000 250,000 #N/A 250,000 250,000 #N/A 250,000 250,000 #N/A 250,000 250,000 #N/A 250,000 250,000 #N/A 250,000 250,000 #N/A 250,000 250,000 #N/A 250,000 250,000 #N/A 250,000 250,000 #N/A 250,000 250,000 #N/A #N/A 89 === page 98 === Feb 2029 May 2029 Apr 2029 Mar 2029 100,000 Jan 2029 150,000 Dec 2028 Nov 2028 Oct 2028 Sep 2028 Aug 2028 Jul 2028 Jun 2028 May 2028 Apr 2028 Mar 2028 Feb 2028 Jan 2028 Dec 2027 Nov 2027 Oct 2027 Sep 2027 Aug 2027 Jul 2027 Jun 2027 May 2027 I Apr 2027 l Mar 2027 250,000 Jan 2027 Project: Program Year: Feb 2027 0 Dec 2026 Nov 2026 Oct 2026 Cumulative WIP Curve Space Force Operational Facility 2027 300,000 Cumulative Funding vs Obligation vs Outlay 200,000 , Cumulative Funding Cumulative Obligation Cumulative Outlay 50,000 j 90 === page 99 === 1. COMPONENT FY USSF 2027 MILITARY CONSTRUCTION PROGRAM 3. INSTALLATION AND LOCATION 20260326 4. COMMAND Patrick Space Force Base Cape Canaveral Space Force Station, Site #1 Florida 6. PERSONNEL 2. DATE (YYYYMMDD) 5. AREA CONTRUCTION COST INDEX Space Systems Command (1) PERMANENT .97 (2) STUDENTS (3) SUPPORTED OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN a. AS OF 30 SEP 25 b. END FY 181 634 1,257 0 0 0 0 0 211 2,283 181 634 1,257 0 0 0 0 0 211 2,283 7. INVENTORY DATA ($000) 16,239 $12,742,812.00 $49,800.00 $409,000.00 $383,400.00 $166,000.00 $648,000.00 $14,399,012.00 a. TOTAL ACREAGE b. INVENTORY TOTAL AS OF 30-Sep-25 c. AUTHORIZATION NOT YET IN INVENTORY d. AUTHORIZATION REQUESTED IN THIS PROGRAM e. AUTHORIZATION INCLUDED IN FOLLOWING PROGRAM f. PLANNED IN NEXT THREE PROGRAM YEARS g. REMAINING DEFICIENCY h. GRAND TOTAL 8. PROJECTS REQUESTED IN THIS PROGRAM a. CATEGORY 610-123 c. DESIGN STATUS (3) SCOPE b. COST ($000) (1) START Base Support Warehouse 7.656 SM $64,000 09/24 03/26 Command Facility 6,671 SM $85,000 12/24 03/26 (1) CODE 442-758 (4) TOTAL (2) PROJECT TITLE (2) COMPLETE 442-758 Communications Plant Warehouse 5,574 SM $48,400 09/24 03/26 610-123 Launch Support Facility 7,011 SM $84,000 12/24 03/26 214-425 LRS Vehicle Maintenance Facility 5,291 SM $80,400 10/24 03/26 730-835 Security Forces Operations Facility 2,049 SM $48,000 10/24 03/26 9. FUTURE PROJECTS FY28, 851-147 Widen ICBM Road, (35,547 SY/$10,400,000) FY28, 890-181 Install Redundant Power Dist., ICBM Rd (4,023 SM/$12,000,000) FY28, 422-264 Consolidate Munitions Storage (17,141 SM/$320,000,000) FY28, 442-758 Construct Consolidated Base Support Complex (4,181 SM/$41,000) FY29, 730-835 Consolidated Shop/Lab Facility, Phase 3 (1,951 SM/$40,000,000) FY30, 610-123 Consolidated Launch Support Facility, Phase 4 (2,973 SM/$56,000,000) FY30, 442-758 Consolidated Storage/Warehouse, Phase 3 (5,435 SM/$35,000,000) FY30, 442-758 Consolidated Storage/Warehouse, Phase 4 (4,645 SM/$35,000,000) 10. MISSION OR MAJOR FUNCTIONS Space Launch Delta 45 provides a network for radar, telemetry, and communications instrumentation on Cape Canaveral Space Force Station (CCSFS) to support the launches for all Department of War National Security Space, National Aeronautics Space Administration (NASA), National Oceanic and Atmospheric Administration, commercial and Naval Strategic Systems Programs through the Eastern Range. Extending more than 10,000 miles from the Florida coast, the Eastern Range consists of multiple active launch complexes on or adjacent to CCSFS that are used by the United Launch Alliance Atlas and Vulcan rockets (Complex 41) SpaceX Falcon 9 rockets (Complexes 37, 39A, and 40), NASA Space Launch System (Complex 39B), and the Blue Origin New Glenn rocket (Complex 36). Relativity Space (Complex 16) and Stoke Space (Complex14) are rebuilding launch complexes on CCSFS being rebuilt to launch their proprietary vehicles within the next 12 months. 91 === page 100 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA MAR 2026 SPACE FORCE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE CAPE CANAVERAL SPACE FORCE STATION FLORIDA BASE SUPPORT WAREHOUSE 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211S 442-758 DBEH227756 8. PROJECT COST ($000) 64,000 9. COST ESTIMATES ITEM UM QUANTITY UNIT COST COST($000) PRIMARY FACILITIES 41,246 WAREHOUSE SUPPLY AND EQUIPMENT BASE (442-758) SM 7,656 3,893 (29,803) UTILITY LINE DUCTS (890-181) M 1,524 6,315 (9,624) WATER FIRE PUMPING STATION (843-316) SM 46 17,684 (813) CYBERSECURITY OF FACILITY-RELATED CONTROL SYS LS (1,006) SUPPORTING FACILITIES 16,218 UTILITIES LS (8,820) SITE PREPARATION LS (3,742) ROADS, SIDEWALKS, AND PARKING LS (3,226) SITE IMPROVEMENTS LS (263) DEMOLITION SM 382 437 (167) SUBTOTAL 57,465 CONTINGENCY (5.00%) 2,873 TOTAL CONTRACT COST 60,338 SUPERVISION, INSPECTION AND OVERHEAD (6.50%) 3,922 TOTAL REQUEST 64,260 TOTAL REQUEST (ROUNDED) 64,000 EQUIPMENT FROM OTHER APPROPRIATIONS (NON-ADD) (211) 10. DESCRIPTION OF PROPOSED CONSTRUCTION Construct a 7,656 SM storage and warehouse facility and supporting paving, parking, and sitework. The high bay portion of the facility shall be built upon a 10-inch-thick slab on grade with thickened edges and the administrative space shall be supported by an 8-inch slab on grade. Provide breakroom/kitchenette and two restrooms within the facility. The building will be insulated pre-cast concrete. The roof will be a low-slope membrane roof with external drains. Windows will be aluminum. Gutters and downspouts will be pre-finished aluminum. Lightning and fire protection systems will be provided. Potable water, sewer, and power will be provided within the facility. Construct a 46 SM Fire Pump Building to support fire suppression requirements. All mechanical systems shall be controlled through Building Automation and Control Network (BACnet) Direct Digital Control (DDC) and be compatible with existing energy management and control systems, in accordance with Cape Canaveral Space Force Station (CCSFS) Installation Facility Standards (IFS), Patrick Space Force Base (PSFB) Installation Facility Standards (IFS), or Space Launch Delta 45 (SLD 45) Installation Facility Standards (IFS). Connectivity to the base communications network shall also be provided. Install approximately 1,524 linear meters of concrete encased communications duct bank, precast concrete manholes, and fiberoptic cabling. Underground stormwater detention will be provided on site. Building 85110 will be demolished (382 SM). A survey of hazardous materials will be performed and mitigation plan created for proper disposal of materials in accordance with federal, state, and Air Force regulations, and as determined appropriate in an off-site approved hazardous materials landfill. Facilities will be designed as permanent construction in accordance with Department of War Unified Facilities Criteria 1-200-01, General Building requirements. This project will comply with Department of War antiterrorism/ force protection requirements per Unified Facilities Criteria 4-010-01. DD FORM 1391, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 92 === page 101 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA MAR 2026 SPACE FORCE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE CAPE CANAVERAL SPACE FORCE STATION FLORIDA BASE SUPPORT WAREHOUSE 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211S 442-758 8. PROJECT COST ($000) DBEH227756 64,000 Air Conditioning: 27 Tons 11. REQ: 7,656 SM ADQT: 0 SUBSTD: 0 PROJECT: Construct consolidated storage warehouse, fire pump facility, and communications duct bank. REQUIREMENT: CCSFS is an installation of the United States Space Force Space Operations Command Space Launch Delta 45 (SLD 45). CCSFS is the primary launch head of United States Eastern Range with numerous active launch pads. Launch operations at CCSFS directly support unique Department of War (DoW) and national interest missions. This project is required to construct a safe, secure, and consolidated storage, and warehouse facility in direct support of various launch support operations at CCSFS. This facility will include high-bay warehouse space and associated administrative space in support of critical launch support operations currently performed by SLD 45 personnel in various facilities often forced to evacuate during space launch operations. The consolidation of storage and warehouse functions in a facility a safe distance away from active space launch complexes (SLCs) will eliminate the need for personnel evacuations, increasing safety and mission efficiency. This project will also provide space on CCSFS for launch support personnel to relocate from PSFB, once again raising efficiency and lowering operational costs. This project is one of four phases of storage and warehouse facility recapitalization necessary to offer sufficient real estate for commercial launch providers and SLD 45 personnel and ensure Space Force mission continuity. This is not a tenant or supported service requirement. CURRENT SITUATION: Currently, various launch operations at CCCSFS force the evacuation of non-launch related personnel located in areas of the installation in proximity to the SLCs. CCSFS is the world's busiest spaceport, facilitating 93 space launches in Calendar Year 2024. Each evacuation event leads to approximately four (4) hours of workday interruption per person required to evacuate. This accounts for evacuation up to two (2) hours prior to the scheduled launch time, and an additional two (2) hours for the landing window. The anticipated increase in space launch operations tempo will only increase the number of evacuations, resulting in a greater loss in efficiency and an unacceptable level of mission disruption. Additionally, several launch critical tasks are currently performed at PSFB, located 30 minutes south of CCSFS. These inefficiencies will continue to negatively affect CCSFS and the Eastern Range without this project. IMPACT IF NOT PROVIDED: Various launch operations at CCSFS force the evacuation of non-launch related personnel located in areas of the installation in proximity of the SLCs. The anticipated increase in space launch operations tempo will increase the number of evacuations, resulting in a loss in efficiency and an unacceptable level of DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 93 === page 102 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA MAR 2026 SPACE FORCE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE CAPE CANAVERAL SPACE FORCE STATION FLORIDA BASE SUPPORT WAREHOUSE 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211S 442-758 DBEH227756 8. PROJECT COST ($000) 64,000 mission disruption. ADDITIONAL: This project meets applicable criteria/scope specified in Department of the Air Force Manual 32-1084, Standard Facility Requirements. This design shall conform to criteria established in the Air Force Corporate Facilities Standards, the Installation Facilities Standards, but will not employ a standard facility design because there is no Air Force standard facility design for this project, and there is no applicable standard design from Air Force Civil Engineer Center A Waiver to an Economic Analysis has been approved for this project. Sustainable principles, to include life-cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with Unified Facilities Criteria 1-200-02, High Performance and Sustainable Building Requirements. This includes preparation of a life-cycle cost analysis for energy consuming systems, renewable energy generating systems, or whenever life-cycle cost effective is selected as the reason any requirement of Unified Facilities Criteria 1-200-02 is partially compliant or not applicable. This project does not fall within or partly within the 100-year floodplain. Facility is sited in accordance with the Installation Development Plan and is within a compatible land use area. Supporting Facilities exceed 25% of the Primary Facilities total due to underground stormwater detention requirements and fill soil surcharges required due to the subsurface soils. The construction growth offset for this requirement is 7,274 SM (78,289 SF). Future Related Projects: DBEH227786 - Communications Plant Warehouse DBEH227787 - Communications Supply Warehouse DBEH227788 - Mission Support Warehouse Warehouse Supply and Equipment Base (442-758): 7,656 SM = 82,404 Square Feet; Utility Line Ducts (890-181): 1,524 SM = 5,000 Linear Feet; Water Fire Pumping Station (843-316): 46 SM = 500 Square Feet; Demolition: 382 SM = 4,115 Square Feet. SLD 45 Base Civil Engineer (321)-854-4041 JOINT USE CERTIFICATION: This facility can be used by other components on an "as available" basis; however, the scope of the project is based on Air Force requirements. Facility Condition Index: This is not a recapitalization project. No Facility Condition Index data exists for this facility type. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 94 === page 103 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA MAR 2026 SPACE FORCE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE CAPE CANAVERAL SPACE FORCE STATION FLORIDA BASE SUPPORT WAREHOUSE 5. PROGRAM ELEMENT 7. PROJECT NUMBER 12. 6. CATEGORY CODE 8. PROJECT COST ($000) 91211S 442-758 DBEH227756 SUPPLEMENTAL DATA: A. Estimated Execution Data: (1) Acquisition Strategy: Design-Bid-Build (2) Design Data (a) Design or Request for Proposal(RFP) Started: (b) Percent of Design Completed as of SEP 2025: (c) Percent of Design Completed as of JAN 2026: (d) Design or RFP Complete: (e) Total Design Cost ($000): (f) Energy Study and/or Life Cycle Cost Analysis (g) Standard or Definitive Design Used? (3) Construction Data: (a) Contract Award: (b) Construction Start: (c) Construction Complete: 64,000 SEP/2024 35% 65% MAR/2026 9,600 YES NO FEB/2027 MAY/2027 JUL/2029 B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) FF&E DD FORM 1391C, JUL 1999 3080 PREVIOUS EDITION IS OBSOLETE 2029 211 PAGE NO. 95 === page 104 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA MAR 2026 SPACE FORCE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE CAPE CANAVERAL SPACE FORCE STATION FLORIDA COMMAND FACILITY 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211S 610-123 8. PROJECT COST ($000) DBEH033001 85,000 9. COST ESTIMATES ITEM UM QUANTITY UNIT COST COST($000) PRIMARY FACILITIES 58,592 AIR FORCE PLANT ADMINISTRATION OFFICE (610SM 6,671 8,569 (57,163) 123) CYBERSECURITY OF FACILITY-RELATED CONTROL SYS LS (1,429) SUPPORTING FACILITIES 17,780 UTILITIES LS (5,429) SITE IMPROVEMENTS LS (4,633) SITE PREPARATION LS (3,326) ROADS, SIDEWALKS, AND PARKING LS (2,278) COMMUNICATIONS LS (2,115) SUBTOTAL 76,372 CONTINGENCY (5.00%) 3,819 TOTAL CONTRACT COST 80,191 SUPERVISION, INSPECTION AND OVERHEAD (6.50%) 5,212 TOTAL REQUEST 85,403 TOTAL REQUEST (ROUNDED) 85,000 EQUIPMENT FROM OTHER APPROPRIATIONS (NON-ADD) (3,400) 10. DESCRIPTION OF PROPOSED CONSTRUCTION Construct a 3-story, 6,671 SM building with administration and support space for roughly 326 Space Launch Delta 45 (SLD 45) staff and contractor partners on Cape Canaveral Space Force Station (CCSFS). The building will be a concrete frame structure. Exterior walls will be a high-performance unitized curtain wall system paired with a curtain wall glazing system with a clear anodized finish. Entrances and windows will be aluminum window and curtainwall systems. The roof will be a lightweight insulating concrete roofing system over a structural cast-in-place (CIP) concrete slab and modified bitumen roofing over the main facility. The viewing terrace roof system will be a liquid-applied polymethyl methacrylate (PMMA) membrane with sloped polyisocyanurate insulation. Roof crickets will be used to divert water towards scuppers and steel downspouts. The building structure and exterior components will be designed for Hurricane Risk Category III. Provide lightning and fire protection systems. Potable water, sewer, and power will be provided within the facility. The building will be comprised of individual offices, open offices, conference spaces and support spaces. All mechanical systems will be controlled through Building Automation and Control Networks (BACnet) Direct Digital Control (DDC) and shall be compatible with existing installation energy management and control systems (ECMS). Facilities will be designed as permanent construction in accordance with Department of War Unified Facilities Criteria 1-200-01, General Building requirements. This project will comply with Department of War antiterrorism/ force protection requirements per Unified Facilities Criteria 4-010-01. 11. REQ: 6,671 SM ADQT: 0 SUBSTD: 0 PROJECT: Construct a consolidated launch command facility. DD FORM 1391, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 96 === page 105 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA MAR 2026 SPACE FORCE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE CAPE CANAVERAL SPACE FORCE STATION FLORIDA COMMAND FACILITY 5. PROGRAM ELEMENT 7. PROJECT NUMBER 6. CATEGORY CODE 8. PROJECT COST ($000) 91211S 610-123 DBEH033001 85,000 REQUIREMENT: To provide a safe, secure, and consolidated administrative facility in support of various launch operations at CCSFS. This project will consolidate administrative and critical launch support operations currently performed by 326 SLD 45 personnel in various facilities often forced to evacuate during space launch operations. In particular, this project relocates personnel from buildings 01645, 01711, 44410, 44440, and 60701 at CCSFS. This project will construct a facility a safe distance away from active space launch complexes (SLCs) to eliminate the need for personnel evacuations, increasing safety and efficiency. This project will also provide space on CCSFS for launch support personnel to relocate from PSFB, once again raising efficiency and lowering operational costs. This is not a tenant or supported service requirement. CURRENT SITUATION: Currently, various launch operations at CCSFS force the evacuation of non-launch related personnel located in areas of the installation in proximity to the SLCs. CCSFS is the world's busiest spaceport, facilitating 93 space launches in Calendar Year 2024. Each evacuation event leads to approximately four (4) hours of workday interruption per person required to evacuate. This accounts for evacuation up to two (2) hours prior to the scheduled launch time, and an additional two (2) hours for the landing window. The anticipated increase in space launch operations tempo will only increase the number of evacuations, resulting in a greater loss in efficiency and an unacceptable level of mission disruption. Additionally, several launch critical tasks are currently performed at PSFB, located 30 minutes south of CCSFS. These inefficiencies will continue to negatively affect CCSFS and the Eastern Range. IMPACT IF NOT PROVIDED: The anticipated increase in launch operations tempo will drive an increased frequency of personnel having to evacuate their current facilities during launch operations, increasing mission disruptions, and decreasing mission readiness and efficiency. ADDITIONAL: This project meets applicable criteria/scope specified in Department of the Air Force Manual 32-1084, Standard Facility Requirements. This design shall conform to criteria established in the Air Force Corporate Facilities Standards, the Installation Facilities Standards, but will not employ a standard facility design because there is no Air Force standard facility design for this project, and there is no applicable standard design from Air Force Civil Engineer Center or U.S. Army Corps of Engineers. A Waiver to an Economic Analysis has been approved for this project. Sustainable principles, to include life-cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with Unified Facilities Criteria 1-200-02, High Performance and Sustainable Building Requirements. This includes preparation of a life-cycle cost analysis for energy consuming systems, renewable energy generating systems, or whenever life-cycle cost effective is selected as the reason any requirement of Unified Facilities Criteria 1-200-02 is partially compliant or not applicable. The project falls within the 100-year floodplain. The risk will be mitigated by DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 97 === page 106 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA MAR 2026 SPACE FORCE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE CAPE CANAVERAL SPACE FORCE STATION FLORIDA COMMAND FACILITY 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211S 610-123 8. PROJECT COST ($000) DBEH033001 85,000 constructing the facility and any flood-susceptible utilities above the 100-year flood level. This is a mission critical facility. The facility and any floodsusceptible utilities will be constructed a minimum of three feet above the 100year flood elevation. Facility is sited in accordance with the Installation Development Plan and is within a compatible land use area. Supporting Facilities exceed 25% of the Primary Facilities total due to the cost for developing an undeveloped green site to include an additional future command facility, utilities, and the need to raise the finished floor elevation to be above the storm surge elevation. The construction growth offset for this requirement is 6,671 square meters (71,801 square feet). Future Related Projects: DBEH033000 - Launch Support Facility DBEH033002 - Gymnasium DBEH033003 - Launch Control Center Air Force Plant Administration Office: 6,671 SM = 71,801 SF SLD 45 Base Civil Engineer (321)-854-4041 JOINT USE CERTIFICATION: This facility can be used by other components on an "as available" basis; however, the scope of the project is based on Air Force requirements. Facility Condition Index: This is not a recapitalization project. No Facility Condition Index data exists for this facility type. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 98 === page 107 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA MAR 2026 SPACE FORCE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE CAPE CANAVERAL SPACE FORCE STATION FLORIDA COMMAND FACILITY 5. PROGRAM ELEMENT 7. PROJECT NUMBER 12. 6. CATEGORY CODE 8. PROJECT COST ($000) 91211S 610-123 DBEH033001 SUPPLEMENTAL DATA: A. Estimated Execution Data: (1) Acquisition Strategy: Design-Bid-Build (2) Design Data (a) Design or Request for Proposal(RFP) Started: (b) Percent of Design Completed as of SEP 2025: (c) Percent of Design Completed as of JAN 2026: (d) Design or RFP Complete: (e) Total Design Cost ($000): (f) Energy Study and/or Life Cycle Cost Analysis (g) Standard or Definitive Design Used? (3) Construction Data: (a) Contract Award: (b) Construction Start: (c) Construction Complete: 85,000 DEC/2024 35% 65% MAR/2026 12,750 NO NO FEB/2027 MAY/2027 JUN/2029 B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) FF&E (est. 4%) DD FORM 1391C, JUL 1999 3080 PREVIOUS EDITION IS OBSOLETE 2029 3,400 PAGE NO. 99 === page 108 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA SPACE FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE CAPE CANAVERAL SPACE FORCE STATION FLORIDA COMMUNICATIONS PLANT WAREHOUSE 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211S 442-758 DBEH227786 8. PROJECT COST ($000) 48,400 9. COST ESTIMATES ITEM UM QUANTITY UNIT COST COST($000) PRIMARY FACILITIES 25,197 WAREHOUSE SUPPLY AND EQUIPMENT BASE (442-758) SM 5,474 4,491 (24,582) CYBERSECURITY OF FACILITY-RELATED CONTROL SYS LS (615) SUPPORTING FACILITIES 18,085 UTILITIES LS (7,529) SITE PREPARATION LS (4,501) COMMUNICATIONS LS (3,601) SITE IMPROVEMENTS LS (627) ROADS, SIDEWALKS, AND PARKING LS (1,827) SUBTOTAL 43,282 CONTINGENCY (5.00%) 2,164 TOTAL CONTRACT COST 45,446 SUPERVISION, INSPECTION AND OVERHEAD (6.50%) 2,954 TOTAL REQUEST 48,400 TOTAL REQUEST (ROUNDED) 48,400 EQUIPMENT FROM OTHER APPROPRIATIONS (NON-ADD) (234) 10. DESCRIPTION OF PROPOSED CONSTRUCTION Construct 5,474 SM of high-bay storage and warehouse space to include administrative and laboratory space. The interior building slabs will be concrete slab-on-grade construction with turndowns around the perimeter. The warehouse slab will be 10 inches thick, and the administrative spaces will be 6 inches thick. The warehouse structure will consist of metal deck over manufactured steel joists. The roof system will utilize a Modified Bitumen membrane with tapered rigid insulation set on the structural deck. The exterior walls will be non-load bearing precast walls and the exterior walls for the administration area will be CMU with a stucco finish. Aluminum storefront/glazing will be used for vestibule entry, clerestory windows in warehouse spaces and into the single height spaces. Large coiling doors will be installed in the interior warehouse space. Interior walls are to be metal stud construction with gypsum board applied to both sides. Flooring in workshops will be sealed concrete except for areas that require anti-static coatings. Flooring in administrative support areas and kitchenette will utilize no wax luxury vinyl tile (LVT). Flooring in restrooms will be porcelain tile. Walls in administrative support areas and kitchenette will be painted gypsum. Restroom walls to continue floor tile on wet walls to 48-inches above finished floor (AFF). Ceilings will be exposed in workshop areas and gypsum board ceilings in administrative support areas, kitchenette, and restroom. Provide lightning and fire protection systems for the new facility. Potable water, sewer, and power will be provided within the facility. All mechanical systems will be controlled through Building Automation and Control Network (BACnet) Direct Digital Control (DDC) and shall be compatible with existing installation energy management and control systems. Connectivity to the base communications network shall also be provided. Install approximately 760 meters of concrete encased duct bank, manholes, and fiber optic cables. Facilities will be designed as permanent construction in accordance with Department of War Unified Facilities Criteria 1-200-01, General Building requirements. This project will comply with Department of War antiterrorism/ force protection requirements per Unified Facilities DD FORM 1391, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 100 === page 109 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA SPACE FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE CAPE CANAVERAL SPACE FORCE STATION FLORIDA COMMUNICATIONS PLANT WAREHOUSE 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211S 442-758 8. PROJECT COST ($000) 48,400 DBEH227786 Criteria 4-010-01. Air Conditioning: 65 Tons 11. REQ: 5,474 SM ADQT: 0 SUBSTD: 0 PROJECT: COMMUNICATIONS PLANT WAREHOUSE REQUIREMENT: Cape Canaveral Space Force Station (CCSFS) is an installation of the United States Space Force Space Operations Command Space Launch Delta 45 (SLD 25). CCSFS is the primary launch head of United States Eastern Range with numerous active launch pads. Launch operations at CCSFS directly support unique Department of War (DoW) and national interest missions. This project is required to construct a safe, secure, and consolidated storage and warehouse facility in direct support of various launch support operations at CCSFS. This facility will include high-bay warehouse space and associated administrative space in support of critical launch support operations currently performed by SLD 45 personnel in various facilities often forced to evacuate during space launch operations. The consolidation of storage and warehouse functions in a facility at a safe distance from active space launch complexes (SLCs) will eliminate the need for personnel evacuations, increasing safety and mission efficiency. This project will also provide space on CCSFS for launch support personnel to relocate from Patrick Space Force Base (PSFB), once again raising efficiency and lowering operational costs. This project is one of four related projects for storage and warehouse facilities necessary to offer sufficient real estate for commercial launch providers and SLD 45 personnel and ensure Space Force mission continuity.This is not a tenant or supported service requirement. CURRENT SITUATION: Currently, various launch operations at CCSFS force the evacuation of non-launch related personnel located in areas of the installation in proximity to the SLCs. CCSFS is the World's busiest spaceport, facilitating 93 space launches in Calendar Year 2024. Each evacuation event leads to approximately four (4) hours of workday interruption per person required to evacuate. This accounts for evacuation up to two (2) hours prior to the scheduled launch time, and an additional two (2) hours for the landing window. The anticipated increase in space launch operations tempo will only increase the number of evacuations, resulting in a greater loss in efficiency and an unacceptable level of mission disruption. Additionally, several launch critical tasks are currently performed at PSFB, located 30 minutes south of CCSFS. These inefficiencies will continue to negatively affect CCSFS and the Eastern Range without this project. IMPACT IF NOT PROVIDED: If this project is not provided, various launch operations at CCSFS will continue to force the evacuation of non-launch related personnel located in areas of the installation in proximity of the space launch complexes. The anticipated increase DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 101 === page 110 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA SPACE FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE CAPE CANAVERAL SPACE FORCE STATION FLORIDA COMMUNICATIONS PLANT WAREHOUSE 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211S 442-758 8. PROJECT COST ($000) DBEH227786 48,400 in space launch operations tempo will increase the number of evacuations, resulting in a loss in efficiency and an unacceptable level of mission disruption. ADDITIONAL: This project meets applicable criteria/scope specified in Department of the Air Force Manual 32-1084, Standard Facility Requirements. This design shall conform to criteria established in the Air Force Corporate Facilities Standards, the Installation Facilities Standards, but will not employ a standard facility design because there is no Air Force standard facility design for this project, and there is no applicable standard design from Air Force Civil Engineer Center or U.S. Army Corps of Engineers MILCON is the only option that will meet operational requirements. Sustainable principles, to include life-cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with Unified Facilities Criteria 1-200-02, High Performance and Sustainable Building Requirements. This includes preparation of a life-cycle cost analysis for energy consuming systems, renewable energy generating systems, or whenever life-cycle cost effective is selected as the reason any requirement of Unified Facilities Criteria 1-200-02 is partially compliant or not applicable. This project does not fall within or partly within the 100-year floodplain. Facility is sited in accordance with the Installation Development Plan and is within a compatible land use area. Supporting Facilities exceed 25% of the Primary Facilities total due to the addition of a large storm chamber and increase in telecommunications scope. The construction growth offset for this requirement is 5,474 square meters (58,925 square feet). Related Projects: DBEH227756 - Base Support Warehouse DBEH227787 - Communications Supply Warehouse DBEH227788 - Mission Support Warehouse Warehouse Supply and Equipment Base (442-758): 5,474 SM = 58,925 SF SLD 45 Base Civil Engineer (321)-854-4041 JOINT USE CERTIFICATION: This facility can be used by other components on an "as available" basis; however, the scope of the project is based on Air Force requirements. Facility Condition Index: This is not a recapitalization project. No Facility Condition Index data exists for this facility type. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 102 === page 111 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA SPACE FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE CAPE CANAVERAL SPACE FORCE STATION FLORIDA COMMUNICATIONS PLANT WAREHOUSE 5. PROGRAM ELEMENT 7. PROJECT NUMBER 12. 6. CATEGORY CODE 8. PROJECT COST ($000) 91211S 442-758 DBEH227786 SUPPLEMENTAL DATA: A. Estimated Execution Data: (1) Acquisition Strategy: Design-Bid-Build (2) Design Data (a) Design or Request for Proposal(RFP) Started: (b) Percent of Design Completed as of SEP 2025: (c) Percent of Design Completed as of JAN 2026: (d) Design or RFP Complete: (e) Total Design Cost ($000): (f) Energy Study and/or Life Cycle Cost Analysis (g) Standard or Definitive Design Used? (3) Construction Data: (a) Contract Award: (b) Construction Start: (c) Construction Complete: 48,400 SEP/2024 35% 65% MAR/2026 7,200 YES NO FEB/2027 MAY/2027 AUG/2029 B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) FF&E DD FORM 1391C, JUL 1999 3080 PREVIOUS EDITION IS OBSOLETE 2029 234 PAGE NO. 103 === page 112 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA MAR 2026 SPACE FORCE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE CAPE CANAVERAL SPACE FORCE STATION FLORIDA LAUNCH SUPPORT FACILITY 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211S 610-123 8. PROJECT COST ($000) DBEH033000 84,000 9. COST ESTIMATES ITEM UM QUANTITY UNIT COST COST($000) PRIMARY FACILITIES 59,842 AIR FORCE PLANT ADMINISTRATION OFFICE (610SM 7,011 8,327 (58,382) 123) CYBERSECURITY OF FACILITY-RELATED CONTROL SYS LS (1,460) SUPPORTING FACILITIES 15,197 UTILITIES LS (8,647) SITE PREPARATION LS (2,679) ROADS, SIDEWALKS, AND PARKING LS (2,117) SITE IMPROVEMENTS LS (1,754) SUBTOTAL 75,038 CONTINGENCY (5.00%) 3,752 TOTAL CONTRACT COST 78,790 SUPERVISION, INSPECTION AND OVERHEAD (6.50%) 5,121 TOTAL REQUEST 83,911 TOTAL REQUEST (ROUNDED) 84,000 EQUIPMENT FROM OTHER APPROPRIATIONS (NON-ADD) (3,360) 10. DESCRIPTION OF PROPOSED CONSTRUCTION Construct a 3-story, 7,011 SM (75,468 SF) building with administration and support space for roughly 310 Space Launch Delta 45 (SLD 45) staff and contractor partners on Cape Canaveral Space Force Station (CCSFS). The building will be a concrete frame structure. Exterior walls will be a high-performance unitized curtain wall system paired with a curtain wall glazing system with a clear anodized finish. Entrances and windows will be aluminum window and curtainwall systems. The roof will be a lightweight insulating concrete roofing system over a structural castin-place (CIP) concrete slab and modified bitumen roofing over the main facility. The viewing terrace roof system will be a liquid-applied polymethyl methacrylate (PMMA) membrane with sloped polyisocyanurate insulation. Roof crickets will be used to divert water towards scuppers and steel downspouts. The building structure and exterior components will be designed for Hurricane Risk Category III. Provide lightning and fire protection systems. Potable water, sewer, and power will be provided within the facility. The building will be comprised of individual offices, open offices, conference spaces and support spaces. All mechanical systems will be controlled through building automation and control network (BACnet) Direct Digital Control (DDC) and shall be compatible with existing installation energy management and control systems (ECMS). Facilities will be designed as permanent construction in accordance with Department of War Unified Facilities Criteria 1-200-01, General Building requirements. This project will comply with Department of War antiterrorism/ force protection requirements per Unified Facilities Criteria 4-010-01. 11. REQ: 7,011 SM ADQT: 0 SUBSTD: 0 PROJECT: Construct 7,011 SM launch support facility. REQUIREMENT: CCSFS is an installation of the United States Space Force Space Operations Command DD FORM 1391, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 104 === page 113 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA MAR 2026 SPACE FORCE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE CAPE CANAVERAL SPACE FORCE STATION FLORIDA LAUNCH SUPPORT FACILITY 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211S 610-123 DBEH033000 8. PROJECT COST ($000) 84,000 Space Launch Delta 45 (SLD 45). CCSFS is the primary launch head of United States Eastern Range with numerous active launch pads. Launch operations at CCSFS directly support unique Department of War (DoW) and national interest missions. This project is required to construct a safe, secure, and consolidated administrative facility for approximately 310 SLD 45 personnel in direct support of various launch support operations at CCSFS. This facility will include consolidated administrative and critical launch support spaces for operations currently performed in various facilities often forced to evacuate during space launch operations. In particular, this project is required to relocate personnel from buildings 01645, 01711, 44410, 44440, 60701, and personnel from building 989 at Patrick Space Force Base (PSFB). The consolidation of launch support functions in a facility which is a safe distance away from active space launch complexes (SLCs) will eliminate the need for personnel evacuations, increasing safety and mission efficiency. This is not a tenant or supported service requirement. CURRENT SITUATION: Currently, various launch operations at CCSFS force the evacuation of non-launch related personnel located in areas of the installation in proximity to the SLCs. CCSFS is the world's busiest spaceport, facilitating 93 space launches in Calendar Year 2024. Each evacuation event leads to approximately four (4) hours of workday interruption per person required to evacuate. This accounts for evacuation up to two (2) hours prior to the scheduled launch time, and an additional two (2) hours for the landing window. The anticipated increase in space launch operations tempo will only increase the number of evacuations, resulting in a greater loss in efficiency and an unacceptable level of mission disruption. Additionally, several launch critical tasks are currently performed at PSFB, located 30 minutes south of CCSFS. These inefficiencies will continue to negatively affect CCSFS and the Eastern Range. IMPACT IF NOT PROVIDED: The anticipated increase in launch operations tempo will drive an increased frequency of personnel having to evacuate their current facilities during launch operations, increasing mission disruptions, and decreasing mission readiness and efficiency. ADDITIONAL: This project meets applicable criteria/scope specified in Department of the Air Force Manual 32-1084, Standard Facility Requirements. This design shall conform to criteria established in the Air Force Corporate Facilities Standards, the Installation Facilities Standards, but will not employ a standard facility design because there is no Air Force standard facility design for this project, and there is no applicable standard design from Air Force Civil Engineer Center or U.S. Army Corps of Engineers. A Waiver to an Economic Analysis has been approved for this project. Sustainable principles, to include life-cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with Unified Facilities Criteria 1-200-02, High Performance and Sustainable Building Requirements. This includes preparation of a life-cycle cost analysis for energy consuming systems, renewable energy generating systems, or DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 105 === page 114 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA MAR 2026 SPACE FORCE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE CAPE CANAVERAL SPACE FORCE STATION FLORIDA LAUNCH SUPPORT FACILITY 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211S 610-123 8. PROJECT COST ($000) DBEH033000 84,000 whenever life-cycle cost effective is selected as the reason any requirement of Unified Facilities Criteria 1-200-02 is partially compliant or not applicable. The project falls within the 100-year floodplain. The risk will be mitigated by constructing the facility and any flood-susceptible utilities above the 100-year flood level. This is a mission critical facility. The facility and any floodsusceptible utilities will be constructed a minimum of three feet above the 100year flood elevation. Facility is sited in accordance with the Installation Development Plan and is within a compatible land use area. Supporting Facilities exceed 25% of the Primary Facilities total due to the cost for developing an undeveloped green site to include an additional future command facility, utilities, and the need to raise the finished floor elevation to be above the storm surge elevation. The construction growth offset for this requirement is 7,011 square meters (75,468 square feet). Future Related Project: DBEH033001 - Command Facility DBEH033002 - Gymnasium DBEH033003 - Launch Control Center Air Force Plant Administration Office: 7,011 SM = 75,468 SF SLD 45 Base Civil Engineer (321)-854-4041 JOINT USE CERTIFICATION: This facility can be used by other components on an "as available" basis; however, the scope of the project is based on Air Force requirements. Facility Condition Index: This is not a recapitalization project. No Facility Condition Index data exists for this facility type. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 106 === page 115 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA MAR 2026 SPACE FORCE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE CAPE CANAVERAL SPACE FORCE STATION FLORIDA LAUNCH SUPPORT FACILITY 5. PROGRAM ELEMENT 7. PROJECT NUMBER 12. 6. CATEGORY CODE 8. PROJECT COST ($000) 91211S 610-123 DBEH033000 SUPPLEMENTAL DATA: A. Estimated Execution Data: (1) Acquisition Strategy: Design-Bid-Build (2) Design Data (a) Design or Request for Proposal(RFP) Started: (b) Percent of Design Completed as of SEP 2025: (c) Percent of Design Completed as of JAN 2026: (d) Design or RFP Complete: (e) Total Design Cost ($000): (f) Energy Study and/or Life Cycle Cost Analysis (g) Standard or Definitive Design Used? (3) Construction Data: (a) Contract Award: (b) Construction Start: (c) Construction Complete: 84,000 DEC/2024 35% 65% MAR/2026 12,600 NO NO FEB/2027 MAY/2027 JUN/2029 B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) FF&E (est. 4%) DD FORM 1391C, JUL 1999 3080 PREVIOUS EDITION IS OBSOLETE 2029 3,360 PAGE NO. 107 === page 116 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA SPACE FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE CAPE CANAVERAL SPACE FORCE STATION FLORIDA LRS VEHICLE MAINTENANCE FACILITY 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211S 214-425 8. PROJECT COST ($000) 80,400 DBEH227784 9. COST ESTIMATES ITEM UM QUANTITY UNIT COST COST($000) PRIMARY FACILITIES 51,604 VEHICLE MAINTENANCE SHOP (214-425) SM 5,291 9,515 (50,345) CYBERSECURITY OF FACILITY-RELATED CONTROL SYS LS (1,259) SUPPORTING FACILITIES 20,261 ROADS, SIDEWALKS, AND PARKING LS (7,116) SITE PREPARATION LS (6,409) SITE IMPROVEMENTS LS (4,186) UTILITIES LS (2,168) COMMUNICATIONS LS (382) SUBTOTAL 71,865 CONTINGENCY (5.00%) 3,593 TOTAL CONTRACT COST 75,458 SUPERVISION, INSPECTION AND OVERHEAD (6.50%) 4,905 TOTAL REQUEST 80,363 TOTAL REQUEST (ROUNDED) 80,400 EQUIPMENT FROM OTHER APPROPRIATIONS (NON-ADD) (428) 10. DESCRIPTION OF PROPOSED CONSTRUCTION The facility will include high-bay shop space and administrative space. The high bay portion of the facility shall be built upon a 10-inch-thick slab on grade with thickened edges and the administrative and laboratory space shall be supported by an 8-inch slab on grade. Provide breakroom/kitchenette and two restrooms within the facility. Walls will be pre-finished galvanized aluminum sandwich panels with a split-face Concrete Masonry Unit (CMU) base to 7'4" above finished floor level. The roof will be insulated standing seam metal panels. Windows will be aluminum and gutters and downspouts will be pre-finished aluminum. The building structure and exterior components will be designed for Hurricane Risk Category III. Provide lightning and fire protection systems for the new facility. Potable water, sewer, and power will be provided within the facility. Connectivity to the building's office and administration spaces heating and cooling will be served by a MultiZone Variable Volume Air Handling Unit. All mechanical systems will be controlled through Building Automation and Control Network (BACnet) Direct Digital Control (DDC) and shall be compatible with existing installation energy management and control systems (ECMS). Supporting site improvements include exterior lighting, miscellaneous and facility signage. Improvements also include 1.01 hectares of asphalt cement concrete parking/queuing areas, access roads, and concrete sidewalk. Additional site improvements include crosswalk marking, stormwater drainage structures, and grading to support stormwater detention. Facilities will be designed as permanent construction in accordance with Department of War Unified Facilities Criteria 1-200-01, General Building requirements. This project will comply with Department of War antiterrorism/ force protection requirements per Unified Facilities Criteria 4-010-01. 11. REQ: 5,291 SM ADQT: 0 SUBSTD: 0 PROJECT: LRS VEHICLE MAINTENANCE FACILITY DD FORM 1391, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 108 === page 117 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA SPACE FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE CAPE CANAVERAL SPACE FORCE STATION FLORIDA LRS VEHICLE MAINTENANCE FACILITY 5. PROGRAM ELEMENT 7. PROJECT NUMBER 6. CATEGORY CODE 8. PROJECT COST ($000) 80,400 91211S 214-425 DBEH227784 REQUIREMENT: Cape Canaveral Space Force Station (CCSFS) is an installation of the United States Space Force Space Operations Command Space Launch Delta 45 (SLD 45). CCSFS is the primary launch head of United States Eastern Range with numerous active launch pads. Launch operations at CCSFS directly support unique DoW and national interest missions. This project is required to construct a safe, secure, and consolidated shop and laboratory facility in direct support of various launch support operations at CCSFS. This facility will include high-bay shop space and administrative space in support of critical launch support operations currently performed by SLD 45 personnel in various facilities often forced to evacuate during space launch operations. In particular, this project is required to relocates personnel from buildings 01744, 01759, 49536, 49535, 49505, and 54814, thereby increasing safety and efficiency. The consolidation of shop and laboratory functions in a facility which is a safe distance away from active space launch complexes (SLCs) will eliminate the need for personnel evacuations, increasing safety and mission efficiency. This project will also provide space on CCSFS for launch support personnel to relocate from Patrick Space Force Base (PSFB), once again raising efficiency and lowering operational costs. This project is one of four phases of shop and laboratory facility recapitalization necessary to offer sufficient real estate for commercial launch providers and SLD 45 personnel and ensure Space Force mission continuity. This is not a tenant or supported service requirement. CURRENT SITUATION: Currently, various launch operations at CCSFS force the evacuation of non-launch related personnel located in areas of the installation in proximity to the SLCs. CCSFS is the world's busiest spaceport, facilitating 93 space launches in Calendar Year 2024. Each evacuation event leads to approximately four (4) hours of workday interruption per person required to evacuate. This accounts for evacuation up to two (2) hours prior to the scheduled launch time, and an additional two (2) hours for the landing window. The anticipated increase in space launch operations tempo will only increase the amount of evacuations, resulting in a greater loss in efficiency and an unacceptable level of mission disruption. Additionally, several launch critical tasks are currently performed at PSFB, located 30 minutes south of CCSFS. These inefficiencies will continue to negatively affect CCSFS and the Eastern Range without this project. IMPACT IF NOT PROVIDED: If not provided, various launch operations at CCSFS will continue to force the evacuation of non-launch related personnel located in areas of the installation in proximity of the SLCs. The anticipated increase in space launch operations tempo will increase the number of evacuations, resulting in a loss in efficiency and an unacceptable level of mission disruption. ADDITIONAL: This project meets applicable criteria/scope specified in Department of the Air Force Manual 32-1084, Standard Facility Requirements. This design shall conform to criteria established in the Air Force Corporate Facilities Standards but will not employ a standard facility design because there is no Air Force standard facility DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 109 === page 118 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA SPACE FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE CAPE CANAVERAL SPACE FORCE STATION FLORIDA LRS VEHICLE MAINTENANCE FACILITY 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211S 214-425 DBEH227784 8. PROJECT COST ($000) 80,400 design for this project, and there is no applicable standard design from Air Force Civil Engineer Center or U.S. Army Corps of Engineers. All reasonable alternatives were considered during the development of this project to include status quo and new construction. An approved Economic Analysis determined new construction as the only viable option to meet this requirement. Sustainable principles, to include life-cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with Unified Facilities Criteria 1-200-02, High Performance and Sustainable Building Requirements. This includes preparation of a life-cycle cost analysis for energy consuming systems, renewable energy generating systems, or whenever life-cycle cost effective is selected as the reason any requirement of Unified Facilities Criteria 1-200-02 is partially compliant or not applicable. The project falls within the 100-year floodplain. The risk will be mitigated by constructing the facility and any flood-susceptible utilities above the 100-year flood level. This is a mission critical facility. The facility and any flood-susceptible utilities will be constructed a minimum of three feet above the 100-year flood elevation. Facility is sited in accordance with the Installation Development Plan and is within a compatible land use area. Supporting Facilities exceed 25% of the Primary Facilities total due to the cost for developing an undeveloped green site to include utilities and the need to raise the finished floor elevation to be above the storm surge elevation. The construction growth offset for this requirement is 5,291 square meters (56,957 square feet). Future Related Projects: DBEH227755 - Security Forces Operations Facility DBEH227785 - Security Forces Training Center DBEH251525 - Fuel Testing Chemical Laboratory Vehicle Maintenance Shop: 5,291 SM = 56,957 SF SLD 45 Base Civil Engineer (321)-854-4041 JOINT USE CERTIFICATION: This facility can be used by other components on an "as available" basis; however, the scope of the project is based on Air Force requirements. Facility Condition Index: This is not a recapitalization project. No Facility Condition Index data exists for this facility type. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 110 === page 119 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA SPACE FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE CAPE CANAVERAL SPACE FORCE STATION FLORIDA LRS VEHICLE MAINTENANCE FACILITY 5. PROGRAM ELEMENT 7. PROJECT NUMBER 12. 6. CATEGORY CODE 8. PROJECT COST ($000) 91211S 214-425 DBEH227784 SUPPLEMENTAL DATA: A. Estimated Execution Data: (1) Acquisition Strategy: Design-Bid-Build (2) Design Data (a) Design or Request for Proposal(RFP) Started: (b) Percent of Design Completed as of SEP 2025: (c) Percent of Design Completed as of JAN 2026: (d) Design or RFP Complete: (e) Total Design Cost ($000): (f) Energy Study and/or Life Cycle Cost Analysis (g) Standard or Definitive Design Used? (3) Construction Data: (a) Contract Award: (b) Construction Start: (c) Construction Complete: 80,400 OCT/2024 35% 65% MAR/2026 12,000 YES NO FEB/2027 MAY/2027 MAR/2030 B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) FF&E DD FORM 1391C, JUL 1999 3080 PREVIOUS EDITION IS OBSOLETE 2030 428 PAGE NO. 111 === page 120 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA SPACE FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE CAPE CANAVERAL SPACE FORCE STATION FLORIDA SECURITY FORCES OPERATIONS FACILITY 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211S 730-835 DBEH227755 8. PROJECT COST ($000) 48,000 9. COST ESTIMATES ITEM UM QUANTITY UNIT COST COST($000) PRIMARY FACILITIES 30,954 SECURITY POLICE OPERATIONS (730-835) SM 2,100 14,621 (30,704) CYBERSECURITY OF FACILITY-RELATED CONTROL SYS LS (250) SUPPORTING FACILITIES 11,818 SITE PREPARATION LS (4,832) SITE IMPROVEMENTS LS (2,621) ROADS, SIDEWALKS, AND PARKING LS (2,471) UTILITIES LS (1,208) GENERATOR KW 600 657 (394) COMMUNICATIONS LS (291) SUBTOTAL 42,772 CONTINGENCY (5.00%) 2,139 TOTAL CONTRACT COST 44,911 SUPERVISION, INSPECTION AND OVERHEAD (6.50%) 2,919 TOTAL REQUEST 47,830 TOTAL REQUEST (ROUNDED) 48,000 EQUIPMENT FROM OTHER APPROPRIATIONS (NON-ADD) (1,054) 10. DESCRIPTION OF PROPOSED CONSTRUCTION The facility will include 2,100 SM of administrative and armory space for security forces. The Base Defense Operations Center (BDOC) will be a reinforced concrete structure with interior and exterior cast-in-place shear walls and a cast-in-place roof slab. The primary framing will consist of conventional braced steel frames with non-load bearing exterior precast walls. The main roof will be framed with a mix of conventional wide flange beams and joists, which support a steel wide rib roof deck. The steel decking will be structured as a diaphragm. The armory will be a free-standing space isolated from the larger structure formed using cast-inplace concrete walls and roof. The exterior walls will consist of insulated precast wall panels. The roof assemblies use a half-inch glass mat gypsum thermal board, Class III vapor retarder, rigid insulation with a modified bitumen roofing system. Entrances and windows will be aluminum window and curtainwall systems. Scuppers, downspouts, and overflow scuppers are provided on buildingâs perimeter. The building structure and exterior components will be designed for Hurricane Risk Category III. Provide lightning and fire protection systems. Potable water, sewer, and power will be provided within the facility. The building's shop and laboratory spaces heating, cooling, and ventilation will be served by a Multi-Zone Variable Volume 100% Outdoor Air Makeup Air Handling Unit. All mechanical systems will be controlled through Building Automation and Control Network (BACnet) Direct Digital Control (DDC) and shall be compatible with existing installation energy management and control systems (EMCS). Provide lightning and fire protection systems. Potable water, sewer, and power will be provided within the facility. Equip facility with a 600kW emergency backup generator and 100-gallon AST. Supporting site improvements include exterior lighting, miscellaneous and facility signage. Improvements also include asphalt cement concrete parking/queuing areas, access roads, and concrete sidewalk. Additional site improvements include crosswalk marking, stormwater drainage structures, and grading to support stormwater detention. Facilities will be designed as permanent construction in accordance DD FORM 1391, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 112 === page 121 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA SPACE FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE CAPE CANAVERAL SPACE FORCE STATION FLORIDA SECURITY FORCES OPERATIONS FACILITY 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211S 730-835 8. PROJECT COST ($000) DBEH227755 48,000 with Department of War Unified Facilities Criteria 1-200-01, General Building requirements. This project will comply with Department of War antiterrorism/force protection requirements per Unified Facilities Criteria 4-010-01. 11. REQ: 2,100 SM ADQT: 0 SUBSTD: 0 PROJECT: SECURITY FORCES OPERATIONS FACILITY REQUIREMENT: Cape Canaveral Space Force Station (CCSFS) is an installation of the United States Space Force Space Operations Command Space Launch Delta 45 (SLD 45). CCSFS is the primary launch head of United States Eastern Range with numerous active launch pads. Launch operations at CCSFS directly support unique DoW and national interest missions. This facility is part of the Relocation of Non-Launch Missions out of the Launch Operations Zone and into the Mission Operations & Launch Support Zone. This facility will consist of a Base Defense Operations Center (BDOC), a data center, two holding cells, a guard mount, weapons cleaning room, armory, associated staff offices, a Siemens Tech alarm office, counter-small unmanned aerial systems (C-SUAS) office and storage, locker rooms, shower rooms, and conference rooms. The Security Forces functions is part of the proposed administrative campus master plan which locates the facility a safe distance away from active space launch complexes (SLCs) and will eliminate the need for personnel evacuations, increasing safety and mission efficiency. This project will also provide space on CCSFS for launch support personnel to relocate from Patrick Space Force Base (PSFB), once again raising efficiency and lowering operational costs. This project is one of four phases of administrative and laboratory facility recapitalization necessary to offer sufficient real estate for commercial launch providers and SLD 45 personnel and ensure Space Force mission continuity. This is not a tenant or supported service requirement. CURRENT SITUATION: Currently, various launch operations at CCSFS force the evacuation of non-launch related personnel located in areas of the installation in proximity to the SLCs. CCSFS is the world's busiest spaceport, facilitating 93 space launches in Calendar Year 2024. Each evacuation event leads to approximately four (4) hours of workday interruption per person required to evacuate. This accounts for evacuation up to two (2) hours prior to the scheduled launch time, and an additional two (2) hours for the landing window. The anticipated increase in space launch operations tempo will only increase the amount of evacuations, resulting in a greater loss in efficiency and an unacceptable level of mission disruption. Additionally, several launch critical tasks are currently performed at PSFB, located 30 minutes south of CCSFS. These inefficiencies will continue to negatively affect CCSFS and the Eastern Range without this project. IMPACT IF NOT PROVIDED: If not provided, various launch operations at CCSFS will continue to force the evacuation of non-launch related personnel located in areas of the installation in DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 113 === page 122 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA SPACE FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE CAPE CANAVERAL SPACE FORCE STATION FLORIDA SECURITY FORCES OPERATIONS FACILITY 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211S 730-835 DBEH227755 8. PROJECT COST ($000) 48,000 proximity of the SLCs. The anticipated increase in space launch operations tempo will increase the number of evacuations, resulting in a loss in efficiency and an unacceptable level of mission disruption. ADDITIONAL: This project meets applicable criteria/scope specified in Department of the Air Force Manual 32-1084, Standard Facility Requirements. This design shall conform to criteria established in the Air Force Corporate Facilities Standards, the Installation Facilities Standards, but will not employ a standard facility design because there is no Air Force standard facility design for this project, and there is no applicable standard design from Air Force Civil Engineer Center or U.S. Army Corps of Engineers. All reasonable alternatives were considered during the development of this project to include status quo and new construction. An approved Economic Analysis determined new construction as the only viable option to meet this requirement. Sustainable principles, to include life-cycle costeffective practices, will be integrated into the design, development, and construction of the project in accordance with Unified Facilities Criteria 1-20002, High Performance and Sustainable Building Requirements. This includes preparation of a life-cycle cost analysis for energy consuming systems, renewable energy generating systems, or whenever life-cycle cost effective is selected as the reason any requirement of Unified Facilities Criteria 1-200-02 is partially compliant or not applicable. The project falls within the 100-year floodplain. The risk will be mitigated by constructing the facility and any flood-susceptible utilities above the 100-year flood level. This is a mission critical facility. The facility and any flood-susceptible utilities will be constructed a minimum of three feet above the 100-year flood elevation. Facility is sited in accordance with the Installation Development Plan and is within a compatible land use area. Supporting Facilities exceed 25% of the Primary Facilities total due to the cost for developing an undeveloped green site to include utilities and the need to raise the finished floor elevation to be above the storm surge elevation. The construction growth offset for this requirement is 2,100 square meters (22,605 square feet). Future Related Projects: DBEH227784 - LRS Vehicle Maintenance Facility DBEH227785 - Security Forces Training Center DBEH251525 - Fuel Testing Chemical Laboratory Security Police Operations: 2,100 SM = 22,605 SF SLD 45 Base Civil Engineer (321)-854-4041 JOINT USE CERTIFICATION: This facility can be used by other components on an "as available" basis; however, the scope of the project is based on Air Force requirements. Facility Condition Index: This is not a recapitalization project. No Facility DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 114 === page 123 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA SPACE FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE CAPE CANAVERAL SPACE FORCE STATION FLORIDA SECURITY FORCES OPERATIONS FACILITY 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211S 730-835 DBEH227755 8. PROJECT COST ($000) 48,000 Condition Index data exists for this facility type. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 115 === page 124 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA SPACE FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE CAPE CANAVERAL SPACE FORCE STATION FLORIDA SECURITY FORCES OPERATIONS FACILITY 5. PROGRAM ELEMENT 7. PROJECT NUMBER 12. 6. CATEGORY CODE 8. PROJECT COST ($000) 91211S 730-835 DBEH227755 SUPPLEMENTAL DATA: A. Estimated Execution Data: (1) Acquisition Strategy: Design-Bid-Build (2) Design Data (a) Design or Request for Proposal(RFP) Started: (b) Percent of Design Completed as of SEP 2025: (c) Percent of Design Completed as of JAN 2026: (d) Design or RFP Complete: (e) Total Design Cost ($000): (f) Energy Study and/or Life Cycle Cost Analysis (g) Standard or Definitive Design Used? (3) Construction Data: (a) Contract Award: (b) Construction Start: (c) Construction Complete: 48,000 OCT/2024 35% 65% MAR/2026 7,050 YES NO FEB/2027 MAY/2027 APR/2030 B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) FF&E AV Equipment DD FORM 1391C, JUL 1999 3080 3080 PREVIOUS EDITION IS OBSOLETE 2030 2030 827 227 PAGE NO. 116 === page 125 === 1. COMPONENT 2. DATE (YYYYMMDD) FY 2027 AIR FORCE MILITARY CONSTRUCTION PROGRAM 3. INSTALLATION AND LOCATION 4. COMMAND TYNDALL AIR FORCE BASE, FLORIDA 20260326 5. AREA CONTRUCTION COST INDEX AIR COMBAT COMMAND 0.97 6. PERSONNEL (1) PERMANENT (2) STUDENTS (3) SUPPORTED OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN (4) TOTAL a. AS OF 30-Sep-25 352 2,685 846 171 100 0.00 343 676 346 5,519 b. END FY 30-Sep-30 351 2,685 811 171 100 0 343 675 346 5,482 7. INVENTORY DATA ($000) 28,791 6,349,540.00 48,000.00 0.00 0.00 0.00 0.00 6,397,540.00 a. TOTAL ACREAGE b. INVENTORY TOTAL AS OF 30-Sep-25 c. AUTHORIZATION NOT YET IN INVENTORY d. AUTHORIZATION REQUESTED IN THIS PROGRAM e. AUTHORIZATION INCLUDED IN FOLLOWING PROGRAM f. PLANNED IN NEXT THREE PROGRAM YEARS g. REMAINING DEFICIENCY h. GRAND TOTAL 8. PROJECTS REQUESTED IN THIS PROGRAM a. CATEGORY (1) CODE 310-928 (2) PROJECT TITLE AFCEC RDT&E Facilities and Gate (3) SCOPE b. COST ($000) 36,075 SM 160,000 c. DESIGN STATUS (1) START (2) COMPLETE 09/19 05/20 9. FUTURE PROJECTS None 10. MISSION OR MAJOR FUNCTIONS Tyndall Air Force Base (TAFB) is tasked by the Department of War to support 325 Fighter Wing (FW) permanently assigned fifth-generation fighter aircraft and the 53rd Weapons Evaluation Group (WEG). In addition to the 325 FW fifth-generation fighter mission, the wing is host to Air Combat Command’s Lead Wing (LW) certification exercise, AGILE FLAG, and CHECKERED FLAG. The 53rd WEG executes the Joint Service’s only air-to-air, air-to-ground combat certification mission. This certification mission is required for units to support NORTHCOM Homeland Defense missions and COCOM requirements globally. Wing personnel also manage the southeastern air combat maneuvering installation range in support of the Commander, North American Aerospace Defense Commander/First Air Force contingency plans. TAFB is also home to Air Force Civil Engineer Center (AFCEC) East. AFCEC is a reach back source for all bases across the Air Force when they need technical questions answered related to installation activities. 11. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES N/A DD FORM 1390, JUL 1999 PREVIOUS EDITION IS OBSOLETE. 117 === page 126 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE TYNDALL AIR FORCE BASE FLORIDA AFCEC RDT&E FACILITIES AND GATE 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211F 310-928 XLWU203027 8. PROJECT COST ($000) 160,000 9. COST ESTIMATES ITEM UM QUANTITY UNIT COST COST($000) PRIMARY FACILITIES 86,069 AFCEC RDT&E RESEARCH FACILITY (310-928) SM 12,553 5,808 (72,909) VEHICLE MAINTENANCE FACILITY (214-425) SM 1,165 7,789 (9,074) VEHICLE EQUIPMENT YARD (852-267) SM 23,226 88 (2,044) TENT CITY LAYDOWN AREA (851-147) SM 11,613 88 (1,022) SECURITY FENCE (872-247) LM 3,353 304 (1,020) SUPPORTING FACILITIES 52,254 ELECTRIC SERVICE LS (3,668) WATER, SEWER, GAS LS (4,436) PAVING, WALKS, CURBS AND GUTTERS LS (976) STORM DRAINAGE LS (4,531) SITE IMPROVEMENTS LS (16,404) INFORMATION SYSTEMS LS (130) UPGRADED PRIVATIZED UTILITIES (UP) LS (22,110) SUBTOTAL 138,323 6,916 CONTINGENCY (5.00%) TOTAL CONTRACT COST 145,239 SUPERVISION, INSPECTION AND OVERHEAD (6.50%) 9,441 DESIGN/BUILD - DESIGN COST (4.00% OF SUBTOTAL) 5,533 TOTAL REQUEST 160,213 TOTAL REQUEST (ROUNDED) 160,000 EQUIPMENT FROM OTHER APPROPRIATIONS (NON-ADD) (28,673) 10. DESCRIPTION OF PROPOSED CONSTRUCTION Construct a consolidated Research, Development, Test, and Evaluation (RDT&E) facility to support various Civil Engineer research projects. The project includes construction of approximately [147,659] gross square feet of laboratory, high bay research, specialized tests, administrative, and support space. The facility will provide laboratory environments, mission support areas, equipment staging space, and building systems necessary to support current RDT&E operations. Construction includes reinforced concrete foundation and structural systems, utilities distribution, mechanical and electrical systems sized for laboratory operations, fire protection, communications infrastructure, antiterrorism/force protection measures, and supporting site improvements. Supporting facilities include utilities connections, parking, access roads, storm drainage, and site preparation. Comply with Unified Facilities Criteria 3-301-01 (Structural Engineering) draft which adopts wind speed requirements from ASCE 7-16 applying a minimum Risk Category III, 165 mph. Climatic Resiliency Measures shall also include compliance with Florida Building Code, High Velocity Hurricane Zone standards applicable to Miami-Dade County where they exceed the Unified Facilities Criteria such as opening reinforcement, roof framing to foundation connections, and impact glazing and doors approved by Miami-Dade County. The proposed facility provides complete and usable operational capability for validated Research, Development, Testing & Evaluation requirements and supports current mission execution without reliance on future construction. Smart technology measures include technology and data systems for more resource efficient building operations and to enhance capability to respond to, and recover from, natural and DD FORM 1391, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 118 === page 127 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE TYNDALL AIR FORCE BASE FLORIDA AFCEC RDT&E FACILITIES AND GATE 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211F 310-928 8. PROJECT COST ($000) XLWU203027 160,000 man made disruptions. Privatized utility connection fees are included in their respective supporting facilities line items for electrical Gulf Coast Electric Cooperative (GCEC), water Gulf Coast Electric Cooperative, and gas Peoples Gas Systems (PGS). Air Conditioning: 877 Tons Privatized Utility Connection Fee Electrical LS (15) Privatized Utility Connection Fee Water LS (5) Privatized Utility Connection Fee Gas LS (5) 11. REQ: 13,178 SM ADQT: 12,694 SM SUBSTD: 4,179 SM PROJECT: AFCEC RDT&E Facilities and Gate REQUIREMENT: Construct Air Force Civil Engineer Center (AFCEC) Research, Development, Testing & Evaluation (RDT&E) Complex for the Airbase Acquisition Branch (CXAE). Facilities include: Main Research, Development, Testing & Evaluation research facility, vehicle maintenance facility & other supporting facilities. The main facility, Air Force Civil Engineer Center Research, Development, Testing & Evaluation includes admin, technical info center, research & testing for materials, mechanics,& explosive effects research, pavements, robotics, energy/utilities, fabrication, carpentry, & operations support. Tent city laydown area for analytical & testing equipment directly related to expeditionary research. The vehicle maintenance facility and yard are used to service & repair construction & utility vehicles critical to research operations. A perimeter security fence will span the site of the Research, Development, Testing & Evaluation primary & supporting facilities. Due to coastal, hurricane prone location, resiliency, sustainability and smart technology are critical to mission assurance. When constructed, this facility must demonstrate the ability to adapt to changing conditions; and withstand, respond to and recover from any climatic or other mission disruptions. CURRENT SITUATION: On 10 October, 2018, Tyndall Air Force Base, Florida sustained a direct hit from Hurricane Michael, the strongest sustained-wind hurricane to hit the continental United States in over 25 years. Every facility on the installation sustained at least some damage with approximately 50% of the facilities significantly damaged from the Category 5 Hurricane with wind speeds in excess of 156 miles per hour. Buildings (9704, 9706, 9708, 9710, 9718, 9719, 9720, 9721, 9725, 9727, 9729, 9730, 9733, 9735, 9738, 9739, 9742, and 9768), the facilities which previously housed DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 119 === page 128 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE TYNDALL AIR FORCE BASE FLORIDA AFCEC RDT&E FACILITIES AND GATE 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211F 310-928 XLWU203027 8. PROJECT COST ($000) 160,000 Air Force Civil Engineer Center Research, Development, Testing & Evaluation Facilities were severely damaged. Until a new complex can be constructed, the Air Force Civil Engineer Center Research, Development, Testing & Evaluation personnel are temporarily housed in the Air Force Civil Engineer East Facility (B1117 and 1120). Personnel are operating in adverse conditions, and interactions with offbase personnel are limited. IMPACT IF NOT PROVIDED: If this project is not provided, personnel, and Research, Development, Testing & Evaluation functions will operate with minimal capabilities until replacement facilities are constructed. The Airbase Acquisition Branch (CXAE) will not be able to operate to its full mission capacity and Research, Development, Testing & Evaluation capabilities to further develop new field technologies and prototypes will suffer. The remaining Research, Development, Testing & Evaluation facilities and equipment could be compromised further with high potential for loss of valuable research, materials and equipment ADDITIONAL: This project meets applicable criteria/scope specified in Department of the Air Force Manual 32-1084, Standard Facility Requirements. This design shall conform to criteria established in the Air Force Corporate Facilities Standards but will not employ a standard facility design because there is no Air Force standard facility design for this project, and there is no applicable standard design from Air Force Civil Engineer Center A Waiver to an Economic Analysis has been approved for this project. Sustainable principles, to include life-cycle cost effective practices, will be integrated into the design, development, and construction of the project in accordance with Unified Facilities Criteria 1-200-02, High Performance and Sustainable Building Requirements. This includes preparation of a life-cycle cost analysis for energy consuming systems, renewable energy generating systems, or whenever life-cycle cost effective is selected as the reason any requirement of Unified Facilities Criteria 1-200-02 is partially compliant or not applicable. The RDT&E design shall be user justified according to AFMAN 32-1084, other standalone primary and supporting facilities with criteria should conform to their own standards as listed in the requirements. This design shall conform to criteria established in the Air Force Corporate Facilities Standards (AFCS), the Installation Facilities Standards (IFS), but will not employ a standard facility design because there is no AF standard facility design for this project and there is no applicable standard design due to the uniqueness of the RDT&E mission from AFCEC. This project does not fall within or partly within the 100-year floodplain. Facility is sited in accordance with the Installation Development Plan and is within a compatible land use area. During advanced planning and cost validation, updated market conditions, construction escalation, and refined design requirements resulted in significant cost growth compared to earlier planning estimates. A comprehensive review of scope and mission requirements was conducted to ensure alignment with validated operational needs and fiscal constraints. The revised project scope reflects optimization of facility configuration to provide essential RDT&E capability within available authorization parameters. The proposed construction delivers a complete and fully functional research capability that DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 120 === page 129 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE TYNDALL AIR FORCE BASE FLORIDA AFCEC RDT&E FACILITIES AND GATE 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211F 310-928 XLWU203027 8. PROJECT COST ($000) 160,000 satisfies current validated mission requirements while incorporating efficiency measures and right-sizing of programmed space. The project eliminates redundant or lower-priority capability elements identified during scope validation and focuses resources on critical laboratory, testing, and mission support functions necessary for sustained RDT&E operations. **Supporting facilities cost are elevated due to installation of new utilities, access improvements, and stormwater infrastructure required to support the remote facility.** NOTE: Utility connections are required to privatized electrical, water, and gas distribution systems. The Air Force intends to have the respective Utilities Privatization System Owners Gulf Coast Electric Cooperative and Peoples Gas System make and own the necessary connections up to the facility service disconnects or other defined points of demarcation. The connection Fee(s)are paid to each System Owner through the UP contract via DLA. AFCEC RDT&E Research Facility 12,553 SM = 135,120 SF Vehicle Maintenance Facility 1,165 SM = 12,540 SF Vehicle Equipment Yard 23,226 SM = 250,000 SF Tent City Laydown Area 11,613 SM = 125,000 SF JOINT USE CERTIFICATION: This facility can be used by other components on an "as available" basis; however, the scope of the project is based on Air Force requirements. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 121 === page 130 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE TYNDALL AIR FORCE BASE FLORIDA AFCEC RDT&E FACILITIES AND GATE 5. PROGRAM ELEMENT 7. PROJECT NUMBER 12. 6. CATEGORY CODE 8. PROJECT COST ($000) 91211F 310-928 XLWU203027 SUPPLEMENTAL DATA: A. Estimated Execution Data: (1) Acquisition Strategy: Design-Build (2) Design Data (a) Design or Request for Proposal(RFP) Started: (b) Percent of Design Completed as of SEP 2025: (c) Percent of Design Completed as of JAN 2026: (d) Design or RFP Complete: (e) Total Design Cost ($000): (f) Energy Study and/or Life Cycle Cost Analysis (g) Standard or Definitive Design Used? (3) Construction Data: (a) Contract Award: (b) Construction Start: (c) Construction Complete: 160,000 SEP/2019 0% 0% MAY/2020 24,900 YES NO FEB/2027 MAR/2027 MAR/2029 B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) EQUIPMENT FROM OTHER APPROPRIA DD FORM 1391C, JUL 1999 10/2028 PREVIOUS EDITION IS OBSOLETE 2028 28,673 PAGE NO. 122 === page 131 === MILCON Work-in-Place (WIP) Curve – Automated Spend Plan Project Information Project Title Installation Program Year (FY) Project # AFCEC RDT&E FACILITIES AND GATE Tyndall AFB, FL 2027 XLWU203027 Financial Inputs & Derived Amounts ($000) Programmed Amount (PA) SIOH Rate Contingency Rate SIOH Amount Contingency Amount Construction (PA less SIOH & Cont) Total Increments 160,000 5.7% 5.0% 9,120 8,000 142,880 1 Key Dates (Calculated) Oct 1, 2026 Apr 1, 2027 May 1, 2029 Begin Date (FY Start) Award Date (Assumed) Complete Date (Award + 1100d; set to 1st of month) Period of Performance Measured in Days 790 Funding & Obligation Increments ($000) Increment Amount ($000) Funding Date Jan 1, 2027 Increment1 160,000 Total Funding 160,000 Check vs PA Obligation Date Apr 1, 2027 0 Outlay Curve Controls (Adjust if needed) Outlay Curve Steepness (k) Normalized Logistic Base (t=0) Normalized Logistic Top (t=1) Total Outlay ($000) (assumed = PA) 8.0 0.01798621 0.98201379 160,000 123 === page 132 === Monthly Cash Flow (Automated from Spend Plan) Month Oct 2026 Nov 2026 Dec 2026 Jan 2027 Feb 2027 Mar 2027 Apr 2027 May 2027 Jun 2027 Jul 2027 Aug 2027 Sep 2027 Oct 2027 Nov 2027 Dec 2027 Jan 2028 Feb 2028 Mar 2028 Apr 2028 May 2028 Jun 2028 Jul 2028 Aug 2028 Sep 2028 Oct 2028 Nov 2028 Dec 2028 Jan 2029 Feb 2029 Mar 2029 Apr 2029 May 2029 TOTAL Funding ($000) Obligation ($000) 0 0 0 0 0 0 160,000 0 0 0 0 0 0 160,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 160,000 160,000 Outlay ($000) Cumulative FundingCumulative Obligation Cumulative Outlay 0 0 0 0 0 0 0 0 0 0 0 0 0 160,000 0 0 0 160,000 0 0 0 160,000 0 0 1,049 160,000 160,000 1,049 1,406 160,000 160,000 2,455 1,874 160,000 160,000 4,329 2,480 160,000 160,000 6,809 3,251 160,000 160,000 10,060 4,211 160,000 160,000 14,271 5,370 160,000 160,000 19,641 6,711 160,000 160,000 26,352 8,180 160,000 160,000 34,532 9,674 160,000 160,000 44,205 11,037 160,000 160,000 55,243 12,090 160,000 160,000 67,333 12,667 160,000 160,000 80,000 12,667 160,000 160,000 92,667 12,090 160,000 160,000 104,757 11,037 160,000 160,000 115,795 9,674 160,000 160,000 125,468 8,180 160,000 160,000 133,648 6,711 160,000 160,000 140,359 5,370 160,000 160,000 145,729 4,211 160,000 160,000 149,940 3,251 160,000 160,000 153,191 2,480 160,000 160,000 155,671 1,874 160,000 160,000 157,545 1,406 160,000 160,000 158,951 1,049 160,000 160,000 160,000 160,000 160,000 160,000 160,000 124 === page 133 === Cumulative WIP Curve Project: Program Year: AFCEC RDT&E FACILITIES AND GATE 2027 Cumulative Funding vs Obligation vs Outlay 180,000 160,000 140,000 120,000 100,000 80,000 60,000 40,000 20,000 0 - Cumulative Funding - Cumulative Obligation - Cumulative Outlay 125 === page 134 === 1. COMPONENT 2. DATE (YYYYMMDD) FY 2027 BBBBBB MILITARY CONSTRUCTION PROGRAM AIR FORCE 3. INSTALLATION AND LOCATION 4. COMMAND REMOTE MAUI EXPERIMENTAL SITE SITE #1, HAWAII UNITED STATE SPACE FORCE 6. PERSONNEL (1) PERMANENT (2) STUDENTS 20260326 5. AREA CONTRUCTION COST INDEX 2.22 (3) SUPPORTED (4) TOTAL OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN a. AS OF 30-Sep-25 20 11 31 0 0 0 0 0 0 62 b. END FY 30-Sep-30 20 16 31 0 0 0 0 0 0 67 7. INVENTORY DATA ($000) 21.14 265,078.00 116,269.00 0.00 0.00 0.00 0.00 381,347.00 a. TOTAL ACREAGE b. INVENTORY TOTAL AS OF 30-Sep-30 c. AUTHORIZATION NOT YET IN INVENTORY d. AUTHORIZATION REQUESTED IN THIS PROGRAM e. AUTHORIZATION INCLUDED IN FOLLOWING PROGRAM f. PLANNED IN NEXT THREE PROGRAM YEARS g. REMAINING DEFICIENCY h. GRAND TOTAL 8. PROJECTS REQUESTED IN THIS PROGRAM (1) CODE a. CATEGORY (2) PROJECT TITLE 310-931 Secure INTEGRATION SUPPORT LAB W/LAND ACQ, CTC (3) SCOPE b. COST ($000) (1) START c. DESIGN STATUS (2) COMPLETE 5,182 3,600 11/20 07/21 9. FUTURE PROJECTS None 10.MISSION OR MAJOR FUNCTIONS The Space Situational Awareness mission provides critical data for today and the future of our Nation’s space program. This facility will enable significant new programs necessary to support the top two classified needs in the areas of Feature Recognition Techniques and Deep Space Imagery with substantial future system performance improvements. 11. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES None DD FORM 1390, JUL 1999 126 PREVIOUS EDITION IS OBSOLETE. === page 135 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE KIRTLAND AIR FORCE BASE, REMOTE MAUI EXPERIMENTAL SITE SITE #1, HAWAII SECURE INTEGRATION SUPPORT LAB W/ LAND ACQ, CTC 5. PROGRAM ELEMENT 7. PROJECT NUMBER 6. CATEGORY CODE 72806 310-931 PNEK063092 8. PROJECT COST ($000) AUTH: 0 APPR: 3,600 9. COST ESTIMATES ITEM UM QUANTITY UNIT COST COST($000) PRIMARY FACILITIES 56,544 SM 5,182 10,010 (51,872) SPACE SITUATIONAL AWARENESS LAB AC 10 399,895 (3,999) LAND ACQUISITION LS (500) CYBERSECURITY OF FACILITY-RELATED CONTROL SYS GUARD HOUSE SM 28 6,195 (173) SUPPORTING FACILITIES 9,369 SITEWORK LS (1,868) UTILITIES LS (3,085) PAVEMENTS LS (2,763) LS (1,653) GENERATOR SUBTOTAL 65,913 CONTINGENCY (5.00%) 3,296 TOTAL CONTRACT COST 69,209 SUPERVISION, INSPECTION AND OVERHEAD (7.30%) 5,191 TOTAL REQUEST 74,399 TOTAL REQUEST (ROUNDED) 74,000 EQUIPMENT FROM OTHER APPROPRIATIONS (NON-ADD) (0) 10. DESCRIPTION OF PROPOSED CONSTRUCTION Construct a new 5,182 SM lab facility for Air Force Research Laboratory (AFRL) to include administrative spaces, a high performance computing data center, laboratories, laboratory support spaces, SCIF spaces and warehouse functions. The project includes a two-story steel-framed facility with masonry veneer and a single ply roof system; local materials and construction techniques shall be used where cost effective. The lower level of the facility will have vibration isolated slabs, and the grade of the site will be utilized in the construction as much as possible. Because the new building is not located within an installation boundary, additional security measures such as an 8'-0" architectural perimeter fence and guardhouse are included. The project will also include supporting facilities such as utilities, pavements, and site improvements to provide a complete and useable facility. The project includes purchasing a 10 acre land parcel, including the Remote Maui Experimental (RME) building and adjacent acreage. This project consolidates all sea level functions in Maui onto one site (MHPCC, RME, Research & Warehouse). Lease avoidance across four sites of $1.4M annually. The facility should be compatible with applicable DoW, Air Force, and base design standards. Facilities will be designed as permanent construction in accordance with the DoW United Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance Sustainable Building Requirements. This project will comply with DoW Antiterrorism/force protection requirements per UFC 4-010-01, DoW Minimum Antiterrorism Standards for Buildings. Air Conditioning: 125 Tons 11. REQ: 5,182 SM DD FORM 1391, JUL 1999 ADQT: 1,195 SM PREVIOUS EDITION IS OBSOLETE SUBSTD: 2,314 SM PAGE NO. 127 === page 136 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE KIRTLAND AIR FORCE BASE, REMOTE MAUI EXPERIMENTAL SITE SITE #1, HAWAII SECURE INTEGRATION SUPPORT LAB W/ LAND ACQ, CTC 5. PROGRAM ELEMENT 7. PROJECT NUMBER 6. CATEGORY CODE 72806 310-931 PNEK063092 PROJECT: SECURE INTEGRATION SUPPORT LAB W/ LAND ACQ 8. PROJECT COST ($000) AUTH: 0 APPR: 3,600 REQUIREMENT: The United States, more than any other nation, relies on space for both civil and defense purposes; television, global positioning systems and earth sciences depend on safe access to and in space. The Air Force (AF) assists in achieving this freedom, in part, by maintaining an awareness of the locations and capabilities of all man-made objects in space. More than 2,500 working and dead satellites orbit the Earth since the Soviets launched Sputnik 1 into space in October 1957. To minimize the risk of collision between satellites and space junk the Air Force tracks around 19,000 space objects and debris larger than 4 inches in Earth's orbit. It is the Air Force Research Laboratory's (AFRL) responsibility to advance technologies that improve the nation's capability to maintain space situational awareness (SSA) as the numbers, sizes, locations, and capabilities of man-made objects in space evolve over time. AFRL operates two telescope sites: a New Mexico site solely devoted to research and the Maui site combining both research and SSA operations. According to the National Science Foundation, MSSC offers the best daytime viewing conditions in the world. Research efforts at the Air Force Maui Optical and Supercomputing (AMOS) site include satellite detection, characterization and identification. AMOS provides critical data for today and the future of our Nation's space program. This project supports the Air Force's Capabilities Review and Risk Assessment (CRRA) 2011, paragraphs 3.4 and 3.6 (additional detailed information can be provided in a classified addendum or briefing upon request). CURRENT SITUATION: The AMOS site consists of two primary assets conducting research and development for SSA: (1) the Maui Space Surveillance Complex (MSSC) which maintains multiple telescopes and laboratories located on the top of Mount Haleakala at an altitude of 10,000 feet and (2) the Maui High Performance Computing Center (MHPCC), which is located in 550 Lipoa at sea level and connected to the MSSC via high-speed fiber optic links. Travel between these locations involves three paid hours on winding narrow roads through an open cattle range while competing with tourists and locals who bicycle up and down these roads. Altitude sickness is common with employees and visitors. MHPCC computers process and transmit the SSA information collected by MSSC to Air Force MAJCOMs and DoW organizations. Government personnel work in a contractor-leased commercial facility (550 Lipoa) with large plate glass windows near the MHPCC and adjacent to an existing condominium complex. The facility will solve the three most challenging problems with the current Air Force configuration at sea level in Maui; (1) the anti-terrorist and force protection concerns for the leased, contractor-provided facility; (2) The mock-up lab space will reduce the health burden on the telescope site operators working at high altitude by allowing extensive preparation, integration and testing at sea-level before transporting equipment to the summit telescopes; and (3) A Remote Operations Control Center, data center, and telecommunications space at sea level. The existing operating lease is expiring in September 2023 and a long term solution is required for this research site. The Remote Maui Experimental (RME) DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 128 === page 137 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE KIRTLAND AIR FORCE BASE, REMOTE MAUI EXPERIMENTAL SITE SITE #1, HAWAII SECURE INTEGRATION SUPPORT LAB W/ LAND ACQ, CTC 5. PROGRAM ELEMENT 7. PROJECT NUMBER 72806 6. CATEGORY CODE 310-931 PNEK063092 8. PROJECT COST ($000) AUTH: 0 APPR: 3,600 Site and the warehouse in Kahului are two other operational sea level sites that are currently not co-located with the existing MHPCC function at 550 Lipoa. This MILCON project will consolidate the functions in 550 Lipoa (MHPCC), the RME building, and Kahului warehouse onto one site and into one facility. IMPACT IF NOT PROVIDED: Without the new facility, annual costs of $1,450,000 remain, which includes: a) $600,000 for lease costs for space in the contractor leased facility; b) $350,000 contracted security; c) $500,000 travel costs up and down Mount Haleakala to the RME Site. The current contractor-leased facility does not meet DoW and Air Force requirements for Anti-Terrorism Protection (ATP), which places the government workforce and the mission of the site at risk. These ATP shortfalls were identified in Local Vulnerability Assessments (VA) by Hickam AFB in Mar 2007 and May 2008 as well as an AF VA in Aug 2008 by HQ AFSFC, Lackland AFB. The additional requirement to comply with the Defense Security Service National Industrial Security Program Operating Manual (NISPOM) DoW 5220.22-M, creates an additional contractor security requirement, which drives operating costs higher than those in a government-owned building. In the new facility, only current AF security personnel will be required to provide security. In addition, the force protection measures can be implemented securing both our people and mission. The new facility will 1) Reduce paid man-hours spent on daily 3-hour drive times to and from the 10,000 foot summit; 2) Improve workforce safety by reducing time in high altitude work environments and improving the ATP of government personnel; 3) Reduce vehicle wear and fuel consumption by reducing required trips to the top of Haleakala; 4) Reduce the AF environmental impact on the culturally and environmentally sensitive site at the summit of Mount Haleakala through decreased traffic and personnel usage; and 5) Increase the amount of time spent on advancing research and development for national security by using the mock-up lab and remote capabilities at sea-level. The absence of this facility places severe constraints on the AF's ability to monitor space activity and secure space assets by increasing costs and reducing time spent on research and development. ADDITIONAL: This project meets the criteria/scope specified in Air Force Handbook 32-1084, "Facility Requirements". Sustainable principles, to include life cycle cost effective practices will be integrated into the design, development and construction of the project in accordance wtih UFC 1-200-02. Base Civil Engineer: JOINT USE CERTIFICATION: This facility can be used by other components on an "as available" basis; however, the scope of the project is based on Air Force requirements. I have reviewed this document and certify it is complete and accurate. I have validated the primary and supporting costs and work classification. The scope has been fully coordinated with the user and other appropriate agencies and approved by the Installation Commander. The BCE signature below validates the requirements; however these signatures are not the approval authority. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 129 === page 138 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE KIRTLAND AIR FORCE BASE, REMOTE MAUI EXPERIMENTAL SITE SITE #1, HAWAII SECURE INTEGRATION SUPPORT LAB W/ LAND ACQ, CTC 5. PROGRAM ELEMENT 7. PROJECT NUMBER 12. 6. CATEGORY CODE 8. PROJECT COST ($000) 72806 310-931 PNEK063092 AUTH: 0 SUPPLEMENTAL DATA: A. Estimated Execution Data: (1) Acquisition Strategy: (2) Design Data (a) Design or Request for Proposal(RFP) Started: (b) Percent of Design Completed as of SEP 2025: (c) Percent of Design Completed as of JAN 2026: (d) Design or RFP Complete: (e) Total Design Cost ($000): (f) Energy Study and/or Life Cycle Cost Analysis (g) Standard or Definitive Design Used? (3) Construction Data: (a) Contract Award: (b) Construction Start: (c) Construction Complete: APPR: 3,600 NOV/2020 100% 100% JUL/2021 7,342 NO NO B. Authorization and Appropriation Summary: Authorization $(000) 89,000 FY2023 ENACTED 0 FY2024 ENACTED 26,269 COST VARIATION JUNE 2024 0 FY2024 APPROVED REPROGRAMING 0 FY2027 BUDGET REQUEST 115,269 Total DD FORM 1391C, JUL 1999 Auth of Approp $(000) 89,000 0 0 0 3,600 92,600 PREVIOUS EDITION IS OBSOLETE Appropriation $(000) 90,000 0 25,269 0 3,600 118,869 PAGE NO. 130 === page 139 === 1. COMPONENT FY AIR FORCE 2027 3. INSTALLATION AND LOCATION 4. COMMAND COLUMBUS AIR FORCE BASE, MISSISSIPPI AIR EDUCATION AND TRAINING COMMAND 6. PERSONNEL 2. DATE (Y Y Y Y MMDD) MILITARY CONSTRUCTION PROGRAM (1) PERMANENT (2) STUDENTS 20260326 5. AREA CONTRUCTION COST INDEX 0.83 (3) SUPPORTED OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN a. AS OF 30 Sep 25 b. END FY (4) TOTAL 399 476 585 370 0 0 114 39 2 1,985 439 474 556 370 0 0 112 39 2 1,992 7. INVENTORY DATA ($000) 5,367 2,523,251.00 48,950.00 11,800.00 0.00 0.00 129,745.00 2,713,746.00 a. TOTAL ACREAGE b. INVENTORY TOTAL AS OF 21 Sep 25 c. AUTHORIZATION NOT YET IN INVENTORY d. AUTHORIZATION REQUESTED IN THIS PROGRAM e. AUTHORIZATION INCLUDED IN FOLLOWING PROGRAM f. PLANNED IN NEXT THREE PROGRAM YEARS g. REMAINING DEFICIENCY h. GRAND TOTAL 8. PROJ ECTS REQUESTED IN THIS PROGRAM a. CATEGORY (1) CODE 113-321 (2) PROJ ECT TITLE T-7A ALLIED SUPPORT (3) SCOPE 600 SM b. COST ($000) 11,800 c. DESIGN STATUS (1) START (2) COMPLETE 02/23 08/26 9. FUTURE PROJ ECTS None 10. MISSION OR MAJ OR FUNCTIONS Columbus Air Force Base's (CAFB) primary missions are Undergraduate Pilot Training (SUPT) and Introduction to Fighter Fundamentals (IFF). Columbus Air Force Base's mission statement is "Train World Class Pilots”. The 37th Flying Training Squadron (FTS) and 41st Flying Training Squadron operate the T-6A, the 48th Flying Training Squadron operates the T-1A, and the 50th FTS operates the T-38C, all as part of Undergraduate Pilot Training course, and the 49th Fighter Training Squadron operates the T-38C as part of the Introduction to Fighter Fundamentals course. Support for base administrative services, transportation and supply, civil engineering, communications, security, financial, religious, educational, legal, social actions, medical services, and morale, welfare, and recreational facilities and activities are provided by units of the 14th Flying Training Wing. 11. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES N/A DD FORM 1390, JUL 1999 PREVIOUS EDITION IS OBSOLETE. Adobe131 Professional 8.0 === page 140 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE COLUMBUS AIR FORCE BASE MISSISSIPPI T-7A ALLIED SUPPORT 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 84701F 113-321 8. PROJECT COST ($000) EEPZ197005 11,800 9. COST ESTIMATES ITEM UM QUANTITY UNIT COST COST($000) PRIMARY FACILITIES 5,494 APRON (113-321) SM 600 9,157 (5,494) SUPPORTING FACILITIES 5,000 UTILITIES LS (5,000) SUBTOTAL 10,494 CONTINGENCY (5.00%) 525 TOTAL CONTRACT COST 11,019 SUPERVISION, INSPECTION AND OVERHEAD (6.50%) 716 DESIGN DURING CONSTRUCTION 65 TOTAL REQUEST 11,800 TOTAL REQUEST (ROUNDED) 11,800 EQUIPMENT FROM OTHER APPROPRIATIONS (NON-ADD) (45,000) 10. DESCRIPTION OF PROPOSED CONSTRUCTION Construct all allied support required to adequately launch, park and recover T-7A aircraft on the existing ramp at Columbus Air Force Base. Project will include complete demolition of existing sunshades and minimal demolition of pavement for abandonment of existing utilities and installation of new utilities. New utilities will stub up and terminate to a junction box at the south-west column line adjacent to first aircraft parking spot at each sunshade. Projects also includes 4 tie-downs and 2 static grounding points per aircraft, and new airfield striping for taxi-lane centerlines, radii, nose wheel parking and grounding points. Facility will be designed as permanent construction in accordance with Department of War Unified Facilities Criteria 1-200-01. This project will comply with Department of War antiterrorism/force protection requirements per Unified Facilities Criteria 4-010-01. 11. REQ: 600 SM ADQT: 0 SUBSTD: 0 PROJECT: T-7A Allied Support REQUIREMENT: Allied support is needed to support all launch, parking and recovery operations for the T-7A aircraft. Headquarters Air Education and Training Command (AETC) is engaged in a $20B major acquisition effort to recapitalize its aging fleet of 430 T-38C aircraft and associated training systems. The T-38C is used in Air Education and Training Command's Specialized Undergraduate Pilot Training (SUPT) program which provides advanced training for student pilots selected for fighter and bomber assignments. These systems are currently located at five existing Air Education and Training Command bases and will be replaced with the T-7A system comprised of 350 total aircraft. The T-7A aircraft beddown consists of new ramp supporting infrastructure requirements that are not compatible with existing aircraft, and Columbus Air Force Base has no other infrastructure that can support the aircraft. This project provides the ability to adequately launch, park and recover as well as perform minor maintenance and trouble-shooting for T-7A aircraft on the existing parking ramp. This is not a tenant or supported service requirement DD FORM 1391, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 132 === page 141 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE COLUMBUS AIR FORCE BASE MISSISSIPPI T-7A ALLIED SUPPORT 5. PROGRAM ELEMENT 7. PROJECT NUMBER 6. CATEGORY CODE 8. PROJECT COST ($000) 84701F 113-321 EEPZ197005 11,800 CURRENT SITUATION: Currently, the existing aircraft parking apron is configured to support 84 T-38C aircraft and consists of infrastructure that is not compatible with T-7A aircraft requirements. Maintaining status quo would result in negative impacts to the T-7A training mission. Columbus Air Force Base does not have additional ramp capacity with adequate infrastructure to fulfill the requirement making the use of other ramp space on base non-viable. New allied support construction is determined to be the only method possible to accomplish the objective. IMPACT IF NOT PROVIDED: If not provided, there will not be adequate aircraft parking apron space to launch, park and recover as well as perform minor maintenance and trouble-shooting on T-7A aircraft which will cause delays in the training pipeline. Columbus Air Force Base currently has no opportunities for workarounds to meet this need to support the Air Force T-7A beddown. ADDITIONAL: This project meets the criteria/scope in Department of the Air Force Manual 32-1084, Standard Facility Requirements. All reasonable alternatives were considered during the development of this project to include status quo, add/alter, and new construction. New construction is the only viable option to meet this requirement. This design shall conform to criteria established in the Air Force Corporate Facilities Standards, the Installation Facilities Standards, but will not employ a standard facility design because there is no Air Force standard facility design for this project, and there is no applicable standard design from United States Corps of Engineers. Sustainable principles, to include life-cycle costeffective practices, will be integrated into the design, development, and construction of the project in accordance with Unified Facility Criteria 1-200-02, High Performance and Sustainable Building Requirements. This includes preparation of a life-cycle cost analysis for energy consuming systems, renewable energy generating systems, whenever life- cycle cost effective is selected as the reason any requirement of Unified Facility Criteria 1-200-02 is partially compliant or not applicable. This project does not fall within or partly within the 100-year flood plain. Facility is sited in accordance with the Installation Development Plan and is within a compatible land use area. Supporting Facilities exceeds 25% of Primary Facilities due to this project primarily being supporting facilities work to install aircraft sunshades. No construction growth offset is required for this project. Apron 600SM = 6,456SF 14th Civil Engineer Squadron, Base Civil Engineer: 662-434-7325. JOINT USE CERTIFICATION: Mission Requirements, operational considerations, and location are incompatible with use by other components. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 133 === page 142 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE COLUMBUS AIR FORCE BASE MISSISSIPPI T-7A ALLIED SUPPORT 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 84701F 113-321 EEPZ197005 8. PROJECT COST ($000) 11,800 Facility Condition Index: This is not a recapitalization project. No Facility Condition Index data exists for this facility type. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 134 === page 143 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE COLUMBUS AIR FORCE BASE MISSISSIPPI T-7A ALLIED SUPPORT 5. PROGRAM ELEMENT 7. PROJECT NUMBER 12. 6. CATEGORY CODE 8. PROJECT COST ($000) 84701F 113-321 EEPZ197005 SUPPLEMENTAL DATA: A. Estimated Execution Data: (1) Acquisition Strategy: Design-Bid-Build (2) Design Data (a) Design or Request for Proposal(RFP) Started: (b) Percent of Design Completed as of SEP 2025: (c) Percent of Design Completed as of JAN 2026: (d) Design or RFP Complete: (e) Total Design Cost ($000): (f) Energy Study and/or Life Cycle Cost Analysis (g) Standard or Definitive Design Used? (3) Construction Data: (a) Contract Award: (b) Construction Start: (c) Construction Complete: 11,800 FEB/2023 65% 65% AUG/2026 1,350 YES NO FEB/2027 APR/2027 APR/2028 B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) Aircraft Sunshades DD FORM 1391C, JUL 1999 3080 PREVIOUS EDITION IS OBSOLETE 2026 45,000 PAGE NO. 135 === page 144 === 1. COMPONENT 2. DATE (YYYYMMDD) FY 2027 AIR FORCE MILITARY CONSTRUCTION PROGRAM 3. INSTALLATION AND LOCATION 4. COMMAND WHITEMAN AIR FORCE BASE, MISSOURI 6. PERSONNEL 20260326 5. AREA CONTRUCTION COST INDEX AIR FORCE GLOBAL STRIKE COMMAND (1) PERMANENT (2) STUDENTS 1.07 (3) SUPPORTED OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN (4) TOTAL a. AS OF 30-Sep-25 384 3,437 536 0 0 0.00 226 1,546 319 6,448 b. END FY 30-Sep-30 386 3,429 527 0 0 0 170 1,091 165 5,768 7. INVENTORY DATA ($000) 5,364 6,579,496.00 154,600.00 169,000.00 43,000.00 207,000.00 313,000.00 7,466,096.00 a. TOTAL ACREAGE b. INVENTORY TOTAL AS OF 30-Sep-25 c. AUTHORIZATION NOT YET IN INVENTORY d. AUTHORIZATION REQUESTED IN THIS PROGRAM e. AUTHORIZATION INCLUDED IN FOLLOWING PROGRAM f. PLANNED IN NEXT THREE PROGRAM YEARS g. REMAINING DEFICIENCY h. GRAND TOTAL 8. PROJECTS REQUESTED IN THIS PROGRAM a. CATEGORY (1) CODE (2) PROJECT TITLE 171-618 B-21 ADAL Field Training Detachment, B152 171-875 B-21 Weapons Load Trainer (3) SCOPE c. DESIGN STATUS b. COST ($000) (1) START (2) COMPLETE 5,017 SM 89,000 10/23 05/26 5,595 SM 80,000 08/24 05/26 9. FUTURE PROJECTS 141-182 B-21 Environmental Protection Shelters 1-3 ( 5,908 SM / $43,000 ) 211-159 B-21 Low Observable Facility ( 8,875 SM / $187,000 ) 610-129 B-21 Composite Tool Kit ( 2,415 SM / $20,000 ) 10. MISSION OR MAJOR FUNCTIONS The 509th Bomb Wing is part of Air Force Global Strike Command and is the host wing at Whiteman Air Force Base. The Bomb Wing and its fleet of B-2 Spirit stealth bombers serve as part of the Air Force's conventional and strategic combat force. The Bomb Wing can project U.S airpower anywhere around the world from home station and employ a wide range of precision-guided munitions. The 509th Bomb Wing oversees the 509th Operations Group, 509th Maintenance Group, 509th Mission Support Group and 509th Medical Group, which handle various aspects of the wing's mission and supports the Air National Guard 131st Bomb Wing, Air Force Reserve Command 442d Fighter Wing and the 20th Attack Squadron missions. 11. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES N/A DD FORM 1390, JUL 1999 PREVIOUS EDITION IS OBSOLETE. 136 === page 145 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA MARCH 2026 AIR FORCE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE WHITEMAN AIR FORCE BASE MISSOURI B-21 ADAL FIELD TRAINING DETACHMENT, B152 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 64015F 171-618 8. PROJECT COST ($000) YWHG212102 89,000 9. COST ESTIMATES ITEM UM QUANTITY UNIT COST COST($000) PRIMARY FACILITIES 62,801 FIELD TRAINING FACILITY (171-618) SM 5,017 11,840 (59,401) ICD 705 PREMIUM LS (2,200) CYBERSECURITY OF FACILITY-RELATED CONTROL SYS LS (1,200) SUPPORTING FACILITIES 14,600 DEMOLITION SM 686 1,020 (700) UTILITIES LS (2,000) SITE PREPARATION LS (5,600) SITE IMPROVEMENTS LS (3,000) ROADS, SIDEWALKS, AND PARKING LS (2,900) COMMUNICATIONS LS (400) SUBTOTAL 77,401 CONTINGENCY (5.00%) 3,870 TOTAL CONTRACT COST 81,271 SUPERVISION, INSPECTION AND OVERHEAD (6.50%) 5,283 DESIGN DURING CONSTRUCTION 1,548 POST CONSTRUCTION AWARD SERVICES 836 TOTAL REQUEST 88,938 TOTAL REQUEST (ROUNDED) 89,000 EQUIPMENT FROM OTHER APPROPRIATIONS (NON-ADD) (4,000) 10. DESCRIPTION OF PROPOSED CONSTRUCTION Construct a Field Training Detachment Facility that can accommodate 59 full-time personnel with a peak student load of 101. New structure will feature a reinforced concrete foundation with steel frame, brick veneer exterior with insulated metal wall panels, and a standing seam metal roof. Specialized spaces include administrative space for Maintenance Training Flight, Air Education and Training Command, Contractor Logistics Support, Training Systems Support Center; unclassified areas for computer labs, large training rooms, conference rooms, and small meeting rooms; and secured areas for server rooms, cockpit part task trainers, egress trainer, engine part task trainers, landing gear trainers, avionics training, aircraft engine removal and replacement training spaces, weapons system training aid classrooms, Air Education and Training Command classrooms, testing rooms, conference rooms, and a dedicated tool crib. Construct a new asphalt parking lot properly sized for the number of personnel who work and train within the facility (staff and students). Work will require grading, base/subbase preparation, and site drainage. The project will demolish Building 524 (686 square meters). Facilities will be designed as permanent construction in accordance with Department of War Unified Facilities Criteria 1-200-01. This project will comply with Department of War antiterrorism/force protection requirements per Unified Facilities Criteria 4-010-01. Air Conditioning: 245 tons 11. REQ: 5,017 SM DD FORM 1391, JUL 1999 ADQT: 0 PREVIOUS EDITION IS OBSOLETE SUBSTD: 686 SM PAGE NO. 137 === page 146 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA MARCH 2026 AIR FORCE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE WHITEMAN AIR FORCE BASE MISSOURI B-21 ADAL FIELD TRAINING DETACHMENT, B152 5. PROGRAM ELEMENT 7. PROJECT NUMBER 6. CATEGORY CODE 64015F 171-618 PROJECT: Construct B-21 Field Training Detachment YWHG212102 8. PROJECT COST ($000) 89,000 REQUIREMENT: Whiteman Air Force Base is home to the 509th Bomb Wing, which operates the only B2 Spirit Bomber in the United States' inventory. In September 2024, the Secretary of the Air Force announced Whiteman Air Force Base as the second Main Operating Base of the new B-21 Raider bomber. Due to variations in requirements and the projected number of new aircraft, Whiteman Air Force Base must accomplish many infrastructure upgrades to support the new bomber platform. Several upgrades will involve renovations to existing facilities, whereas others will require new construction. The Field Training Detachment is the single schoolhouse for aircraft maintainers to receive the necessary training and certification needed to perform work on the aircraft. The existing Field Training Detachment facility at Whiteman Air Force Base, Building 152, does not have adequate space for all B-21 cadre and students. Furthermore, the training spaces do not have adequate floor space or vertical clearance for several of the trainers currently in development for the B21 training mission. A new facility is required to accommodate the full B-21 Field Training Detachment mission set. This is not a tenant or supported service requirement. CURRENT SITUATION: The existing B-2 Field Training Detachment, Building 152, shall remain in use for the remainder of the B-2 mission at Whiteman Air Force Base. The installation lacks any other available facilities that could be altered or expanded to satisfy this requirement. A new facility is required to house the training staff, specialized equipment, training resources, and study body of the B-21 Field Training Detachment. The site of the former Bowling Center which was recently demolished is well suited and adequately sized to receive the new facility. The location is situated in between unaccompanied housing and the flightline maintenance facilities where the trainees will eventually work. It is also in close proximity to base support facilities such as the Base Exchange, Commissary, and Stealth Lounge. IMPACT IF NOT PROVIDED: Without this facility, Whiteman will not be able to train aircraft maintainers prior to performing maintenance activities on live B-21 aircraft. B-21 maintainers will have to receive training elsewhere (at another B-21 installation) prior to their arrival. The Field Training Detachment facilities at other installations are not being sized or staffed adequately to handle the additional load incurred by adopting Whiteman's field training mission. Ultimately, the B-21 program as a whole will suffer aircraft maintenance delays as training staffs struggle to prepare students in inadequate facilities. ADDITIONAL: This project meets applicable criteria/scope specified in Department of the Air Force Manual 32-1084, Standard Facility Requirements. This design shall conform to criteria established in the Air Force Corporate Facilities Standards, the Installation Facilities Standards, but will not employ a standard facility design DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 138 === page 147 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA MARCH 2026 AIR FORCE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE WHITEMAN AIR FORCE BASE MISSOURI B-21 ADAL FIELD TRAINING DETACHMENT, B152 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 64015F 171-618 8. PROJECT COST ($000) YWHG212102 89,000 because there is no Air Force standard facility design for this project and there is no applicable standard design from the Army Corps of Engineers. All reasonable alternatives were considered during the development of this project to include status quo, addition/alteration, and new construction. An approved economic analysis found that new construction is the most beneficial option to meet operational requirements. Sustainable principles, to include life-cycle costeffective practices, will be integrated into the design, development, and construction of the project in accordance with Unified Facility Criteria 1-200-02, High Performance and Sustainable Building Requirements. This includes preparation of a life-cycle cost analysis for energy consuming systems, renewable energy generating systems, or when life-cycle cost effective is selected as the reason any requirement of Unified Facility Criteria 1-200-02 is partially compliant or not applicable. This project does not fall within or partly within the 100-year flood plain. Facility is sited in accordance with the Installation Development Plan and is within a compatible land use area. The construction growth offset for this requirement is 46,619 square feet. 509th Bomb Wing Base Civil Engineer: 660-687-3503 Field Training Detachment: 5,017 Square Meters = 54,003 Square Feet; Demolition: 686 Square Meters = 7,384 Square Feet. JOINT USE CERTIFICATION: Mission Requirements, operational considerations, and location are incompatible with use by other components. Facility Condition Index: This is not a recapitalization project. No Facility Condition Index data exists for this facility type. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 139 === page 148 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA MARCH 2026 AIR FORCE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE WHITEMAN AIR FORCE BASE MISSOURI B-21 ADAL FIELD TRAINING DETACHMENT, B152 5. PROGRAM ELEMENT 7. PROJECT NUMBER 12. 6. CATEGORY CODE 8. PROJECT COST ($000) 64015F 171-618 YWHG212102 SUPPLEMENTAL DATA: A. Estimated Execution Data: (1) Acquisition Strategy: Design-Bid-Build (2) Design Data (a) Design or Request for Proposal(RFP) Started: (b) Percent of Design Completed as of SEP 2025: (c) Percent of Design Completed as of JAN 2026: (d) Design or RFP Complete: (e) Total Design Cost ($000): (f) Energy Study and/or Life Cycle Cost Analysis (g) Standard or Definitive Design Used? (3) Construction Data: (a) Contract Award: (b) Construction Start: (c) Construction Complete: 89,000 OCT/2023 65% 65% MAY/2026 13,350 YES NO APR/2027 MAY/2027 NOV/2029 B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) FURNITURE, FIXTURES, & EQUIPME ESS System DD FORM 1391C, JUL 1999 3400 3080 PREVIOUS EDITION IS OBSOLETE 2028 2028 3,000 1,000 PAGE NO. 140 === page 149 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA MARCH 2026 AIR FORCE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE WHITEMAN AIR FORCE BASE MISSOURI B-21 WEAPONS LOAD TRAINER 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 64015F 171-875 8. PROJECT COST ($000) YWHG212104 80,000 9. COST ESTIMATES ITEM UM QUANTITY UNIT COST COST($000) PRIMARY FACILITIES 59,090 MUNITIONS LOAD CREW TRAINING (171-875) SM 5,595 10,331 (57,800) ICD 705 PREMIUM LS (90) CYBERSECURITY OF FACILITY-RELATED CONTROL SYS LS (1,200) SUPPORTING FACILITIES 10,600 UTILITIES LS (3,000) SITE PREPARATION LS (2,800) SITE IMPROVEMENTS LS (4,000) ROADS, SIDEWALKS, AND PARKING LS (600) COMMUNICATIONS LS (200) SUBTOTAL 69,690 CONTINGENCY (5.00%) 3,485 TOTAL CONTRACT COST 73,175 SUPERVISION, INSPECTION AND OVERHEAD (6.50%) 4,756 DESIGN DURING CONSTRUCTION 1,400 POST CONSTRUCTION AWARD SERVICES 800 TOTAL REQUEST 80,131 TOTAL REQUEST (ROUNDED) 80,000 EQUIPMENT FROM OTHER APPROPRIATIONS (NON-ADD) (3,950) 10. DESCRIPTION OF PROPOSED CONSTRUCTION This project will construct a new B-21 Weapons Load Trainer. Facility shall feature a secure area, administrative spaces, and classroom sized for eight people. All office, administrative, shop, and break room areas are to be air conditioned and heated to meet the standards for administrative spaces. The load trainer area will require proper air circulation and fume ventilation for the various diesel-powered pieces of equipment used within the facility. Training bays will consist of a steel frame with braced frames providing lateral support and a clear span roof structure with standing seam metal roof. Office and Shop structure will be load-bearing reinforced concrete masonry unit shear walls structurally independent from the training bay structure. Facility architecture will feature an integral color soldier course and running bond brick patterned veneer, and prefinished vertical metal wall panels from top of brick to eave or peak. Prefinished metal wall panel will have a stucco-embossed texture with color palette matching other adjacent facilities on the Whiteman Air Force Base airfield. Facilities will be designed as permanent construction in accordance with Department of War Unified Facilities Criteria 1-200-01. This project will comply with Department of War antiterrorism/force protection requirements per Unified Facilities Criteria 4-010-01. Air Conditioning: 55 tons 11. REQ: 5,595 SM ADQT: 0 SUBSTD: 0 PROJECT: Construct B-21 Weapons Load Trainer DD FORM 1391, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 141 === page 150 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA MARCH 2026 AIR FORCE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE WHITEMAN AIR FORCE BASE MISSOURI B-21 WEAPONS LOAD TRAINER 5. PROGRAM ELEMENT 7. PROJECT NUMBER 6. CATEGORY CODE 8. PROJECT COST ($000) 64015F 171-875 YWHG212104 80,000 REQUIREMENT: Whiteman Air Force Base is home to the 509th Bomb Wing, which operates the only B2 Spirit Bomber in the United States' inventory. In September 2024, the Secretary of the Air Force announced Whiteman Air Force Base as the second Main Operating Base of the new B-21 Raider bomber. Due to variations in requirements and the projected number of new aircraft, Whiteman Air Force Base must accomplish many infrastructure upgrades to support the new bomber platform. Several upgrades will involve renovations to existing facilities, whereas others will require new construction. The Weapons Load Trailer houses two exact replicas of the bomber undercarriage and weapons bay. In the bay, load crews undergo weapons loader training and certification to remain proficient at loading weapons onto the aircraft. Neither the existing weapons load trainer, nor other existing facilities can accommodate this requirement, therefore a new facility is required. This is not a tenant or supported service requirement. CURRENT SITUATION: This is a new mission requirement which is not currently being met at the installation. The existing B-2 Weapons Load Trainer is a single-bay facility, and cannot support B-21 operations due to differences in the bomb bays of the two aircraft. Due to the projected number of aircraft and operations tempo, the B-21 program requires a new, two-bay Weapons Load Trainer. IMPACT IF NOT PROVIDED: Without this facility, Whiteman Air Force Base would utilize Building 14 or convert another existing facility to serve as the B-21 Weapons Load Trainer. Use of Building 14 would severely limit load trainer capabilities as it is only a single-bay facility. Conversion of another facility, most likely a dock-pair, would eliminate critical parking spaces for other stealth bomber aircraft. This would drive a domino requirement to construct other bomber parking areas on the flightline. Use of Building 14 and another single-bay facility would result in disjointed operations, placing a great strain on training staff and training/certification processes. ADDITIONAL: This project meets applicable criteria/scope specified in Air Force Manual 321084, Standard Facility Requirements. This design shall conform to criteria established in the Air Force Corporate Facilities Standards, the Installation Facilities Standards, but will not employ a standard facility design because there is no Air Force standard facility design for this project and there is no applicable standard design from the Army Corps of Engineers. All reasonable alternatives were considered during the development of this project to include status quo, renovation, and construction of a single-bay facility. New construction of a full 2-bay facility is the only viable option to meet this requirement. A Waiver to an Economic Analysis has been approved for this project. Sustainable principles, to include life-cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with Unified Facility Criteria 1-200-02, High Performance and Sustainable Building Requirements. This includes preparation of a life-cycle cost analysis for energy consuming systems, renewable energy generating systems, or DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 142 === page 151 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA MARCH 2026 AIR FORCE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE WHITEMAN AIR FORCE BASE MISSOURI B-21 WEAPONS LOAD TRAINER 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 64015F 171-875 8. PROJECT COST ($000) YWHG212104 80,000 when life-cycle cost effective is selected as the reason any requirement of Unified Facility Criteria 1-200-02 is partially compliant or not applicable. This project does not fall within or partly within the 100-year flood plain. Facility is sited in accordance with the Installation Development Plan and is within a compatible land use area. The construction growth offset for this requirement is 60,224 square feet. 509th Bomb Wing Base Civil Engineer: 660-687-3503 Munitions Load Crew Training: 5,595 Square Meters = 60,224 Square Feet. JOINT USE CERTIFICATION: Mission Requirements, operational considerations, and location are incompatible with use by other components. Facility Condition Index: This is not a recapitalization project. No Facility Condition Index data exists for this facility type. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 143 === page 152 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA MARCH 2026 AIR FORCE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE WHITEMAN AIR FORCE BASE MISSOURI B-21 WEAPONS LOAD TRAINER 5. PROGRAM ELEMENT 7. PROJECT NUMBER 12. 6. CATEGORY CODE 8. PROJECT COST ($000) 64015F 171-875 YWHG212104 SUPPLEMENTAL DATA: A. Estimated Execution Data: (1) Acquisition Strategy: Design-Bid-Build (2) Design Data (a) Design or Request for Proposal(RFP) Started: (b) Percent of Design Completed as of SEP 2025: (c) Percent of Design Completed as of JAN 2026: (d) Design or RFP Complete: (e) Total Design Cost ($000): (f) Energy Study and/or Life Cycle Cost Analysis (g) Standard or Definitive Design Used? (3) Construction Data: (a) Contract Award: (b) Construction Start: (c) Construction Complete: 80,000 AUG/2024 65% 95% MAY/2026 12,000 YES NO APR/2027 MAY/2027 NOV/2029 B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) ESS System FF&E AV System DD FORM 1391C, JUL 1999 3080 3400 3400 PREVIOUS EDITION IS OBSOLETE 2028 2028 2028 550 3,200 200 PAGE NO. 144 === page 153 === 1. COMPONENT 2. DATE (YYYYMMDD) FY 2027 BBBBBB MILITARY CONSTRUCTION PROGRAM AIR FORCE 3. INSTALLATION AND LOCATION 4. COMMAND MALMSTROM AIR FORCE BASE, MONTANA AIR FORCE GLOBAL STRIKE COMMAND 6. PERSONNEL (1) PERMANENT (2) STUDENTS 20260326 5. AREA CONTRUCTION COST INDEX 1.09 D (3) SUPPORTED (4) TOTAL OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN a. AS OF 30-Sep-25 475 2,869 631 0 0 0 17 134 6 4,132 b. END FY 30-Sep-30 474 2,903 633 0 0 0 17 134 6 4,167 7. INVENTORY DATA ($000) 33,116.00 6,705,930.00 20,000.00 1,390,000.00 172,000.00 2,068,561.00 122,000.00 10,478,491.00 a. TOTAL ACREAGE b. INVENTORY TOTAL AS OF 30-Sep-25 c. AUTHORIZATION NOT YET IN INVENTORY d. AUTHORIZATION REQUESTED IN THIS PROGRAM e. AUTHORIZATION INCLUDED IN FOLLOWING PROGRAM f. PLANNED IN NEXT THREE PROGRAM YEARS g. REMAINING DEFICIENCY h. GRAND TOTAL 8. PROJECTS REQUESTED IN THIS PROGRAM (3) SCOPE b. COST ($000) (1) START (2) COMPLETE 911-146 SENTINEL LAND ACQUISITION 26,600 AC 43,500 N/A N/A 212-216 SENTINEL OPERATIONS AND MAINTENANCE COMPLEX 16,738 SM 95,000 09/23 07/27 (1) CODE a. CATEGORY (2) PROJECT TITLE c. DESIGN STATUS 9. FUTURE PROJECTS a. Included in Following Program (FY28): see attachment. b. Planned Next Three Years (FY29, 30, 31): see attachment. c. R&M Unfunded Requirements: Unavailable. 10.MISSION OR MAJOR FUNCTIONS Malmstrom Air Force Base is home to the 341st Missile Wing of Air Force Global Strike Command and also home to the 819th Red Horse Squadron of Air Combat Command. The mission of the 341st Missile Wing is to defend America with safe, secure, effective nuclear forces and combat-ready Airmen. The 341st Missile Wing operates, maintains and secures 150 Intercontinental Ballistic Missiles positioned across 23,500-square miles of Montana. The wing also operates eight UH-1N Huey helicopters that perform nuclear convoy security and missile site support. 11. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES N/A DD FORM 1390, JUL 1999 145 PREVIOUS EDITION IS OBSOLETE. === page 154 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE MALMSTROM AIR FORCE BASE MONTANA SENTINEL LAND ACQUISITION, INC 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 11233F 911-146 NZAS233014 8. PROJECT COST ($000) AUTH: 290,000 APPR: 43,500 9. COST ESTIMATES ITEM UM QUANTITY UNIT COST COST($000) PRIMARY FACILITIES 276,000 LAND FEE PURCHASE (911-146) AC 26,600 10,376 (276,000) SUPPORTING FACILITIES SUBTOTAL 276,000 CONTINGENCY (5.00%) 13,800 TOTAL CONTRACT COST 289,800 SUPERVISION, INSPECTION AND OVERHEAD (0.00%) 0 TOTAL REQUEST 289,800 TOTAL REQUEST (ROUNDED) 290,000 EQUIPMENT FROM OTHER APPROPRIATIONS (NON-ADD) (0) 10. DESCRIPTION OF PROPOSED CONSTRUCTION Acquire temporary and permanent interests in land to support new utilities and infrastructure for the Ground Based Strategic Deterrent, also known as Sentinel, weapon system, at Malmstrom Air Force Base, Montana. Sentinel land acquisitions are located throughout the state of Montana. Project will be accomplished in alignment with the Order of Service for retrofitting and converting Minuteman III launch facilities to accept the Sentinel weapon system. 11. REQ: 26,600 AC ADQT: 0 SUBSTD: 0 PROJECT: Acquire sufficient interests in land to support deployment of Sentinel Land Acquisition communications network at Malmstrom Air Force Base. This request includes land acquisition for the Initial Operational Capability, Wing Complete, communication towers, and temporary laydown yards to procure sufficient interests in land to reach wing completion milestones and support the deployment of Sentinel. Reuse of existing United States Air Force owned utility corridors will substantially reduce the need for new perpetual easements. Estimated planning assumption for condemnation rates provided by most recent United States Army Corps of Engineers Real Estate Planning Report. REQUIREMENT: Malmstrom Air Force Base Real Estate Acquisitions; approximately 26,600 acres to support Ground Based Strategic Deterrent communications network. Easement widths of 16.5' for new perpetual easements totaling approximately 3,752 acres, and 83.5' for temporary construction easements adjacent to new and existing perpetual easements totaling approximately 22,848 acres. Temporary easement term is 7 years in duration. The length of the agreement is largely determined by postconstruction restoration activities. An additional one-acre temporary laydown yard will need to be acquired adjacent to the 150 Launch Facilities and 8 Missile Alert Facilities to be converted. This requirement includes the acquisition of thirtyone (31) individual, 5-acre tower sites totaling approximately 155 acres. Thirtythree (33) Perpetual easements for access roads will also need to be acquired for access to tower sites. Federal land acquisition rules require a fair market value payment to landowners. DD FORM 1391, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 146 === page 155 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE MALMSTROM AIR FORCE BASE MONTANA SENTINEL LAND ACQUISITION, INC 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 11233F 911-146 NZAS233014 8. PROJECT COST ($000) AUTH: 290,000 APPR: 43,500 Valuations of land are dependent upon location, real estate market conditions, state law, municipal zoning laws, and landowner documentation. Initial land valuations conducted by the United States Army Corps of Engineers in Real Estate Planning Report Phase 1 valued temporary construction easements at less than $500 an acre across the 341st Missile Wing area of operations. Additionally, land valuations must account for the economic impacts created by government activities. Furthermore, each transaction must balance the length of negotiations against the Conversion Order of Service established by Missile Alert Rate. CURRENT SITUATION: Current configuration of the Intercontinental Ballistic Missile field does not meet the Sentinel weapon system required to modernize the ground-based leg of the United States Nuclear Triad. Additional real estate must be purchased to meet weapon system requirements. IMPACT IF NOT PROVIDED: Intercontinental Ballistic Missile nuclear weapon modernization cannot start until real estate is purchased. Conversion of Minuteman III sites cannot begin without constructing utility corridors. Any delay to funding real estate acquisitions will greatly impact the Sentinel mission and severely affect the ability of the United State Air Force to deliver a $96B Major Defense Acquisition Program. ADDITIONAL: All reasonable alternatives were considered during the development of this project to include status quo, reduction of weapon system requirements, and land acquisition. New land acquisition and temporary construction easements are the only viable options to meet the Sentinel weapon system requirement for the Acquisition Category 1 program. Base Civil Engineer: (406) 731-6188. JOINT USE CERTIFICATION: Mission Requirements, operational considerations, and location are incompatible with use of other components. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 147 === page 156 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE MALMSTROM AIR FORCE BASE MONTANA SENTINEL LAND ACQUISITION, INC 5. PROGRAM ELEMENT 7. PROJECT NUMBER 12. 6. CATEGORY CODE 8. PROJECT COST ($000) AUTH: 290,000 11233F 911-146 NZAS233014 APPR: 43,500 SUPPLEMENTAL DATA: A. Estimated Execution Data: (1) Acquisition Strategy: Other Land Acquisition (2) Design Data (a) Design or Request for Proposal(RFP) Started: AUG/2024 (b) Percent of Design Completed as of SEP 2025: N/A (c) Percent of Design Completed as of JAN 2026: N/A (d) Design or RFP Complete: AUG/2025 (e) Total Design Cost ($000): 0 (f) Energy Study and/or Life Cycle Cost Analysis YES (g) Standard or Definitive Design Used? NO (3) Construction Data: (a) Contract Award: MAR/2027 (b) Construction Start: APR/2027 (c) Construction Complete: APR/2031 C. Authorization and Appropriation Summary: FY2027 Budget Request Future Request Total DD FORM 1391C, JUL 1999 Authorization $(000) 290,000 0 290,000 Auth of Approp $(000) 43,500 246,500 290,000 PREVIOUS EDITION IS OBSOLETE Appropriation $(000) 43,500 246,500 290,000 PAGE NO. 148 === page 157 === MILCON Work-in-Progress (WIP) Curve – Automated Spend Plan Project Information Project Title Installation Program Year (FY) Project # Sentinel (GBSD) Land Acquisition, Inc MALMSTROM AFB, MT MONTANA 2027 NZAS233014 Financial Inputs & Derived Amounts ($000) Programmed Amount (PA) SIOH Rate Contingency Rate SIOH Amount Contingency Amount Construction (PA less SIOH & Cont) Total Increments Key Dates (Calculated) Begin Date (FY Start) Award Date (Assumed) Complete Date (Award + POP; set to 1st of month) Award Month (1st of month) Complete Month (1st of month) Period of Performance Funding & Obligation Increments ($000) Increment 1 Increment 2 Increment 3 Increment 4 Increment Total Funding Outlay Curve Controls (Adjust if needed) Outlay Curve Steepness (k) Normalized Logistic Base (t=0) Normalized Logistic Top (t=1) Total Outlay ($000) (assumed = PA) 290,000 0.0% 5.0% 0 14,500 275,500 4 Oct 1, 2026 Mar 1, 2027 Apr 1, 2031 Mar 1, 2027 Apr 1, 2031 1492 Amount ($000) 43,500 87,000 87,000 72,500 Funding Date Jan 1, 2027 Oct 1, 2027 Oct 1, 2028 Oct 1, 2029 290,000 Check vs PA Obligation Date Apr 1, 2027 Jan 1, 2028 Jan 1, 2029 Jan 1, 2030 0 5.0 0.07585818 0.92414182 290,000 149 === page 158 === Monthly Cash Flow (Automated from Spend Plan) Project: Month Oct 2026 Nov 2026 Dec 2026 Jan 2027 Feb 2027 Mar 2027 Apr 2027 May 2027 Jun 2027 Jul 2027 Aug 2027 Sep 2027 Oct 2027 Nov 2027 Dec 2027 Jan 2028 Feb 2028 Mar 2028 Apr 2028 May 2028 Jun 2028 Jul 2028 Aug 2028 Sep 2028 Oct 2028 Nov 2028 Dec 2028 Jan 2029 Feb 2029 Mar 2029 Apr 2029 May 2029 Jun 2029 Jul 2029 Aug 2029 Sep 2029 Oct 2029 Nov 2029 Dec 2029 Jan 2030 Feb 2030 Mar 2030 Apr 2030 May 2030 Jun 2030 Jul 2030 Aug 2030 Sep 2030 Oct 2030 Nov 2030 Dec 2030 Jan 2031 Feb 2031 Mar 2031 Apr 2031 TOTAL Sentinel (GBSD) Land Acquisition, Inc Funding ($000) Obligation ($000) 0 0 0 0 0 0 43,500 0 0 0 0 0 0 43,500 0 0 0 0 0 0 0 0 0 0 87,000 0 0 0 0 0 0 87,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 87,000 0 0 0 0 0 0 87,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 72,500 0 0 0 0 0 0 72,500 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 290,000 290,000 Outlay ($000) Cumulative Funding Cumulative Obligation Cumulative Outlay 0 0 0 0 0 0 0 0 0 0 0 0 0 43,500 0 0 0 43,500 0 0 2,501 43,500 0 2,501 2,718 43,500 43,500 5,219 2,949 43,500 43,500 8,168 3,195 43,500 43,500 11,363 3,455 43,500 43,500 14,818 3,728 43,500 43,500 18,546 4,014 43,500 43,500 22,561 4,312 130,500 43,500 26,873 4,621 130,500 43,500 31,494 4,938 130,500 43,500 36,432 5,262 130,500 130,500 41,693 5,589 130,500 130,500 47,283 5,918 130,500 130,500 53,200 6,244 130,500 130,500 59,444 6,564 130,500 130,500 66,009 6,875 130,500 130,500 72,883 7,171 130,500 130,500 80,054 7,448 130,500 130,500 87,502 7,703 130,500 130,500 95,205 7,930 217,500 130,500 103,135 8,127 217,500 130,500 111,262 8,289 217,500 130,500 119,551 8,413 217,500 217,500 127,963 8,497 217,500 217,500 136,460 8,540 217,500 217,500 145,000 8,540 217,500 217,500 153,540 8,497 217,500 217,500 162,037 8,413 217,500 217,500 170,449 8,289 217,500 217,500 178,738 8,127 217,500 217,500 186,865 7,930 217,500 217,500 194,795 7,703 290,000 217,500 202,498 7,448 290,000 217,500 209,946 7,171 290,000 217,500 217,117 6,875 290,000 290,000 223,991 6,564 290,000 290,000 230,556 6,244 290,000 290,000 236,800 5,918 290,000 290,000 242,717 5,589 290,000 290,000 248,307 5,262 290,000 290,000 253,568 4,938 290,000 290,000 258,506 4,621 290,000 290,000 263,127 4,312 290,000 290,000 267,439 4,014 290,000 290,000 271,454 3,728 290,000 290,000 275,182 3,455 290,000 290,000 278,637 3,195 290,000 290,000 281,832 2,949 290,000 290,000 284,781 2,718 290,000 290,000 287,499 2,501 290,000 290,000 290,000 290,000 150 === page 159 === Cumulative WIP Curve Project: Program Year: Sentinel (GBSD) Land Acquisition, Inc 2027 Cumulative Funding vs Obligation vs Outlay 350,000 300,000 250,000 200,000 150,000 100,000 Cumulative Funding Cumulative Obligation Cumulative Outlay 50,000 0 151 === page 160 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE MALMSTROM AIR FORCE BASE MONTANA SENTINEL OPERATIONS AND MAINTENANCE COMPLEX 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 11233F 212-216 NZAS220028 8. PROJECT COST ($000) AUTH: 1,100,000 APPR: 95,000 9. COST ESTIMATES ITEM UM QUANTITY UNIT COST COST($000) PRIMARY FACILITIES 594,301 SHOP, MISSILE SERVICE (212-216) SM 16,738 13,610 (227,804) MISSILE OPERATIONS BUILDING (141-911) SM 7,401 16,663 (123,323) HIGH-BAY TECHNICAL TRAINING (171-625) SM 8,031 15,387 (123,573) MISSILE TRANSFER BUILDING (141-915) SM 2,287 12,666 (28,967) HEMP SHIELDING LS (22,930) VEHICLE OPERATIONS HEATED PARKING (214-426) SM 2,567 11,131 (28,573) ALTER TELECOMMUNICATIONS FACILITY (131-111) SM 132 51,733 (6,829) Total from Continuation page(s) (32,302) SUPPORTING FACILITIES 367,628 UTILITIES LS (119,526) SITE PREPARATION LS (42,277) SPECIAL FOUNDATION LS (32,903) SITE IMPROVEMENTS LS (48,400) COMMUNICATIONS LS (44,559) PAVEMENTS LS (8,000) GENERATOR (INTEGRATED TRAINING CENTER) KW 2,000 2,208 (4,416) GENERATOR (WING COMMAND CENTER) KW 1,250 2,246 (2,808) CONSTRUCTION SECURITY SURVEILANCE LS (20,653) NORTHWEST ENERGY LS (15,000) ELECTRIC SUBSTATION LS (26,734) BASE HAZARDOUS STORAGE LS (2,352) SUBTOTAL 961,929 CONTINGENCY (5.00%) 48,096 TOTAL CONTRACT COST 1,010,025 SUPERVISION, INSPECTION AND OVERHEAD (6.50%) 65,652 DESIGN DURING CONSTRUCTION 9,619 POST CONSTRUCTION AWARD SERVICES 14,429 TOTAL REQUEST 1,099,725 TOTAL REQUEST (ROUNDED) 1,100,000 EQUIPMENT FROM OTHER APPROPRIATIONS (NON-ADD) (78,044) 10. DESCRIPTION OF PROPOSED CONSTRUCTION Construct four primary operational/training facilities for the deployment and sustained operations of the Sentinel Ground Based Strategic Deterrent Intercontinental Ballistic Missile system at Malmstrom Air Force Base. - Construct Wing Command Center to Intelligence Community Directive 705 technical specifications with emergency power and mitigation measures to counter direct hostile threats, High-altitude Electromagnetic Pulse events, and Chemical, Biological, Radiological threats to ensure 24-hour operations and survivability. - Construct Consolidated Maintenance Facility to house the Missile Maintenance Squadron and provide administrative space, shops, a transporter/erector test facility, drive-thru high bays for Transporter/Erector's, Payload Transporter's, M-vans, a vault and secure storage areas built to Intelligence Community Directive DD FORM 1391, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 152 === page 161 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE MALMSTROM AIR FORCE BASE MONTANA SENTINEL OPERATIONS AND MAINTENANCE COMPLEX 5. PROGRAM ELEMENT 7. PROJECT NUMBER 6. CATEGORY CODE 11233F 212-216 9. COST ESTIMATES (CONTINUED) NZAS220028 8. PROJECT COST ($000) AUTH: 1,100,000 APPR: 95,000 ITEM UM QUANTITY PRIMARY FACILITIES (CONTINUED) TEST CELL (211-183) ICD 705 PREMIUM CYBERSECURITY OF FACILITY-RELATED CONTROL SYS SM LS LS 91 UNIT COST COST ($000) 27,304 (2,485) (20,482) (9,335) 32,302 Total 705 technical standards, a loading dock, and shipping and receiving areas with forklift movements area. Bays include overhead cranes and vehicle exhaust systems. - Construct Integrated Training Center designed to house Sentinel specific equipment and training devices used for wing-level maintenance, security forces, cyber defense, and operations training into a single, purpose-built facility. The facility includes both high-bay and single-story technical training labs, shops, and classrooms built to Intelligence Community Directive 705 technical specifications. - Construct a Missile Handling Complex which includes two facilities, the Missile Handling Facility and the Transporter Storage and Administration Facility. Additionally, the Missile Handling Facility will also require upgrades to the access roads, utilities, and two supporting outdoor storage and holding pads. The Missile Handling Facility is intended to store missile elements. The entire Missile Handling Facility is classified as Secret Collateral and will be located within a controlled booster handling and storage area, while the Transporter Storage and Administration Facility includes both secure and unclassified controlled spaces. - Construct support structures and utility conveyances for facilities as well as construct an Integrated Technical Network facility, switchgear control building, tower booster station, emergency pump station and remodel existing Technical Network facility. Utility systems include a water tower, water, sanitary sewer including 12 manholes and 36 manhole repairs, gas including gas meter and regulator, electric including new switchgear/control station, and telecom including 36 manholes. Construction of these facilities includes facility electrical, mechanical, water, sewer, fire and lighting protection systems, security systems, and NIPR and SIPR communications systems. Overall site improvements include clearing, grubbing, grading, minor demolition, drainage, utility and communications connections, plus access paving, parking, and walkways as applicable. Use of a generator for the Tower Pump Station and the new ITN Building approved by AFCEC/CF. Facilities will be designed as permanent construction in accordance with DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 153 === page 162 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE MALMSTROM AIR FORCE BASE MONTANA SENTINEL OPERATIONS AND MAINTENANCE COMPLEX 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 11233F 212-216 NZAS220028 8. PROJECT COST ($000) AUTH: 1,100,000 APPR: 95,000 Department of War Unified Facilities Criteria 1-200-01. This project will comply with Department of War antiterrorism/ force protection requirements per Unified Facilities Criteria 4-010-01. Air Conditioning: Wing Command Center 210 tons Missile Handling Complex 65 tons Consolidated Maintenance Facility 540 tons Integrated Training Center 510 tons ITN Sentinel 30 tons Renovate Existing ITN 145 30 tons 11. REQ: 16,738 SM ADQT: 0 SUBSTD: 0 PROJECT: Sentinel Ground Based Strategic Deterrent deployment at Malmstrom Air Force Base. REQUIREMENT: This project provides necessary command, maintenance, training, and missile handling facilities for the Sentinel (GBSD) Intercontinental Ballistic Missile (ICBM) to replace the current Minuteman III (MMIII) ICBM over the next two decades. The Sentinel (GBSD) Wing Command Center is necessary to provide centralized operations for: day-to-day mission control, status and security monitoring, weapons systems management, cyber defense, and completing the realtime, tailored leadership picture. The Consolidated Maintenance Facility centralizes all Sentinel maintenance functions under one roof while the Integrated Training Center is required to consolidate all Sentinel wing-level operational, maintenance, security forces, and cyber-defense training into one facility where airmen train together in a collaborative environment on Sentinel (GBSD) unique systems and devices. The Missile Handling Complex is designed to accommodate the Sentinel (GBSD) ICBM system which uses different handling methods and security levels than the current MMIII system. These Sentinel (GBSD) purpose-designed and built facilities are necessary to improve interaction, collaboration, and efficiency in conducting day-to-day operations, maintenance, and training; they replace outdated, inadequately sized MMIII facilities; they improve working conditions and thus airmen retention; and they directly support the Nations continued commitment to strategic deterrence. This is not a tenant or supported service requirement. CURRENT SITUATION: The current Minuteman III ICBM system will remain operational during transition to the new Sentinel (GBSD) ICBM system and existing facilities will neither be available nor satisfy the specific facility requirements of the new Sentinel (GBSD) ICBM system. There is no current equivalent to the Wing Command Center for coordinating day-to-day operations and providing a tailored leadership picture. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 154 === page 163 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE MALMSTROM AIR FORCE BASE MONTANA SENTINEL OPERATIONS AND MAINTENANCE COMPLEX 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 11233F 212-216 NZAS220028 8. PROJECT COST ($000) AUTH: 1,100,000 APPR: 95,000 Presently, missile handling, maintenance, and training activities are spread across multiple locations in facilities which are often substandard with obsolete systems. Lack of consolidated, purpose-designed facilities upsets efficient, effective, and coordinated workflow, complicating or hindering operations, and resulting in delays and limitations. IMPACT IF NOT PROVIDED: This project is mission-critical to the on-time transition from the Minuteman III to the Sentinel Ground Based Strategic Deterrent weapons system at Malmstrom Air Force Base. Without these correctly sized and configured facilities, the deployment of the Sentinel Ground Based Strategic Deterrent weapons system that is vital to the defense and security of the United States and its allies will be delayed. ADDITIONAL: This project meets applicable criteria/scope specified in Department of the Air Force Manual 32-1084, Standard Facility Requirements and the design conforms to criteria established in the Air Force Corporate Facilities Standards and the Installation Facilities Standards. However, as the Sentinel (GBSD) missile system is a new weapons system there are no existing standard Air Force facility designs. Consequently, this project uses facility designs specifically developed by the Air Force Nuclear Weapons Center in coordination with Air Force Global Strike Command and the Air Force Civil Engineer Center for the Sentinel (GBSD) deployment at FE Warren Air Force Base to achieve commonality across the enterprise. A waiver to an economic analysis has been approved for this project. Sustainable principles, to include life-cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with Unified Facilities Criteria 1-200-02, High Performance and Sustainable Building Requirements. This includes preparation of a life-cycle cost analysis for energy consuming systems, renewable energy generating systems, or whenever life-cycle cost effective is selected as the reason any requirement of Unified Facilities Criteria 1-200-02 is partially compliant or not applicable. This project does not fall within or partly within the 100-year flood plain. This project is sited in accordance with the Installation Development Plan, is within a compatible land use area. Supporting Facilities exceed 25% of the Primary Facilities total due to continued growth of existing base utility demand and need to maintain current capacity while expending for the needs of the Sentinel project. The construction growth offset for this requirement is 372,313 square feet. Base Civil Engineer: 406-731-6188 Shop, Missile Service: 16,738 SM = 180,166 SF; Missile Operations Building: 7,401 SM = 79,664 SF; High-Bay Technical Training: 8,031 SM = 86,445 SF; Missile Transfer Building: 2,287 SM = 24,617 SF; Vehicle Operations Heated Parking: 2,567 SM = 27,631 SF; DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 155 === page 164 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE MALMSTROM AIR FORCE BASE MONTANA SENTINEL OPERATIONS AND MAINTENANCE COMPLEX 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 11233F 212-216 Alter Telecommunications Facility: Test Cell: 91 SM = 980 SF. NZAS220028 8. PROJECT COST ($000) AUTH: 1,100,000 APPR: 95,000 132 SM = 1,421 SF; JOINT USE CERTIFICATION: Mission Requirements, operational considerations, and location are incompatible with use by other components. Facility Condition Index: This is not a recapitalization project. No facility condition index exists for this facility type. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 156 === page 165 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE MALMSTROM AIR FORCE BASE MONTANA SENTINEL OPERATIONS AND MAINTENANCE COMPLEX 5. PROGRAM ELEMENT 7. PROJECT NUMBER 12. 6. CATEGORY CODE 8. PROJECT COST ($000) AUTH: 1,100,000 11233F 212-216 NZAS220028 APPR: 95,000 SUPPLEMENTAL DATA: A. Estimated Execution Data: (1) Acquisition Strategy: Design-Bid-Build (2) Design Data (a) Design or Request for Proposal(RFP) Started: SEP/2023 (b) Percent of Design Completed as of SEP 2025: 35% (c) Percent of Design Completed as of JAN 2026: 65% (d) Design or RFP Complete: JUL/2027 (e) Total Design Cost ($000): 42,401 (f) Energy Study and/or Life Cycle Cost Analysis YES (g) Standard or Definitive Design Used? YES (3) Construction Data: (a) Contract Award: MAY/2027 (b) Construction Start: AUG/2027 (c) Construction Complete: JUL/2032 B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) Furniture, Fixtures, & Equipme UPS Equipment Electronic Security System Audio-Visual Equipment Site Security/Surveillance Communications Equipment IT Equipment Weapons System Installation 3080 3080 3080 3080 3080 3080 3080 3080 2030 2030 2030 2030 2027 2030 2030 2030 22,097 1,372 3,950 24,615 9,499 6,112 9,199 1,200 Auth of Approp $(000) 95,000 1,005,000 Appropriation $(000) 95,000 1,005,000 1,100,000 C. Authorization and Appropriation Summary: FY2027 Budget Request Future Request Total DD FORM 1391C, JUL 1999 Authorization $(000) 1,100,000 0 1,100,000 PREVIOUS EDITION IS OBSOLETE PAGE NO. 157 === page 166 === MILCON Work-in-Progress (WIP) Curve – Automated Spend Plan Project Information Project Title Installation Program Year (FY) Project # SENTINEL OPERATIONS AND MAINTENANCE COMPLEX MALMSTROM AIR FORCE BASEMONTANA 2027 NZAS220028 Financial Inputs & Derived Amounts ($000) Programmed Amount (PA) SIOH Rate Contingency Rate SIOH Amount Contingency Amount Construction (PA less SIOH & Cont) Total Increments 1,100,000 6.5% 5.0% 71,500 55,000 973,500 6 Key Dates (Calculated) Begin Date (FY Start) Award Date (Assumed) Complete Date (Award + POP; set to 1st of month) Award Month (1st of month) Complete Month (1st of month) Period of Performance Funding & Obligation Increments ($000) Increment 1 Increment 2 Increment 3 Increment 4 Increment 5 Increment 6 Total Funding Increment Outlay Curve Controls (Adjust if needed) Outlay Curve Steepness (k) Normalized Logistic Base (t=0) Normalized Logistic Top (t=1) Total Outlay ($000) (assumed = PA) Oct 1, 2026 May 1, 2027 Jul 1, 2032 May 1, 2027 Jul 1, 2032 1888 Amount ($000) Funding Date 95,000 Jan 1, 2027 379,000 Oct 1, 2027 440,000 Oct 1, 2028 156,000 Oct 1, 2029 17,000 Oct 1, 2030 13,000 Oct 1, 2031 1,100,000 Check vs PA Obligation Date Apr 1, 2027 Jan 1, 2028 Jan 1, 2029 Jan 1, 2030 Jan 1, 2031 Jan 1, 2032 0 8.0 0.01798621 0.98201379 1,100,000 158 === page 167 === Monthly Cash Flow (Automated from Spend Plan) Project: Month Oct 2026 Nov 2026 Dec 2026 Jan 2027 Feb 2027 Mar 2027 Apr 2027 May 2027 Jun 2027 Jul 2027 Aug 2027 Sep 2027 Oct 2027 Nov 2027 Dec 2027 Jan 2028 Feb 2028 Mar 2028 Apr 2028 May 2028 Jun 2028 Jul 2028 Aug 2028 Sep 2028 Oct 2028 Nov 2028 Dec 2028 Jan 2029 Feb 2029 Mar 2029 Apr 2029 May 2029 Jun 2029 Jul 2029 Aug 2029 Sep 2029 Oct 2029 Nov 2029 Dec 2029 Jan 2030 Feb 2030 Mar 2030 Apr 2030 May 2030 Jun 2030 Jul 2030 Aug 2030 Sep 2030 Oct 2030 Nov 2030 Dec 2030 Jan 2031 Feb 2031 Mar 2031 Apr 2031 May 2031 Jun 2031 Jul 2031 Aug 2031 SENTINEL OPERATIONS AND MAINTENANCE COMPLEX Funding ($000) Obligation ($000) Outlay ($000) Cumulative Funding Cumulative Obligation Cumulative Outlay 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 95,000 0 0 95,000 0 0 0 0 0 95,000 0 0 0 0 0 95,000 0 0 0 95,000 0 95,000 95,000 0 0 0 2,722 95,000 95,000 2,722 0 0 3,075 95,000 95,000 5,797 0 0 3,471 95,000 95,000 9,268 0 0 3,914 95,000 95,000 13,182 0 0 4,411 95,000 95,000 17,593 379,000 0 4,966 474,000 95,000 22,559 0 0 5,585 474,000 95,000 28,144 0 0 6,272 474,000 95,000 34,416 0 379,000 7,035 474,000 474,000 41,451 0 0 7,878 474,000 474,000 49,328 0 0 8,806 474,000 474,000 58,134 0 0 9,824 474,000 474,000 67,958 0 0 10,936 474,000 474,000 78,895 0 0 12,145 474,000 474,000 91,040 0 0 13,451 474,000 474,000 104,491 0 0 14,852 474,000 474,000 119,342 0 0 16,345 474,000 474,000 135,687 440,000 0 17,923 914,000 474,000 153,610 0 0 19,575 914,000 474,000 173,185 0 0 21,286 914,000 474,000 194,471 0 440,000 23,037 914,000 914,000 217,509 0 0 24,805 914,000 914,000 242,314 0 0 26,562 914,000 914,000 268,876 0 0 28,275 914,000 914,000 297,151 0 0 29,910 914,000 914,000 327,062 0 0 31,430 914,000 914,000 358,492 0 0 32,797 914,000 914,000 391,289 0 0 33,975 914,000 914,000 425,264 0 0 34,930 914,000 914,000 460,194 156,000 0 35,634 1,070,000 914,000 495,828 0 0 36,066 1,070,000 914,000 531,894 0 0 36,212 1,070,000 914,000 568,106 0 156,000 36,066 1,070,000 1,070,000 604,172 0 0 35,634 1,070,000 1,070,000 639,806 0 0 34,930 1,070,000 1,070,000 674,736 0 0 33,975 1,070,000 1,070,000 708,711 0 0 32,797 1,070,000 1,070,000 741,508 0 0 31,430 1,070,000 1,070,000 772,938 0 0 29,910 1,070,000 1,070,000 802,849 0 0 28,275 1,070,000 1,070,000 831,124 0 0 26,562 1,070,000 1,070,000 857,686 17,000 0 24,805 1,087,000 1,070,000 882,491 0 0 23,037 1,087,000 1,070,000 905,529 0 0 21,286 1,087,000 1,070,000 926,815 0 17,000 19,575 1,087,000 1,087,000 946,390 0 0 17,923 1,087,000 1,087,000 964,313 0 0 16,345 1,087,000 1,087,000 980,658 0 0 14,852 1,087,000 1,087,000 995,509 0 0 13,451 1,087,000 1,087,000 1,008,960 0 0 12,145 1,087,000 1,087,000 1,021,105 0 0 10,936 1,087,000 1,087,000 1,032,042 0 0 9,824 1,087,000 1,087,000 1,041,866 159 === page 168 === Sep 2031 Oct 2031 Nov 2031 Dec 2031 Jan 2032 Feb 2032 Mar 2032 Apr 2032 May 2032 Jun 2032 Jul 2032 0 13,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 13,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8,806 7,878 7,035 6,272 5,585 4,966 4,411 3,914 3,471 3,075 2,722 0 0 0 0 0 0 0 0 0 0 0 TOTAL 1,100,000 1,100,000 1,100,000 1,087,000 1,100,000 1,100,000 1,100,000 1,100,000 1,100,000 1,100,000 1,100,000 1,100,000 1,100,000 1,100,000 1,100,000 1,100,000 1,100,000 1,100,000 1,100,000 1,100,000 1,100,000 1,100,000 1,100,000 1,100,000 1,100,000 1,087,000 1,087,000 1,087,000 1,087,000 1,100,000 1,100,000 1,100,000 1,100,000 1,100,000 1,100,000 1,100,000 1,100,000 1,100,000 1,100,000 1,100,000 1,100,000 1,100,000 1,100,000 1,100,000 1,100,000 1,100,000 1,100,000 1,050,672 1,058,549 1,065,584 1,071,856 1,077,441 1,082,407 1,086,818 1,090,732 1,094,203 1,097,278 1,100,000 1,100,000 1,100,000 1,100,000 1,100,000 1,100,000 1,100,000 1,100,000 1,100,000 1,100,000 1,100,000 1,100,000 160 === page 169 === Jun 2032 Apr 2032 Feb 2032 Dec 2031 400,000 Oct 2031 600,000 Aug 2031 Jun 2031 Apr 2031 Feb 2031 Dec 2030 Oct 2030 Aug 2030 Jun 2030 Apr 2030 Feb 2030 Dec 2029 Oct 2029 Aug 2029 Jun 2029 Apr 2029 Feb 2029 Dec 2028 Oct 2028 Aug 2028 Jun 2028 Apr 2028 Feb 2028 Dec 2027 Oct 2027 Aug 2027 Jun 2027 Apr 2027 Project: Program Year: Feb 2027 Dec 2026 Oct 2026 Cumulative WIP Curve SENTINEL OPERATIONS AND MAINTENANCE COMPLEX 2027 Cumulative Funding vs Obligation vs Outlay 1,200,000 1,000,000 800,000 Cumulative Funding Cumulative Obligation Cumulative Outlay 200,000 0 161 === page 170 === 1. COMPONENT 2. DATE (YYYYMMDD) FY 2027 BBBBBB MILITARY CONSTRUCTION PROGRAM AIR FORCE 3. INSTALLATION AND LOCATION 4. COMMAND NELLIS AIR FORCE BASE, NEVADA AIR COMBAT COMMAND 6. PERSONNEL (1) PERMANENT (2) STUDENTS 20260326 5. AREA CONTRUCTION COST INDEX 1.20 (3) SUPPORTED OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN (4) TOTAL a. AS OF 30-Sep-25 1,231 4,959 1,037 84 24 0 619 1,996 664 10,614 b. END FY 30-Sep-29 1,235 4,950 860 1,350 300 0 591 1,698 648 11,632 7. INVENTORY DATA ($000) 2,978,902.00 11,351,748.00 0.00 1,057,200.00 0.00 16,500.00 238,000.00 12,663,448.00 a. TOTAL ACREAGE b. INVENTORY TOTAL AS OF 30-Sep-25 c. AUTHORIZATION NOT YET IN INVENTORY d. AUTHORIZATION REQUESTED IN THIS PROGRAM e. AUTHORIZATION INCLUDED IN FOLLOWING PROGRAM f. PLANNED IN NEXT THREE PROGRAM YEARS g. REMAINING DEFICIENCY h. GRAND TOTAL 8. PROJECTS REQUESTED IN THIS PROGRAM (1) CODE a. CATEGORY (2) PROJECT TITLE 211-111 F-47 Operational Test Inc (3) SCOPE b. COST ($000) (1) START c. DESIGN STATUS (2) COMPLETE 5,850 730,700 Mar 2026 Sep 2026 9. FUTURE PROJECTS 310-916 F-35 Data Lab Support Facility (965 SM/$16,500) 211-111 F-47 Operational Test, Inc (5,850 SM/$326,500) 10.MISSION OR MAJOR FUNCTIONS The "Home of the Fighter Pilot" Nellis Air Force Base is home to the United States Air Force Warfare Center, the largest and most demanding advanced air combat training mission in the world. At Nellis, we provide training for composite strike forces which include every type 11. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES None DD FORM 1390, JUL 1999 162 PREVIOUS EDITION IS OBSOLETE. === page 171 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE NELLIS AIR FORCE BASE NEVADA F-47 Operational Test 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 27110F 211-111 RKMF273007 8. PROJECT COST ($000) AUTH: 1,057,200 APPR: 730,700 9. COST ESTIMATES ITEM UM QUANTITY UNIT COST COST($000) PRIMARY FACILITIES 645,020 HANGAR, MAINTENANCE (211-111) SM 5,850 10,798 (63,168) FUEL SYSTEM MAINTENANCE DOCK (211-179) SM 1,861 10,819 (20,134) AIRCRAFT CORROSION CONTROL (211-159) SM 2,302 12,024 (27,679) AIRCRAFT WASHRACK (116-672) SM 775 8,926 (6,918) SQUADRON OPERATIONS (141-753) SM 4,193 13,239 (55,511) SHOP, AIRCRAFT MAINTENANCE, ORGANIZATIONAL SM 3,155 6,674 (21,056) (211-154) SHOP, AIRCRAFT GENERAL PURPOSE (211-152) SM 803 11,921 (9,573) Total from Continuation page(s) (440,981) SUPPORTING FACILITIES 247,503 UTILITIES LS (133,444) SITE PREPARATION LS (14,139) ROADS, SIDEWALKS, AND PARKING LS (48,153) SITE IMPROVEMENTS LS (9,080) COMMUNICATIONS LS (5,737) GENERATOR LS (1,084) AIRCRAFT SHELTER ALLIED SUPPORT LS (2,870) RELOCATE PRIVATE FUEL LINE LS (8,372) FENCING LS (2,869) OVER HEAD PROTECTION LS (354) COMMISSIONING LS (108) ENVIRONMENTAL REMEDIATION LS (19,689) RECRATION AREA FOR DORM LS (1,604) SUBTOTAL 892,523 CONTINGENCY (5.00%) 44,626 TOTAL CONTRACT COST 937,149 SUPERVISION, INSPECTION AND OVERHEAD (6.50%) 60,915 DESIGN/BUILD - DESIGN COST (4.00% OF SUBTOTAL) 35,701 CONSTRUCTION SECURITY SURVEILLANCE 23,428 TOTAL REQUEST 1,057,193 TOTAL REQUEST (ROUNDED) 1,057,000 EQUIPMENT FROM OTHER APPROPRIATIONS (NON-ADD) (84,826) 10. DESCRIPTION OF PROPOSED CONSTRUCTION This project intends to leverage the authorities granted in the Fiscal Year 2026 National Defense Authorization Act to take advantage of private sector innovative design and construction methods. It will use a combination of Other Transaction Authority (OTA), Progressive Design-Build (PDB), and other execution methods to innovate in delivery, reduce construction timelines, and lifecycle costs. Other Transaction Authority, Progressive Design-Build execution will capitalize on the construction industry's expertise and innovation while avoiding costly and timeconsuming federal contracting regulatory burdens. The execution strategy is intentionally non-prescriptive to empower industry partners to innovate and propose the most effective technical solution to meet the defined needs. DD FORM 1391, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 163 === page 172 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE NELLIS AIR FORCE BASE NEVADA F-47 Operational Test 5. PROGRAM ELEMENT 7. PROJECT NUMBER 6. CATEGORY CODE 27110F 211-111 9. COST ESTIMATES (CONTINUED) RKMF273007 ITEM PRIMARY FACILITIES (CONTINUED) FLIGHT SIMULATOR TRAINING (171-212) SIMULATION CENTER (172-423) AIRCRAFT RESEARCH LABORATORY (311-171) AIRCRAFT RESEARCH LABORATORY (311-171) BUILDING, AIRCRAFT WEAPONS CALIBRATION (211147) FIELD TRAINING FACILITY (171-618) STORAGE MAGAZINE ABOVE GROUND TYPE A, B, & (422-258) SHOP, NON-DESTRUCTIVE INSPECTION (211-153) APRON (113-321) AIRCRAFT SUPPORT EQUIPMENT STORAGE YARD (852273) MAINTENANCE AIRCRAFT SPARES / STORAGE (211601) DORMITORY AIRMAN PERMANENT PARTY/PCS-STUDE (721-312) FLIGHT KITCHEN (723-388) F-35 FUEL SYSTEM MAINTENANCE DOCK (211-179) POWER CHECK (116-664) JET BLAST DEFLECTOR (116-945) POL - VEHICLE FUELING STATION (123-335) POL - VEHICLE FUELING STATION (123-335) ICD 705 PREMIUM CYBERSECURITY OF FACILITY-RELATED CONTROL SYS 8. PROJECT COST ($000) AUTH: 1,057,200 APPR: 730,700 UNIT COST COST ($000) 2,460 1,340 1,204 2,713 2,305 14,195 9,386 34,986 16,140 9,286 (34,920) (12,577) (42,123) (43,788) (21,404) SM SM 2,008 535 7,477 6,034 (15,014) (3,228) SM SM SM 52 100,940 1,446 5,143 502 1,842 (267) (50,672) (2,664) SM 1,727 5,243 (9,055) SM 14,598 9,585 (139,922) SM SM SM M OL OL LS LS 246 13,535 3,605 7,615 6,610 309 182 37,571 2 608,634 4 742,931 (3,330) (27,452) (2,042) (6,838) (1,217) (2,972) (11,389) (10,107) 440,981 UM QUANTITY SM SM SM SM SM Total Using this approach, the cost estimate will continue to be refined and will differ from the original government estimate due to the early and ongoing involvement of industry experts. This collaborative approach allows for a more detailed and realistic cost to be developed as the design progresses and facilities are constructed. This project provides a multi-facility campus to beddown and enable one squadron of the F-47 fighter aircraft and associated equipment and operations. The campus will include aircraft hangars; corrosion control facilities; squadron and other operations facilities; airfield pavements (e.g., taxiways, aprons, shoulders, and specialized pads); maintenance shops for inspection, testing, repair, and safe handling of aircraft and equipment; munitions complex storage and maintenance; housing for unaccompanied permanent party airmen; training for various missionrelated functions (e.g., simulators, field training, munitions); petroleum operations; and support facilities for visitor control, dining, supply, and DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 164 === page 173 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE NELLIS AIR FORCE BASE NEVADA F-47 Operational Test 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 27110F 211-111 RKMF273007 8. PROJECT COST ($000) AUTH: 1,057,200 APPR: 730,700 warehousing. As the campus design develops, it is likely that some existing facilities will be modified or demolished as determined to be most advantageous to the government. In addition to the Primary Facilities, the project will include all Supporting Facilities needed for complete and usable facilities. These will include site preparation and improvements, extensive utilities (electrical, water, HVAC, pumps, lighting, etc.), roadways, parking, sidewalks, communication systems, and backup generators as authorized by Air Force Manual 32-1062. As the campus design develops, additional Support Facilities made be identified and included in this project as determined to be most advantageous to the government, Facilities will be designed as permanent construction in accordance with the Department of War Unified Facilities Criteria 1-200-01, General Building requirements. This project will comply with Department of War antiterrorism/force protection requirements per Unified Facility Criteria 4-01001. 11. REQ: 5,850 SM ADQT: 0 SUBSTD: 0 PROJECT: F-47 Operational Test REQUIREMENT: The beddown of this new aircraft requires unique purpose-built facilities to meet the unique needs of this mission and operations. This project is a complete campus approach to bedding down this suite aircraft to ensure all required facilities will be available and synchronized with the mission-driven equipment procurement, movement of personnel, and logistical chain needed. A more detailed description of individual facilities planned is described in the accompanied DD1391C for this project. CURRENT SITUATION: Nellis Air Force Base is the premier testing and training base for fighters, housing both the Weapons School, the Virtual Test and Training Center and the Nevada Test and Training Range. The west side of the runway houses the majority of the operations functions at Nellis Air Force Base and is currently at capacity. Facilities that support the assigned flying units at Nellis Air Force Base are geographically separated from the F-47 bed down complex, are fully occupied for existing missions, and do not meet the security or space requirements to support the F-47 mission. In order to support an additional aircraft bed down, the east side of the runway must be further developed. Establishing the infrastructure and apron are the first priority in developing initial operational capability for this mission. IMPACT IF NOT PROVIDED: Nellis Air Force Base has been identified by the Secretary of the Air Force as the DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 165 === page 174 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE NELLIS AIR FORCE BASE NEVADA F-47 Operational Test 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 27110F 211-111 RKMF273007 8. PROJECT COST ($000) AUTH: 1,057,200 APPR: 730,700 location for F-47 operational test and weapons school missions. Without this project, Nellis Air Force Base will not be able to meet the United States Air Force Operational Imperatives, nor the Lines of Effort mandated by the Secretary of the Air Force. Additionally, Nellis Air Force Base will not be able to meet National Defense Strategy requirements. High-risk workarounds will not allow the squadron to properly train, maintain, test, or evaluate data and systems on the new weapons system, significantly impacting the test and training mission directly supporting the F-47 program. ADDITIONAL: This project meets applicable criteria/scope specified in Department of the Air Force Manual 32-1084, Standard Facility Requirements. This design shall conform to criteria established in the Air Force Corporate Facilities Standards, the Installation Facilities Standards, but will not employ a standard facility design because there is no Air Force standard facility design for this project, and there is no applicable standard design from U.S. Army Corps of Engineers MILCON is the only option that will meet operational requirements. An economic analysis is in progress This project does not fall within or partly within the 100-year floodplain. This project was not included in the Fiscal Year 2026 future years' defense plan. Facility is sited in accordance with the Installation Development Plan and is within a compatible land use area. Supporting Facilities exceed 25% of the Primary Facilities total due to this primarily being a large apron expansion thus requiring considerable sitework. Due to this project being executed by progressive design build the to size of new facilities is not known, the Growth offset requirement will be determined later in design. 99th Air Base Wing Civil Engineer: (702) 652-6862 Maintenance Hangar 5,850 SM = 62,969 SF Fuel System Maintenance Dock 1,861 SM = 20,032 SF Aircraft Corrosion Control 2,302 SM = 24,779 SF Aircraft Washrack 775 SM = 8,342 SF Squadron Operations 4,193 SM = 45,133 SF Aircraft Maintenance Shop 3,155 SM = 33,960 SF Aircraft General Purpose Shop 803 SM = 8,643 SF Flight Simulator Training 2,460 SM = 26,479 SF Simulator Center 1,340 SM = 14,424 SF Aircraft Research Laboratory 2,713 SM = 29,202 SF Aircraft Research Laboratory 1,204 SM = 12,960 SF Aircraft Weapons Calibration Building 2,305 = 24,811 SF Field Training Facility 2,008 SM = 21,614 SF Above Ground Storage Magazine 535 SM = 5,759 SF Non-Destructive Inspection Shop 52 SM = 560 SF Apron 100,940 SM = 1,086,509 SF Aircraft Support Equipment Storage Yard 1,446 SM = 15,565 SF Aircraft Maintenance Spares/Storage 1,727 SM = 18,589 SF Dormitory 14,598 SM = 157,132 SF Flight Kitchen 246 SM = 2,648 SF DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 166 === page 175 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE NELLIS AIR FORCE BASE NEVADA F-47 Operational Test 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 27110F 211-111 RKMF273007 8. PROJECT COST ($000) AUTH: 1,057,200 APPR: 730,700 F-35 Fuel System Maintenance Dock 3,605 SM = 38,804 SF Power Check 6,610 SM = 71,149 SF Jet Blast Deflector 182 LM = 597 LF JOINT USE CERTIFICATION: This facility can be used by other components on an "as available" basis; however, the scope of the project is based on Air Force requirements. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 167 === page 176 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE NELLIS AIR FORCE BASE NEVADA F-47 Operational Test 5. PROGRAM ELEMENT 7. PROJECT NUMBER 12. 6. CATEGORY CODE 8. PROJECT COST ($000) AUTH: 1,057,200 27110F 211-111 RKMF273007 APPR: 730,700 SUPPLEMENTAL DATA: A. Estimated Execution Data: (1) Acquisition Strategy: Progressive Design-Build (PD-B) (2) Design Data (a) Design, RFP, or PD-B Challenge Statement 1 Started: MAR/2026 (b) Percent of Design Completed as of SEP 2025: 0% (c) Percent of Design Completed as of JAN 2026: 10% (d) Design, RFP Complete, or PD-B Phase I Award: SEP/2026 (e) Total Design Cost or Cost to Award PD-B Construction 157,000 Phase I ($000): (f) Energy Study and/or Life Cycle Cost Analysis YES (g) Standard or Definitive Design Used? NO (3) Construction Data: (a) Contract PD-B Construction Phase II Award: JUN/2027 (b) Construction Start: DEC/2027 (c) Construction Complete: DEC/2035 B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) Communication Equipment Intrusion Detection System Furniture, Fixtures, & Equipme 150lb Halon Extingushers Flight Simulator 20 Ton Interior Crane Leveler 7 Engine Offload Ramp Aircraft Sunshades FUTURE YEAR FUTURE YEAR FUTURE YEAR FUTURE YEAR FUTURE YEAR FUTURE YEAR FUTURE YEAR FUTURE YEAR 3080 3080 3080 3400 3080 3080 3080 3080 11,987 6,372 6,152 146 51,881 650 950 6,688 C. Authorization and Appropriation Summary: FY2027 Budget Request Future Request Total DD FORM 1391C, JUL 1999 Authorization $(000) 1,057,200 0 1,057,200 Auth of Approp $(000) 730,700 326,500 PREVIOUS EDITION IS OBSOLETE Appropriation $(000) 730,700 326,500 1,057,200 PAGE NO. 168 === page 177 === 1. COMPONENT AIR FORCE FY 2027 MILITARY CONSTRUCITON PROJECT DATA 2. DATE MARCH 2026 4. PROJECT TITLE: 3. INSTALLATION AND LOCATION NELLIS AIR FORCE BASE F-47 Operational Test NEVADA 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 8. PROJECT COST ($000) 27110F 211-111 RKMF273007 AUTH:1,057,200 APPR:730,700 DESCRIPTION OF PRIMARY FACILITIES F-47 Apron Complex (Reference # RKMF263005) Construct new fighter parking apron, east side two-lane vehicular perimeter road and interior access roads and improve all infrastructure systems to support the beddown of the F-47 aircraft on the east side of the runway at Nellis Air Force Base. The apron is sized to support 16 sunshades and 18 parking spots. It is comprised of 17.5 inch thick Rigid Concrete Pavement on a 6-inch Aggregate Base Course on 6 inches of compacted subbase doweled into existing adjacent apron and will include aircraft tie downs. The project will construct a new water pump house, water treatment facility, water storage tank, jet blast deflectors and telecommunications building. An Aerospace Ground Equipment line will be established as well which will include a covered storage area. The project also includes replacing portions of airfield lighting, pavement markings, signage and shoulders as well as providing storm water control, utility service mains to the building sites for all facilities, aircraft sunshade allied support, airfield fencing, secured vehicle and pedestrian access and circulation, and other supporting work necessary to make complete and usable facilities. Extensive site development and utility upgrades will be required for this undeveloped area to include mass grading and earthwork and building a utility corridor around the new complex. The existing Kinder Morgan owned fuel line will be moved. Combined Operations Maintenance Hangar (Reference # RKMF263006) Construct a three-story Combined Operations Maintenance Hangar. The Combined Operations Maintenance Hangar footprint will encompass a six-bay Maintenance Hangar along with dedicated spaces for Squadron Operations, Data Lab, Aircraft Maintenance Squadron, Fighter Generation Squadron, maintenance back-shops, and include restricted areas and/or special access program facilities. The Combined Operations Maintenance Hangar will utilize durable, long-lasting materials, including reinforced concrete foundations and floor slabs, a primary structural steel frame, and a robust building envelope composed of insulated metal siding and reinforced concrete masonry units. The roof will be a high-performance standing seam metal and/or membrane system designed for the desert climate. This includes the installation of comprehensive fire detection, alarm, and suppression systems, the extension and connection of all necessary utilities, and complete site improvements. Site work will feature landscaping, hardscapes for pedestrian access, new access roads integrated with the base network, and sufficient parking to meet Unified Facilities Criteria standards. The facility will be fully equipped with supporting telecommunications infrastructure, including fiber optics. Restricted areas and/or special access program facility spaces shall comply with the Intelligence Community Directive 705 criteria and standards. 169 === page 178 === 1. COMPONENT AIR FORCE FY 2027 MILITARY CONSTRUCITON PROJECT DATA 2. DATE MARCH 2026 4. PROJECT TITLE: 3. INSTALLATION AND LOCATION NELLIS AIR FORCE BASE F-47 Operational Test NEVADA 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 8. PROJECT COST ($000) 27110F 211-111 RKMF273007 Simulator Facility (Reference # RKMF263007) AUTH:1,057,200 APPR:730,700 Construct a 4-bay F-47 Simulator facility with built in integration space for multi-platform testing and training. The facility includes reinforced concrete foundation and floor slab, structural steel frame with masonry walls, and standing seam metal roof. This project will require compliance with Intelligence Community Directive 705 for the Sensitive Compartmented Information Facility and Special Access Program Facility areas. The project includes all utilities, site improvements, pavements, detection/protection features, security enhancements, environmental mitigation, and other supporting work necessary to make a complete and usable facility. Cybersecurity measures are included in accordance with Unified Facilities Criteria 4-010-06, Cybersecurity of Facility-Related Control Systems. Smart technology measures include technology and data systems for more resource efficient building operations and to enhance capability to respond to, and recover from, natural and man-made disruptions. This project is authorized a generator, per Air Force Instruction 32-1062. Re-Programming Lab (Reference # RKMF273004) Construct F-47 Re-Programming Lab for maintaining avionics-specific hardware, rapid re-programming and to validate mission data with space for a security desk, front office staff, intel, security personnel, IT personnel, re-programming engineers, data management and conditioning, server rack farm and administrative space. Facility will be Intelligence Community Directive 705 compliant and constructed of reinforced concrete grade beam foundation and floor slab, masonry walls with accents of metal panel and/or precast concrete, structural steel roof framing, and standing seam metal roofing systems. Project will include all supporting facilities such as site improvements, pavements, vehicle parking, communications, generator, and utilities necessary to provide a complete and useable facility. Sensitive and/or Special Access Program spaces shall comply with the Intelligence Community Directive 705 criteria and standards. This project is authorized a generator, per Air Force Instruction 32-1062. Fuel Cell (Reference # RKMF273005) Construct a Fuel Cell Maintenance Facility. Facility will be constructed with a reinforced concrete grade beam foundation and floor slab, structural steel frame, masonry walls and a standing seam metal roof. Project will include all supporting facilities such as fire detection and protection, special security enhancements, utilities, site improvements, landscaping, vehicle parking, communications support and all other supporting work necessary to make a complete and usable facility. Fuel systems maintenance bays also require mechanical ventilation, fume sensing and alarm system, fire extinguishing systems, and wash down drainage trenches. Sensitive and/or Special Access Program spaces shall comply with the Intelligence Community Directive 705 criteria and standards. 170 === page 179 === 1. COMPONENT AIR FORCE FY 2027 MILITARY CONSTRUCITON PROJECT DATA 2. DATE MARCH 2026 4. PROJECT TITLE: 3. INSTALLATION AND LOCATION NELLIS AIR FORCE BASE F-47 Operational Test NEVADA 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 8. PROJECT COST ($000) 27110F 211-111 RKMF273007 AUTH:1,057,200 APPR:730,700 Low Observable Corrosion Repair Facility (Reference # RKMF273006) Construct a one-bay F-47 Low Observable Corrosion Repair Facility with a one-bay covered wash-rack. The facility will have reinforced concrete foundation and floor slab, structural steel framing, fire suppression, masonry block and insulated metal walls, and standing seam metal roof. Sensitive and/or Special Access Program spaces shall comply with the Intelligence Community Directive 705 criteria and standards. Project will include all supporting facilities such as site preparation, site improvements, utilities, roadways, sidewalks, parking, communications support, and all other supporting work necessary to make a complete and usable facility. Consolidated Maintenance Facility (Reference # RKMF283001) Construct a new F-47 Consolidated Maintenance facility to include logistics parts storage, engine storage, and non-destructive inspection laboratory. The facility will be of reinforced concrete foundation and floor slab, built with a structural steel frame, masonry walls, and a standing seam metal roof. The logistics parts storage function includes open bay storage, storage meeting Intelligence Community Directive 705 requirements, a pilferable materials area, temperaturecontrolled storage, and a separate hazardous material storage building. The engine storage function provides a drive-through, classified collateral storage space for spare engines. The non-destructive inspection laboratory provides space for field-level inspection of aircraft components and includes a Joint Oil Analysis Program lab. The project includes special equipment such as cranes and a loading dock with a leveler. Sensitive and/or classified information will be processed in this facility. The project will include all supporting facilities such as utilities, site improvements, landscaping, access pavements, vehicle parking, communications support, and all other supporting work necessary to make a complete and usable facility. R-11 Fuel Stand Expansion (Reference # RKMF283002) The project scope includes extending the existing R-11 Fuel stand on the northeast side of the runway at Nellis Air Force Base to accommodate two addition trucks to support the F-47 beddown. The extension will include adding two dispensing stations and extending the existing sunshade. The project will include all supporting facilities such as demolition and repair of pavements, additional pavement section to allow for trucks to merge at the fuel stand exit and movement of any piping or utilities as necessary to provide a complete and useable facility. 171 === page 180 === 1. COMPONENT AIR FORCE FY 2027 MILITARY CONSTRUCITON PROJECT DATA 2. DATE MARCH 2026 4. PROJECT TITLE: 3. INSTALLATION AND LOCATION NELLIS AIR FORCE BASE F-47 Operational Test NEVADA 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 8. PROJECT COST ($000) 27110F 211-111 RKMF273007 Satellite Dining Facility (Reference # RKMF283003) AUTH:1,057,200 APPR:730,700 Construct a Satellite Dining Facility utilizing conventional design and construction methods to support the F-47 beddown mission. The facility should be compatible with applicable Department of War, Air Force, and base design standards. The facility includes reinforced concrete foundation and floor slab, structural steel framing, fire suppression, masonry block and insulated metal walls, and standing seam metal roof. The project will include all supporting facilities such as utilities, site improvements, pavements, parking lot and other supporting work necessary to make it a complete and usable facility. Project will include all supporting facilities such as site improvements, pavements, communications, utilities, Mechanical Systems, Fire detection necessary to provide a complete and useable facility. Weapons Load Training Facility (Reference # RKMF283004) Construct a Weapons Load Training Facility with adequate office and classroom space with appropriate heating and cooling for the academic and training needed on the new F-47 aircraft platform for weapons load crews. The facility will be reinforced concrete grade beam foundation and floor slab, masonry walls with accents of metal panel and/or precast concrete, structural steel roof framing, and standing seam metal roofing systems. This facility includes secure space. Sensitive and/or Special Access Program spaces shall comply with the Intelligence Community Directive 705 criteria and standards. Project will include all supporting facilities such as site preparation, site improvements, utilities, pavements, communications, and all others necessary to provide a complete and useable facility. This project has been approved a generator by AFCEC/CF. Maintenance Training Facility (Reference # RKMF283005) Construct an F-47 Maintenance Training Facility. The Maintenance Training Facility will provide adequate, properly configured space, including administrative offices, tiered classrooms, and hands-on training laboratories, all equipped with appropriate climate control. Facility will be constructed on reinforced concrete foundation with integrated concrete floor slabs. Primary exterior walls will consist of structural masonry. A structural steel frame will support a standing seam metal roofing system. All areas within the facility designated as restricted or requiring control for Special Access Programs will be designed and constructed to meet Intelligence Community Directive 705. The project will encompass all necessary sitework to create a fully functional, stand-alone facility which includes all earthwork, such as grading, excavation, and soil stabilization. The project involves installation and connection of all essential utilities which includes extending electrical, water, and sanitary sewer lines, to the facility. Construction will include all required concrete and asphalt pavements for vehicular and pedestrian access, including service roads, parking lots, and walkways compliant with the Americans with Disabilities Act. 172 === page 181 === 1. COMPONENT AIR FORCE FY 2027 MILITARY CONSTRUCITON PROJECT DATA 2. DATE MARCH 2026 4. PROJECT TITLE: 3. INSTALLATION AND LOCATION NELLIS AIR FORCE BASE F-47 Operational Test NEVADA 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 8. PROJECT COST ($000) 27110F 211-111 RKMF273007 AUTH:1,057,200 APPR:730,700 Facility communication systems will include fiber optic and copper cabling, providing high-speed connectivity throughout the facility. Weapons Storage Facility (Reference # RKMF283006) Construct a Weapons Storage Facility with adequate space to safely house and maintain the quantity and type of arms ammunition required to support the F-47 mission. The facility will be a pre-engineered insulated steel building and include Intelligence Community Directive 705 compliance with detection, alert, and access controls tied into the Base Defense Operations Center. The facility will be located inside the controlled perimeter of the Munitions Storage Area in Area II at Nellis Air Force Base and properly sited by Weapons Safety. Sensitive and/or Special Access Program spaces shall comply with the Intelligence Community Directive 705 criteria and standards. This project includes all utilities, site improvements, pavements, detection/protection features, security enhancements and other supporting work necessary to make it a complete and usable facility. FUEL Station (Reference # RKMF283007) Construct vehicle fueling stations in support of the new F-47 Beddown. The new fuel stations will supply direct fueling to Government Operated Vehicles (GOV) and Aerospace Ground Equipment with petroleum products and gases, utilizing components such as hoses, valves (both manual and automatic), dispensers with hoses, piping from storage tanks to dispensing units, cathodic protection, concrete slabs or islands for dispenser mounting, bollards for dispenser protection, leak detection systems for tanks and pumps, integrated lightning protection, strainers, and coatings systems for piping and components. The fueling facilities, will feature separate, commercial-grade fuel storage and dispensing systems for each fuel type. Dormitory (Reference # RKMF283010) Construct a 240-room permanent party enlisted dormitory to support the F-47 beddown at Nellis Air Force Base. The facility will have reinforced concrete foundation and floor slab, structural steel framing, fire suppression, masonry walls with accents of metal panel and/or precast concrete and standing seam metal roof. Project will include all supporting facilities such as site preparation, site improvements, utilities, roadways, sidewalks, parking, communications support, and all other supporting work necessary to make a complete and usable facility. DFAC Storage Facility (Reference # RKMF290002) Project scope includes an addition to the existing Main Dining Facility at Nellis Air Force Base with 185 SM of additional dry storage space and two walk-in refrigeration units. The refrigerator and freezer units (one each) will be 173 === page 182 === 1. COMPONENT AIR FORCE FY 2027 MILITARY CONSTRUCITON PROJECT DATA 2. DATE MARCH 2026 4. PROJECT TITLE: 3. INSTALLATION AND LOCATION NELLIS AIR FORCE BASE F-47 Operational Test NEVADA 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 8. PROJECT COST ($000) 27110F 211-111 RKMF273007 AUTH:1,057,200 APPR:730,700 located inside an enclosure to protect them from the elements. The dry storage will consist of a pre-engineered building (PEB). The addition will be to the back of the facility near the current loading dock, and the buildings will be accessible from outdoors via a covered walkway. The project will include all supporting facilities such as additional electrical infrastructure, demo and movement of parking curbs, communication and electrical drops and movement of utilities as necessary to provide a complete and useable facility. F-35 Fuel Cell (Reference # RKMF303001) Construct a 2-bay fuel cell maintenance hangar for the F-35 aircraft. Facility will be constructed with a reinforced concrete grade beam foundation and floor slab, structural steel frame, masonry walls and a standing seam metal roof. Project will include all supporting facilities such as fire detection and protection, special security enhancements, utilities, site improvements, landscaping, vehicle parking, communications support and all other supporting work necessary to make a complete and usable facility. Fuel systems maintenance bays also require mechanical ventilation, fume sensing and alarm system, fire extinguishing systems, and wash down drainage trenches. 174 === page 183 === 1. COMPONENT 2. DATE (YYYYMMDD) FY 2027 BBBBBB MILITARY CONSTRUCTION PROGRAM AIR FORCE 3. INSTALLATION AND LOCATION 4. COMMAND CANNON AFB, NEW MEXICO ASFOC 6. PERSONNEL (1) PERMANENT 20260326 5. AREA CONTRUCTION COST INDEX 1.02 (2) STUDENTS (3) SUPPORTED OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN (4) TOTAL a. AS OF 15-May-25 934 4,340 486 0 0 0 11 2 0 5,773 b. END FY 15-May-25 969 4,423 490 0 0 0 11 25 0 5,918 7. INVENTORY DATA ($000) 85,139.00 3,394,220.00 90,000.00 0.00 0.00 0.00 0.00 3,484,220.00 a. TOTAL ACREAGE b. INVENTORY TOTAL AS OF 15-May-25 c. AUTHORIZATION NOT YET IN INVENTORY d. AUTHORIZATION REQUESTED IN THIS PROGRAM e. AUTHORIZATION INCLUDED IN FOLLOWING PROGRAM f. PLANNED IN NEXT THREE PROGRAM YEARS g. REMAINING DEFICIENCY h. GRAND TOTAL 8. PROJECTS REQUESTED IN THIS PROGRAM (1) CODE a. CATEGORY (2) PROJECT TITLE 721-312 192 Person Dormitory (3) SCOPE b. COST ($000) (1) START c. DESIGN STATUS (2) COMPLETE 8345 SM 10,000 JAN-2024 AUG-2024 9. FUTURE PROJECTS None 10.MISSION OR MAJOR FUNCTIONS Cannon Air Force Base is a Special Operations Command installation. The 27th Special Operations Wing is assigned to Cannon which provides specialized air power across a spectrum of conflict from a premier installation. Aircraft assigned to Cannon include the AC-130, MC-130, U-2, CV-22 Osprey, and MQ-9 Reaper. Cannon Air Force Base supports the flying mission of approximately 2,100 takeoff and landing operations annually. This quality of life project will provide critically needed housing for unaccompanied enlisted personnel assigned to Cannon Air Force Base with dormitories that comply with the new 2019 Air Force Standard Design Permanent Party Enlisted Dormitory. Properly designed and furnished quarters providing individual privacy is conducive to proper rest, relaxation and personal well-being of Airmen and is essential to success. 11. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES There are no outstanding pollution or safety deficiencies. DD FORM 1390, JUL 1999 175 PREVIOUS EDITION IS OBSOLETE. === page 184 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA MAR 2026 AIR FORCE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE CANNON AIR FORCE BASE NEW MEXICO DORMITORY, INC 2 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 24276F 721-312 CZQZ183026 8. PROJECT COST ($000) AUTH: 0 APPR: 10,000 9. COST ESTIMATES ITEM UM QUANTITY UNIT COST COST($000) PRIMARY FACILITIES 69,594 DORMITORY AIRMAN PERM PARTY/PCS (721-312) SM 8,345 8,141 (67,937) CYBERSECURITY OF FACILITY-RELATED CONTROL SYS LS (1,657) SUPPORTING FACILITIES 8,059 ROADS, SIDEWALKS, AND PARKING LS (495) PASSIVE FORCE PROTECTION MEASURES LS (1,176) SITE PREPARATION SM (501) COMMUNICATIONS M 304.80 407 (124) UTILITIES M (579) SITE IMPROVEMENTS M (200) STATE TAXES LS (4,983) SUBTOTAL 77,653 3,883 CONTINGENCY (5.00%) TOTAL CONTRACT COST 81,536 SUPERVISION, INSPECTION AND OVERHEAD (6.50%) 5,300 DESIGN/BUILD - DESIGN COST (4.00% OF SUBTOTAL) 3,106 TOTAL REQUEST 89,942 TOTAL REQUEST (ROUNDED) 90,000 EQUIPMENT FROM OTHER APPROPRIATIONS (NON-ADD) (2,591) 10. DESCRIPTION OF PROPOSED CONSTRUCTION This project will construct a three-story dormitory for Airmen with 192 rooms to follow the 2019 Air Force Standard Design Permanent Party Enlisted Dormitory design to include private bathrooms and kitchenettes, reinforced concrete foundation, steel frame and reinforced concrete walls and floors. The exterior finish will consist of split-face concrete masonry unit walls and standing-seam metal roof. This project includes all utilities, pavements, site improvements, landscaping, paved parking lot and all necessary supporting work to provide a complete and useable facility. Facility will be designed as permanent construction in accordance with Department of War Unified Facilities Criteria 1-200-01. This project will comply with Department of War antiterrorism/force protection requirements per Unified Facilities Criteria 4-010-01. Air Conditioning: 150 Tons 11. REQ: 8,345 SM ADQT: 0 SUBSTD: 0 PROJECT: This project will Construct a 192 Person Dormitory. REQUIREMENT: This quality-of-life project will provide critically necessary housing for unaccompanied enlisted personnel assigned to Cannon Air Force Base with dormitories that comply with the new 2019 Air Force Standard Design Permanent Party Enlisted Dormitory, the Air Force Dorm Master Plan, and the Cannon Air Force Base General Plan. According to Cannons Unit Manning Document throughout FY25, the UEP housing requirement will rise to a steady state of 1,207 rooms while there are DD FORM 1391, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 176 === page 185 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA MAR 2026 AIR FORCE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE CANNON AIR FORCE BASE NEW MEXICO DORMITORY, INC 2 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 24276F 721-312 CZQZ183026 8. PROJECT COST ($000) AUTH: 0 APPR: 10,000 currently only 738 dorm rooms. This project will help alleviate the shortage of adequate technical training beds and single-Airmen living quarters by 192 rooms. Properly designed and furnished quarters providing individual privacy is conducive to proper rest, relaxation and personal well-being of Airmen and is essential to the successful accomplishment of the Special Operations mission. his is not a tenant or supported service requirement. CURRENT SITUATION: Air Force Special Operations Command E1-4 manning at Cannon Air Force Base, New Mexico, has historically been documented at 18-20% overmanned per the UMD. This un-programmed population of younger Airmen has exhausted Cannons dormitory inventory and exasperated the deficit. This deficit position has forced man E1-4 airmen off installation for housing. The New Mexico community has a shortage of adequate housing and drives cost of living up for the acceptable housing. This puts many of the younger airmen in less-desirable areas and housing units affecting retainability and morale of our younger force. IMPACT IF NOT PROVIDED: Adequate living quarters that meet current Air Force living standards and provide a level of privacy required for todays Airmen will not be available resulting in degradation of morale, productivity, and career satisfaction for unaccompanied enlisted personnel. The dormitory deficit will force increased occupancy of existing dorms beyond Air Force standard or force the 27 Scope of Work to require additional younger, single Airmen to find off-base housing. Much off-base housing is substandard and/or unaffordable on airman basic allowance for housing rates. Most of the housing with affordable rent for Airmen is in the higher crime areas of the surrounding communities. There is no local mass transit system, which would force new Airmen living off-base to purchase vehicles which may create a financial hardship. Additionally, these single Airmen will compete for housing in an already limited market impacting other military families seeking off-base housing. Highly trained and competent Airmen are essential to the Special Operations readiness posture and continuing world-wide presence. Highly technical demanding jobs, coupled with the high-ops tempo of the unique Air Force Special Operations mission, carries increased stress for younger single Airmen and inadequacies in dwellings will have the potential to negatively impact retention. Degradation of existing dormitories will increase, continuing the increase of dormitory shortages. ADDITIONAL: This project meets the criteria/scope in Department of the Air Force Manual 321084, Standard Facility Requirements, the most recent Dormitory Design Guidelines, the Air Force Dorm Master Plan, and the Cannon Air Force Base General Plan. This design shall conform to criteria established in the Air Force Corporate Facilities Standards, the Installation Facilities Standards, but will not employ a standard facility design because there is no Air Force standard facility design for this project, and there is no applicable standard design from Air Force Civil Engineer Center. A preliminary analysis of reasonable options for accomplishing this DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 177 === page 186 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA MAR 2026 AIR FORCE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE CANNON AIR FORCE BASE NEW MEXICO DORMITORY, INC 2 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 24276F 721-312 CZQZ183026 8. PROJECT COST ($000) AUTH: 0 APPR: 10,000 project (status quo, renovation, new construction) was completed. It indicates there is only one option that will meet operation requirements. An economic analysis will be completed prior to submission to the President's Budget. Sustainable principles to include life-cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with Unified Facility Criteria 1-200-02. This includes preparation of a lifecycle cost analysis for energy consuming systems, renewable energy generating systems, whenever life-cycle cost effective is selected as the reason any requirement of Unified Facility Criteria 1-200-02 is partially compliant or not applicable. This project does not fall within or partly within the 100-year flood plain. The New Mexico Gross Receipts Tax is unique to New Mexico, and, unlike a sales tax, it is an excise tax imposed on the seller of certain goods and services in exchange for the privilege of doing business in New Mexico. The approximate New Mexico Gross Receipts Tax for this project is included in the overall cost estimate. Facility will be sited in accordance with the Installation Development Plan and is within a compatible land use area. Facility is sited in accordance with the Installation Development Plan and is within a compatible land use area. The construction growth offset for this requirement is 89,825 Square Feet. 27th Special Operations Wing Base Civil Engineer: (575) 784-2008 Dormitory Airman Perm Party/PCS: 8,345 Square Meter = 89,825 Square Feet. JOINT USE CERTIFICATION: This facility can be used by other components on an "as available" basis; however, the scope of the project is based on Air Force requirements." DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 178 === page 187 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA MAR 2026 AIR FORCE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE CANNON AIR FORCE BASE NEW MEXICO DORMITORY, INC 2 5. PROGRAM ELEMENT 7. PROJECT NUMBER 12. 6. CATEGORY CODE 8. PROJECT COST ($000) 24276F 721-312 CZQZ183026 AUTH: 0 SUPPLEMENTAL DATA: A. Estimated Execution Data: (1) Acquisition Strategy: Design-Build (2) Design Data (a) Design or Request for Proposal(RFP) Started: (b) Percent of Design Completed as of SEP 2025: (c) Percent of Design Completed as of JAN 2026: (d) Design or RFP Complete: (e) Total Design Cost ($000): (f) Energy Study and/or Life Cycle Cost Analysis (g) Standard or Definitive Design Used? (3) Construction Data: (a) Contract Award: (b) Construction Start: (c) Construction Complete: APPR: 10,000 JAN/2024 35% 35% AUG/2025 9,315 YES NO AUG/2026 FEB/2027 AUG/2030 B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) Furnishings Communication Equipment 3080 3080 2027 2027 2,384 207 Auth of Approp $(000) 80,000 10,000 Appropriation $(000) 80,000 10,000 90,000 C. Authorization and Appropriation Summary: FY 2026 ENACTED FY 2027 BUDGET REQUEST Total DD FORM 1391C, JUL 1999 Authorization $(000) 90,000 0 90,000 PREVIOUS EDITION IS OBSOLETE PAGE NO. 179 === page 188 === MILCON Work-in-Place (WIP) Curve – Automated Spend Plan Project Information Project Title Installation Program Year (FY) Project # 192 Person Dorm Cannon 2027 CZQZ183026 Financial Inputs & Derived Amounts ($000) Programmed Amount (PA) SIOH Rate Contingency Rate SIOH Amount Contingency Amount Construction (PA less SIOH & Cont) Total Increments 90,000 6.5% 5.0% 5,850 4,500 79,650 2 Key Dates (Calculated) Begin Date (FY Start) Award Date (Assumed) Complete Date (Award + POP; set to 1st of month) Award Month (1st of month) Complete Month (1st of month) Period of Performance Oct 1, 2026 Apr 1, 2027 Aug 1, 2031 Apr 1, 2027 Aug 1, 2031 1600 Funding & Obligation Increments ($000) Increment Amount ($000) Funding Date Jan 1, 2027 Oct 1, 2027 Increment 1 Increment 2 80,000 10,000 Total Funding 90,000 Check vs PA Obligation Date Apr 1, 2027 Jan 1, 2028 0 Outlay Curve Controls (Adjust if needed) Outlay Curve Steepness (k) Normalized Logistic Base (t=0) Normalized Logistic Top (t=1) Total Outlay ($000) (assumed = PA) 8.0 0.01798621 0.98201379 90,000 180 === page 189 === Monthly Cash Flow (Automated from Spend Plan) Month Oct 2026 Nov 2026 Dec 2026 Jan 2027 Feb 2027 Mar 2027 Apr 2027 May 2027 Jun 2027 Jul 2027 Aug 2027 Sep 2027 Oct 2027 Nov 2027 Dec 2027 Jan 2028 Feb 2028 Mar 2028 Apr 2028 May 2028 Jun 2028 Jul 2028 Aug 2028 Sep 2028 Oct 2028 Nov 2028 Dec 2028 Jan 2029 Feb 2029 Mar 2029 Apr 2029 May 2029 TOTAL Funding ($000) 0 0 0 80,000 0 0 0 0 0 0 0 0 10,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 90,000 Obligation ($000) 0 0 0 0 0 0 80,000 0 0 0 0 0 0 0 0 10,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 90,000 Outlay ($000) 0 0 0 0 0 0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Cumulative Funding Cumulative Obligation Cumulative Outlay 0 0 0 0 0 0 0 0 0 80,000 0 0 80,000 0 0 80,000 0 0 80,000 80,000 #N/A 80,000 80,000 #N/A 80,000 80,000 #N/A 80,000 80,000 #N/A 80,000 80,000 #N/A 80,000 80,000 #N/A 90,000 80,000 #N/A 90,000 80,000 #N/A 90,000 80,000 #N/A 90,000 90,000 #N/A 90,000 90,000 #N/A 90,000 90,000 #N/A 90,000 90,000 #N/A 90,000 90,000 #N/A 90,000 90,000 #N/A 90,000 90,000 #N/A 90,000 90,000 #N/A 90,000 90,000 #N/A 90,000 90,000 #N/A 90,000 90,000 #N/A 90,000 90,000 #N/A 90,000 90,000 #N/A 90,000 90,000 #N/A 90,000 90,000 #N/A 90,000 90,000 #N/A 90,000 90,000 #N/A #N/A 181 === page 190 === 0 Dec 2026 Nov 2026 Oct 2026 ' j May 2029 Apr 2029 Mar 2029 Feb 2029 Jan 2029 Dec 2028 Nov 2028 Oct 2028 Sep 2028 Aug 2028 Jul 2028 Jun 2028 May 2028 Apr 2028 Mar 2028 Feb 2028 Jan 2028 Dec 2027 Nov 2027 Oct 2027 Sep 2027 Aug 2027 Jul 2027 Jun 2027 May 2027 I Apr 2027 70,000 Mar 2027 80,000 Jan 2027 Project: Program Year: Feb 2027 Cumulative WIP Curve 192 Person Dorm 2027 100,000 Cumulative Funding vs Obligation vs Outlay 90,000 60,000 I 50,000 Cumulative Funding 40,000 Cumulative Obligation 30,000 20,000 Cumulative Outlay 10,000 182 === page 191 === 1. COMPONENT 2. DATE (YYYYMMDD) FY 2027 BBBBBB MILITARY CONSTRUCTION PROGRAM AIR FORCE 3. INSTALLATION AND LOCATION 4. COMMAND KIRTLAND AIR FORCE BASE, NEW MEXICO AIR FORCE GLOBAL STRIKE COMMAND 6. PERSONNEL (1) PERMANENT (2) STUDENTS 20260325 5. AREA CONTRUCTION COST INDEX 0.92 D (3) SUPPORTED OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN (4) TOTAL a. AS OF 30-Sep-25 860 2,523 2,579 0 0 0 197 843 137 7,139 b. END FY 30-Sep-30 843 2,506 2,533 0 0 0 197 843 137 7,059 7. INVENTORY DATA ($000) 162,500.00 7,888,379.00 83,000.00 341,000.00 0.00 454,000.00 0.00 8,766,379.00 a. TOTAL ACREAGE b. INVENTORY TOTAL AS OF 30-Sep-25 c. AUTHORIZATION NOT YET IN INVENTORY d. AUTHORIZATION REQUESTED IN THIS PROGRAM e. AUTHORIZATION INCLUDED IN FOLLOWING PROGRAM f. PLANNED IN NEXT THREE PROGRAM YEARS g. REMAINING DEFICIENCY h. GRAND TOTAL 8. PROJECTS REQUESTED IN THIS PROGRAM (1) CODE a. CATEGORY (2) PROJECT TITLE 141-456 Space Force Operations Facility (3) SCOPE b. COST ($000) (1) START c. DESIGN STATUS (2) COMPLETE 17,090 SM 250,000 AUG-2026 AUG-2027 9. FUTURE PROJECTS 140-422 Joint Navigation Warfare Center HQ (6,039 SM / $92,000) 312-472 Systems & Digital Engineering Lab, B592 (6,503 SM / $345,000) 442-758 JNWC Warehouse Complex (2,323 SM / $17,000) a. R&M Unfunded Requirements: N/A 10.MISSION OR MAJOR FUNCTIONS The Kirtland AFB is the largest installation in Air Force Global Strike Command, and the sixth largest in the United States Air Force. The host organization on Kirtland AFB is the 377th Air Base Wing organization which reports to Air Force Global Strike. The missions of Kirtland AFB fall into four major categories: research, development, and testing; readiness and training; munitions maintenance; and support to base operations for more than 25 major mission partners. The mission of the 377th Air Base Wing is to execute nuclear, readiness, and support operations for American air power. MAJCOMS and their roles at Kirtland AFB include: AFGSC for Nuclear Deterrence, AETC for Aircrew and PJ Training, AFMC (AFRL) for Directed Energy and Space Vehicles, USSF for Space Operations, and AFSOC for Air Force Special Operations Command. 11. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES Outstanding Pollution and Safety Deficiencies ($000): N/A DD FORM 1390, JUL 1999 183 PREVIOUS EDITION IS OBSOLETE. === page 192 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA SPACE FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE KIRTLAND AIR FORCE BASE NEW MEXICO SPACE FORCE OPERATIONS FACILITY 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211S 141-456 USSF270003 8. PROJECT COST ($000) 250,000 9. COST ESTIMATES ITEM UM QUANTITY UNIT COST COST($000) PRIMARY FACILITIES 188,382 INTELLIGENCE, SURVEILLANCE AND RECONNAISSA SM 17,090 10,434 (178,317) (141-456) ICD 705 PREMIUM LS (6,965) CYBERSECURITY OF FACILITY RELATED CONTROL LS (3,100) SUPPORTING FACILITIES 12,109 UTILITIES LS (3,000) SITE PREPARATION LS (750) ROADS, SIDEWALKS, AND PARKING LS (2,000) SITE IMPROVEMENTS LS (750) COMMUNICATIONS LS (500) GENERATOR KW 5,000 800 (4,000) PASSIVE FORCE PROTECTION MEASURES LS (50) SECURITY FENCING LS (59) PRIVATIZED UTILITIES SERVICE AND CONNECTION LS (1,000) 200,491 SUBTOTAL CONTINGENCY (5.00%) 10,025 TOTAL CONTRACT COST 210,516 SUPERVISION, INSPECTION AND OVERHEAD (6.50%) 13,684 DESIGN/BUILD - DESIGN COST (10.00% OF 20,049 SUBTOTAL) 5,261 CONSTRUCTION SECURITY SURVILLANCE 249,510 TOTAL REQUEST 250,000 TOTAL REQUEST (ROUNDED) EQUIPMENT FROM OTHER APPROPRIATIONS (NON-ADD) (150,000) 10. DESCRIPTION OF PROPOSED CONSTRUCTION Construct a three-story Space Operations Facility (SOF)with reinforced concrete foundation, steel structure, clad with precast concrete panels and a low slope membrane roof. Sensitive and/or Special Access Program spaces shall comply with the Intelligence Community Directive 705 criteria and standards. Construction includes a perimeter fence surrounding the Space Operations Facility to provide Protection Level 2 (PL2). Project will include all supporting facilities such as site improvements, pavements, communications, utilities, and protection level 2 fencing necessary to provide a complete and useable facility. This project is authorized a generator, per AFI 32-1062. Facility will be designed as permanent construction in accordance with Department of War Unified Facilities Criteria 1-200-01. This project will comply with Department of War antiterrorism/force protection requirements per Unified Facilities Criteria 4-010-01. This project intends to leverage the authorities granted in the FY 2026 National Defense Authorization Act to take advantage of private sector innovative design and construction methods. It will use a combination of Other Transactional Authority (OTA), Progressive Design-Build (PDB), and other execution methods to innovate in delivery, reduce construction timelines, and lifecycle costs. OTA/PDB execution will capitalize on the construction industry's expertise and innovation. DD FORM 1391, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 184 === page 193 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA SPACE FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE KIRTLAND AIR FORCE BASE NEW MEXICO SPACE FORCE OPERATIONS FACILITY 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211S 141-456 8. PROJECT COST ($000) USSF270003 250,000 The execution strategy is intentionally non-prescriptive to empower industry partners to innovate and propose the most effective technical solution to meet the defined needs. Air Conditioning: 1400 Tons 11. REQ: 17,090 SM ADQT: 0 SUBSTD: 0 PROJECT: Construct Space Operations Facility. REQUIREMENT: A highly classified and secured contiguous area to enable National Reconnaissance Organization (NRO) and United States Space Force (USSF) emergent missions including Air Moving Target Indicator, Ground Moving Target Indicator, and Proliferated Warfighter Space Architecture. Workspaces will house intelligence analysis and production for new and expanded all-source means, enabling near-real time capabilities and missions unique to United States Space Force. Facility will support the intelligence needs of the Defense Intelligence Enterprise and the United States Space Force as well as other joint warfighters, policymakers and acquisition professionals, through analysis or application. Mission is responsible for Intelligence, Surveillance and Reconnaissance (ISR) for the United States Space Force, providing actionable and time-sensitive intelligence for space domain operations including detection, characterization and targeting adversary space capabilities. The Space Operations Facility must be constructed to meet Protection Level 2 requirements. To ensure reliable operations, the Space Operations Facility will have multiple active power and cooling distribution paths and redundant components to meet the fault-tolerant facility "Tier IV" standard as defined by The Uptime Institute. The Space Operations Facility will include ICD 705 compliant construction spaces to meet all mission separation and collaboration requirements. A 500-person auditorium is required for secure briefings and conferences. The Space Operations Facility will also include a dining area to support 24/7 operations. Adequate parking will be constructed for the Space Operations Facility. This is a Space Operations Facility supported service requirement and supports SPACEFOR-SPACE. CURRENT SITUATION: Schriever does not have the physical space to accommodate new analysts and information technology requirements to accomplish its expanded national security mission. Per Air Force Manual 32-1084 "Facility Requirements", this is the requirement for the new mission and future growth current situation. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 185 === page 194 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA SPACE FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE KIRTLAND AIR FORCE BASE NEW MEXICO SPACE FORCE OPERATIONS FACILITY 5. PROGRAM ELEMENT 7. PROJECT NUMBER 6. CATEGORY CODE 8. PROJECT COST ($000) 91211S 141-456 USSF270003 250,000 IMPACT IF NOT PROVIDED: The emerging missions will be late to need and will begin operations in facilities which do not meet the resiliency requirements of Tier IV facilities. The Space Force will miss an opportunity to disperse and replicate to increase survivability of the mission. ADDITIONAL: This design shall conform to criteria established in the Air Force Corporate Facilities Standards (AFCFS), the Installation Facilities Standards (IFS), but will not employ a standard facility design because there is no AF standard facility design for this project and there is no applicable standard design from Air Force Civil Engineer Center. Sustainable principles, to include life-cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with Unified Facility Criteria 1-200-02. This includes preparation of a life-cycle cost analysis for energy consuming systems, renewable energy generating systems, or when life-cycle cost effective is selected as the reason any requirement of Unified Facility Criteria 1-200-02 is partially compliant or not applicable. Project not in flood plain: This project will not be sited within or partly within the 100-year flood plain. In accordance with IDP: Facility will be sited in accordance with the Installation Development Plan and within a compatible land use area. The construction growth offset for this requirement is 183,955 square feet. Base Civil Engineer: (505) 853-2043 SPACE FORCE OPERATIONS FACILITY: 17,090 SM = 183,955 Square Feet; JOINT USE CERTIFICATION: Mission Requirements, operational considerations, and location are incompatible with use by other components. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 186 === page 195 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA SPACE FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE KIRTLAND AIR FORCE BASE NEW MEXICO SPACE FORCE OPERATIONS FACILITY 5. PROGRAM ELEMENT 7. PROJECT NUMBER 12. 6. CATEGORY CODE 8. PROJECT COST ($000) 91211S 141-456 USSF270003 SUPPLEMENTAL DATA: A. Estimated Execution Data: (1) Acquisition Strategy: Design-Build (2) Design Data (a) Design or Request for Proposal(RFP) Started: (b) Percent of Design Completed as of SEP 2025: (c) Percent of Design Completed as of JAN 2026: (d) Design or RFP Complete: (e) Total Design Cost ($000): (f) Energy Study and/or Life Cycle Cost Analysis (g) Standard or Definitive Design Used? (3) Construction Data: (a) Contract Award: (b) Construction Start: (c) Construction Complete: 250,000 AUG/2026 0% 0% AUG/2027 20,000 YES NO JUL/2027 NOV/2028 NOV/2032 B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) Communications / Data Uninterruptable Power Supply Electronic Security System Physical Security Furniture, Fixtures, & Equipme DD FORM 1391C, JUL 1999 3410 3080 3080 3080 3410 PREVIOUS EDITION IS OBSOLETE 2031 2031 2031 2031 2031 110,000 10,000 5,000 5,000 20,000 PAGE NO. 187 === page 196 === MILCON Work-in-Place (WIP) Curve – Automated Spend Plan Project Information Project Title Installation Program Year (FY) Project # Space Force Operational Facility Kirtland 2027 USSF270003 Financial Inputs & Derived Amounts ($000) Programmed Amount (PA) SIOH Rate Contingency Rate SIOH Amount Contingency Amount Construction (PA less SIOH & Cont) Total Increments 250,000 6.5% 5.0% 16,250 12,500 221,250 3 Key Dates (Calculated) Begin Date (FY Start) Award Date (Assumed) Complete Date (Award + POP; set to 1st of month) Award Month (1st of month) Complete Month (1st of month) Period of Performance Funding & Obligation Increments ($000) Increment 1 Increment 2 Increment 3 Increment Total Funding Outlay Curve Controls (Adjust if needed) Outlay Curve Steepness (k) Normalized Logistic Base (t=0) Normalized Logistic Top (t=1) Total Outlay ($000) (assumed = PA) Oct 1, 2026 Jul 1, 2027 Jan 1, 2032 Jul 1, 2027 Jan 1, 2032 1660 Amount ($000) 250,000 0 0 Funding Date Jan 1, 2027 250,000 Check vs PA Obligation Date Jul 1, 2027 0 8.0 0.01798621 0.98201379 250,000 188 === page 197 === Monthly Cash Flow (Automated from Spend Plan) Month Oct 2026 Nov 2026 Dec 2026 Jan 2027 Feb 2027 Mar 2027 Apr 2027 May 2027 Jun 2027 Jul 2027 Aug 2027 Sep 2027 Oct 2027 Nov 2027 Dec 2027 Jan 2028 Feb 2028 Mar 2028 Apr 2028 May 2028 Jun 2028 Jul 2028 Aug 2028 Sep 2028 Oct 2028 Nov 2028 Dec 2028 Jan 2029 Feb 2029 Mar 2029 Apr 2029 May 2029 TOTAL Funding ($000) 0 0 0 250,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 250,000 Obligation ($000) 0 0 0 0 0 0 0 0 0 250,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 250,000 Outlay ($000) #N/A Cumulative Funding Cumulative Obligation Cumulative Outlay 0 0 0 0 0 0 0 0 0 0 0 0 0 250,000 0 0 0 250,000 0 0 0 250,000 0 0 0 250,000 0 0 0 250,000 0 0 0 250,000 0 0 #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A 189 === page 198 === May 2029 Apr 2029 Mar 2029 Feb 2029 100,000 Jan 2029 150,000 Dec 2028 Nov 2028 Oct 2028 Sep 2028 Aug 2028 Jul 2028 Jun 2028 May 2028 Apr 2028 Mar 2028 Feb 2028 Jan 2028 Dec 2027 Nov 2027 Oct 2027 Sep 2027 Aug 2027 ' Jul 2027 j Jun 2027 May 2027 Apr 2027 200,000 Mar 2027 250,000 Feb 2027 Project: Program Year: Jan 2027 0 Dec 2026 Nov 2026 Oct 2026 Cumulative WIP Curve Space Force Operational Facility 2027 Cumulative Funding vs Obligation vs Outlay 300,000 ' Cumulative Funding Cumulative Obligation Cumulative Outlay 50,000 j 190 === page 199 === 1. COMPONENT 2. DATE (YYYYMMDD) FY 2027 BBBBBB MILITARY CONSTRUCTION PROGRAM AIR FORCE 3. INSTALLATION AND LOCATION 4. COMMAND GRAND FORKS AIR FORCE BASE, NORTH DAKOTA AIR COMBAT COMMAND 6. PERSONNEL (1) PERMANENT (2) STUDENTS 20260323 5. AREA CONTRUCTION COST INDEX 1.15 (3) SUPPORTED OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN a. AS OF 30-Sep-25 b. END FY (4) TOTAL 196 1,433 337 0 0 0 0 0 57 2,023 196 1,433 337 0 0 0 0 0 57 2,023 7. INVENTORY DATA ($000) 5,342.86 4,548,717.59 0.00 250,000.00 0.00 0.00 0.00 4,798,717.59 a. TOTAL ACREAGE b. INVENTORY TOTAL AS OF 30-Sep-24 c. AUTHORIZATION NOT YET IN INVENTORY d. AUTHORIZATION REQUESTED IN THIS PROGRAM e. AUTHORIZATION INCLUDED IN FOLLOWING PROGRAM f. PLANNED IN NEXT THREE PROGRAM YEARS g. REMAINING DEFICIENCY h. GRAND TOTAL 8. PROJECTS REQUESTED IN THIS PROGRAM (1) CODE a. CATEGORY (2) PROJECT TITLE 141-456 Space Force Operations Facility (3) SCOPE b. COST ($000) (1) START c. DESIGN STATUS (2) COMPLETE 17,090 SM 250,000 AUG-2026 AUG-2027 9. FUTURE PROJECTS a. R&M Unfunded Requirements: N/A 10.MISSION OR MAJOR FUNCTIONS Grand Forks Air Force Base provides a decisional advantage to warfighters and national leaders through support of the nation's RQ-4 Global Hawk high altitude Intelligence, Surveillance and Reconnaissance (ISR) mission. These support joint combatant forces in worldwide peacetime, contingency, and wartime operations. 11. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES Outstanding Pollution and Safety Deficiencies ($000): N/A DD FORM 1390, JUL 1999 191 PREVIOUS EDITION IS OBSOLETE. === page 200 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA SPACE FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE GRAND FORKS AIR FORCE BASE NORTH DAKOTA SPACE FORCE OPERATIONS FACILITY 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211S 141-456 USSF270002 8. PROJECT COST ($000) 250,000 9. COST ESTIMATES ITEM UM QUANTITY UNIT COST COST($000) PRIMARY FACILITIES 188,382 INTELLIGENCE, SURVEILLANCE AND RECONNAISSA SM 17,090 10,434 (178,317) (141-456) ICD 705 PREMIUM LS (6,965) CYBERSECURITY OF FACILITY RELATED CONTROL LS (3,100) SUPPORTING FACILITIES 12,109 UTILITIES LS (3,000) SITE PREPARATION LS (750) ROADS, SIDEWALKS, AND PARKING LS (2,000) SITE IMPROVEMENTS LS (750) COMMUNICATIONS LS (500) GENERATOR KW 5,000 800 (4,000) PASSIVE FORCE PROTECTION MEASURES LS (50) SECURITY FENCING LS (59) PRIVATIZED UTILITIES SERVICE AND CONNECTION LS (1,000) 200,491 SUBTOTAL CONTINGENCY (5.00%) 10,025 TOTAL CONTRACT COST 210,516 SUPERVISION, INSPECTION AND OVERHEAD (6.50%) 13,684 DESIGN/BUILD - DESIGN COST (10.00% OF 20,049 SUBTOTAL) 5,261 CONSTRUCTION SECURITY SURVILLANCE 249,510 TOTAL REQUEST 250,000 TOTAL REQUEST (ROUNDED) EQUIPMENT FROM OTHER APPROPRIATIONS (NON-ADD) (150,000) 10. DESCRIPTION OF PROPOSED CONSTRUCTION Construct a three-story Space Operations Facility (SOF)with reinforced concrete foundation, steel structure, clad with precast concrete panels and a low slope membrane roof. Sensitive and/or Special Access Program spaces shall comply with the Intelligence Community Directive 705 criteria and standards. Construction includes a perimeter fence surrounding the Space Operations Facility to provide Protection Level 2 (PL2). Project will include all supporting facilities such as site improvements, pavements, communications, utilities, and protection level 2 fencing necessary to provide a complete and useable facility. This project is authorized a generator, per AFI 32-1062. Facility will be designed as permanent construction in accordance with Department of War Unified Facilities Criteria 1-200-01. This project will comply with Department of War antiterrorism/force protection requirements per Unified Facilities Criteria 4-010-01. This project intends to leverage the authorities granted in the FY 2026 National Defense Authorization Act to take advantage of private sector innovative design and construction methods. It will use a combination of Other Transactional Authority (OTA), Progressive Design-Build (PDB), and other execution methods to innovate in delivery, reduce construction timelines, and lifecycle costs. OTA/PDB execution will capitalize on the construction industry's expertise and innovation. DD FORM 1391, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 192 === page 201 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA SPACE FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE GRAND FORKS AIR FORCE BASE NORTH DAKOTA SPACE FORCE OPERATIONS FACILITY 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211S 141-456 8. PROJECT COST ($000) USSF270002 250,000 The execution strategy is intentionally non-prescriptive to empower industry partners to innovate and propose the most effective technical solution to meet the defined needs. Air Conditioning: 1400 Tons 11. REQ: 17,090 SM ADQT: 0 SUBSTD: 0 PROJECT: Construct Space Operations Facility. REQUIREMENT: A highly classified and secured contiguous area to enable National Reconnaissance Organization (NRO) and United States Space Force (USSF) emergent missions including Air Moving Target Indicator, Ground Moving Target Indicator, and Proliferated Warfighter Space Architecture. Workspaces will house intelligence analysis and production for new and expanded all-source means, enabling near-real time capabilities and missions unique to United States Space Force. Facility will support the intelligence needs of the Defense Intelligence Enterprise and the United States Space Force as well as other joint warfighters, policymakers and acquisition professionals, through analysis or application. Mission is responsible for Intelligence, Surveillance and Reconnaissance (ISR) for the United States Space Force, providing actionable and time-sensitive intelligence for space domain operations including detection, characterization and targeting adversary space capabilities. The Space Operations Facility must be constructed to meet Protection Level 2 requirements. To ensure reliable operations, the Space Operations Facility will have multiple active power and cooling distribution paths and redundant components to meet the fault-tolerant facility "Tier IV" standard as defined by The Uptime Institute. The Space Operations Facility will include ICD 705 compliant construction spaces to meet all mission separation and collaboration requirements. A 500-person auditorium is required for secure briefings and conferences. The Space Operations Facility will also include a dining area to support 24/7 operations. Adequate parking will be constructed for the Space Operations Facility. This is a Space Operations Facility supported service requirement and supports SPACEFOR-SPACE. CURRENT SITUATION: This is a new mission beddown for United States Space Force on Schriever Space Force Base as directed in Program Decision Memorandum III from Secretary of War on the FY27 President's Budget. Schriever does not have the physical space to accommodate new analysts and information technology requirements to accomplish its expanded national security mission. Per Air Force Manual 32-1084 "Facility Requirements", this is the requirement for the new mission and future growth current situation. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 193 === page 202 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA SPACE FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE GRAND FORKS AIR FORCE BASE NORTH DAKOTA SPACE FORCE OPERATIONS FACILITY 5. PROGRAM ELEMENT 7. PROJECT NUMBER 6. CATEGORY CODE 8. PROJECT COST ($000) 91211S 141-456 USSF270002 250,000 IMPACT IF NOT PROVIDED: United States Space Force will struggle to meet the Secretary of War's warfighting objectives as specified in the Program Decision Memorandum III document for Space Superiority. The emerging missions will be late to need and will begin operations in facilities which do not meet the resiliency requirements of Tier IV facilities. The Space Force will miss an opportunity to disperse and replicate to increase survivability of the mission. ADDITIONAL: This design shall conform to criteria established in the Air Force Corporate Facilities Standards (AFCFS), the Installation Facilities Standards (IFS), but will not employ a standard facility design because there is no AF standard facility design for this project and there is no applicable standard design from Air Force Civil Engineer Center. Sustainable principles, to include life-cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with Unified Facility Criteria 1-200-02. This includes preparation of a life-cycle cost analysis for energy consuming systems, renewable energy generating systems, or when life-cycle cost effective is selected as the reason any requirement of Unified Facility Criteria 1-200-02 is partially compliant or not applicable. Project not in flood plain: This project will not be sited within or partly within the 100-year flood plain. In accordance with IDP: Facility will be sited in accordance with the Installation Development Plan and within a compatible land use area. The construction growth offset for this requirement is 183,955 square feet. 319 Base Civil Engineer: (701) 747-4768 SPACE FORCE OPERATIONS FACILITY: 17,090 SM = 183,955 Square Feet; JOINT USE CERTIFICATION: Mission Requirements, operational considerations, and location are incompatible with use by other components. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 194 === page 203 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA SPACE FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE GRAND FORKS AIR FORCE BASE NORTH DAKOTA SPACE FORCE OPERATIONS FACILITY 5. PROGRAM ELEMENT 7. PROJECT NUMBER 12. 6. CATEGORY CODE 8. PROJECT COST ($000) 91211S 141-456 USSF270002 SUPPLEMENTAL DATA: A. Estimated Execution Data: (1) Acquisition Strategy: Design-Build (2) Design Data (a) Design or Request for Proposal(RFP) Started: (b) Percent of Design Completed as of SEP 2025: (c) Percent of Design Completed as of JAN 2026: (d) Design or RFP Complete: (e) Total Design Cost ($000): (f) Energy Study and/or Life Cycle Cost Analysis (g) Standard or Definitive Design Used? (3) Construction Data: (a) Contract Award: (b) Construction Start: (c) Construction Complete: 250,000 AUG/2026 0% 0% AUG/2027 20,000 YES NO JUL/2027 NOV/2028 NOV/2032 B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) Communications / Data Uninterruptable Power Supply Electronic Security System Physical Security Furniture, Fixtures, & Equipme DD FORM 1391C, JUL 1999 3410 3080 3080 3080 3410 PREVIOUS EDITION IS OBSOLETE 2031 2031 2031 2031 2031 110,000 10,000 5,000 5,000 20,000 PAGE NO. 195 === page 204 === MILCON Work-in-Place (WIP) Curve – Automated Spend Plan Project Information Project Title Installation Program Year (FY) Project # Space Force Operational Facility Grand Forks 2027 USSF270002 Financial Inputs & Derived Amounts ($000) Programmed Amount (PA) SIOH Rate Contingency Rate SIOH Amount Contingency Amount Construction (PA less SIOH & Cont) Total Increments 250,000 6.5% 5.0% 16,250 12,500 221,250 3 Key Dates (Calculated) Begin Date (FY Start) Award Date (Assumed) Complete Date (Award + POP; set to 1st of month) Award Month (1st of month) Complete Month (1st of month) Period of Performance Funding & Obligation Increments ($000) Increment 1 Increment 2 Increment 3 Increment Total Funding Outlay Curve Controls (Adjust if needed) Outlay Curve Steepness (k) Normalized Logistic Base (t=0) Normalized Logistic Top (t=1) Total Outlay ($000) (assumed = PA) Oct 1, 2026 Jul 1, 2027 Jan 1, 2032 Jul 1, 2027 Jan 1, 2032 1660 Amount ($000) 250,000 0 0 Funding Date Jan 1, 2027 250,000 Check vs PA Obligation Date Jul 1, 2027 0 8.0 0.01798621 0.98201379 250,000 196 === page 205 === Monthly Cash Flow (Automated from Spend Plan) Month Oct 2026 Nov 2026 Dec 2026 Jan 2027 Feb 2027 Mar 2027 Apr 2027 May 2027 Jun 2027 Jul 2027 Aug 2027 Sep 2027 Oct 2027 Nov 2027 Dec 2027 Jan 2028 Feb 2028 Mar 2028 Apr 2028 May 2028 Jun 2028 Jul 2028 Aug 2028 Sep 2028 Oct 2028 Nov 2028 Dec 2028 Jan 2029 Feb 2029 Mar 2029 Apr 2029 May 2029 TOTAL Funding ($000) 0 0 0 250,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 250,000 Obligation ($000) 0 0 0 0 0 0 0 0 0 250,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 250,000 Outlay ($000) #N/A Cumulative Funding Cumulative Obligation Cumulative Outlay 0 0 0 0 0 0 0 0 0 0 0 0 0 250,000 0 0 0 250,000 0 0 0 250,000 0 0 0 250,000 0 0 0 250,000 0 0 0 250,000 0 0 #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A #N/A 250,000 250,000 #N/A 197 === page 206 === May 2029 Apr 2029 Mar 2029 Feb 2029 100,000 Jan 2029 150,000 Dec 2028 Nov 2028 Oct 2028 Sep 2028 Aug 2028 Jul 2028 Jun 2028 May 2028 Apr 2028 Mar 2028 Feb 2028 Jan 2028 Dec 2027 Nov 2027 Oct 2027 Sep 2027 Aug 2027 ' Jul 2027 j Jun 2027 May 2027 Apr 2027 200,000 Mar 2027 250,000 Feb 2027 Project: Program Year: Jan 2027 0 Dec 2026 Nov 2026 Oct 2026 Cumulative WIP Curve Space Force Operational Facility 2027 Cumulative Funding vs Obligation vs Outlay 300,000 ' Cumulative Funding Cumulative Obligation Cumulative Outlay 50,000 j 198 === page 207 === 1. COMPONENT 2. DATE (YYYYMMDD) FY 2027 BBBBBB MILITARY CONSTRUCTION PROGRAM AIR FORCE 3. INSTALLATION AND LOCATION 4. COMMAND MINOT AIR FORCE BASE, NORTH DAKOTA AIR FORCE GLOBAL STRIKE COMMAND 6. PERSONNEL (1) PERMANENT (2) STUDENTS 20260315 5. AREA CONTRUCTION COST INDEX 1.22 D (3) SUPPORTED (4) TOTAL OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN a. AS OF 30-Sep-25 653 4,669 520 0 0 0 51 86 71 6,050 b. END FY 30-Sep-31 654 5,015 561 0 0 0 56 88 71 6,445 7. INVENTORY DATA ($000) 24,623.00 10,090,173.16 0.00 232,000.00 0.00 a. TOTAL ACREAGE b. INVENTORY TOTAL AS OF 15-Mar-26 c. AUTHORIZATION NOT YET IN INVENTORY d. AUTHORIZATION REQUESTED IN THIS PROGRAM e. AUTHORIZATION INCLUDED IN FOLLOWING PROGRAM f. PLANNED IN NEXT THREE PROGRAM YEARS 1,136,500.00 11,458,673.16 g. REMAINING DEFICIENCY h. GRAND TOTAL 8. PROJECTS REQUESTED IN THIS PROGRAM (3) SCOPE b. COST ($000) (1) START (2) COMPLETE 214-425 Sentinel Consolidated Vehicle Maintenance Complex 10,855 SM 124,000 01/25 09/26 610-243 Sentinel Security Forces Operations Complex 12,106 SM 108,000 11/24 09/26 (1) CODE a. CATEGORY (2) PROJECT TITLE c. DESIGN STATUS 9. FUTURE PROJECTS 911-146 GBSD Land Acquisition, Phase 1, Inc (N/A AC/$328,000) 135-583 Sentinel Utility Corridor, Inc (N/A AC/$378,532) 10.MISSION OR MAJOR FUNCTIONS The 5th BW is the host unit of Minot Air Force Base and ensures nuclear deterrence by operating the nuclear capable B-52 Stratofortress. Minot Air Force Base also has the 91st Missile Wing, which delivers nuclear deterrence by operating out of 15 MAFs and 165 LFs that hold the Minute Man III Inter-Continental Ballistic Missile. The Sentinel weapons system will entirely replace the Minute Man III, providing a modern Inter-Continental Ballistic Missile that will maintain Minot's nuclear deterrence capabilities. 11. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES None. DD FORM 1390, JUL 1999 199 PREVIOUS EDITION IS OBSOLETE. === page 208 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE MINOT AIR FORCE BASE NORTH DAKOTA SENTINEL CONSOLIDATED VEHICLE MAINT. COMPLEX 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 11233F 214-425 QJVF012003 8. PROJECT COST ($000) 124,000 9. COST ESTIMATES ITEM UM QUANTITY UNIT COST COST($000) PRIMARY FACILITIES 86,056 VEHICLE MAINTENANCE SHOP (214-425) SM 8,201 7,895 (64,747) VEHICLE OPERATIONS ADMINISTRATION (610-121) SM 2,654 7,830 (20,781) CYBERSECURITY OF FACILITY-RELATED CONTROL SYS LS (528) SUPPORTING FACILITIES 21,929 PRIVATIZED UTIL. SERVICE AND CONN. (GAS) LS (12) PRIVATIZED UTIL. SERVICE AND CONN. (WATER) LS (771) PRIVATIZED UTIL. SERVICE AND CONN. (ELEC.) LS (2,066) UTILITIES LS (643) SITE IMPROVEMENTS LS (1,818) ROADS, SIDEWALKS, AND PARKING LS (11,250) DEMOLITION SM 3,213 1,671 (5,369) SUBTOTAL 107,985 CONTINGENCY (5.00%) 5,399 TOTAL CONTRACT COST 113,384 SUPERVISION, INSPECTION AND OVERHEAD (6.50%) 7,370 DESIGN DURING CONSTRUCTION 2,835 TOTAL REQUEST 123,589 TOTAL REQUEST (ROUNDED) 124,000 EQUIPMENT FROM OTHER APPROPRIATIONS (NON-ADD) (1,453) 10. DESCRIPTION OF PROPOSED CONSTRUCTION Construct a 10,855 SM Consolidated Transportation Complex. Construction includes two slab-on-grade buildings. The first is identified as the Vehicle Maintenance Facility; and the second is identified as the Vehicle Operations Facility. The buildings will have reinforced concrete footings and foundation walls, heated concrete floor slabs, a supporting post and beam steel structure, and masonry and steel stud or steel girt back-up wall structures with CMU veneer and metal composite panel exterior material finishes. The new facilities will include electrical, water, sewer, Heating Ventilation Air Conditioning, site work and site paving, landscaping, communications, and other utility expansions as required to serve a complete and usable facility. Spaces within the buildings include vehicular work bays, supporting service rooms, parts spaces, training and office areas, general circulation, and mechanical and electrical rooms. The noted site work and utilities required to support the project are included in the project funding request. To site the buildings, the project will demolish building B425 (3,213 SM). Facilities will be designed as permanent construction in accordance with Department of War Unified Facilities Criteria 1-200-01, General Building requirements. This project will comply with Department of War antiterrorism/force protection requirements per Unified Facilities Criteria 4-010-01. Air Conditioning (Vehicle Maintenance Facility): 21 tons Air Conditioning (Vehicle Operations Facility): 9 tons DD FORM 1391, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 200 === page 209 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE MINOT AIR FORCE BASE NORTH DAKOTA SENTINEL CONSOLIDATED VEHICLE MAINT. COMPLEX 5. PROGRAM ELEMENT 7. PROJECT NUMBER 6. CATEGORY CODE 11233F 11. REQ: 10,855 SM 214-425 ADQT: QJVF012003 0 8. PROJECT COST ($000) SUBSTD: 124,000 3,213 SM PROJECT: Construct Transportation Complex REQUIREMENT: This project will replace five existing transportation facilities with two structures. The Vehicle Maintenance Facility will consolidate all vehicle maintenance work bays with the associated administrative, training, and operations functions. The Vehicle Operations Facility, will house all elements of the vehicle operations administration functions. This is not a tenant or supported service requirement. CURRENT SITUATION: The existing facilities were built in the late 1950s and early 1960s. Annually, they require 480 man-hours and $18,300 in repair costs each. The roofs are failing and leak throughout all facilities. The Heating, Ventilation, and Air Conditioning is a steam system and is well beyond its life expectancy. These facilities cannot be properly maintained due to age, failing conditions, and the unavailability of replacement parts. The lighting in the existing facilities is inadequate for the tasks they need to support. The vehicle exhaust systems are inadequate and the maintenance bay floors are failing in many places. The current facilities were built to repair a 500 vehicle fleet. Since then, the vehicle fleet has grown to over 1,100 and vehicles have doubled in size requiring more stall space to perform repairs. Due to space availability, our Airmen are forced to work and maintain vehicles outside even during winter, in conditions that reach -60F with wind-chill, with an average of 184 days per year below freezing. Minot's harsh winter environment creates safety hazards and forces inefficient work-rest cycles. Also, future mission changes will cause Minot's vehicle fleet to grow an additional 300 vehicles bringing the future fleet total to 1,400 vehicles, three times the original buildings' capacity. New vehicles, most notably JLTVs, and the associated equipment require a larger footprint for maintenance that will not safely fit into Minot's current facilities. (Vehicle area comparison: JLTV = 40.3 m3, HMMWV= 9.7 m3) Workable space for maintenance operations is 2,560 SM out of an 8,151 SM complex. Lack of space creates safety issues, including a lack of fire lanes, equipment blocking safety devices, and no fall protection. There is a lack of continuity resulting from the separated buildings split administrative and operation functions. This separation creates lost man-hours in planning, coordination, and parts procurement. Communication infrastructure is not adequate to meet the Department of War Financial Improvement Audit Remediation (FIAR) compliance for the vehicle management enterprise's Defense Property Accountability System (DPAS) reporting system. Each technician is required to input maintenance/labor hours, parts DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 201 === page 210 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE MINOT AIR FORCE BASE NORTH DAKOTA SENTINEL CONSOLIDATED VEHICLE MAINT. COMPLEX 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 11233F 214-425 QJVF012003 8. PROJECT COST ($000) 124,000 ordering for vehicle repairs, and opening/closing work orders; this requirement is only partially met with Minot's current facilities. IMPACT IF NOT PROVIDED: Security of Protection Level - 1 assets will be negatively impacted. The Air Force will continue to allocate resources towards repairing systems that provide temporary fixes rather than permanent solutions. Vehicle maintenance operations under the current conditions are not sustainable and will have a detrimental impact to the readiness of Air Force Global Strike Command's largest vehicle fleet supporting/securing the only installation with two legs of the nuclear triad. Administrative functions will operate at substandard efficiency levels while the readiness of the transportation fleet at Minot Air Force Base will decline. Current facilities are limiting Minot's efforts to keep up with the rapidly evolving transportation community. Without this project, Airmen will also continue to work in aging facilities that present welfare, safety, and environmental hazards. Current facilities present a particularly hazardous work environment for technicians as they work in a constrained work space where they may be pinched or crushed between vehicles, pillars, and walls, which may result in loss of limb or life. The Department of War and Air Force are purchasing larger specialized vehicles that will no longer fit into Minot's current facilities. As these vehicles are put into service, maintenance will only be able to be performed outside as weather conditions permit. Without adequate facilities, productivity will be lost due to arctic work-rest cycles. ADDITIONAL: This project meets applicable criteria/scope specified in Department of the Air Force Manual 32-1084, Standard Facility Requirements. This design shall conform to criteria established in the Air Force Corporate Facilities Standards, the Installation Facilities Standards, but will not employ a standard facility design because there is no Air Force standard facility design for this project, and there is no applicable standard design from United States Army Corps of Engineers. A Waiver to an Economic Analysis has been approved for this project. Sustainable principles, to include life-cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with Unified Facilities Criteria 1-200-02, High Performance and Sustainable Building Requirements. This includes preparation of a life-cycle cost analysis for energy consuming systems, renewable energy generating systems, or whenever life-cycle cost effective is selected as the reason any requirement of Unified Facilities Criteria 1-200-02 is partially compliant or not applicable. This project does not fall within or partly within the 100-year flood plain. Facility is sited in accordance with the Installation Development Plan and is within a compatible land use area. Supporting Facilities exceed 25% of the Primary Facilities total due to privatized utility work needed to support project development. The construction growth offset for this requirement is 82,258 square feet. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 202 === page 211 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE MINOT AIR FORCE BASE NORTH DAKOTA SENTINEL CONSOLIDATED VEHICLE MAINT. COMPLEX 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 11233F 214-425 8. PROJECT COST ($000) QJVF012003 124,000 5th Bomb Wing Base Civil Engineer: 701-723-2434 Vehicle Maintenance Shop: 8,201 SM = 88,275 Square Feet; Vehicle Operations Administration: 2654 SM = 28,567 Square Feet; Demolition: 3,213 SM = 34,584 Square Feet. JOINT USE CERTIFICATION: Mission requirements, operational considerations, and location are incompatible with use by other components. Facility Condition Index: This is not a recapitalization project. No facility condition index exists for this facility type. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 203 === page 212 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE MINOT AIR FORCE BASE NORTH DAKOTA SENTINEL CONSOLIDATED VEHICLE MAINT. COMPLEX 5. PROGRAM ELEMENT 7. PROJECT NUMBER 12. 6. CATEGORY CODE 8. PROJECT COST ($000) 11233F 214-425 QJVF012003 SUPPLEMENTAL DATA: A. Estimated Execution Data: (1) Acquisition Strategy: Design-Bid-Build (2) Design Data (a) Design or Request for Proposal(RFP) Started: (b) Percent of Design Completed as of SEP 2025: (c) Percent of Design Completed as of JAN 2026: (d) Design or RFP Complete: (e) Total Design Cost ($000): (f) Energy Study and/or Life Cycle Cost Analysis (g) Standard or Definitive Design Used? (3) Construction Data: (a) Contract Award: (b) Construction Start: (c) Construction Complete: 124,000 JAN/2025 35% 65% SEP/2026 6,995 YES NO APR/2027 JUL/2027 JAN/2030 B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) Furnishing, Fixtures and Equip Security CCTV Communications DD FORM 1391C, JUL 1999 3080 3400 3400 PREVIOUS EDITION IS OBSOLETE 2030 2030 2030 1,362 71 20 PAGE NO. 204 === page 213 === Spend Plan Project Title: Installation: Program Year Project # CAO: 25-Mar-26 Sentinel Consolidated Vehicle Maint. Complex Instructions and Notes This spreadsheet is designed to help the user develop a WIP Curve for inclusion with a project 1391. The user only needs to know the project cost and schedule. Edit The Green Fields ONLY Minot AFB, ND 2027 QJVF012003 _ _ _ _ _ _1 1 Financials PA ($000) Initial Contract SIOH SIOH / Month Other (Contingency) Other / Month I 6.5% I 5.0% I Schedule Award Complete POP Months 124,000 110,143 8,060 288 5,797 207 ~ I I 1-Apr-27 I<---30-Jan-30 I+--1035 34.0 I Chart Begin 1st Increment 2nd Increment 3rd Increment 4th Increment 5th Increment End Total 1 2 3 4 5 6 7 8 iI Fund 1-Oct-26 1-Jan-27 Obligate ,,I t 1-Apr-27 30-Jan-30 30-Jan-30 Fund mmm-yr ~ 9 10 11 Obligate mmm-yr Months Oct-26 0 Jan-27 Apr-27 33 0 0 0 0 Jan-30 Jan-30 0 33 Enter the Project Title, Location, and Project number Enter the Date this WIP Curve is being updated Enter the Project PA Enter the SIOH required by the agent (6.5% for USACE FY24 and beyond) Enter the contingency percentage plus other amounts withheld by the Agent Enter the projected project Award Date ( usually 1 Apr of the Execution FY) Enter the Project Complete Date (Usually Award plus ~1000 days, use the 1st of a month) Enter the Chart Begin Date ( first day of the Program Year: 1-Oct-XX) ( Use "Short Date" format.) Enter the Dates anticipate to receive each increment of funding (usually January of the Program year, and Oct for subsequent increments) Enter the Dates anticipated to Award the contract ( usually 1 Apr of the Program year and obligate increments (usually 1 Oct for increments after initial award.) Enter the Value of each increment (If the project is less than $250M enter the PA as 1st Increment) Increment ,I. 124,000 124,000 Obligate 110,143 110,143 SIOH 8,060 8,060 Other 5,797 5,797 205 === page 214 === Spend Plan CAO: Project Title: Installation: Program Year Project # 25-Mar-26 Sentinel Consolidated Vehicle Maint. Complex Notes Minot AFB, ND 2027 QJVF012003 Assumes initial appropriation is enacted by Note 1: Congress Jan FY 2027. Assumes funds are available for obligation by 31 January of the execution year and by Note 2: 31 October for subsequent years. All Cost in thousands Chart Begin Oct-26 Month Oct-26 Nov-26 Dec-26 Jan-27 Feb-27 Mar-27 Apr-27 May-27 Jun-27 Jul-27 Aug-27 Sep-27 Oct-27 Nov-27 Dec-27 Jan-28 Feb-28 Mar-28 Apr-28 May-28 Jun-28 Jul-28 Aug-28 Sep-28 Oct-28 Nov-28 Dec-28 Jan-29 Feb-29 Mar-29 Apr-29 May-29 Jun-29 Jul-29 Aug-29 Sep-29 Oct-29 Nov-29 Dec-29 Jan-30 Feb-30 FUNDING (note 1) Enacted 124,000 - OBLIGATION (note 2-3) Cumulative Obligated Cumulative 124,000 124,000 124,000 124,000 124,000 124,000 124,000 124,000 124,000 124,000 124,000 124,000 124,000 124,000 124,000 124,000 124,000 124,000 124,000 124,000 124,000 124,000 124,000 124,000 124,000 124,000 124,000 124,000 124,000 124,000 124,000 124,000 124,000 124,000 124,000 124,000 124,000 124,000 110,143 495 495 495 495 495 495 495 495 495 495 495 495 495 495 495 495 495 495 495 495 495 495 495 495 495 495 495 130 90 85 85 95 10 - 110,143 110,638 111,133 111,628 112,123 112,617 113,112 113,607 114,102 114,597 115,092 115,587 116,082 116,577 117,072 117,566 118,061 118,556 119,051 119,546 120,041 120,536 121,031 121,526 122,020 122,515 123,010 123,505 123,635 123,725 123,810 123,895 123,990 124,000 124,000 OUTLAYS (note 4-5) Monthly 614 930 1,362 1,927 2,632 3,474 4,428 5,452 6,484 7,449 8,266 8,860 9,172 9,172 8,860 8,266 7,449 6,484 5,452 4,428 3,474 2,632 1,927 1,362 930 614 391 241 143 143 143 143 698 - Cumulative 614 1,544 2,906 4,832 7,464 10,938 15,366 20,818 27,303 34,752 43,018 51,877 61,049 70,221 79,081 87,347 94,796 101,280 106,733 111,161 114,634 117,267 119,193 120,555 121,485 122,099 122,490 122,730 122,873 123,016 123,159 123,302 124,000 124,000 Assumes ALL project funds (contract, SIOH, contingency, etc) are obligated NLT 6 Note 3: months prior to project end Assumes contract award in Apr 2027 and contract completion Jan 30 duration 34 Note 4 months. Assumes Agent will retain 1% of project Note 5 obligations for a final payment 206 === page 215 === Consolidated Vehicle Maintenance Complex, Minot AFB, ND $140,000 ----------- $120,000 '' ' $80,000 , , ...- -=--- - - - I I I I I I I I I I I $60,000 I '' ' Funding I Obligation I I Feb-30 Dec-29 Oct-29 Aug-29 Jun-29 Apr-29 Feb-29 Dec-28 Oct-28 Aug-28 Jun-28 Outlays Apr-28 , I Feb-28 ,, Dec-27 --- ... , , ,. , Oct-27 Apr-27 Feb-27 Dec-26 $0 I I Aug-27 $20,000 I I Jun-27 $40,000 Oct-26 Dollars in (000) $100,000 ,, ,. ,, 207 === page 216 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE MINOT AIR FORCE BASE NORTH DAKOTA SENTINEL SECURITY FORCES OPERATIONS COMPLEX 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 11233F 610-243 8. PROJECT COST ($000) QJVF063102 108,000 9. COST ESTIMATES ITEM UM QUANTITY UNIT COST COST($000) PRIMARY FACILITIES 83,253 HEADQUARTERS, GROUP (610-243) SM 12,106 6,672 (80,771) CYBERSECURITY OF FACILITY-RELATED CONTROL SYS LS (2,482) SUPPORTING FACILITIES 11,087 PRIVATIZED UTIL. SERVICE AND CONN. (GAS) LS (1,343) PRIVATIZED UTIL. SERVICE AND CONN. (WATER) LS (90) PRIVATIZED UTIL. SERVICE AND CONN. (ELEC.) LS (2,975) UTILITIES LS (1,113) SITE IMPROVEMENTS LS (2,260) ROADS, SIDEWALKS, AND PARKING LS (1,496) COMMUNICATIONS LS (1,411) GENERATOR KW 100 2,100 (210) FIRE PUMP LS (121) DEMOLITION SM 257 265 (68) SUBTOTAL 94,340 CONTINGENCY (5.00%) 4,717 TOTAL CONTRACT COST 99,057 SUPERVISION, INSPECTION AND OVERHEAD (6.50%) 6,439 DESIGN DURING CONSTRUCTION 495 POST CONSTRUCTION AWARD SERVICES 1,981 TOTAL REQUEST 107,972 TOTAL REQUEST (ROUNDED) 108,000 EQUIPMENT FROM OTHER APPROPRIATIONS (NON-ADD) (8,545) 10. DESCRIPTION OF PROPOSED CONSTRUCTION This new two-story operations building for the 91st Missile Wing's Security Forces Group will provide a consolidated administrative/training, armory/deployment, and storage/ warehouse facility. The personnel from buildings 547, 505, 128, 475, 437, 773, and 718 will move into the new Security Forces Operations Complex building. The project will include additional parking for 20 command vehicles and coderequired handicapped parking. Project will also include the demolition of (2) existing softball fields and concession facility (Building 587, 257 SM) and include construction and replacement of (2) new softball fields and a multipurpose sports field and all associated fencing, dugout awning, lighting, scoreboard and associated equipment. The generator is authorized by Air Force Manual 32-1062. Facilities will be designed as permanent construction in accordance with the Department of War Unified Facilities Criteria 1-200-01, General Building Requirements. This project will comply with Department of War antiterrorism/force protection requirements per Unified Facility Criteria 4-010-01. 11. REQ: 12,106 SM ADQT: 0 SUBSTD: 257 SM PROJECT: Construct 91 Missile Wing's Security Forces Operations Complex REQUIREMENT: This project requires a consolidated facility for the 91st Security Forces Group. DD FORM 1391, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 208 === page 217 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE MINOT AIR FORCE BASE NORTH DAKOTA SENTINEL SECURITY FORCES OPERATIONS COMPLEX 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 11233F 610-243 QJVF063102 8. PROJECT COST ($000) 108,000 The 91st Security Forces Group is composed of 91st Missile Security Forces Squadron Commander/Security Support Squadron and their staff, 791st Missile Security Forces Squadron, 891st Missile Security Forces Squadron, 91st Missile Security Operations Squadron, and 219th Missile Security Forces Squadron (Air National Guard Squadron) and their staff. The 91st Security Forces Group alone has over 1,000 personnel assigned in the 91st, 791st, and 891st, Squadrons. The 219th Missile Security Forces Squadron (Air National Guard) unit embeds with these squadrons. The organization will require the following additional spaces by Organization: group conference room, simulators and evaluator rooms, SIPR cafes, physical security storage, training classrooms, guardmount room, unit learning centers, armory, combat training space, secure theater, mission planning spaces, and warehouse. This is a 91st Missile Wing tenant requirement. CURRENT SITUATION: Currently, the 5th Bomb Wing Security Forces Squadron and the 91st Missile Wing Security Forces Group share the adjacent facility building 547, which is inadequate for accommodating an entire group. As a result, the 91st Security Forces Group is dispersed across seven different buildings on Minot Air Force Base. This separation significantly hampers arming and response times and necessitates the issuance of an Air Force IMT 116, Request for Deviation from Security Criteria, which requires approval from a 4-star General. Additionally, the 91st Missile Wing convoy defenders need three times the approved amount of time to assemble, exceeding the established time limits and requiring further approval. All defenders require ongoing training to operate effectively in the field and safeguard Minot Air Force Base nuclear assets. Currently, defenders must complete 140 mandatory classroom hours of training per year outside of their regular duty hours. This is due to the lack of available training classroom space during the duty day, as facility building 547 is shared with the 5th Bomb Wing. Additionally, the 91st Missile Wing Defenders must seek permission from the 5th Security Forces Squadron to use the physical combat training space in the joint training center, which is managed by the 5th Security Forces Squadron. This restriction significantly limits the combat capabilities of all 1,000-plus defenders. Regulations require mission briefings and debriefings before and after defenders deploy to the missile fields. The current facility lacks sufficient space to host commander's calls and necessary staff meetings, which impairs the efficiency and effectiveness of communication from leadership. Furthermore, the 91st Security Forces Group also trains using the Multiple Interactive Learning Objectives simulator, but there is currently no room to fully operate this trainer within the existing facility. IMPACT IF NOT PROVIDED: The 91st Security Forces Group is the only organization that provides security for the missile sites that belong to Minot Air Force Base. Without the 91st Security Forces Group provided convoy security and missile alert facilities security, the United States would be vulnerable to a wide range of attacks not only at the alert facilities but on the missiles themselves. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 209 === page 218 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE MINOT AIR FORCE BASE NORTH DAKOTA SENTINEL SECURITY FORCES OPERATIONS COMPLEX 5. PROGRAM ELEMENT 7. PROJECT NUMBER 6. CATEGORY CODE 8. PROJECT COST ($000) 11233F 610-243 QJVF063102 108,000 ADDITIONAL: This project meets applicable criteria/scope specified in Department of the Air Force Manual 32-1084, Standard Facility Requirements. All reasonable alternatives were considered during the development of this project to include status quo, renovate current facilities and new construction. New construction is the only viable option to meet this requirement. A formal economic analysis is in progress and will be completed before approval of the president's budget. This design shall conform to criteria established in the Air Force Corporate Facilities Standards, the Installation Facilities Standards, and shall employ the standard facility design Security Force Operations Building from the Air Force Civil Engineer Center. Sustainable principles, to include life-cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with Unified Facilities Criteria 1-200-02, High Performance and Sustainable Building Requirements. This includes preparation of a life-cycle cost analysis for energy consuming systems, renewable energy generating systems, or whenever life-cycle cost effective is selected as the reason any requirement of Unified Facilities Criteria 1-200-02 is partially compliant or not applicable. This project does not fall within or partly within the 100-year flood plain. Facility is sited in accordance with the Installation Development Plan and is within a compatible land use area. The construction growth offset for this requirement is 127,542 square feet. 5th Bomb Wing Base Civil Engineer: 701-723-2434. Headquarters, Group: 12,106 SM = 130,308 Square Feet; Demolition: 257 SM = 2,766 Square Feet. JOINT USE CERTIFICATION: This facility can be used by other components on an "as available" basis; however, the scope of the project is based on Air Force requirements. Facility Condition Index: This is not a recapitalization project. No Facility Condition Index data exists for this facility type. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 210 === page 219 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE MINOT AIR FORCE BASE NORTH DAKOTA SENTINEL SECURITY FORCES OPERATIONS COMPLEX 5. PROGRAM ELEMENT 7. PROJECT NUMBER 12. 6. CATEGORY CODE 8. PROJECT COST ($000) 11233F 610-243 QJVF063102 SUPPLEMENTAL DATA: A. Estimated Execution Data: (1) Acquisition Strategy: Design-Bid-Build (2) Design Data (a) Design or Request for Proposal(RFP) Started: (b) Percent of Design Completed as of SEP 2025: (c) Percent of Design Completed as of JAN 2026: (d) Design or RFP Complete: (e) Total Design Cost ($000): (f) Energy Study and/or Life Cycle Cost Analysis (g) Standard or Definitive Design Used? (3) Construction Data: (a) Contract Award: (b) Construction Start: (c) Construction Complete: 108,000 NOV/2024 65% 65% SEP/2026 7,044 YES NO APR/2027 MAY/2027 OCT/2029 B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) Furnishing, Fixtures and Equip Security CCTV Communications IDS/EES/ACS Devices DD FORM 1391C, JUL 1999 3080 3080 3080 3400 PREVIOUS EDITION IS OBSOLETE 2029 2029 2029 2029 6,813 1,192 367 173 PAGE NO. 211 === page 220 === Spend Plan Project Title: Installation: Program Year Project # CAO: I 6.5% I 5.0% I Schedule Award Complete POP Months I I 108,000 !/ Fund 1-Oct-26 1-Jan-27 1 2 3 4 5 6 7 8 95,931 7,020 293 5,049 210 1-Apr-27 1-Oct-29 914 30.0 I Chart Begin 1st Increment 2nd Increment 3rd Increment 4th Increment 5th Increment End Total Instructions and Notes This spreadsheet is designed to help the user develop a WIP Curve for inclusion with a project 1391. The user only needs to know the project cost and schedule. Edit The Green Fields ONLY Minot AFB, ND 2027 QJVF063102 Financials PA ($000) Initial Contract SIOH SIOH / Month Other (Contingency) Other / Month 25-Mar-26 Security Forces Operations Complex Obligate ,.I t 1-Apr-27 1-Oct-29 1-Oct-29 -Fund mmm-yr - 9 - 10 11 Obligate mmm-yr Months Oct-26 0 Jan-27 Apr-27 30 0 0 0 0 Oct-29 Oct-29 0 30 Enter the Project Title, Location, and Project number Enter the Date this WIP Curve is being updated Enter the Project PA Enter the SIOH required by the agent (6.5% for USACE FY24 and beyond) Enter the contingency percentage plus other amounts withheld by the Agent Enter the projected project Award Date ( usually 1 Apr of the Execution FY) Enter the Project Complete Date (Usually Award plus ~1000 days, use the 1st of a month) Enter the Chart Begin Date ( first day of the Program Year: 1-Oct-XX) ( Use "Short Date" format.) Enter the Dates anticipate to receive each increment of funding (usually January of the Program year, and Oct for subsequent increments) Enter the Dates anticipated to Award the contract ( usually 1 Apr of the Program year and obligate increments (usually 1 Oct for increments after initial award.) Enter the Value of each increment (If the project is less than $250M enter the PA as 1st Increment) I Increment + 108,000 108,000 Obligate 95,931 95,931 SIOH 7,020 7,020 Other 5,049 5,049 212 === page 221 === Spend Plan CAO: Project Title: Installation: Program Year Project # 25-Mar-26 Security Forces Operations Complex Notes Minot AFB, ND 2027 QJVF063102 Assumes initial appropriation is enacted by Note 1: Congress Jan FY 2027. Assumes funds are available for obligation by 31 January of the execution year and by Note 2: 31 October for subsequent years. All Cost in thousands Chart Begin Oct-26 Month Oct-26 Nov-26 Dec-26 Jan-27 Feb-27 Mar-27 Apr-27 May-27 Jun-27 Jul-27 Aug-27 Sep-27 Oct-27 Nov-27 Dec-27 Jan-28 Feb-28 Mar-28 Apr-28 May-28 Jun-28 Jul-28 Aug-28 Sep-28 Oct-28 Nov-28 Dec-28 Jan-29 Feb-29 Mar-29 Apr-29 May-29 Jun-29 Jul-29 Aug-29 Sep-29 Oct-29 FUNDING (note 1) Enacted 108,000 - OBLIGATION (note 2-3) Cumulative Obligated Cumulative 108,000 108,000 108,000 108,000 108,000 108,000 108,000 108,000 108,000 108,000 108,000 108,000 108,000 108,000 108,000 108,000 108,000 108,000 108,000 108,000 108,000 108,000 108,000 108,000 108,000 108,000 108,000 108,000 108,000 108,000 108,000 108,000 108,000 108,000 95,931 503 503 503 503 503 503 503 503 503 503 503 503 503 503 503 503 503 503 503 503 503 503 503 503 - 95,931 96,434 96,937 97,440 97,943 98,445 98,948 99,451 99,954 100,457 100,960 101,463 101,966 102,468 102,971 103,474 103,977 104,480 104,983 105,486 105,989 106,491 106,994 107,497 108,000 108,000 108,000 108,000 108,000 108,000 108,000 OUTLAYS (note 4-5) Monthly 1,613 2,112 2,702 3,370 4,096 4,845 5,576 6,241 6,793 7,188 7,394 7,394 7,188 6,793 6,241 5,576 4,845 4,096 3,370 2,702 2,112 1,613 1,207 889 648 471 347 261 205 115 Cumulative 1,613 3,725 6,427 9,797 13,892 18,737 24,313 30,554 37,347 44,534 51,928 59,322 66,510 73,303 79,544 85,120 89,964 94,060 97,430 100,132 102,244 103,857 105,064 105,953 106,600 107,072 107,418 107,680 107,885 108,000 Assumes ALL project funds (contract, SIOH, contingency, etc) are obligated NLT 6 Note 3: months prior to project end Assumes contract award in Apr 2027 and contract completion Oct 29 duration 30 Note 4 months. Assumes Agent will retain 1% of project Note 5 obligations for a final payment 213 === page 222 === Security Forces Operations Complex, Minot AFB, ND $120,000 -- --- r- --- $100,000 I I Dollars in (000) $80,000 I I I $60,000 I I I I I $40,000 $20,000 I I I $0 I . . . ,, ,, , ,, , , , ,, , , ,, , , ., , , ,, ,, , , , , ,, ------.. . ,. - ,_.. ,_.. ,_.. , ,, , ~ - Funding - Obligation -- Outlays 214 === page 223 === 1. COMPONENT 2. DATE (YYYYMMDD) FY 2027 BBBBBB MILITARY CONSTRUCTION PROGRAM AIR FORCE 3. INSTALLATION AND LOCATION 4. COMMAND TINKER AIR FORCE BASE OKLAHOMA AIR FORCE MATERIEL COMMAND 6. PERSONNEL (1) PERMANENT (2) STUDENTS 20260310 5. AREA CONTRUCTION COST INDEX 0.91 (3) SUPPORTED OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN (4) TOTAL a. AS OF 30-Sep-25 832 2,802 17,770 0 0 0 260 1,359 446 23,469 b. END FY 30-Sep-31 835 2,802 17,746 0 0 0 260 1,359 446 23,448 7. INVENTORY DATA ($000) 5,503.00 13,681,911.00 592,600.00 0.00 0.00 0.00 4,187,800.00 18,462,311.00 a. TOTAL ACREAGE b. INVENTORY TOTAL AS OF 15-May-25 c. AUTHORIZATION NOT YET IN INVENTORY d. AUTHORIZATION REQUESTED IN THIS PROGRAM e. AUTHORIZATION INCLUDED IN FOLLOWING PROGRAM f. PLANNED IN NEXT THREE PROGRAM YEARS g. REMAINING DEFICIENCY h. GRAND TOTAL 8. PROJECTS REQUESTED IN THIS PROGRAM (1) CODE a. CATEGORY (2) PROJECT TITLE 211-116 BOMBER AGILE COMMON HANGAR, INC 2 (3) SCOPE b. COST ($000) (1) START c. DESIGN STATUS (2) COMPLETE 18,302 SM 112,000 OCT-2023 JUN-2025 9. FUTURE PROJECTS 211-116 BOMBER AGILE COMMON HANGAR, INC (18,302 SM/$96,000) 211-159 KC-46 DOCK DEPORT CORROSION CONTROL HANGAR, INC (13,791 SM/$337,000) 211-254 INTEGRATED CAPABILITY DEPOT OXYGEN FACILITY (5,771 SM/$83,000) 211-116 B-21 BOMBER CAMPUS INFRASTRUCTURE (TBD/$109,000) 10.MISSION OR MAJOR FUNCTIONS Tinker Air Force Base combined mission includes operations, supply, maintenance and management in support of the 76th Maintenance Wing, 552nd Air Control Wing, 327th Air Sustainment Wing, 448th Combat Sustainment Wing, 3rd Combat Communications Group, Air Force Reserves, Navy Strategic Communications Wing One, 72nd Air Base Wing, Defense Logistics Agency and Defense Information Systems Agency. 11. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES None. DD FORM 1390, JUL 1999 215 PREVIOUS EDITION IS OBSOLETE. === page 224 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE TINKER AIR FORCE BASE OKLAHOMA BOMBER AGILE COMMON HANGAR, INC 2 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 11113F 211-116 WWYK263009 8. PROJECT COST ($000) AUTH: 0 APPR: 112,000 9. COST ESTIMATES ITEM UM QUANTITY UNIT COST COST($000) PRIMARY FACILITIES 242,389 HANGAR, MAINTENANCE DEPOT (211-116) SM 18,302 10,900 (199,492) APRON (113-321) SM 39,052 971 (37,919) CYBERSECURITY OF FACILITY-RELATED CONTROL SYS LS (4,978) SUPPORTING FACILITIES 56,784 UTILITIES LS (12,994) PRIVATIZED UTILITIES SERVICE AND CONNECTION LS (3,444) SPECIAL DRILLED PIER FOUNDATION LS (14,701) SITE PREPARATION LS (15,358) ROADS, SIDEWALKS, AND PARKING LS (6,315) SITE IMPROVEMENTS LS (196) DEMOLITION SM 148 1,512 (224) COMMUNICATIONS LS (2,592) PASSIVE FORCE PROTECTION MEASURES LS (960) SUBTOTAL 299,173 CONTINGENCY (5.00%) 14,959 TOTAL CONTRACT COST 314,132 SUPERVISION, INSPECTION AND OVERHEAD (6.50%) 20,419 DESIGN DURING CONSTRUCTION 504 TOTAL REQUEST 335,055 TOTAL REQUEST (ROUNDED) 335,000 EQUIPMENT FROM OTHER APPROPRIATIONS (NON-ADD) (76,949) 10. DESCRIPTION OF PROPOSED CONSTRUCTION This project constructs a 4-dock hangar for program depot maintenance. The facility consists of a single-story structural steel framed hangar bay with full span trusses on a cast-in-place concrete slab. Support spaces include a singlestory shop side with a two-story administration side constructed as a steel framed system. The hangar bay will be comprised of a standing seam metal roof with the support areas having a low slope single ply membrane roof. Special deep foundations consisting of piers & driven piles are included. Supporting facilities include all necessary utilities and connections, site demolition and earthwork, apron pavements, fencing, and site improvements to provide a complete and useable facility. The project will demolish building 2302 (148 SM) (Total: 148 Square Meters). Facilities will be designed as permanent construction in accordance with the Department of War Unified Facilities Criteria 1-200-01. This project will comply with Department of War antiterrorism/force protection requirements per Unified Facility Criteria 4-010-01. Air Conditioning: 160 Tons 11. REQ: 18,302 SM ADQT: 0 SUBSTD: 148 SM PROJECT: Bomber Agile Common Hangar DD FORM 1391, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 216 === page 225 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE TINKER AIR FORCE BASE OKLAHOMA BOMBER AGILE COMMON HANGAR, INC 2 5. PROGRAM ELEMENT 7. PROJECT NUMBER 6. CATEGORY CODE 8. PROJECT COST ($000) 11113F 211-116 WWYK263009 AUTH: 0 APPR: 112,000 REQUIREMENT: Construct an Agile Common Hangar at Oklahoma City Air Logistics Complex. The Complex presently performs programmed depot maintenance and modifications on the B-1B, B-52, C-130, E-3, KC-46A, KC-135, and expanded the phase maintenance on the Navy E-6 aircraft. This hangar will provide a maintenance area to support increases in bomber workload and programmed depot maintenance activations. Specifically, this hangar is vital to activate two major bomber fleet requirements: B-52J Commercial Engine Replacement Program and B-21 Programmed Depot Maintenance. The B-52J commercial engine replacement program supports nuclear and conventional operations by replacing the current TF33-PW-103 engine on the B-52H aircraft. The workload extensively modifies the existing platform; providing new engines, associated subsystems, struts, nacelles, electrical power generation system, cockpit controls, and cockpit displays. Any B-52H aircraft modified with the new commercial engines, and associated subsystems, are to be designated as B-52J once complete. To accomplish a program of this magnitude, the time at depot will need to increase, requiring an increase in aircraft depot maintenance hangars. Further, the facility is to be used for the B-21 program depot maintenance at a future date. Both workloads require large hangar bays, flexible back shops and support, administrative space and support, restrooms, and lockers, building support, private offices for dock chiefs, administrative space for scheduling and production support, a multi-purpose break room serving as a tornado shelter, and a hazmat storage space with production interface counter. Additionally, both programs support the United States nuclear mission readiness ensuring a wartime posture against nuclear capable peer competitors in the European and Asian theaters. This is a B-52J Commercial Engine Replacement Program supported service requirement. CURRENT SITUATION: B-52 program depot maintenance has been accomplished at Tinker Air Force Base since 1959. The Oklahoma City Air Logistics Complex is posturing to activate several B-52 Modernization and Sustainment efforts over the next 10 years. The existing B-52 footprint is being utilized for the installation of the Bomber Tactical Data Link modification, the Very Low Frequency/Low Frequency Modernization program, and the Crypto Modernization upgrade. The Complex plans to utilize working capital funding to expand the current B-52 footprint to organically activate the Radar Modernization Program, Advanced Extremely High Frequency Integration, and Quad Crew program. Through evaluation of existing resources and the new working capital funding, it was determined a Military Construction project was needed to activate the B-52J Commercial Engine Replacement Program organically. Existing resources are not projected to have capacity to fully activate the B-52J Commercial Engine Replacement Program. By appropriating and authorizing funds in FY26 and completing this facility in FY30, the depot will have adequate capacity to incorporate the B-52J Commercial Engine Replacement Program into the existing Programmed Depot Maintenance. Completing the modification alongside existing sustainment will decrease the aircraft availability impacts to Air Force Global Strike Command. Independent of the B-52J Commercial Engine Replacement Program, the Oklahoma City Air Logistic Complex has been designated the Depot Source of Repair for the B-21 Program Depot Maintenance DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 217 === page 226 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE TINKER AIR FORCE BASE OKLAHOMA BOMBER AGILE COMMON HANGAR, INC 2 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 11113F 211-116 WWYK263009 8. PROJECT COST ($000) AUTH: 0 APPR: 112,000 and has a standing requirement to develop and construct a new Bomber Campus. This Military Construction Project would construct a hangar to be utilized by both B52J and B-21, aligning requirements and timing. This project enables Oklahoma City Air Logistic Complex to induct and produce the B-52J while also reducing risk to the B-21 Military Construction program. IMPACT IF NOT PROVIDED: If this project is not funded by FY26 and completed in FY30, the B-52J Commercial Engine Replacement Program will not fully activate the program organically, requiring the program to split the workload between organic and contractor. If contracted, Air Force Global Strike Command would experience several negative effects including a greater strain to B-52 Aircraft Availability when compared to a fully organic activation. Additionally, the program would have increased package hours to the B-52J Commercial Engine Replacement Program due to not being accomplished along with the Program Depot Maintenance. Next, the Program cost will increase due to splitting the activation between two sites, resulting in an increase of man-hours. Finally, the Oklahoma City Air Logistic Complex does not possess the facility capacity to activate B-21 Program Depot Maintenance workload. ADDITIONAL: This project meets applicable criteria/scope specified in Department of the Air Force Manual 32-1084, Standard Facility Requirements. This design shall conform to criteria established in the Air Force Corporate Facilities Standards, the Installation Facilities Standards, but will not employ a standard facility design because there is no Air Force standard facility design for this project, and there is no applicable standard design from the Air Force Civil Engineer Center. A waiver to an economic analysis has been approved for this project. Sustainable principles, to include life-cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with Unified Facility Criteria 1-200-02, High Performance and Sustainable Building Requirements. This includes preparation of a life-cycle cost analysis for energy consuming systems, renewable energy generating systems, whenever life-cycle cost effective is selected as the reason any requirement of Unified Facility Criteria 1-200-02 is partially compliant or not applicable. Non-mission critical facility partly in the flood plain: This project falls partially within the 100-year flood plain. This project will mediate the impact of the floodplain by using the approved locations of the stormwater detention basin at the originally designed location for the hangar and cutting out an area to the East to account for the entire campus's floodplain impact. Facility is sited in accordance with the Installation Development Plan and is within a compatible land use area. This will be a Working Capital Fund supported facility, therefore per 1.6 of the Growth Offset Memo, no offset is required. Tinker Civil Engineering commercial phone: (405) 734-3451. HANGAR, MAINTENANCE DEPOT: 18,302 square meters = 197,001 square feet; APRON: 39,052 square meters = 420,352 square feet; DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 218 === page 227 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE TINKER AIR FORCE BASE OKLAHOMA BOMBER AGILE COMMON HANGAR, INC 2 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 11113F 211-116 WWYK263009 8. PROJECT COST ($000) AUTH: 0 APPR: 112,000 DEMOLITION: 148 square meters = 1,593 square feet. JOINT USE CERTIFICATION: This facility can be used by other components on an "as available" basis; however, the scope of the project is based on Air Force requirements. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 219 === page 228 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE TINKER AIR FORCE BASE OKLAHOMA BOMBER AGILE COMMON HANGAR, INC 2 5. PROGRAM ELEMENT 7. PROJECT NUMBER 12. 6. CATEGORY CODE 8. PROJECT COST ($000) 11113F 211-116 WWYK263009 AUTH: 0 SUPPLEMENTAL DATA: A. Estimated Execution Data: (1) Acquisition Strategy: Design-Bid-Build (2) Design Data (a) Design or Request for Proposal(RFP) Started: (b) Percent of Design Completed as of SEP 2025: (c) Percent of Design Completed as of JAN 2026: (d) Design or RFP Complete: (e) Total Design Cost ($000): (f) Energy Study and/or Life Cycle Cost Analysis (g) Standard or Definitive Design Used? (3) Construction Data: (a) Contract Award: (b) Construction Start: (c) Construction Complete: APPR: 112,000 OCT/2023 100% 100% JUN/2025 12,580 YES NO APR/2026 MAY/2026 JUL/2030 B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) CERP-Unique Equipment PDM Equipment FURNITURE FIXTURES & EQUIPMENT COMMUNICATION EQUIPMENT FURNISHINGS 3010 3010 3400 3080 3080 2030 2030 2030 2030 2030 411 75,388 100 650 400 Auth of Approp $(000) 127,000 112,000 96,000 335,000 Appropriation $(000) 127,000 112,000 96,000 335,000 C. Authorization and Appropriation Summary: FY2026 Enacted FY2027 Budget Request Future Request Total DD FORM 1391C, JUL 1999 Authorization $(000) 335,000 0 0 335,000 PREVIOUS EDITION IS OBSOLETE PAGE NO. 220 === page 229 === MILCON Work-in-Progress (WIP) Curve – Automated Spend Plan Project Information Project Title Installation Program Year (FY) Project # BOMBER AGILE COMMON HANGAR, Inc TINKER AFB, OKLAHOMA 2027 WWYK263009 Financial Inputs & Derived Amounts ($000) Programmed Amount (PA) SIOH Rate Contingency Rate SIOH Amount Contingency Amount Construction (PA less SIOH & Cont) Total Increments 335,000 6.5% 5.0% 21,775 16,750 296,475 3 Key Dates (Calculated) Begin Date (FY Start) Award Date (Assumed) Complete Date (Award + POP; set to 1st of month) Award Month (1st of month) Complete Month (1st of month) Period of Performance Oct 1, 2026 Apr 1, 2027 Jul 1, 2031 Apr 1, 2027 Jul 1, 2031 1552 Funding & Obligation Increments ($000) Increment Amount ($000) Funding Date Jan 1, 2027 Oct 1, 2027 Oct 1, 2028 Oct 1, 2029 Increment 1 Increment 2 Increment 3 Increment 4 127,000 112,000 69,000 27,000 Total Funding 335,000 Check vs PA Obligation Date Apr 1, 2027 Jan 1, 2028 Jan 1, 2029 Jan 1, 2030 0 Outlay Curve Controls (Adjust if needed) Outlay Curve Steepness (k) Normalized Logistic Base (t=0) Normalized Logistic Top (t=1) Total Outlay ($000) (assumed = PA) 8.0 0.01798621 0.98201379 335,000 221 === page 230 === Monthly Cash Flow (Automated from Spend Plan) Project: Month Oct 2026 Nov 2026 Dec 2026 Jan 2027 Feb 2027 Mar 2027 Apr 2027 May 2027 Jun 2027 Jul 2027 Aug 2027 Sep 2027 Oct 2027 Nov 2027 Dec 2027 Jan 2028 Feb 2028 Mar 2028 Apr 2028 May 2028 Jun 2028 Jul 2028 Aug 2028 Sep 2028 Oct 2028 Nov 2028 Dec 2028 Jan 2029 Feb 2029 Mar 2029 Apr 2029 May 2029 Jun 2029 Jul 2029 Aug 2029 Sep 2029 Oct 2029 Nov 2029 Dec 2029 Jan 2030 Feb 2030 Mar 2030 Apr 2030 May 2030 Jun 2030 Jul 2030 Aug 2030 Sep 2030 Oct 2030 Nov 2030 Dec 2030 Jan 2031 Feb 2031 Mar 2031 Apr 2031 May 2031 Jun 2031 Jul 2031 TOTAL BOMBER AGILE COMMON HANGAR, Inc Funding ($000) Obligation ($000) 0 0 0 0 0 0 127,000 0 0 0 0 0 0 127,000 0 0 0 0 0 0 0 0 0 0 112,000 0 0 0 0 0 0 112,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 69,000 0 0 0 0 0 0 69,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 27,000 0 0 0 0 0 0 27,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 335,000 335,000 Outlay ($000) 0 0 0 0 0 0 1,018 1,179 1,365 1,578 1,822 2,101 2,417 2,775 3,178 3,629 4,131 4,686 5,293 5,950 6,654 7,397 8,170 8,958 9,745 10,509 11,229 11,880 12,437 12,877 13,183 13,339 13,339 13,183 12,877 12,437 11,880 11,229 10,509 9,745 8,958 8,170 7,397 6,654 5,950 5,293 4,686 4,131 3,629 3,178 2,775 2,417 2,101 1,822 1,578 1,365 1,179 1,018 335,000 Cumulative Funding Cumulative Obligation Cumulative Outlay 0 0 0 0 0 0 0 0 0 127,000 0 0 127,000 0 0 127,000 0 0 127,000 127,000 1,018 127,000 127,000 2,197 127,000 127,000 3,562 127,000 127,000 5,141 127,000 127,000 6,963 127,000 127,000 9,064 239,000 127,000 11,481 239,000 127,000 14,256 239,000 127,000 17,434 239,000 239,000 21,063 239,000 239,000 25,194 239,000 239,000 29,880 239,000 239,000 35,173 239,000 239,000 41,123 239,000 239,000 47,777 239,000 239,000 55,174 239,000 239,000 63,343 239,000 239,000 72,301 308,000 239,000 82,046 308,000 239,000 92,555 308,000 239,000 103,784 308,000 308,000 115,664 308,000 308,000 128,101 308,000 308,000 140,978 308,000 308,000 154,161 308,000 308,000 167,500 308,000 308,000 180,839 308,000 308,000 194,022 308,000 308,000 206,899 308,000 308,000 219,336 335,000 308,000 231,216 335,000 308,000 242,445 335,000 308,000 252,954 335,000 335,000 262,699 335,000 335,000 271,657 335,000 335,000 279,826 335,000 335,000 287,223 335,000 335,000 293,877 335,000 335,000 299,827 335,000 335,000 305,120 335,000 335,000 309,806 335,000 335,000 313,937 335,000 335,000 317,566 335,000 335,000 320,744 335,000 335,000 323,519 335,000 335,000 325,936 335,000 335,000 328,037 335,000 335,000 329,859 335,000 335,000 331,438 335,000 335,000 332,803 335,000 335,000 333,982 335,000 335,000 335,000 222 === page 231 === Cumulative WIP Curve Project: Program Year: BOMBER AGILE COMMON HANGAR, Inc 2027 Cumulative Funding vs Obligation vs Outlay 400,000 350,000 300,000 250,000 200,000 Cumulative Funding 150,000 Cumulative Obligation Cumulative Outlay 100,000 50,000 Jun 2031 Apr 2031 Feb 2031 Dec 2030 Oct 2030 Aug 2030 Jun 2030 Apr 2030 Feb 2030 Dec 2029 Oct 2029 Jun 2029 Aug 2029 Apr 2029 Feb 2029 Dec 2028 Oct 2028 Aug 2028 Jun 2028 Apr 2028 Feb 2028 Oct 2027 Dec 2027 Jun 2027 Aug 2027 Apr 2027 Feb 2027 Dec 2026 Oct 2026 0 223 === page 232 === 1. COMPONENT 2. DATE (YYYYMMDD) FY 2027 BBBBBB MILITARY CONSTRUCTION PROGRAM AIR FORCE 3. INSTALLATION AND LOCATION 4. COMMAND MOUNTAIN HOME AF BASE, GEOGRAPHICALLY SEPARATED, OREGON AIR COMBAT COMAND 6. PERSONNEL (1) PERMANENT 20260326 5. AREA CONTRUCTION COST INDEX 1.2 (2) STUDENTS (3) SUPPORTED (4) TOTAL OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN a. AS OF 30-Sep-25 b. END FY 0 0 0 0 0 0 0 0 0 0 0 0 27 0 0 0 0 0 5 32 7. INVENTORY DATA ($000) 2,622.00 0.00 1,093,000.00 0.00 0.00 0.00 0.00 1,093,000.00 a. TOTAL ACREAGE b. INVENTORY TOTAL AS OF 30-Sep-25 c. AUTHORIZATION NOT YET IN INVENTORY d. AUTHORIZATION REQUESTED IN THIS PROGRAM e. AUTHORIZATION INCLUDED IN FOLLOWING PROGRAM f. PLANNED IN NEXT THREE PROGRAM YEARS g. REMAINING DEFICIENCY h. GRAND TOTAL 8. PROJECTS REQUESTED IN THIS PROGRAM (1) CODE a. CATEGORY (2) PROJECT TITLE 132-134 Homeland Defense Over-The-Horizon Radar, Inc (3) SCOPE b. COST ($000) (1) START c. DESIGN STATUS (2) COMPLETE 2,368 EA 33,650 03/26 01/27 9. FUTURE PROJECTS 10.MISSION OR MAJOR FUNCTIONS NORAD & NORTHOM requires long range early detection capability for low flying targets of interest approaching the borders of the continental United States. Solution: Land-based, 2-D high frequency (HF) bistatic ionospheric backscatter radar. Provides over-the-horizon detection and tracking of air and surface target sets over wide geographic areas; 100 times more sensitive than past and current OTHR systems. Focuses on low flying air target sets that are obscured from conventional line of-sight radar systems by the curvature of the earth. Permits long range early detection and response to land or sea launched targets of interest. Initial deployment: Network of (2) HLD OTHR CONUS transmitter and receiver site facilities for the northwest mission sector sites. 11. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES N/A DD FORM 1390, JUL 1999 224 PREVIOUS EDITION IS OBSOLETE. === page 233 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 4. PROJECT TITLE 3. INSTALLATION AND LOCATION MT HOME AFB, GEOGRAPHICALLY SEPARATED HOMELAND DEFENSE OVER-THE-HORIZON RADAR, INC OREGON 5. PROGRAM ELEMENT 6. CATEGORY CODE 12417F 132-134 7. PAX NUMBER 110993 8. PROJECT COST ($000) AUTH: 0 APPR: 33,650 9. COST ESTIMATES ITEM UM QUANTITY UNIT COST COST($000) PRIMARY FACILITIES 135,703 ANTENNA SUPPORT STRUCTURE (132-134) EA 2,368 7,908 (18,726) LAND ACQUISITION (911-146) AC 2,622 1,660 (4,353) LAND WITHDRAWL (911-146) AC 4,999 200 (1,000) AIRCRAFT CONTROL AND WARNING OPS (141-489) SM 2,266 35,605 (80,681) VEHICLE MAINTENANCE SHOP (214-425) SM 297 6,363 (1,890) VEHICLE OPERATIONS PARKING SHED (214-428) SM 455 2,670 (1,215) VEHICLE FUELING STATION (123-335) OL 2 752,317 (1,505) Total from Continuation page(s) (26,333) SUPPORTING FACILITIES 246,270 UTILITIES LS (52,368) SITE PREPARATION LS (95,486) ROADS, SIDEWALKS, AND PARKING LS (21,446) SITE IMPROVEMENTS LS (9,963) COMMUNICATIONS LS (29,848) DEMOLITION LS (1,713) GENERATOR SUPPORT FACILITY LS (12,940) ELECTRICAL CONTROL BUILDING LS (176) PASSIVE FORCE PROTECTION MEASURES LS (8,354) PRIVATIZED UTILITIES SERVICE AND CONNECTION LS (8,976) ENVIRONMENTAL MITIGATION LS (5,000) SUBTOTAL 381,971 CONTINGENCY (5.00%) 19,099 TOTAL CONTRACT COST 401,070 SUPERVISION, INSPECTION AND OVERHEAD (6.50%) 26,070 DESIGN/BUILD - DESIGN COST (4.00% OF SUBTOTAL) 15,279 DESIGN DURING CONSTRUCTION 6,231 TOTAL REQUEST 448,650 TOTAL REQUEST (ROUNDED) 448,650 EQUIPMENT FROM OTHER APPROPRIATIONS (NON-ADD) (728,000) 10. DESCRIPTION OF PROPOSED CONSTRUCTION Acquisition of land, provide infrastructure support for antenna equipment, and construct multiple single-story buildings to include water supply, power generation, and fuel dispensing facilities to accommodate the mission of the Homeland Defense (HLD) Over-the-Horizon- Radar (OTHR) program. Construction will include concrete foundations for multiple pre-engineered buildings. The land procurement actions include the fee, or lesser real property interest, to include potential withdrawal of public domain land. OTHR sites will require approximately 2,622 acres for the Transmitter systems and 4,999 acres for the Receiver systems. The project consists of a single system. This system will be comprised of two sites, one transmitting and one receiving, and the support buildings areas for each array. This OTHR system array will include all necessary antenna support infrastructure, and communications cabling. Radiofrequency shielding will be utilized to mitigate interference as required. This project includes the reuse of three buildings for a total of 1,394 square meters. Project scope includes backup DD FORM 1391, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 225 === page 234 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 4. PROJECT TITLE 3. INSTALLATION AND LOCATION MT HOME AFB, GEOGRAPHICALLY SEPARATED HOMELAND DEFENSE OVER-THE-HORIZON RADAR, INC OREGON 5. PROGRAM ELEMENT 6. CATEGORY CODE 12417F 132-134 9. COST ESTIMATES (CONTINUED) 7. PAX NUMBER 8. PROJECT COST ($000) 110993 ITEM PRIMARY FACILITIES (CONTINUED) SECURITY POLICE ENTRY CONTR BUILDING (730837) WATER SUPPLY BUILDING (841-169) AIR FORCE COMMUNICATIONS SERVICE MAINTENAN (217-742) CYBERSECURITY OF FACILITY-RELATED CONTROL SYS AUTH: 0 APPR: 33,650 UNIT COST COST ($000) UM QUANTITY SM 71 13,950 (990) SM SM 246 86 75,106 41,076 (18,476) (3,533) Total (3,334) 26,333 LS power generators pursuant to Air Force Manual 32-1062 Electrical Systems, Power Plants and Generators. The Generator will be procured using Research Development Testing and Evaluation (RDT&E) funding and supplied to the contractor as Government Furnished Equipment. The project will include all necessary site improvements, site preparation, access roads, existing roadway improvements, supporting pavements, equipment pads, security fencing, utilities and utility connection fees, emergency/stand-by power, communications, and any other necessary supporting infrastructure to provide complete and usable facilities. This project will comply with Department of War antiterrorism/force protection requirements per United Facilities Criteria 4-010-01 Minimum Antiterrorism Standards for Buildings. 11. REQ: 2,368 EA ADQT: 0 SUBSTD: 0 PROJECT: Acquire land, construct multiple facilities, and field Homeland Defense Over-theHorizon Radar (HLD OTHR) supporting infrastructure. REQUIREMENT: United States adversaries continue to pursue weapon delivery platforms designed to evade detection and strike our homeland. HLD OTHR sensor supports long range, early detection and response to land or sea launched targets of interest. HLD OTHR compromises two major subsystems: the Transmitter, the Receiver. The proposed project will locate one Transmitter and one Receiver subsystem site at suitable locations in a critical mission sector region designated by North American Aerospace Defense Command and Northern Command. HLD-OTHR is a North American Aerospace Defense Command and Northern Command supported service requirement. CURRENT SITUATION: This capability does not currently exist anywhere in the United States. HLD OTHR is the number one air domain awareness priority for Commander, North American Aerospace Defense Command and Northern Command and is a critical component of potential adversary countries and Great Power Competition nations. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 226 === page 235 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 4. PROJECT TITLE 3. INSTALLATION AND LOCATION MT HOME AFB, GEOGRAPHICALLY SEPARATED HOMELAND DEFENSE OVER-THE-HORIZON RADAR, INC OREGON 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PAX NUMBER 8. PROJECT COST ($000) 12417F 132-134 110993 AUTH: 0 APPR: 33,650 IMPACT IF NOT PROVIDED: The United States' adversaries continue to hold the homeland at risk. Timely and accurate threat detection, tracking, and assessment provides critical decision space and time to national leaders, while an inability to do so limits available response options. Lack of domain awareness may contribute to increased risk of miscalculation, unnecessary escalation, and potential for strategic deterrence failure. ADDITIONAL: The criteria/scope for the HLD-OTHR program is not specified in Air Force Manual 32-1084, Facility Requirements Standards; facility requirements are user and/or mission driven. This design will conform to criteria established in the Air Force Corporate Facilities Standards and Installation Facilities Standards but will not employ a standard facility design because there is no Air Force standard facility design for this project, and there is no applicable standard design to accommodate the facility's mission. All reasonable alternatives were considered during the development of this project; new construction is the only viable option to meet this requirement. A waiver to an economic analysis was approved on February 16, 2024. Sustainable principles, to include life-cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with Unified Facilities Criteria 1-200-02, High Performance and Sustainable Building Requirements. This includes preparation of a life-cycle cost analysis for energy consuming systems, renewable energy generating systems, whenever life cycle cost effective is selected as the reason any requirement of Unified Facilities Criteria 1-200-02 is partially compliant or not applicable. This project does not fall within or partly within a 100-year flood plain. Supporting facility costs exceed 25% of primary facility costs due to site dimensions, the likelihood of the sites being located on undeveloped land and the extensive infrastructure required to support the antenna arrays. The construction growth offset for this requirement is 37,905 square feet. 366 Wing Base Civil Engineer: 208-828-2831 AIRCRAFT CONTR AND WARNING OPERATIONS BLDG (141-489) 2,266 SM = 24,391 SF VEHICLE MAINTENANCE SHOP (214-425) 297 SM = 3,200 SF VEHICLE STORAGE SHED (214-428) 455 SM = 4,900 SF WATER SUPPLY BUILDING (841-169) 246 SM = 3,720 SF SECURITY POLICE ENTRY CONTR BUILDING (730-837) 72 SM = 770 SF AIR FORCE COMMUNICATIONS SERVICE MAINTENANCE FACILITY (217-742) 86 SM = 924 SF DEMOLITION: N/A JOINT USE CERTIFICATION: Mission requirements, operations consideration and locations are incompatible with use by other components. This facility can be used by other components on an "as available" basis; however, the scope of the project is based on Air Force. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 227 === page 236 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE MT HOME AFB,GEOGRAPHICALLY SEPARATED OREGON HOMELAND DEFENSE OVER-THE-HORIZON RADAR, INC 5. PROGRAM ELEMENT 7. PAX NUMBER 12. 6. CATEGORY CODE 8. PROJECT COST ($000) 12417F 132-134 110993 AUTH: 0 SUPPLEMENTAL DATA: A. Estimated Execution Data: (1) Acquisition Strategy: Design-Build (2) Design Data (a) Design or Request for Proposal(RFP) Started: (b) Percent of Design Completed as of SEP 2025: (c) Percent of Design Completed as of JAN 2026: (d) Design or RFP Complete: (e) Total Design Cost ($000): (f) Energy Study and/or Life Cycle Cost Analysis (g) Standard or Definitive Design Used? (3) Construction Data: (a) Contract Award: (b) Construction Start: (c) Construction Complete: APPR: 33,650 MAR/2026 0% 0% JAN/2027 31,500 YES NO APR/2027 JUN/2027 OCT/2028 B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) Furniture, Fixtures, and Equip Radar and Supporting Equipment Radar and Supporting Equipment 3600 3600 3600 2027 2025 2027 1,000 327,000 400,000 Auth of Approp Appropriation $(000) 198,000 33,650 217,000 0 448,650 C. Authorization and Appropriation Summary: Authorization $(000) 1,093,000 FY2025 Enacted 0 FY2027 Budget Request 0 FY2027 Budget Request (DW) -644,350 Future Cost Variation 448,650 Total DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE $(000) 198,000 33,650 217,000 0 PAGE NO. 228 === page 237 === MILCON Work‐in‐Place (WIP) Curve – Automated Spend Plan Project Information Project Title Installation Program Year (FY) Project # HOMELAND DEFENSE OVER-THE-HORIZON RADAR, Inc Mountain Home AF Base, Geographically Separated 2027 QYZH253000 Financial Inputs & Derived Amounts ($000) Programmed Amount (PA) SIOH Rate Contingency Rate SIOH Amount Contingency Amount Construction (PA less SIOH & Cont) Total Increments 448,650 6.5% 5.0% 29,162 22,433 397,055 2 Key Dates (Calculated) Begin Date (FY Start) Award Date (Assumed) Complete Date (Award + 1100d; set to 1st of month) Period of Performance Measured in Days Oct 1, 2026 Apr 1, 2029 Oct 1, 2030 550 Funding & Obligation Increments ($000) Increment Amount ($000) Funding Date Jan 1, 2027 Nov 1, 2029 Increment1 Increment2 198,000 250,650 Total Funding 448,650 Check vs PA Obligation Date Apr 1, 2027 Dec 1, 2029 0 Outlay Curve Controls (Adjust if needed) Outlay Curve Steepness (k) Normalized Logistic Base (t=0) Normalized Logistic Top (t=1) Total Outlay ($000) (assumed = PA) 10.0 0.006692851 0.993307149 448,650 229 === page 238 === Monthly Cash Flow (Automated from Spend Plan) Month Oct 2026 Nov 2026 Dec 2026 Jan 2027 Feb 2027 Mar 2027 Apr 2027 May 2027 Jun 2027 Jul 2027 Aug 2027 Sep 2027 Oct 2027 Nov 2027 Dec 2027 Jan 2028 Feb 2028 Mar 2028 Apr 2028 May 2028 Jun 2028 Jul 2028 Aug 2028 Sep 2028 Oct 2028 Nov 2028 Dec 2028 Jan 2029 Feb 2029 Mar 2029 Apr 2029 May 2029 Jun 2029 Jul 2029 Aug 2029 Sep 2029 Oct 2029 Nov 2029 Dec 2029 Jan 2030 Feb 2030 Mar 2030 Apr 2030 May 2030 Jun 2030 Jul 2030 Aug 2030 Sep 2030 Oct 2030 TOTAL Funding ($000) Obligation ($000) 0 0 0 0 0 0 198,000 0 0 0 0 0 0 198,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 250,650 0 0 250,650 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 448,650 448,650 Outlay ($000) Cumulative FundingCumulative Obligation Cumulative Outlay 0 0 0 0 0 0 0 0 0 0 0 0 0 198,000 0 0 0 198,000 0 0 0 198,000 0 0 0 198,000 198,000 0 0 198,000 198,000 0 0 198,000 198,000 0 0 198,000 198,000 0 0 198,000 198,000 0 0 198,000 198,000 0 0 198,000 198,000 0 0 198,000 198,000 0 0 198,000 198,000 0 0 198,000 198,000 0 0 198,000 198,000 0 0 198,000 198,000 0 0 198,000 198,000 0 0 198,000 198,000 0 0 198,000 198,000 0 0 198,000 198,000 0 0 198,000 198,000 0 0 198,000 198,000 0 0 198,000 198,000 0 0 198,000 198,000 0 0 198,000 198,000 0 0 198,000 198,000 0 0 198,000 198,000 0 0 198,000 198,000 0 2,084 198,000 198,000 2,084 3,485 198,000 198,000 5,569 5,777 198,000 198,000 11,346 9,445 198,000 198,000 20,791 15,096 198,000 198,000 35,888 23,278 198,000 198,000 59,166 33,977 198,000 198,000 93,142 45,820 448,650 198,000 138,963 55,617 448,650 448,650 194,580 59,491 448,650 448,650 254,070 55,617 448,650 448,650 309,687 45,820 448,650 448,650 355,508 33,977 448,650 448,650 389,484 23,278 448,650 448,650 412,762 15,096 448,650 448,650 427,859 9,445 448,650 448,650 437,304 5,777 448,650 448,650 443,081 3,485 448,650 448,650 446,566 2,084 448,650 448,650 448,650 448,650 448,650 448,650 448,650 230 === page 239 === 250,000 Oct 2026 Nov 2026 Dec 2026 Jan 2027 Feb 2027 Mar 2027 Apr 2027 May 2027 Jun 2027 Jul 2027 Aug 2027 Sep 2027 Oct 2027 Nov 2027 Dec 2027 Jan 2028 Feb 2028 Mar 2028 Apr 2028 May 2028 Jun 2028 Jul 2028 Aug 2028 Sep 2028 Oct 2028 Nov 2028 Dec 2028 Jan 2029 Feb 2029 Mar 2029 Apr 2029 May 2029 Jun 2029 Jul 2029 Aug 2029 Sep 2029 Oct 2029 Nov 2029 Dec 2029 Jan 2030 Feb 2030 Mar 2030 Apr 2030 May 2030 Jun 2030 Jul 2030 Aug 2030 Sep 2030 Oct 2030 Cumulative WIP Curve Project: Program Year: HOMELAND DEFENSE OVER-THE-HORIZON RADAR, Inc 2027 500,000 Cumulative Funding vs Obligation vs Outlay 450,000 FY27 AF Budget Request $33,650K Defense Wide Budget Request $217,000K Cumulative Funding Cumulative Obligation FY27 400,000 350,000 300,000 200,000 FY25 Enacted $198M 150,000 100,000 50,000 0 Cumulative Outlay 231 === page 240 === 1. COMPONENT 2. DATE (YYYYMMDD) FY 2027 AIR FORCE MILITARY CONSTRUCTION PROGRAM 3. INSTALLATION AND LOCATION 4. COMMAND DYESS AIR FORCE BASE, TEXAS 6. PERSONNEL 5. AREA CONTRUCTION COST INDEX AIR FORCE GLOBAL STRIKE COMMAND (1) PERMANENT (2) STUDENTS 20260326 0.88 (3) SUPPORTED OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN (4) TOTAL a. AS OF 30-Sep-25 510 3,884 422 0 0 0.00 59 229 41 5,145 b. END FY 30-Sep-30 510 3,947 421 0 0 0 59 227 41 5,205 7. INVENTORY DATA ($000) 6,118 4,177,223.00 122,100.00 386,000.00 567,000.00 249,000.00 907,600.00 6,408,923.00 a. TOTAL ACREAGE b. INVENTORY TOTAL AS OF 30-Sep-25 c. AUTHORIZATION NOT YET IN INVENTORY d. AUTHORIZATION REQUESTED IN THIS PROGRAM e. AUTHORIZATION INCLUDED IN FOLLOWING PROGRAM f. PLANNED IN NEXT THREE PROGRAM YEARS g. REMAINING DEFICIENCY h. GRAND TOTAL 8. PROJECTS REQUESTED IN THIS PROGRAM a. CATEGORY (1) CODE (2) PROJECT TITLE (3) SCOPE c. DESIGN STATUS b. COST ($000) (1) START (2) COMPLETE 171-212 B-21 Flight Simulator Facility 3,106 SM 63,000 09/24 04/26 211-159 B-21 LO Corrosion Cntrl Fac/RFF, Inc 8,875 SM 74,000 10/23 10/26 812-225 B-21 Utilities Site Improvements Electrical 1,836 LM 23,000 09/24 03/26 9. FUTURE PROJECTS 211-159 B-21 LO Corrosion Cntrl Fac/RFF, Inc (8,875 SM / $226,000) 422-265 B-21 Armaments Storage (465 SM / $10,000) 171-618 B-21 Field Training Detachment Facility (5,167 SM / $84,000) 113-321 B-21 NAOC Support (68,748 SM / $4,000) 610-129 B-21 B-21 Squadron Ops/Aircraft Maint Unit (11,686 SM / $118,000) 442-758 B-21 Aircraft Parts Store (3,717 SM / $34,000) 215-582 Weapons Generation Facility, Inc (7,404 SM / $365,000) 218-712 B-21 Aircraft Ground Equipment Shop (2,787 SM / $27,000) 211-173 B-21 Phased Maintenance Hangar (3,670 SM / $93,000) 171-875 B-21 Weapons Load Training Facility (6,918 SM / $81,000) D 10. MISSION OR MAJOR FUNCTIONS The mission of the Dyess Air Force Base 7th Bomb Wing is to employ the world's finest bomber, deploy, sustain, maintain & employ the B-1 to combatant commanders for employment worldwide, train the world's finest bomber crews, and support the joint fight anywhere in the world. Dyess Air Force Base consists of 7th Bomb Wing, 317th Air Lift Wing, 489 Bomb Group, 29th Training Systems Squadron, ACC Training Support Squadron, 337th Test & Evaluation Squadron, 77th Weapons Squadron, 436th Training Squadron, Air Force Audit Agency, Area Defense Council, 372 Training Squadron, Air Force Office of Special Investigation, Defense Commissary Agency, Army Air Force Exchange Service, US Army Corps of Engineers, and US Marine Corps Reserves. 11. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES N/A DD FORM 1390, JUL 1999 PREVIOUS EDITION IS OBSOLETE. 232 === page 241 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE DYESS AIR FORCE BASE TEXAS B-21 FLIGHT SIMULATOR FACILITY 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 64015F 171-212 8. PROJECT COST ($000) FNWZ213009 63,000 9. COST ESTIMATES ITEM UM QUANTITY UNIT COST COST($000) PRIMARY FACILITIES 49,098 FLIGHT SIMULATOR TRAINING (171-212) SM 3,106 14,066 (43,689) SPECIAL FOUNDATION LS (1,828) ICD 705 PREMIUM LS (2,566) CYBERSECURITY OF FACILITY-RELATED CONTROL LS (1,015) SUPPORTING FACILITIES 6,262 SITE PREPARATION LS (543) SITE IMPROVEMENTS LS (457) ROADS, SIDEWALKS, AND PARKING LS (781) UTILITIES LS (2,524) COMMUNICATIONS LS (386) CONSTRUCTION SECURITY SURVEILLANCE LS (1,571) SUBTOTAL 55,360 2,768 CONTINGENCY (5.00%) TOTAL CONTRACT COST 58,128 SUPERVISION, INSPECTION AND OVERHEAD (6.50%) 3,778 DESIGN DURING CONSTRUCTION 619 TOTAL REQUEST 62,525 TOTAL REQUEST (ROUNDED) 63,000 EQUIPMENT FROM OTHER APPROPRIATIONS (NON-ADD) (13,200) 10. DESCRIPTION OF PROPOSED CONSTRUCTION This project will construct a single-story Flight Simulator facility with three high bay sections housing three simulator training devices and other training related activities. The facility includes secure space. Intelligence Community Directive 705 Premium includes those items which could be identified separately as being required for compliance with Intelligence Community Directive 705. Construction includes steel frame structure, metal roof, brick veneer and insulated metal panel exterior walls. Special foundation is due to local soils and includes a drilled pier concrete foundation. Construction Security Surveillance includes security personnel, a temporary guard shack and additional cost for United States citizenship requirements. Site preparation includes site demolition, clearing, grubbing and earthwork. Site improvements includes landscaping, dumpster locations, equipment pads and other required structures. Utilities include domestic and fire water, electrical, sanitary sewer and storm water. Communications include ducted connections from the building to main distribution infrastructure. Roadways, sidewalks and parking includes asphalt and concrete paving for sidewalks, a parking lot and access drive. Facilities will be designed as permanent construction in accordance with the Department of War Unified Facilities Criteria 1-200-01, General Building Requirements. This project will comply with Department of War anti-terrorism/force protection requirements per Unified Facility Criteria 4-010-01, DoW Minimum Anti-terrorism Standards for Buildings. Air Conditioning: 344 Tons 11. REQ: 3,106 SM DD FORM 1391, JUL 1999 ADQT: 0 PREVIOUS EDITION IS OBSOLETE SUBSTD: 0 PAGE NO. 233 === page 242 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE DYESS AIR FORCE BASE TEXAS B-21 FLIGHT SIMULATOR FACILITY 5. PROGRAM ELEMENT 7. PROJECT NUMBER 6. CATEGORY CODE 8. PROJECT COST ($000) 64015F 171-212 FNWZ213009 63,000 PROJECT: This project constructs a flight simulator training facility in support of the new B-21 weapons system. REQUIREMENT: Dyess Air Force Base operates both B-1B and C-130J aircraft in over 9000 annual sorties. In 2019, the Secretary of the Air Force announced Dyess Air Force Base as one of three preferred Main Operating Bases for the B-21. To support this announcement, several pieces of key infrastructure must be in place to support this critical combat capability. The Flight Simulator facility will house new mission B-21 simulators, training spaces and technical functions integral to providing mission ready pilots. Simulator training has and will continue to be an ongoing mission essential activity that is required for initial operational capability of the B-21. The facility will have trainer bays, server rooms, parts storage and repair space, open and closed office space, training rooms, debriefing rooms, security rooms and building support spaces. The B-21 program also has additional requirements including large portions of space meeting Intelligence Community Directive 705 standards, other secure space and access control. Key activities will include general and mission specific flight training, academic and demonstrative instruction, flight operations in a secure environment, aircrew mission briefs and debriefs, communications, mission planning and administrative support. This is not a tenant or supported service requirement. CURRENT SITUATION: This is a new requirement to support the incoming B-21 weapons system at Dyess Air Force Base. There are no current facilities that meet all mission requirements, nor can existing facilities be modified without heavy modification and extensive impact to current mission capabilities. Current mission simulator training occurs in B6030 and B6999, supporting the B-1B and C-130J programs respectively. Air Force Global Strike Command A8X has determined these facilities to be inadequate for B-21 needs based on size, security and program specific factors. Furthermore, Dyess Air Force Base must continue to support the C-130J program indefinitely and B-1B program as well, until B-1B's have been fully divested. IMPACT IF NOT PROVIDED: Adequate vacant space to support B-21 simulator requirements in other Dyess facilities does not exist. Reducing scale, overcrowding or splitting the training program up over multiple facilities fails to provide multiple needs listed in the B-21 Facilities Requirements Document and will reduce productivity and training effectiveness for all personnel involved. This new facility is essential to meet the full beddown requirement and is required for initial operational capability of the B-21 at Dyess Air Force Base. If this facility is not provided, Dyess will be unable to begin operation of B-21 aircraft and the Air Force will not meet initial operational capabilities. ADDITIONAL: This project meets applicable criteria/scope specified in Air Force Manual 321084, Standard Facility Requirements. Project criteria/scope determined based on 171-212 Flight Simulator Facility and complies with Category Group 17, Training DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 234 === page 243 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE DYESS AIR FORCE BASE TEXAS B-21 FLIGHT SIMULATOR FACILITY 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 64015F 171-212 8. PROJECT COST ($000) FNWZ213009 63,000 Facilities. This design shall conform to criteria established in the Air Force Corporate Facilities Standards and Installation Facilities Standards but will not employ a standard facility design because the standard design does not account for specific B-21 program requirements required for mission training objectives to be met. All reasonable alternatives were considered during the development of this project to include status quo, add/alter, and new construction. Headquarters Air Force determined through FMCE Action Memo on 22 May 2023 that construction of a new facility is the only feasible alternative and waived the requirement for comparative analysis. Sustainable principles, to include life-cycle cost-effective practices, will be integrated into the design, development and construction of the project in accordance with Unified Facility Criteria 1-200-02. This includes the preparation of a life-cycle cost analysis for energy consuming systems, renewable energy generating systems, or when life-cycle cost effective is selected as the reason any requirement of Unified Facility Criteria 1-200-02 is partially compliant or not applicable. This project does not fall within or partly within the 100-year flood plain. Facility is sited in accordance with the Installation Development Plan and is within a compatible land use area. The construction growth offset for this requirement is 33,433 square feet. 7th Bomb Wing Base Civil Engineer: Commercial 325-696-2250. Flight Simulator Training: 3,106 SM = 33,433 Square Feet. JOINT USE CERTIFICATION: This facility can be used by other components on an "as available" basis; however, the scope of this project is based on Air Force requirements. Facility Condition Index: This is not a recapitalization project. No Facility Condition Index data exists for this facility type. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 235 === page 244 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE DYESS AIR FORCE BASE TEXAS B-21 FLIGHT SIMULATOR FACILITY 5. PROGRAM ELEMENT 7. PROJECT NUMBER 12. 6. CATEGORY CODE 8. PROJECT COST ($000) 64015F 171-212 FNWZ213009 SUPPLEMENTAL DATA: A. Estimated Execution Data: (1) Acquisition Strategy: Design-Bid-Build (2) Design Data (a) Design or Request for Proposal(RFP) Started: (b) Percent of Design Completed as of SEP 2025: (c) Percent of Design Completed as of JAN 2026: (d) Design or RFP Complete: (e) Total Design Cost ($000): (f) Energy Study and/or Life Cycle Cost Analysis (g) Standard or Definitive Design Used? (3) Construction Data: (a) Contract Award: (b) Construction Start: (c) Construction Complete: 63,000 SEP/2024 65% 95% APR/2026 5,670 YES NO MAR/2027 APR/2027 APR/2029 B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) Furniture, Fixtures, & Equipme Communications Equipment Other Equipment DD FORM 1391C, JUL 1999 3080 3400 3080 PREVIOUS EDITION IS OBSOLETE 2030 2030 2030 1,444 235 11,521 PAGE NO. 236 === page 245 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE DYESS AIR FORCE BASE TEXAS B-21 LO CORROSION CNTRL FAC/RFF, INC 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 64015F 211-159 FNWZ213007 8. PROJECT COST ($000) AUTH: 300,000 APPR: 74,000 9. COST ESTIMATES ITEM UM QUANTITY UNIT COST COST($000) PRIMARY FACILITIES 229,917 AIRCRAFT CORROSION CONTROL (211-159) SM 8,875 14,679 (130,276) SHOP, AVIONICS (217-712) SM 5,343 13,474 (71,992) OPERATIONAL STORAGE (143-770 SM 377 5,145 (1,940) APRON (113-321) SM 7,999 2,732 (21,853) ICD 705 PREMIUM LS (2,179) CYBERSECURITY OF FACILITY-RELATED CONTROL SYS LS (1,677) SUPPORTING FACILITIES 35,852 SITE PREPARATION LS (10,434) SITE IMPROVEMENTS LS (1,139) ROADS, SIDEWALKS, AND PARKING LS (11,693) UTILITIES LS (8,944) COMMUNICATIONS LS (490) DEMOLITION SM 2,456 732 (1,798) TEMPORARY FACILITIES LS (807) GENERATOR KW 275 1,984 (546) SUBTOTAL 265,769 CONTINGENCY (5.00%) 13,288 TOTAL CONTRACT COST 279,057 SUPERVISION, INSPECTION AND OVERHEAD (6.50%) 18,139 DESIGN DURING CONSTRUCTION 2,789 TOTAL REQUEST 299,985 TOTAL REQUEST (ROUNDED) 300,000 EQUIPMENT FROM OTHER APPROPRIATIONS (NON-ADD) (9,288) 10. DESCRIPTION OF PROPOSED CONSTRUCTION This project constructs an aircraft low observable corrosion control hangar in support of the new B-21 weapons system. Construction includes drilled pier foundation, steel frame, masonry and metal panel walls and a standing seam metal roof. The facility includes secure space. Intelligence Community Directive 705 Premium captures those elements which can be separated from normal building elements and cyber security captures building system control hardening against cyber attack. This project will also construct a single bay radio frequency measurement facility to support the new B-21 weapons system while undergoing periodic inspections of low observable characteristics. Construction includes a reinforced concrete foundation, steel frame structure with metal roof and powered hangar doors. Construction for both facilities also includes fire protection, grounding points, temperature and humidity control, filtration and ventilation, back-up power, painting, surface prep and aircraft electrical power. The nature of work in this facility requires radio frequency shielding of the hangar bay. Programmatic security measures require certain spaces within the facility to meet ICD-705 specifications. This project also constructs operational storage consisting of a metal storage building and a fenced staging area serving the 7th Logistics Readiness Squadron cargo pad function. In addition, this project constructs a new concrete equipment pad for the weapons bay fuel tank storage function. Site preparation and improvements includes tree clearing and grubbing, DD FORM 1391, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 237 === page 246 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE DYESS AIR FORCE BASE TEXAS B-21 LO CORROSION CNTRL FAC/RFF, INC 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 64015F 211-159 FNWZ213007 8. PROJECT COST ($000) AUTH: 300,000 APPR: 74,000 earthwork and hauling, construction fencing, lighting and clean up, demolition and re-routing of existing transitioning underground utilities as well as demolition of miscellaneous concrete pavement and access drives throughout the site. Site improvements includes earthwork, landscaping and exterior lighting. Roadways sidewalks and parking includes sidewalks, vehicle access drives and full depth replacement of the adjacent aircraft apron. Roadways, sidewalks and parking includes two sections of parking lot, building access drives, sidewalks and a new aircraft hangar access apron. Utilities includes new connections for power, exterior lighting, domestic water, natural gas, sanitary sewer and storm water. Communications includes ducted runs of single mode fiber optic cable and ducted fiber optic connections to the existing communications network infrastructure. The project will demolish buildings B4111 (682 SM), B4112 (555 SM), B4119 (377 SM), B4317 (714 SM) and B4160 (128 SM) (Total: 2,456 SM). This project also provides temporary facilities for B4111 occupants until completion of a permanent facility by a separate, prior year project. These facilities will be contractor provided and contractor removed upon project completion. Functions of other facilities to be demolished will be consolidated into other facilities prior to project execution. The demolition line item also includes demolition of the existing aircraft hangar apron. This project is authorized a generator, per Air Force Manual 32-1062. Facilities to be designed as permanent construction in accordance with Department of War Unified Facilities Criteria 1-200-01, General Building Requirements. This project will comply with Department of War anti-terrorism/force protection requirements per Unified Facility Criteria 4-010-01, Department of War Minimum Anti-terrorism Standards for Buildings, and Unified Facility Criteria 4-010-06, Cyber-security of Facility-Related Control Systems. Air Conditioning: 493 Tons 11. REQ: 8,875 SM ADQT: 0 SUBSTD: 2,456 SM PROJECT: This project constructs a corrosion control facility and a radio frequency measurement facility for maintenance of B-21 low observable characteristics. REQUIREMENT: Dyess Air Force Base operates both B-1B and C-130J aircraft in over 9000 annual sorties. In 2019, the Secretary of the Air Force announced Dyess Air Force Base as one of three preferred Main Operating Bases for the B-21. To support this announcement, several pieces of key infrastructure must be in place to support this critical combat capability. Low observability is a critical capability for B21 operation. Maintaining this capability will require two restoration spaces in which repairs & maintenance can be performed. Key activities will include application of materials by spraying, restoration of composite surfaces, training and administrative support. The facility supports 350 personnel, over three scheduled shifts and must be equipped with temperature/humidity control, air ventilation and filtration. The facility requires secured storage and support space for Composite Tool Kits, Low Observable Restoration Materials and war DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 238 === page 247 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE DYESS AIR FORCE BASE TEXAS B-21 LO CORROSION CNTRL FAC/RFF, INC 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 64015F 211-159 FNWZ213007 8. PROJECT COST ($000) AUTH: 300,000 APPR: 74,000 readiness material support kits as well as a Low Observable Task Trainer. Functional requirements for the radio frequency measurements facility include a measurement bay, aircraft power supply room, maintenance area, composite tool kits storage, classified entry vestibule, data analysis room, server room, administrative and building support space. The planned location for both facilities is adjacent to an existing aircraft apron. Due to the age and nature of repairs, Dyess Civil Engineering and B-21 program management determined the entire apron should be demolished as part of this project, which will in turn install a new hangar apron compatible with the B-21 mission. Several facilities lie within the planned footprint of the new low observable corrosion control facility. One of these facilities, the 7th Logistics Readiness Squadron cargo pad, does not have a facility to relocate to or a project to create one. This project will construct a new storage building and fenced staging area equivalent to the existing area and meeting minimum requirements. Analysis of alternatives determined the most economically feasible solution is to locate the new 7th Logistics Readiness Squadron cargo pad within the footprint of a defunct existing facility and a section of existing airfield pavement used by the weapons bay fuel tank storage function. This project includes demolition of the defunct facility and construction of a new concrete pad to support the weapons bay fuel tank storage function. This is not a tenant or supported service requirement. CURRENT SITUATION: This is a new requirement to support the incoming B-21 weapons system, identified through the site activation task force and the B-21 program office. This requirement is driven by the requirements owner, Air Force Global Strike Command A8X and funded by the B-21 Rapid Capabilities Office. Current mission B-1B and C130J aircraft do not have low observable characteristics and a function for maintenance and testing of those capabilities does not exist at Dyess Air Force Base. Alternatives considered included analysis of several existing facilities. The nature of work performed in these facilities requires a fully enclosed aircraft hangar and only four hangars large enough to accommodate the B-21 wingspan exist at Dyess Air Force Base. Of those four, two are required for ongoing C-130J mission activities and the other two have already been planned for use with other B-21 projects. There are no other existing facilities capable of meeting mission requirements without heavy modification and extensive impact to current mission capabilities. The planned locations for the corrosion control and radio frequency measurement hangars are located in a largely undeveloped part of the Dyess flight line and requires displacement of only a handful of small facilities. These two hangars will form the beginning of what has been termed the 'B-21 campus' which is an area of the base where the majority of all B-21 functions will be located, creating greater inter-operational efficiency and availability of shared resources. Both facilities will be located adjacent to an existing aircraft hangar apron currently used as a refueler truck parking area. This apron was rated 'poor' based on a 2019 Pavement Condition report and in 2020 it was repaired with non-aircraft rated concrete and a trench drain was installed. These modifications, while adequate for refueler trucks, cannot handle aircraft traffic, therefore this project will demolish and replace the entire apron. Prior DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 239 === page 248 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE DYESS AIR FORCE BASE TEXAS B-21 LO CORROSION CNTRL FAC/RFF, INC 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 64015F 211-159 FNWZ213007 8. PROJECT COST ($000) AUTH: 300,000 APPR: 74,000 to demolition, the refueler truck function will be relocated to a new area provided by a prior year project. IMPACT IF NOT PROVIDED: Aircraft must undergo maintenance & restoration on a regular basis or else the aircraft's low observable signature will be compromised. Testing of these characteristics periodically and after maintenance is required to ensure mission ready aircraft. Low observable maintenance capabilities and the facilities to perform them do not exist at Dyess Air Force Base. Without this project Dyess will be unable to provide overall bomber readiness. ADDITIONAL: This project meets applicable criteria/scope specified in Department of the Air Force Manual 32-1084, Standard Facility Requirements. Project criteria/scope determined based on 211159 Aircraft Corrosion Control and 217712 Avionics Shop and with Category Group 21, Maintenance Facilities. This design shall conform to criteria established in the Air Force Corporate Facilities Standards and Installation Facilities Standards, but will not employ a standard facility design because there is no Air Force standard facility design for this project and there is no applicable standard design from the United States Army Corps of Engineers. However, both facilities will be designed according to an established programmatic basis of design used for low observable corrosion control and radio frequency facilities at all B-21 bases. A preliminary analysis of reasonable options for accomplishing this project (status quo, lease/rent, relocate, add/alter, & new construction) was done. New construction is the only viable option to meet all mission requirements. A waiver from comparative analysis was approved by the Secretary of the Air Force/FMCE for both facilities in June 2023. Sustainable principles, to include life-cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with Unified Facility Criteria 1-200-02. This includes preparation of a life-cycle cost analysis for energy consuming systems, renewable energy generating systems, or when life-cycle cost effective is selected as the reason any requirement of Unified Facility Criteria 1-200-02 is partially compliant or not applicable. This project does not fall within or partly within the 100-year flood plain. Facility is sited in accordance with the Installation Development Plan and is within a compatible land use area. The construction growth offset of this requirement is 130,664 square feet. 7th Bomb Wing Base Civil Engineer: (325) 696-2250. Aircraft Corrosion Control: 8,875 SM = 95,530 Square Feet; Shop Avionics: 5,343 SM = 57,512 Square Feet; Operational Storage: 377 SM = 4,058 Square Feet; Apron: 7,999 SM = 86,101 Square Feet; Demolition: 2,456 SM = 26,436 Square Feet. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 240 === page 249 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE DYESS AIR FORCE BASE TEXAS B-21 LO CORROSION CNTRL FAC/RFF, INC 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 64015F 211-159 FNWZ213007 8. PROJECT COST ($000) AUTH: 300,000 APPR: 74,000 JOINT USE CERTIFICATION: This facility can be used by other components on an "as available" basis; however, the scope of the project is based on Air Force requirements. Facility Condition Index: This is not a recapitalization project. No Facility Condition Index data exists for this facility type. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 241 === page 250 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE DYESS AIR FORCE BASE TEXAS B-21 LO CORROSION CNTRL FAC/RFF, INC 5. PROGRAM ELEMENT 7. PROJECT NUMBER 12. 6. CATEGORY CODE 8. PROJECT COST ($000) AUTH: 300,000 64015F 211-159 FNWZ213007 SUPPLEMENTAL DATA: A. Estimated Execution Data: (1) Acquisition Strategy: Design-Bid-Build (2) Design Data (a) Design or Request for Proposal(RFP) Started: (b) Percent of Design Completed as of SEP 2025: (c) Percent of Design Completed as of JAN 2026: (d) Design or RFP Complete: (e) Total Design Cost ($000): (f) Energy Study and/or Life Cycle Cost Analysis (g) Standard or Definitive Design Used? (3) Construction Data: (a) Contract Award: (b) Construction Start: (c) Construction Complete: APPR: 74,000 OCT/2023 35% 65% OCT/2026 16,862 YES NO JUL/2027 AUG/2027 AUG/2030 B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) FURNITURE, FIXTURES & EQUIPMEN COMMUNICATION EQUIPMENT OTHER EQUIPMENT 3080 3400 3080 2030 2030 2030 6,742 3 2,543 Auth of Approp $(000) 74,000 226,000 300,000 Appropriation $(000) 74,000 226,000 300,000 C. Authorization and Appropriation Summary: FY2027 Budget Request Future Request Total DD FORM 1391C, JUL 1999 Authorization $(000) 300,000 0 300,000 PREVIOUS EDITION IS OBSOLETE PAGE NO. 242 === page 251 === Spend Plan Project Title: Installation: Program Year Project # CAO: Instructions and Notes This spreadsheet is designed to help the user develop a WIP Curve for inclusion with a project 1391. The user only needs to know the project cost and schedule. Edit The Green Fields ONLY Dyess AFB, TX 2027 FNWZ213007 Financials PA ($000) Initial Contract SIOH I SIOH / Month Other (Contingency) I Other / Month I 6.5% I 5.0% I Schedule Award Complete POP Months I I 300,000 266,475 19,500 629 14,025 452 1-Jul-27 1-Aug-30 1127 37.0 I Chart Begin 1st Increment 2nd Increment 3rd Increment 4th Increment 5th Increment End Total 25-Mar-26 B-21 LO CORROSION CNTRL FAC/RFF, INC tI Fund 1-Oct-26 1-Jan-27 1-Oct-27 1-Oct-28 t 1-Aug-30 Obligate I • 1-Feb-27 1 2 3 4 5 6 7 8 Enter the Project Title, Location, and Project number Enter the Date this WIP Curve is being updated Enter the Project PA Enter the SIOH required by the agent (6.5% for USACE FY24 and beyond) Enter the contingency percentage plus other amounts withheld by the Agent Enter the projected project Award Date ( usually 1 Apr of the Execution FY) Enter the Project Complete Date (Usually Award plus ~1000 days, use the 1st of a month) Enter the Chart Begin Date ( first day of the Program Year: 1-Oct-XX) ( Use "Short Date" format.) 9 Enter the Dates anticipate to receive each increment of funding (usually January of the Program year, and Oct for subsequent increments) Enter the Dates anticipated to Award the contract ( usually 1 Apr of the Program year and obligate increments (usually 1 Oct for increments after initial award.) 10 11 Fund mmm-yr 1-Nov-27 1-Nov-28 Oct-26 Jan-27 Oct-27 Oct-28 1-Aug-30 Aug-30 Enter the Value of each increment (If the project is less than $250M enter the PA as 1st Increment) I Obligate mmm-yr Months 0 Feb-27 9 Nov-27 12 Nov-28 21 0 0 Aug-30 0 42 I Increment + 74,000 120,000 106,000 300,000 Obligate 65,731 106,590 94,155 266,475 SIOH 4,810 7,800 6,890 19,500 Other 3,460 5,610 4,956 14,025 243 === page 252 === Spend Plan CAO: Project Title: Installation: Program Year Project # 25-Mar-26 B-21 LO CORROSION CNTRL FAC/RFF, INC Notes Dyess AFB, TX 2027 FNWZ213007 Assumes initial appropriation is enacted by Note 1: Congress Jan FY 2027. Assumes funds are available for obligation by 31 January of the execution year and by Note 2: 31 October for subsequent years. All Cost in thousands Chart Begin Oct-26 Month Oct-26 Nov-26 Dec-26 Jan-27 Feb-27 Mar-27 Apr-27 May-27 Jun-27 Jul-27 Aug-27 Sep-27 Oct-27 Nov-27 Dec-27 Jan-28 Feb-28 Mar-28 Apr-28 May-28 Jun-28 Jul-28 Aug-28 Sep-28 Oct-28 Nov-28 Dec-28 Jan-29 Feb-29 Mar-29 Apr-29 May-29 Jun-29 Jul-29 Aug-29 Sep-29 Oct-29 Nov-29 Dec-29 Jan-30 Feb-30 Mar-30 Apr-30 FUNDING (note 1) Enacted 74,000 120,000 106,000 - OBLIGATION (note 2-3) Cumulative Obligated Cumulative 74,000 74,000 74,000 74,000 74,000 74,000 74,000 74,000 74,000 194,000 194,000 194,000 194,000 194,000 194,000 194,000 194,000 194,000 194,000 194,000 194,000 300,000 300,000 300,000 300,000 300,000 300,000 300,000 300,000 300,000 300,000 300,000 300,000 300,000 300,000 300,000 300,000 300,000 300,000 300,000 65,731 1,081 1,081 1,081 107,671 1,081 1,081 1,081 1,081 1,081 1,081 1,081 1,081 1,081 1,081 1,081 95,236 1,081 1,081 1,081 1,081 1,081 1,081 1,081 1,081 1,081 1,081 1,081 1,081 1,081 1,081 1,081 - 65,731 65,731 65,731 65,731 65,731 65,731 66,812 67,893 68,975 176,646 177,728 178,809 179,891 180,972 182,054 183,135 184,216 185,298 186,379 187,461 188,542 283,778 284,860 285,941 287,023 288,104 289,185 290,267 291,348 292,430 293,511 294,593 295,674 296,756 297,837 298,919 300,000 300,000 300,000 OUTLAYS (note 4-5) Monthly Cumulative 539 785 1,119 1,562 2,133 2,852 3,732 4,778 5,989 7,346 8,820 10,363 11,918 13,414 14,777 15,932 16,812 17,363 17,551 17,363 16,812 15,932 14,777 13,414 11,918 10,363 8,820 7,346 5,989 4,778 3,732 2,852 2,133 1,562 1,119 785 - 539 1,324 2,443 4,005 6,138 8,990 12,722 17,500 23,489 30,835 39,655 50,018 61,935 75,349 90,126 106,057 122,869 140,232 157,782 175,145 191,957 207,889 222,665 236,079 247,997 258,360 267,179 274,525 280,514 285,293 289,024 291,876 294,009 295,571 296,691 297,475 297,475 Assumes ALL project funds (contract, SIOH, contingency, etc) are obligated NLT 6 Note 3: months prior to project end Assumes contract award in JUL 2027 and contract completion AUG 2030; duration 37 Note 4 months. Assumes Agent will retain 1% of project Note 5 obligations for a final payment 244 === page 253 === B-21 Low Observable / Radio Frequency Hangar, Dyess AFB, TX $350,000 ---------------., $300,000 $200,000 $150,000 $100,000 , ,, ----- $50,000 , ,, ,, , ,, , , , , , , ,, , ,, ., ,, Funding Obligation Outlays Apr-30 Feb-30 Dec-29 Oct-29 Aug-29 Jun-29 Apr-29 Feb-29 Dec-28 Oct-28 Aug-28 Jun-28 Apr-28 Feb-28 Dec-27 Oct-27 Aug-27 Jun-27 Apr-27 Feb-27 Dec-26 $0 Oct-26 Dollars in (000) $250,000 ,.,. ,.,. 245 === page 254 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE DYESS AIR FORCE BASE TEXAS B-21 UTILITIES SITE IMPROVEMENTS ELECTRIC 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 64015F 812-225 8. PROJECT COST ($000) FNWZ243116 23,000 9. COST ESTIMATES ITEM UM QUANTITY UNIT COST COST($000) PRIMARY FACILITIES 3,247 PRIMARY DISTRIBUTION LINE UNDERGROUND (812LM 1,836 990 (1,818) 225) PRIMARY DISTRIBUTION LINE OVERHEAD (812-223) LM 2,438 186 (453) ELECTRIC SWITCHING STATION (813-228) KVA 13 75,077 (976) SUPPORTING FACILITIES 17,338 UTILITY CONNECTION FEE LS (14,736) SITE PREPARATION LS (2,526) SITE IMPROVEMENTS LS (76) SUBTOTAL 20,585 1,029 CONTINGENCY (5.00%) TOTAL CONTRACT COST 21,614 SUPERVISION, INSPECTION AND OVERHEAD (6.50%) 1,405 DESIGN DURING CONSTRUCTION 230 TOTAL REQUEST 23,249 TOTAL REQUEST (ROUNDED) 23,000 EQUIPMENT FROM OTHER APPROPRIATIONS (NON-ADD) (0) 10. DESCRIPTION OF PROPOSED CONSTRUCTION This project adds electrical distribution infrastructure to support the beddown of the B-21 weapons system at Dyess Air Force Base. Primary Distribution underground includes cabling, duct banks, manholes, pull boxes and terminations. Primary Distribution Overhead includes cabling, terminations, poles and pole accessories. Electric Switching Station includes switchgear and related equipment. Site preparation includes jacking, boring and earth work. Site Improvements include fencing, gravel and concrete. Utility Connection Fee is funding required for the local utility provider to expand their capability to support the B-21 beddown. The utility provider will use this funding to construct new substation components consisting of primary transformers, cabling, a support structure and other related appurtenances. The utility provider will install these components by their own means and retain ownership of the finished product. These components will not be considered real property but are required for the Air Force project to function and will be paid for using project funds. Facilities to be designed as permanent construction in accordance with Department of War Unified Facilities Criteria 1-200-01, General Building Requirements. This project will comply with Department of War anti-terrorism/force protection requirements per Unified Facility Criteria 4-010-01, Department of War Minimum Anti-terrorism Standards for Buildings, and Unified Facility Criteria 4-010-06, Cyber-security of Facility-Related Control Systems. Air Conditioning: N/A 11. REQ: 1,836 LM ADQT: 0 SUBSTD: 0 PROJECT: Add a new switch yard, new distribution lines and provide connection to utilities source in support of the B-21 beddown. DD FORM 1391, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 246 === page 255 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE DYESS AIR FORCE BASE TEXAS B-21 UTILITIES SITE IMPROVEMENTS ELECTRIC 5. PROGRAM ELEMENT 7. PROJECT NUMBER 6. CATEGORY CODE 8. PROJECT COST ($000) 64015F 812-225 FNWZ243116 23,000 REQUIREMENT: Dyess Air Force Base operates both B-1B and C-130J aircraft in over 9000 annual sorties. In 2019, the Secretary of the Air Force announced Dyess Air Force Base as one of three preferred Main Operating Bases for the B-21. To support this announcement, several pieces of key infrastructure must be in place to support this critical combat capability. The beddown of the B-21 at Dyess Air Force Base includes more than 4 dozen individual new facilities and facility renovations that all require electrical support. Many of these facilities are located in undeveloped areas where electrical infrastructure either does not exist or has inadequate capacity. The existing Dyess substation was determined through an infrastructure capacity study to be incapable of supporting the new loads imposed by planned B-21 facilities. The commercial utility service provider for Dyess has enough generation capacity to support the new loads but additional equipment is needed to deliver that power to Dyess. Therefore, the utility provider requires the Air Force to provide funds to install the additional equipment. This new equipment will be owned, purchased and installed by the commercial utility provider, but funded through the B-21 rapid capabilities office. The remaining portions of this project will be government owned and will provide high voltage 3phase primary electrical service to the beddown area as well as a new substation switch yard. This is not a tenant or supported service requirement. CURRENT SITUATION: The majority of new B-21 facilities will be located near the north end of the main Dyess parking apron which is largely undeveloped. Ordinarily most of these facilities would be serviced through the 'bravo' substation and feeder 'B1'. However, a 2024 infrastructure capacity study determined they would be unable to handle the both the new and future loads. IMPACT IF NOT PROVIDED: Utility services are required by every B-21 function and the existing infrastructure network is incapable of supporting the new facilities. If this project is not completed the alternative course of action is to construct the required upgrades one piece at a time as part of each individual facility project. Completing the required upgrades in this way will add to the overall workload and increase strain on local labor resources during a time when area project loading is expected to be high. The overarching goal of this effort is to complete all required upgrades at the same time and under the same contract. The area development plan process found this approach to reduce overall costs due to escalation as well as compounding of mark-ups and is expected to result in a more consistent final product. Planning this effort early in the overall timeline reduces connection delays and will expedite completion of subsequent projects. ADDITIONAL: This project meets applicable criteria/scope specified in Air Force Manual 321084, Facility Requirements. Project criteria/scope determined based on 812225 Primary Distribution Line Underground and complies with Category Group 81 Electricity. This design shall conform to criteria established in the Air Force Corporate Facilities Standards, the Installation Facilities Standards, but will not employ a standard facility design because there is no Air Force standard DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 247 === page 256 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE DYESS AIR FORCE BASE TEXAS B-21 UTILITIES SITE IMPROVEMENTS ELECTRIC 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 64015F 812-225 8. PROJECT COST ($000) FNWZ243116 23,000 facility design for this project and there is no applicable standard design from the United States Army Corps of Engineers. A preliminary analysis of reasonable options for accomplishing this project (status quo, lease/rent, relocate, add/alter, and new construction) was done. New construction is the only viable option to meet all mission requirements. A formal economic analysis was completed and signed April 2025. Sustainable principles, to include life-cycle costeffective practices, will be integrated into the design, development and construction of the project in accordance with Unified Facility Criteria 1-200-02. This includes the preparation of a life-cycle cost analysis for energy consuming systems, renewable energy generating systems, or when life-cycle cost effective is selected as the reason any requirement of Unified Facility Criteria 1-200-02 is partially compliant or not applicable. This project does not fall within or partly within the 100-year flood plain. Facility is sited in accordance with the Installation Development Plan and is within a compatible land use area. Supporting facilities exceed 25% of the primary facilities total due to utility connection costs required by the utility provider. No construction growth offset is required for this project. 7th Bomb Wing Base Civil Engineer: (325) 696-2250. Primary Distribution Line Underground (812-225): 1,836 LM = 6,024 LF; Primary Distribution Line Overhead (812-223): 2,438 LM = 7,999 LF; JOINT USE CERTIFICATION: This facility can be used by other components on an "as available" basis; however, the scope of the project is based on Air Force requirements. Facility Condition Index: This is not a recapitalization project. No Facility Condition Index data exists for this facility type. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 248 === page 257 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE DYESS AIR FORCE BASE TEXAS B-21 UTILITIES SITE IMPROVEMENTS ELECTRIC 5. PROGRAM ELEMENT 7. PROJECT NUMBER 12. 6. CATEGORY CODE 8. PROJECT COST ($000) 64015F 812-225 FNWZ243116 SUPPLEMENTAL DATA: A. Estimated Execution Data: (1) Acquisition Strategy: Design-Bid-Build (2) Design Data (a) Design or Request for Proposal(RFP) Started: (b) Percent of Design Completed as of SEP 2025: (c) Percent of Design Completed as of JAN 2026: (d) Design or RFP Complete: (e) Total Design Cost ($000): (f) Energy Study and/or Life Cycle Cost Analysis (g) Standard or Definitive Design Used? (3) Construction Data: (a) Contract Award: (b) Construction Start: (c) Construction Complete: 23,000 SEP/2024 65% 95% MAR/2026 1,582 YES NO DEC/2026 JAN/2027 JUN/2028 B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) None DD FORM 1391C, JUL 1999 None PREVIOUS EDITION IS OBSOLETE None None PAGE NO. 249 === page 258 === 1. COMPONENT FY AIR FORCE 2027 3. INSTALLATION AND LOCATION 4. COMMAND GOODFELLOW AIR FORCE BASE, TEXAS, U.S.A AIR EDUCATION & TRAINING COMMAND 6. PERSONNEL 2. DATE (Y Y Y Y MMDD) MILITARY CONSTRUCTION PROGRAM (1) PERMANENT (2) STUDENTS 20260326 5. AREA CONTRUCTION COST INDEX 0.88 (3) SUPPORTED OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN a. AS OF 30 SEP 24 b. END FY (4) TOTAL 126 885 616 230 3,170 0 11 17 0 5,055 126 885 616 230 3,170 0 11 17 0 5,055 7. INVENTORY DATA ($000) 1,235 2,041,814.00 112,000.00 0.00 0.00 0.00 236,000.00 2,389,814.00 a. TOTAL ACREAGE b. INVENTORY TOTAL AS OF 30 SEP 24 c. AUTHORIZATION NOT YET IN INVENTORY d. AUTHORIZATION REQUESTED IN THIS PROGRAM e. AUTHORIZATION INCLUDED IN FOLLOWING PROGRAM f. PLANNED IN NEXT THREE PROGRAM YEARS g. REMAINING DEFICIENCY h. GRAND TOTAL 8. PROJ ECTS REQUESTED IN THIS PROGRAM a. CATEGORY (1) CODE 721-313 (2) PROJ ECT TITLE PIPELINE STUDENT DORMITORY (3) SCOPE 9,940 SM b. COST ($000) 12,000 c. DESIGN STATUS (1) START (2) COMPLETE 09/23 12/24 9. FUTURE PROJ ECTS None 10. MISSION OR MAJ OR FUNCTIONS Goodfellow Air Force Base's mission is to develop exceptional Intelligence, Surveillance, and Reconnaissance (ISR) and Fire Protection Professionals for America and her allies. The host command for Goodfellow AFB is the 17 Training Wing under Air Education & Training Command. Goodfellow AFB consists of four groups and fourteen squadrons to include the Louis F. Garland Department of War Fire Academy and three ISR training squadrons that train all 17 members of the US Intelligence Community. There are multiple tenant units on base to include the 344th Military Intelligence Battalion, Marine Corps Detachment, and Navy Center for Information Warfare Training Detachment. 11. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES N/A DD FORM 1390, JUL 1999 PREVIOUS EDITION IS OBSOLETE. Adobe250 Professional 8.0 === page 259 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE GOODFELLOW AIR FORCE BASE TEXAS PIPELINE STUDENT DORMITORY 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 24276F 721-313 JCGU133001 8. PROJECT COST ($000) AUTH: 0 APPR: 12,000 9. COST ESTIMATES ITEM UM QUANTITY UNIT COST COST($000) PRIMARY FACILITIES 82,772 TECHNICAL TRAINING STUDENT HOUSING (721-313) SM 9,940 8,029 (79,808) RECREATION PAVILION (750-371) SM 139 6,801 (945) CYBERSECURITY OF FACILITY-RELATED CONTROL SYS LS (2,019) SUPPORTING FACILITIES 10,460 SITE PREPARATION LS (2,486) SITE IMPROVEMENT LS (4,212) UTILITIES LS (1,536) COMMUNICATION LS (359) PAVEMENTS LS (1,823) PRIVATIZED UTILITIES SERVICE AND CONNECTION LS (44) SUBTOTAL 93,233 CONTINGENCY (5.00%) 4,662 TOTAL CONTRACT COST 97,895 SUPERVISION, INSPECTION AND OVERHEAD (6.50%) 6,363 DESIGN/BUILD - DESIGN COST (8.00% OF SUBTOTAL) 7,459 TOTAL REQUEST 111,717 TOTAL REQUEST (ROUNDED) 112,000 EQUIPMENT FROM OTHER APPROPRIATIONS (NON-ADD) (4,451) 10. DESCRIPTION OF PROPOSED CONSTRUCTION Construct a three story, 6th generation learning environment technical training student dormitory with 200 rooms and recreation pavilion to house 400 students in accordance with the 2023 dormitory master plan. The building will be constructed with a structural steel frame with brick veneer facade, standing seam metal roof and pile foundation. The building will provide spaces for bedrooms, bathrooms, administrative support space, training rooms, storage, break areas, laundry, and janitor's closets. The building systems will include heating and air conditioning, information systems, fire protection and alarm systems, energy control monitoring systems, and lighting system. Sustainability and energy enhancement measures are included. The recreation pavilion will be constructed with a structural steel frame, standing seam metal roof and slab on grade foundation. The structure will provide space for large gatherings for training and instructor led physical fitness activities. The project includes site development, utilities and connections, paving, parking, sidewalks, troop walks, curbs and gutters, storm drainage, communication, landscaping, signage, and any other necessary supporting facilities to provide a complete and usable facility. Facilities will be designed as permanent construction in accordance with Department of War Unified Facilities Criteria 1-200-01, General Building Requirements. This project will comply with Department of War antiterrorism/force protection requirements per Unified Facilities Criteria 4-010-01. Air Conditioning: 250 tons 11. REQ: 9,940 SM DD FORM 1391, JUL 1999 ADQT: 0 PREVIOUS EDITION IS OBSOLETE SUBSTD: 0 PAGE NO. 251 === page 260 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE GOODFELLOW AIR FORCE BASE TEXAS PIPELINE STUDENT DORMITORY 5. PROGRAM ELEMENT 7. PROJECT NUMBER 6. CATEGORY CODE 24276F 721-313 JCGU133001 PROJECT: Construct technical training student facility. 8. PROJECT COST ($000) AUTH: 0 APPR: 12,000 REQUIREMENT: The mission of Goodfellow Air Force Base is to train, transform, and empower joint coalition warriors. The 2023 Dorm Master Plan identified a 372-bed deficit for pipeline students. The bed deficit has been temporarily mitigated by the addition of temporary dorms and a housing agreement with the local university, but this is a stop gap measure that is unsustainable. An additional permanent dormitory is needed to reduce the deficit in student housing and support the training mission of the base. This is not a tenant or supported service requirement. CURRENT SITUATION: The existing pipeline dormitory assets on Goodfellow Air Force Base are insufficient to support the current student population attending training and the students who are delayed as they wait to obtain the required security clearances. An adequacy waiver was submitted for dormitory space from 2017-2019, which allowed the installation to triple bunk students. However, the waiver expired in January of 2020 and triple bunking is no longer authorized in accordance with Air Force Instruction 32-6005 Unaccompanied Housing Management. The final 2023 Dorm Master Plan shows a 372 Technical Training Student bed deficit. The deficit is currently mitigated with temporary leased of a 384-person modular dormitories. The average daily student load is expected to increase from 2,502 in Fiscal Year 2023 to 2,585 in Fiscal Year 2025. The average daily student load is projected to increase to 2,940 by Fiscal Year 2027 due to increases in contingency intelligence networks, distributed common ground systems and new course starts with the US Space Force and US Army Electronic Intelligence. The Air Force currently leases 300 beds for $1.4 Million per year; and the Navy leases 84 beds for $740k/year, totaling $2.14M/year. IMPACT IF NOT PROVIDED: Failure to construct a new dormitory impacts the recruitment, retention, resilience, and readiness of the next generation of lethal and capable intelligence, surveillance, and reconnaissance and firefighting professionals. Furthermore, the unavailability of adequate living quarters will result in degraded learning environments, morale, academic performance, and quality of life directly impacting the day-one readiness of 17th Training Wing graduates joining every combatant command on the globe. ADDITIONAL: This project meets the scope/criteria specified in Department of Air Force Manual 32-1084, Standard Facility Requirements. All reasonable alternatives were considered during the development of this project to include status quo, renovation and new construction. An approved Economic Analysis recommended New Construction as the viable option to meet this requirement. This design shall conform to criteria established in the Air Force Corporate Facilities Standards, the Installation Facilities Standards, and shall employ the standard facility design based on the Air Force Unaccompanied Housing Design Guide. This project DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 252 === page 261 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE GOODFELLOW AIR FORCE BASE TEXAS PIPELINE STUDENT DORMITORY 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 24276F 721-313 JCGU133001 8. PROJECT COST ($000) AUTH: 0 APPR: 12,000 does not fall within or partly within the 100-year flood plain. Facility is sited in accordance with the Installation Development Plan and is within a compatible land use area. Sustainable principles, to include life-cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with Unified Facilities Criteria 1-200-02. This includes the preparation of a life-cycle cost analysis for energy consuming systems, renewable energy generating systems, or when life cycle cost effective is selected as the reason any requirement of Unified Facilities Criteria 1-200- 02 is partially compliant or not applicable. The construction growth offset for this requirement is 106,993 Square Feet 17th Base Civil Engineer: 325-654-3464 Technical Training Student Housing: 9,940 Square Meter = 106,993 Square Feet Recreation Pavilion: 139 Square Meter = 1,496 Square Feet JOINT USE CERTIFICATION: This facility can be used by other components on an "as available" basis; however, the scope of the project is based on Air Force requirements. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 253 === page 262 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE GOODFELLOW AIR FORCE BASE TEXAS PIPELINE STUDENT DORMITORY 5. PROGRAM ELEMENT 7. PROJECT NUMBER 12. 6. CATEGORY CODE 8. PROJECT COST ($000) 24276F 721-313 JCGU133001 AUTH: 0 SUPPLEMENTAL DATA: A. Estimated Execution Data: (1) Acquisition Strategy: Design-Build (2) Design Data (a) Design or Request for Proposal(RFP) Started: (b) Percent of Design Completed as of SEP 2025: (c) Percent of Design Completed as of JAN 2026: (d) Design or RFP Complete: (e) Total Design Cost ($000): (f) Energy Study and/or Life Cycle Cost Analysis (g) Standard or Definitive Design Used? (3) Construction Data: (a) Contract Award: (b) Construction Start: (c) Construction Complete: APPR: 12,000 SEP/2023 35% 35% DEC/2024 6,892 YES YES FEB/2026 SEP/2026 JUN/2028 B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) Furniture Fixtures & Equipment Communication Equipment 3080 3080 2028 2028 3,164 1,287 Auth of Approp $(000) 100,000 12,000 112,000 Appropriation $(000) 100,000 12,000 112,000 C. Authorization and Appropriation Summary: FY2026 Enacted FY2027 Budget Request Total DD FORM 1391C, JUL 1999 Authorization $(000) 112,000 0 112,000 PREVIOUS EDITION IS OBSOLETE PAGE NO. 254 === page 263 === Spend Plan CAO: Goodfellow Air Force Base 2027 JCGU133001 Financials PA ($000) I Initial Contract SIOH I SIOH / Month Other (Contingency) I Other / Month 6.5% I 10.0% I Schedule Award Complete POP Months I I 112,000 94,248 7,280 221 10,472 317 24-Apr-26 1-Aug-29 1195 39.0 I Chart Begin 1st Increment 2nd Increment 3rd Increment 4th Increment 5th Increment End Total 25-Mar-26 Pipeline Student Dormitory Project Title: Installation: Program Year Project # tI Fund 1-Oct-25 1-Jan-26 1-Oct-26 t 1-Aug-29 Obligate I • 24-Apr-26 Instructions and Notes This spreadsheet is designed to help the user develop a WIP Curve for inclusion with a project 1391. The user only needs to know the project cost and schedule. Edit The Green Fields ONLY n ~~ 1 2 3 4 5 6 7 8 Enter the Project Title, Location, and Project number Enter the Date this WIP Curve is being updated Enter the Project PA Enter the SIOH required by the agent (6.5% for USACE FY24 and beyond) Enter the contingency percentage plus other amounts withheld by the Agent Enter the projected project Award Date ( usually 1 Apr of the Execution FY) Enter the Project Complete Date (Usually Award plus ~1000 days, use the 1st of a month) Enter the Chart Begin Date ( first day of the Program Year: 1-Oct-XX) ( Use "Short Date" format.) 9 Enter the Dates anticipate to receive each increment of funding (usually January of the Program year, and Oct for subsequent increments) Enter the Dates anticipated to Award the contract ( usually 1 Apr of the Program year and obligate increments (usually 1 Oct for increments after initial award.) 10 11 Fund mmm-yr 1-Dec-26 Oct-25 Jan-26 Oct-26 1-Aug-29 Aug-29 Enter the Value of each increment (If the project is less than $250M enter the PA as 1st Increment) I Obligate mmm-yr Months 0 Apr-26 8 Dec-26 32 0 0 0 Aug-29 0 40 I Increment + 100,000 12,000 112,000 Obligate 84,150 10,098 94,248 SIOH 6,500 780 7,280 Other 9,350 1,122 10,472 255 === page 264 === Spend Plan CAO: Project Title: Installation: Program Year Project # 25-Mar-26 Pipeline Student Dormitory Notes Goodfellow Air Force Base 2027 JCGU133001 Assumes initial appropriation is enacted by Note 1: Congress OCT FY 2025 Assumes funds are available for obligation by 31 January of the execution year and by 31 Note 2: October for subsequent years. All Cost in thousands Chart Begin Oct-25 Month Oct-25 Nov-25 Dec-25 Jan-26 Feb-26 Mar-26 Apr-26 May-26 Jun-26 Jul-26 Aug-26 Sep-26 Oct-26 Nov-26 Dec-26 Jan-27 Feb-27 Mar-27 Apr-27 May-27 Jun-27 Jul-27 Aug-27 Sep-27 Oct-27 Nov-27 Dec-27 Jan-28 Feb-28 Mar-28 Apr-28 May-28 Jun-28 Jul-28 Aug-28 Sep-28 Oct-28 Nov-28 Dec-28 Jan-29 Feb-29 Mar-29 Apr-29 May-29 Jun-29 Jul-29 Aug-29 FUNDING (note 1) Enacted 100,000 12,000 - OBLIGATION (note 2-3) Cumulative Obligated Cumulative 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 112,000 112,000 112,000 112,000 112,000 112,000 112,000 112,000 112,000 112,000 112,000 112,000 112,000 112,000 112,000 112,000 112,000 112,000 112,000 112,000 112,000 112,000 112,000 112,000 112,000 112,000 112,000 112,000 112,000 112,000 112,000 112,000 112,000 112,000 112,000 84,150 538 538 538 538 538 538 538 10,636 538 538 538 538 538 538 538 538 538 538 538 538 538 538 538 538 538 538 538 538 538 538 538 538 538 538 - 84,150 84,688 85,226 85,764 86,302 86,840 87,378 87,916 98,552 99,089 99,627 100,165 100,703 101,241 101,779 102,317 102,855 103,393 103,931 104,469 105,007 105,545 106,083 106,621 107,159 107,696 108,234 108,772 109,310 109,848 110,386 110,924 111,462 112,000 112,538 112,538 112,538 112,538 112,538 112,538 112,538 OUTLAYS (note 4-5) Monthly Cumulative - - 78 128 204 316 475 695 988 1,365 1,835 2,397 3,046 3,761 4,517 5,273 5,985 6,605 7,086 7,392 7,497 7,392 7,086 6,605 5,985 5,273 4,517 3,761 3,046 2,397 1,835 27 4,461 78 207 411 727 1,202 1,897 2,885 4,250 6,085 8,482 11,528 15,289 19,806 25,079 31,064 37,668 44,754 52,146 59,643 67,035 74,121 80,725 86,710 91,983 96,500 100,261 103,307 105,704 107,539 107,566 107,566 107,566 107,566 107,566 107,566 107,566 107,566 107,566 107,566 112,027 Assumes ALL project funds (contract, SIOH, contingency, etc) are obligated NLT 6 months Note 3: prior to project end Note 4 Assumes contract award in FEB 26 and contract completion AUG 28; duration 30 months. Note 5 Assumes Agent will retain 1% of project obligations for a final payment 256 === page 265 === Pipeline Student Dormitory $120,000 $100,000 -- ,, I I I I I I I OBLIGATION I I OUTLAYS I I I I I I I FUNDING I I I I I I I , , , , I I I I I $0 _, I $60,000 $20,000 I ,- - - I $80,000 $40,000 --. -- ,---------' ,, I --I , ., , I , ,, I , , ,, I I I I I I I I I I I 257 === page 266 === 1. COMPONENT 2. DATE (YYYYMMDD) FY 2027 BBBBBB MILITARY CONSTRUCTION PROGRAM AIR FORCE 3. INSTALLATION AND LOCATION 4. COMMAND JOINT BASE SAN ANTONIO, TEXAS AIR EDUCATION AND TRAINING COMMAND 6. PERSONNEL (1) PERMANENT (2) STUDENTS 20260326 5. AREA CONTRUCTION COST INDEX 0.85 D (3) SUPPORTED (4) TOTAL OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN a. AS OF 30-Sep-25 24,961 8,516 15,960 1,589 13,135 26 1,172 3,656 116 69,131 b. END FY 30-Sep-30 2,549 51 1,171 3,631 116 50,788 8,485 15,143 2,329 17,313 7. INVENTORY DATA ($000) 44,225.00 29,312,898.00 649,500.00 276,000.00 404,292.00 494,450.00 552,000.00 31,689,140.00 a. TOTAL ACREAGE b. INVENTORY TOTAL AS OF 30-Sep-25 c. AUTHORIZATION NOT YET IN INVENTORY d. AUTHORIZATION REQUESTED IN THIS PROGRAM e. AUTHORIZATION INCLUDED IN FOLLOWING PROGRAM f. PLANNED IN NEXT THREE PROGRAM YEARS g. REMAINING DEFICIENCY h. GRAND TOTAL 8. PROJECTS REQUESTED IN THIS PROGRAM (3) SCOPE b. COST ($000) (1) START (2) COMPLETE 721-313 METC - Barracks/Ships/Dorms #1, Inc 40,881 SM 308,000 07/25 01,26 730-841 Military Working Dog Large Capacity Kennel 9,500 SM 180,000 03/25 12/26 141-456 91 Cyber Opertions Center 3,958 SM 96,000 07/18 09/28 (1) CODE a. CATEGORY (2) PROJECT TITLE c. DESIGN STATUS 9. FUTURE PROJECTS 721-311 BMT Recruit Dormitory 7 (21,482 SM/$274,000) 721-313 METC - Barracks/Ships/Dorms #1, Inc (40,881 SM/$84,000) 171-621 BMT Classrooms/Dining Facility 4, Inc (9,898 SM/$64,792) 730-841 Military Working Dog Large Capacity Kennel (11,274 SM/$93,000) 218-852 T-7A ADAL Egress Facility (539 SM/$6,950) 141-456 Multi-Domain Cyber & Intel Ops Center (56,858 SM/$650,000) 10.MISSION OR MAJOR FUNCTIONS The 502nd Air Base Wing is the host wing for Joint Base San Antonio (JBSA) which is comprised of three primary locations: Lackland, Randolph, and Fort Sam Houston as well as eight other operating locations. The 502 Air Base Wing provides installation support services to more than 41 Air Force Mission Partners, 30 Army Mission Partners, 6 Navy Mission Partners, Marine Corps Mission Partners, Cost Gaurd, and 15 United States Governmental Organizations Mission Partners, that accomplish diverse training, flying, cyber, intelligence, medical, and installations missions every day. 11. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES N/A DD FORM 1390, JUL 1999 258 PREVIOUS EDITION IS OBSOLETE. === page 267 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE JOINT BASE SAN ANTONIO TEXAS METC BARRACKS/SHIPS/DORMS #1, INC 2 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211F 721-313 JBSF200567 8. PROJECT COST ($000) AUTH: 0 APPR: 308,000 9. COST ESTIMATES ITEM UM QUANTITY UNIT COST COST($000) PRIMARY FACILITIES 362,540 TECHNICAL TRAINING STUDENT HOUSING (721-313) SM 40,881 7,707 (315,070) ATHLETIC FIELD, TRACK (750-177) EA 1 379,350 (379) OVERHEAD PROTECTION (145-921) SM 2,921 2,203 (6,435) AIR CONDITIONING CENTRAL PLANT (890-123) SM 699 49,722 (34,756) CYBERSECURITY OF FACILITY-RELATED CONTROL SYS LS (5,900) SUPPORTING FACILITIES 41,960 SPECIAL CONSTRUCTION FEATURES LS (5,585) UTILITIES LS (17,875) ROADS, SIDEWALKS, AND PARKING LS (4,690) SITE IMPROVEMENTS LS (7,556) COMMUNICATIONS LS (2,153) DEMOLITION SM 764 1,006 (769) ENVIRONMENTAL REMEDIATION LS (135) PRIVATIZED UTILITIES SERVICE AND CONNECTION LS (3,197) SUBTOTAL 404,500 CONTINGENCY (5.00%) 20,225 TOTAL CONTRACT COST 424,725 SUPERVISION, INSPECTION AND OVERHEAD (6.50%) 27,607 DESIGN/BUILD - DESIGN COST (4.00% OF SUBTOTAL) 16,180 TOTAL REQUEST 468,512 TOTAL REQUEST (ROUNDED) 469,000 EQUIPMENT FROM OTHER APPROPRIATIONS (NON-ADD) (8,500) 10. DESCRIPTION OF PROPOSED CONSTRUCTION Construct a multi-story dormitory with an elevator and running track for the Medical Technical Training students. Construction will consist of drilled pier foundation, concrete floor slabs, concrete steel frame, standing seam metal roof, and insulated precast concrete exterior walls. Facilities will incorporate features that provide the lowest practical life cycle cost solutions satisfying the facility requirements with the goal of maximizing energy efficiency and eliminating carbon emissions. Facility will also comply with the regulations set forth in Executive Order 14057. The project will include a new central utility plan to house the required electrical and mechanical equipment. The project will demolish buildings 1370 (144 SM), 1381 (140 SM), 1383 (140 SM), 1368 (140 SM), 1371 (140 SM), 1388 (10 SM), and an unnumbered building north of building 1370 (50 SM) (Total: 764 Square Meters). The demolition work will include testing/removal of asbestos and lead-based paint and any work needed to mitigate potential hazards. Project includes all utilities, communications, site improvements, environmental remediation and any other necessary supporting facilities to provide a complete and usable facility. Project will also demolish Koehler Road between Williams Way-Womack Road. Facility will be designed as permanent construction in accordance with Department of War Unified Facilities Criteria 1-200-01. This project will comply with Department of War antiterrorism/force protection requirements per Unified Facilities Criteria 4-010-01. This will be carried out as a prototype project pursuant to the authority in Sec. 4022, Title 10 United States DD FORM 1391, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 259 === page 268 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE JOINT BASE SAN ANTONIO TEXAS METC BARRACKS/SHIPS/DORMS #1, INC 2 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211F 721-313 JBSF200567 8. PROJECT COST ($000) AUTH: 0 APPR: 308,000 Code notwithstanding subchapters I and III of chapter 169 of title 10, United States Code, and chapter 11 of title 40, United States Code. Air Conditioning: 510 Tons. 11. REQ: 40,881 SM ADQT: 0 SUBSTD: 764 SM PROJECT: Medical Education & Training Campus (METC) Barracks/Ships/Dorms #1 REQUIREMENT: Joint Base San Antonio Fort Sam Houston requires space for the Medical Education Training Campus. This would accommodate the Army, Navy, and Air Force when repairs or replacements are made to recapitalize the current facilities to provide the medical trainees with a facility conductive to proper housing and training. Construct a new 1,200 person multi-story dormitory that is resistant to high traffic wear. Properly sized, sited, designed, and furnished facilities are essential to successfully train future medical trainees. This is not a tenant or supported service requirement. CURRENT SITUATION: Currently Medical Education Training Campus is comprised of 5 barracks, ships and dorms with capacity of 6,000 personnel, 3,000 rooms (2x Army, 2x Navy and 1x Air Force) commissioned in 2010/2011; annual student load of 15-20,000 medical trainees. Base Realignment and Closure funded 3 dorms and Army military construction funded 2 dorms, Design-Build utilizing Type V (e.g. "stick-built") modular construction through United States Army Corps of Engineers selected for lower cost (estimated $60M in savings) and to achieve mission readiness end state (3-5 years). Within 3-4 years post acceptance, systematic infrastructure issues surfaced resulting in non-mission capable rooms across the campus. For the last seven years, Joint Base San Antonio has worked to address issues raised by Office of the Secretary of War on life, health, and safety concerns related to medical trainees. The Medical Education and Training Campus dormitories on the installation have become unsustainable as we continually battle mold, catastrophic flooding, structural failures and water damage plaguing a campus that is less than 10 years old. As a result of the major design flaws, these facilities have already received over $67M in additional repair investments since originally constructed. While these repairs did improve the overall condition of the facilities, there continues to be catastrophic failures on the campus. During 2021 inspections, 711 rooms required remediation to remove mold and mildew. The magnitude of these systematic failures has forced unplanned and emergency trainee evacuations across the last 5 years. The sensitivity of the situation and its impacts to students warrants immediate action to mitigate further impacts to the mission at Joint Base San Antonio Fort Sam Houston. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 260 === page 269 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE JOINT BASE SAN ANTONIO TEXAS METC BARRACKS/SHIPS/DORMS #1, INC 2 5. PROGRAM ELEMENT 7. PROJECT NUMBER 6. CATEGORY CODE 8. PROJECT COST ($000) 91211F 721-313 JBSF200567 AUTH: 0 APPR: 308,000 IMPACT IF NOT PROVIDED: Living quarters will continue to remain far below minimum Air Force dormitory standards. Extensive, ongoing facility maintenance costs will continue to escalate as needed repairs and upgrades are postponed due to the heavy civil engineering shop workload and unavailable repair funding. Failure to construct new dorms will result in continued deterioration and eventual inoperability of the existing dorms. ADDITIONAL: This project meets the criteria/scope in Department of the Air Force Manual 321084, Standard Facility Requirements. All reasonable alternatives were considered during the development of this project to include status quo, add/alter, and new construction. New construction is the only viable option to meet this requirement. A formal economic analysis is in progress. This design shall conform to criteria established in the Air Force Corporate Facilities Standards, the Installation Facilities Standards, but will not employ a standard facility design because there is no Air Force standard facility design for this project, and there is no applicable standard design from United States Army Corps of Engineers. Sustainable principles, to include life-cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with Unified Facility Criteria 1-200-02. This includes preparation of a life-cycle cost analysis for energy consuming systems, renewable energy generating systems, whenever life cycle cost effective is selected as the reason any requirement of Unified Facility Criteria 1-200-02 is partially compliant or not applicable. Facility is sited in accordance with the Installation Development Plan and is within a compatible land use area. This project does not fall within or partly within the 100-year flood plain. The construction growth offset for this requirement is 439,339 square feet. Base Civil Engineer: (210) 671-2977 TECHNICAL TRAINING STUDENT DORMITORY: 40,881 SM = 440,039 Square Feet. OVERHEAD PROTECTION: 2,921 SM = 31,441 Square Feet AIR CONDITIONING CENTRAL PLANT: 699 SM = 7,524 Square Feet DEMOLITION: 764 SM = 8,224 Square Feet. JOINT USE CERTIFICATION: The facility can be used by other components on an "as available" basis; however, the scope of the project is based on Air Force requirements. Acquisition Strategy: Other Transaction Authority DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 261 === page 270 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE JOINT BASE SAN ANTONIO TEXAS METC BARRACKS/SHIPS/DORMS #1, INC 2 5. PROGRAM ELEMENT 7. PROJECT NUMBER 12. 6. CATEGORY CODE 8. PROJECT COST ($000) 91211F 721-313 JBSF200567 AUTH: 0 SUPPLEMENTAL DATA: A. Estimated Execution Data: (1) Acquisition Strategy: Design-Build (2) Design Data (a) Design or Request for Proposal(RFP) Started: (b) Percent of Design Completed as of SEP 2025: (c) Percent of Design Completed as of JAN 2026: (d) Design or RFP Complete: (e) Total Design Cost ($000): (f) Energy Study and/or Life Cycle Cost Analysis (g) Standard or Definitive Design Used? (3) Construction Data: (a) Contract Award: (b) Construction Start: (c) Construction Complete: APPR: 308,000 MAY/2025 10% 20% MAY/2026 23,693 YES NO SEP/2026 APR/2027 AUG/2029 B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) Furniture Fixtures & Equipment Communications Equipment 3080 3080 2029 2029 5,000 3,500 Auth of Approp $(000) 77,000 308,000 Appropriation $(000) 77,000 308,000 84,000 469,000 C. Authorization and Appropriation Summary: FY2025 Enacted FY2027 Budget Request Future Request Total DD FORM 1391C, JUL 1999 Authorization $(000) 469,000 0 0 469,000 PREVIOUS EDITION IS OBSOLETE 84,000 469,000 PAGE NO. 262 === page 271 === MILCON Work-in-Place (WIP) Curve – Automated Spend Plan Project Information Project Title Installation Program Year (FY) Project # METC - Barracks/Ships/Dorms #1, Inc JBSA Fort Sam Houston 2025 JBSF200567 Financial Inputs & Derived Amounts ($000) Programmed Amount (PA) SIOH Rate Contingency Rate SIOH Amount Contingency Amount Construction (PA less SIOH & Cont) Total Increments 469,000 6.5% 5.0% 30,485 23,450 415,065 3 Key Dates (Calculated) Begin Date (FY Start) Award Date (Assumed) Complete Date (Award + POP; set to 1st of month) Award Month (1st of month) Complete Month (1st of month) Period of Performance Oct 1, 2024 Apr 1, 2025 Apr 1, 2028 Apr 1, 2025 Apr 1, 2028 1100 Funding & Obligation Increments ($000) Increment Amount ($000) Funding Date Jan 1, 2025 Oct 1, 2025 Oct 1, 2026 Increment 1 Increment 2 Increment 3 77,000 308,000 84,000 Total Funding 469,000 Check vs PA Obligation Date Apr 1, 2025 Jan 1, 2026 Jan 1, 2027 0 Outlay Curve Controls (Adjust if needed) Outlay Curve Steepness (k) Normalized Logistic Base (t=0) Normalized Logistic Top (t=1) Total Outlay ($000) (assumed = PA) 8.0 0.01798621 0.98201379 469,000 263 === page 272 === Monthly Cash Flow (Automated from Spend Plan) Month Oct 2024 Nov 2024 Dec 2024 Jan 2025 Feb 2025 Mar 2025 Apr 2025 May 2025 Jun 2025 Jul 2025 Aug 2025 Sep 2025 Oct 2025 Nov 2025 Dec 2025 Jan 2026 Feb 2026 Mar 2026 Apr 2026 May 2026 Jun 2026 Jul 2026 Aug 2026 Sep 2026 Oct 2026 Nov 2026 Dec 2026 Jan 2027 Feb 2027 Mar 2027 Apr 2027 May 2027 Jun 2027 Jul 2027 Aug 2027 Sep 2027 Oct 2027 Nov 2027 Dec 2027 Jan 2028 Feb 2028 Mar 2028 Apr 2028 TOTAL Funding ($000) 0 0 0 77,000 0 0 0 0 0 0 0 0 308,000 0 0 0 0 0 0 0 0 0 0 0 84,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 469,000 Obligation ($000) 0 0 0 0 0 0 77,000 0 0 0 0 0 0 0 0 308,000 0 0 0 0 0 0 0 0 0 0 0 84,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 469,000 Outlay ($000) 0 0 0 0 0 0 2,065 2,539 3,114 3,809 4,644 5,637 6,810 8,175 9,744 11,512 13,463 15,558 17,730 19,890 21,923 23,698 25,084 25,968 26,272 25,968 25,084 23,698 21,923 19,890 17,730 15,558 13,463 11,512 9,744 8,175 6,810 5,637 4,644 3,809 3,114 2,539 2,065 469,000 Cumulative Funding Cumulative Obligation Cumulative Outlay 0 0 0 0 0 0 0 0 0 77,000 0 0 77,000 0 0 77,000 0 0 77,000 77,000 2,065 77,000 77,000 4,604 77,000 77,000 7,718 77,000 77,000 11,528 77,000 77,000 16,171 77,000 77,000 21,809 385,000 77,000 28,618 385,000 77,000 36,794 385,000 77,000 46,537 385,000 385,000 58,050 385,000 385,000 71,513 385,000 385,000 87,071 385,000 385,000 104,801 385,000 385,000 124,691 385,000 385,000 146,614 385,000 385,000 170,312 385,000 385,000 195,396 385,000 385,000 221,364 469,000 385,000 247,636 469,000 385,000 273,604 469,000 385,000 298,688 469,000 469,000 322,386 469,000 469,000 344,309 469,000 469,000 364,199 469,000 469,000 381,929 469,000 469,000 397,487 469,000 469,000 410,950 469,000 469,000 422,463 469,000 469,000 432,206 469,000 469,000 440,382 469,000 469,000 447,191 469,000 469,000 452,829 469,000 469,000 457,472 469,000 469,000 461,282 469,000 469,000 464,396 469,000 469,000 466,935 469,000 469,000 469,000 264 === page 273 === Cumulative WIP Curve Project: Program Year: METC - Barracks/Ships/Dorms #1, Inc 2025 Cumulative Funding vs Obligation vs Outlay 500,000 450,000 400,000 350,000 300,000 250,000 200,000 150,000 Cumulative Funding Cumulative Obligation Cumulative Outlay 100,000 50,000 0 Oct Dec Feb Apr Jun Aug Oct Dec Feb Apr Jun Aug Oct Dec Feb Apr Jun Aug Oct Dec Feb Apr 2024 2024 2025 2025 2025 2025 2025 2025 2026 2026 2026 2026 2026 2026 2027 2027 2027 2027 2027 2027 2028 2028 265 === page 274 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE AUGUST 2025 3. INSTALLATION AND LOCATION 4. PROJECT TITLE JOINT BASE SAN ANTONIO LACKLAND AIR FORCE BASE SITE 1 TEXAS MWD LARGE CAPACITY KENNEL 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211F 730-841 MPYJ213587 8. PROJECT COST ($000) 180,000 9. COST ESTIMATES ITEM UM QUANTITY UNIT COST COST($000) PRIMARY FACILITIES 138,264 SECURITY POLICE KENNEL CANINE (730-841) SM 9,500 11,579 (110,001) SECURITY POLICE KENNEL SUPPORT BUILDING (730SM 6,340 3,926 (24,891) 842) CYBERSECURITY OF FACILITY-RELATED CONTROL SYS LS (3,372) SUPPORTING FACILITIES 22,897 UTILITIES LS (9,043) SITE PREPARATION LS (2,815) ROADS, SIDEWALKS, AND PARKING LS (4,771) SITE IMPROVEMENTS LS (1,106) COMMUNICATIONS LS (3,162) PRIVATIZED UTILITIES SERVICE AND CONNECTION LS (2,000) SUBTOTAL 161,160 CONTINGENCY (5.00%) 8,058 TOTAL CONTRACT COST 169,218 SUPERVISION, INSPECTION AND OVERHEAD (6.50%) 10,999 TOTAL REQUEST 180,217 TOTAL REQUEST (ROUNDED) 180,000 EQUIPMENT FROM OTHER APPROPRIATIONS (NON-ADD) (0) 10. DESCRIPTION OF PROPOSED CONSTRUCTION Construct Department of War Military Working Dog (MWD) kennel complex comprised of three kennel facilities, providing a total of 400 dog-runs, and one Kennel Support Facility. Kennel facilities will include private indoor and outdoor dog runs for each animal, as well as interior and exterior corridors to access dogs from both the indoor and outdoor runs. Each kennel facility will also include central support spaces including a latrine, tack room, grooming/screening room, food prep areas, and storage rooms. Kennel facilities will also have a covered artificial turf exercise area running the length of the building, with fencing and gates to subdivide the area as necessary to isolate one or multiple dogs. Kennel buildings will be single-story structures with roof material and slope per Joint Base San Antonio Installation Facility Standard and sufficient insulation above deck to meet the local energy requirements, galvanized steel roof decks, reinforced concrete rigid mat foundations supporting walls and columns, pre-engineered metal building system, painted interior construction, and sealed concrete floors. The Kennel Support Facility will be a single story, largely administrative building, with spaces for private offices, open work areas, training rooms/classrooms, locker rooms for trainers, storage rooms, etc. The final layout of the facility will be determined in close coordination with the end user in subsequent phases of design. The project includes all required site preparation, site improvements, utilities, stormwater management features, communications support, fire alarm systems, mass notification systems (Kennel Support Facility only), fire suppression systems, pavements, landscaping, and all supporting work for complete and usable facilities. With the site not currently having utilities to support the mission, DD FORM 1391, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 266 === page 275 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE AUGUST 2025 3. INSTALLATION AND LOCATION 4. PROJECT TITLE JOINT BASE SAN ANTONIO LACKLAND AIR FORCE BASE SITE 1 TEXAS MWD LARGE CAPACITY KENNEL 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211F 730-841 8. PROJECT COST ($000) MPYJ213587 180,000 this project will include the sizing of site utilities for mission facilities. This will include additional primary electric infrastructure, a sanitary sewer line, fiber optic cable for telecommunications, domestic water line, and storm water drainage. Facilities will be designed as permanent construction in accordance with Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements. This project will comply with DoW Antiterrorism/Force Protection requirements per Unified Facilities Criteria 4-010-01. Air Conditioning: 1,300 Tons 11. REQ: 9,500 SM ADQT: 0 SUBSTD: 0 PROJECT: Construct a Department of War Military Working Dog Kennel Complex at Chapman Training Annex. REQUIREMENT: The Department of War Executive Agent and the 341 Training Squadron identified a total requirement of 850 dog-runs in support of the Defense Military Working Dog Kennel Program at Joint Base San Antonio - Lackland West and the Chapman Training Annex. This is comprised of 450 dog-runs at Lackland West, and 400 dog-runs at the Chapman Training Annex (150 kennel spaces for "new buy" dogs that remain in quarantine for 10 days, 125 training aids, 125 transient/swing space for cleaning). The kennel facility requirements include features that adequately address the kennel management principles and procedures prescribed by the Defense Health Agency (DHA), functional elements identified in the Air Force Military Working Dog Facility Standard Design, and guidance from the Military Working Dog mission partners at Joint Base San Antonio. This is a Department of War Military Working Dog supported service driven requirement. CURRENT SITUATION: Currently there are a total of 26 kennels with 1,204 dog runs (882 dog runs at Lackland West and 322 dog runs at Chapman Training Annex). Current facilities are inadequate and do not meet Defense Health Agency requirements and specifications for Department of War Military Working Dog facilities. The existing net area per canine ranges from 88 SF to 126 SF. Additionally, current facilities only possess outdoor kennels/dog-runs that are not temperature controlled. Given the extreme heat experienced in San Antonio during the summer months, the lack of safe temperature-controlled environments puts Military Working Dogs at significant risk of heat related injuries and even death. Existing kennels do not have adequate potable water, are not equipped with an overhead sanitation spray system, and are not equipped with adequate systems to remove/dispose of solid waste. Existing kennels and support facilities are also located in a 100-year flood plain. The new kennels must be constructed on a new site, separated from existing support facilities, necessitating the construction of one new administrative building. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 267 === page 276 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE AUGUST 2025 3. INSTALLATION AND LOCATION 4. PROJECT TITLE JOINT BASE SAN ANTONIO LACKLAND AIR FORCE BASE SITE 1 TEXAS MWD LARGE CAPACITY KENNEL 5. PROGRAM ELEMENT 7. PROJECT NUMBER 6. CATEGORY CODE 8. PROJECT COST ($000) 91211F 730-841 MPYJ213587 180,000 IMPACT IF NOT PROVIDED: Joint Base San Antonio is home to the primary training program for Military Working Dogs for the entire Department of War and is tasked with providing trained military working dogs and handlers for the Department of War, Department of Homeland Security (DHS), and other government agencies and allies through training, logistical, veterinary support, and research and development. If trainers, handlers, and caretakers continue operating in inadequate and unsafe facilities, the program will be significantly impacted. The largest explosive detection canine program for the Department of Homeland Security will be unable to provide adequate canine resources to teams operating in multimodal environments globally. At a minimum, the throughput of the Military Working Dog breeding and training programs will likely decrease affecting the level of protection provided by these working dogs and handlers at overseas contingency locations. Just as importantly, the health and wellness of the canines will be in real jeopardy due to facility conditions and the extreme regional climate. ADDITIONAL: This project meets the criteria/scope in Department of the Air Force Manual 32-1084, Standard Facility Requirements. This design shall conform to criteria established in the Air Force Corporate Facilities Standards (AFCFS), the Installation Facilities Standards (IFS), and will employ a standard facility design This project is the only feasible option that will meet the operational requirements. An economic analysis waiver is being processed for this project. Sustainable principles, to include life-cycle cost-effective practices, will be integrated into the design, development and construction of the project in accordance with UFC 1-200-02. This includes the preparation of a life-cycle cost analysis (LCCA) for energy consuming systems, renewable energy generating systems, or when life-cycle cost effective (LCCE) is selected as the reason any requirement of UFC 1-200-02 is partially compliant or not applicable. This project does not fall within or partly within the 100-year flood plain. The facility will be sited in accordance with the Installation Development Plan and will be within compatible land use areas. 802 Base Civil Engineer: (210) 671-2977 SECURITY POLICE KENNEL CANINE (730841): 9,500 SM = 102,257 Square Feet. SECURITY POLICE KENNEL SUPPORT BUILDING (730842): 6,340 SM = 68,243 Square Feet. JOINT USE CERTIFICATION: This facility can be used by other DOW components on an "as available" basis. The scope of the project is based on mission requirements, operational considerations, and location. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 268 === page 277 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE AUGUST 2025 3. INSTALLATION AND LOCATION 4. PROJECT TITLE JOINT BASE SAN ANTONIO LACKLAND AIR FORCE BASE SITE 1 TEXAS MWD LARGE CAPACITY KENNEL 5. PROGRAM ELEMENT 7. PROJECT NUMBER 12. 6. CATEGORY CODE 8. PROJECT COST ($000) 91211F 730-841 MPYJ213587 SUPPLEMENTAL DATA: A. Estimated Execution Data: (1) Acquisition Strategy: Design-Bid-Build (2) Design Data (a) Design or Request for Proposal(RFP) Started: (b) Percent of Design Completed as of SEP 2025: (c) Percent of Design Completed as of JAN 2026: (d) Design or RFP Complete: (e) Total Design Cost ($000): (f) Energy Study and/or Life Cycle Cost Analysis (g) Standard or Definitive Design Used? (3) Construction Data: (a) Contract Award: (b) Construction Start: (c) Construction Complete: 180,000 MAR/2025 65% 100% DEC/2025 16,240 YES YES JUN/2027 AUG/2027 FEB/2030 B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) NONE DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 269 === page 278 === Spend Plan Project: AS Of CHAPMAN MILITARY WORKING DOG LARGE CAPACITY KENNEL 25-Mar-26 PA ($000) 180,000 Obligate SIOH SIOH / Month Other Other / Month 6.5% 5.0% Award Complete POP Months 23-Jun-27 17-Jan-30 939 31.0 IChart Begin 1st Increment 2nd Increment 3rd Increment 4th Increment 5th Increment End Total 159,885 11,700 377 8,415 271 Fund 1-Oct-26 1-Mar-27 17-Jan-30 Fund Obligate mmm-yr mmm-yr Oct-26 22-Jun-27 Mar-27 Jun-27 Jan-00 Jan-00 Obligate 17-Jan-30 Jan-30 Jan-30 Months 0 31 0 0 0 0 0 31 Increment 180,000 180,000 Obligate 159,912 159,912 SIOH 11,687 11,687 Other 8,401 8,401 Edit the Green Fields 270 I === page 279 === Project: CHAPMAN MILITARY WORKING DOG LARGE CAPACITY KENNEL Project Spending Plan As of: 25-Mar-26 All Cost in thousands ($000) Chart Begin Oct-26 FUNDING (note 1) Month Enacted Oct-26 Nov-26 Dec-26 Jan-27 Feb-27 Mar-27 Apr-27 May-27 Jun-27 Jul-27 Aug-27 Sep-27 Oct-27 Nov-27 Dec-27 Jan-28 Feb-28 Mar-28 Apr-28 May-28 Jun-28 Jul-28 Aug-28 Sep-28 Oct-28 Nov-28 Dec-28 Jan-29 Feb-29 Mar-29 Apr-29 May-29 Jun-29 Jul-29 Aug-29 Sep-29 Oct-29 Nov-29 Dec-29 Jan-30 - OBLIGATION (note 2) Cumulative - Obligated Cumulative 648 648 648 648 648 648 648 648 648 648 648 648 648 648 648 648 648 648 648 648 648 648 748 648 648 648 648 648 648 648 550 648 1,296 1,944 2,592 3,240 3,888 4,536 5,184 5,832 6,480 7,128 7,776 8,424 9,072 9,720 10,368 11,016 11,664 12,312 12,960 13,608 14,256 15,004 15,652 16,300 16,948 17,596 18,244 18,892 19,540 20,090 OUTLAYS (note 3) Monthly 2,323 3,080 3,974 4,992 6,105 7,269 8,425 9,507 10,443 11,168 11,627 11,784 11,627 11,168 10,443 9,507 8,425 7,269 6,105 4,992 3,974 3,080 2,573 2,200 1,700 1,602 1,402 1,100 950 780 650 55 Cumulative 2,323 5,403 9,377 14,369 20,475 27,744 36,169 45,676 56,119 67,287 78,914 90,698 102,324 113,492 123,935 133,442 141,868 149,137 155,242 160,234 164,208 167,288 169,861 172,061 173,761 175,363 176,765 177,865 178,815 179,595 180,245 180,300 Note 1: Assumes initial appropriation is enacted by Congress Mar FY 2027. Note 2: Assumes funds are available for obligation by 31 May of the execution year and by 31 March for subsequent years. Note 3: Assumes contract award date of June 2027, construction start: Aug 2027, contract completion:Jan 2030, Duration 31 months 271 === page 280 === CHAPMAN MILITARY WORKING DOG LARGE CAPACITY KENNEL $200,000 $180,000 $160,000 $140,000 , $120,000 , ,,' , , ,, ,, _, -- -- -- ------- I I $100,000 I I I $80,000 • I .I $60,000 -, - I -- Obligations .,I Dec-29 Aug-29 Outlays Jun-29 Apr-29 Feb-29 Dec-28 Oct-28 Aug-28 Jun-28 Apr-28 Feb-28 - Dec-27 Oct-27 Apr-27 Feb-27 Dec-26 Jun-27 - I Oct-26 $0 -- Funding I ~ -- ----------- ,, ,, ,, Aug-27 $20,000 , , ,, Oct-29 $40,000 272 - === page 281 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE JOINT BASE SAN ANTONIO TEXAS 91 CYBER OPERATIONS CENTER 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211F 141-456 MPLS163002 8. PROJECT COST ($000) AUTH: 96,000 APPR: 96,000 9. COST ESTIMATES ITEM UM QUANTITY UNIT COST COST($000) PRIMARY FACILITIES 69,068 AIR FORCE SECURITY SERVICE OPERATIONS (141SM 3,958 13,787 (54,570) 456) ICD 705 PREMIUM LS (14,248) CYBERSECURITY OF FACILITY-RELATED CONTROL SYS LS (250) SUPPORTING FACILITIES 16,807 GENERATOR KW 3,000 1,867 (5,601) ROADS, SIDEWALKS, AND PARKING LS (3,682) COMMUNICATIONS LS (198) PRIVATIZED UTILITIES SERVICE AND CONNECTION LS (575) SITE IMPROVEMENTS LS (3,228) UTILITIES LS (3,523) SUBTOTAL 85,875 CONTINGENCY (5.00%) 4,294 TOTAL CONTRACT COST 90,169 SUPERVISION, INSPECTION AND OVERHEAD (6.50%) 5,861 TOTAL REQUEST 96,030 TOTAL REQUEST (ROUNDED) 96,000 EQUIPMENT FROM OTHER APPROPRIATIONS (NON-ADD) (6,009) 10. DESCRIPTION OF PROPOSED CONSTRUCTION Construct a Cyberspace Operations Center in support of Air Combat Command's 91st Cyber Operations Squadron worldwide missions. The construction will include reinforced concrete foundations, structural steel framing, brick masonry exterior walls, and metal standing seam roofing on metal decking. The project will include fire suppression system, integrated lightning suppression system, as well as all supporting facilities such as site improvements, utilities, communications, access roads, parking areas and (2) generators in support of critical infrastructure to provide a complete and usable facility. Additionally, the project will include secure spaces that shall comply with Intelligence Community Directive 503/705 criteria and standards. Generators are authorized in accordance with Air Force Manual 32-1062, Electrical Systems, Power Plants, and Generators. Facilities will be designed as permanent construction in accordance with Department of War Unified Facilities Criteria 1-200-01, General Building Requirements. This project will comply with Department of War antiterrorism/force protection requirements per Unified Facilities Criteria 4-010-01. Air Conditioning: 200 tons 11. REQ: 3,958 SM ADQT: 0 SUBSTD: 0 PROJECT: 91 Cyber Operations Center REQUIREMENT: Construct a controlled space operations facility that is optimally sized and configured as a Cyberspace Operations Center for the expanding 91 Cyber Operation DD FORM 1391, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 273 === page 282 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE JOINT BASE SAN ANTONIO TEXAS 91 CYBER OPERATIONS CENTER 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211F 141-456 MPLS163002 8. PROJECT COST ($000) AUTH: 96,000 APPR: 96,000 Squadron, 67 Cyberspace Wing, and 16 Air Force mission sets in support of United States Cyber Command's worldwide mission. The facility enables Offensive Cyberspace Operations in accordance with delegated authority to satisfy Combatant Commander's requirements. It degrades, disrupts, denies, deceives, and exploits adversary information systems and presents trained forces to United States Cyber Command as part of the Cyber Mission Force. This is a 16th Air Force tenant requirement. CURRENT SITUATION: The current 91 Cyber Operation Squadron facility is inadequate to fully support existing mission tasks. The 91 Cyber Operation Squadron resides in building 2058 with two other JBSA tenants: 16 Air Force and the 67 Cyberspace Wing. Both the 91 Cyber Operation Squadron and 67 Cyberspace Wing have expanding missions and require more space for personnel and weapon systems. Additionally, the current facility does not have adequate space requirements for increasing missions and Joint Base San Antonio is at 99% capacity. The current facility was not designed for its current occupant's electrical power requirements and Heating, Ventilation, and Air Conditioning loads resulting in fluctuating power access and potential damage to critical equipment due to overheating. Construction of a specially purposed Cyber Operations Facility will reduce power and Heating, Ventilation, and Air Conditioning demands on building 2058 and allow optimal configuration of mission requirements between the facilities. IMPACT IF NOT PROVIDED: As the only Air Force owned Offensive Cyberspace Operations unit, the 91 Cyber Operation Squadron must be appropriately resourced to integrate new and expanded capabilities. Continued cyber operations in an undersized and poorly configured facility increases the risk of catastrophic Air Conditioning failure resulting in server room shutdown causing the loss of time sensitive Department of War critical cyber resources and negatively impacts United States Cyber Command and combatant commander requirements. Without this project, the 91 Cyber Operations Squadron will be unable to meet timelines to expand its capabilities to support operational and contingency planning due to an inadequate facility that limits support to combat operations and expanding the cadre of ready airmen. ADDITIONAL: This project meets the criteria/scope in Department of the Air Force Manual 321084, Standard Facility Requirements. This design shall conform to criteria established in the Air Force Corporate Facilities Standards, the Installation Facilities Standards, but will not employ a standard facility design because there is no Air Force standard facility design for this project, and there is no applicable standard design from United States Army Corps of Engineers. All reasonable alternatives were considered during the development of this project to include status quo, add/alter, and new construction. An approved Economic Analysis determined new construction as the only viable option to meet this requirement. Sustainable principles, to include life-cycle cost-effective practices, will be integrated into the design, development, and construction of the project in DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 274 === page 283 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE JOINT BASE SAN ANTONIO TEXAS 91 CYBER OPERATIONS CENTER 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211F 141-456 MPLS163002 8. PROJECT COST ($000) AUTH: 96,000 APPR: 96,000 accordance with Unified Facility Criteria 1-200-02, High Performance and Sustainable Building Requirements. This includes preparation of a life-cycle cost analysis for energy consuming systems, renewable energy generating systems, or whenever life-cycle cost effective is selected as the reason any requirement of Unified Facility Criteria 1-200-02 is partially compliant or not applicable. This project does not fall within or partly within the 100-year flood plain. Facility is sited in accordance with the Installation Development Plan and is within a compatible land use area. Supporting facility costs are roughly 25% of primary facility cost due to the generator requirement. The construction growth offset for this requirement is 42,604 square feet. 502d Civil Engineer Group, Base Civil Engineer: (210) 671-2977 AIR FORCE SECURITY SERVICE OPERATIONS: 3,958 SM = 42,604 Square Feet JOINT USE CERTIFICATION: This facility can be used by other components on an "as available" basis; however, the scope of the project is based on Air Force requirements. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 275 === page 284 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE JOINT BASE SAN ANTONIO TEXAS 91 CYBER OPERATIONS CENTER 5. PROGRAM ELEMENT 7. PROJECT NUMBER 12. 6. CATEGORY CODE 8. PROJECT COST ($000) AUTH: 96,000 91211F 141-456 MPLS163002 APPR: 96,000 SUPPLEMENTAL DATA: A. Estimated Execution Data: (1) Acquisition Strategy: Design-Bid-Build (2) Design Data (a) Design or Request for Proposal(RFP) Started: JUL/2018 (b) Percent of Design Completed as of SEP 2025: 100% (c) Percent of Design Completed as of JAN 2026: 100% (d) Design or RFP Complete: JAN/2021 (e) Total Design Cost ($000): 3,330 (f) Energy Study and/or Life Cycle Cost Analysis YES (g) Standard or Definitive Design Used? NO (3) Construction Data: (a) Contract Award: MAR/2027 (b) Construction Start: APR/2027 (c) Construction Complete: SEP/2028 B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) FURNITURE FIXTURES & EQUIPMENT MISSION EQUIPMENT CONSTRUCTION SURVEILLANCE ESCO UNINTERRUPTIBLE POWER SUPPLY 3080 3080 3400 3080 2027 2027 2027 2027 2,045 2,917 520 527 Auth of Approp $(000) 96,000 96,000 Appropriation $(000) 96,000 96,000 C. Authorization and Appropriation Summary: FY 2027 Total DD FORM 1391C, JUL 1999 Authorization $(000) 96,000 96,000 PREVIOUS EDITION IS OBSOLETE PAGE NO. 276 === page 285 === MILCON Work-in-Place (WIP) Curve – Automated Spend Plan Project Information Project Title Installation Program Year (FY) Project # 91st Cyber Operations Center JBSA Lackland AFB, TX 2027 MPLS163002 Financial Inputs & Derived Amounts ($000) Programmed Amount (PA) SIOH Rate Contingency Rate SIOH Amount Contingency Amount Construction (PA less SIOH & Cont) Total Increments 114,000 6.5% 5.0% 7,410 5,700 100,890 Key Dates (Calculated) Begin Date (FY Start) Award Date (Assumed) Complete Date (Award + POP; set to 1st of month) Award Month (1st of month) Complete Month (1st of month) Period of Performance Oct 1, 2026 Apr 1, 2027 Jan 1, 2030 Apr 1, 2027 Jan 1, 2030 1035 Funding & Obligation Increments ($000) Increment Total Funding Amount ($000) 114,000 0 Funding Date 114,000 Check vs PA Obligation Date 0 Outlay Curve Controls (Adjust if needed) Outlay Curve Steepness (k) Normalized Logistic Base (t=0) Normalized Logistic Top (t=1) Total Outlay ($000) (assumed = PA) 8.0 0.01798621 0.98201379 114,000 277 === page 286 === Monthly Cash Flow (Automated from Spend Plan) Month Oct 2026 Nov 2026 Dec 2026 Jan 2027 Feb 2027 Mar 2027 Apr 2027 May 2027 Jun 2027 Jul 2027 Aug 2027 Sep 2027 Oct 2027 Nov 2027 Dec 2027 Jan 2028 Feb 2028 Mar 2028 Apr 2028 May 2028 Jun 2028 Jul 2028 Aug 2028 Sep 2028 Oct 2028 Nov 2028 Dec 2028 Jan 2029 Feb 2029 Mar 2029 Apr 2029 May 2029 Jun 2029 Jul 2029 Aug 2029 Sep 2029 Oct 2029 Nov 2029 Dec 2029 Jan 2030 TOTAL Funding ($000) Obligation ($000) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Outlay ($000) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 551 690 862 1,072 1,328 1,636 2,002 2,431 2,924 3,475 4,074 4,698 5,319 5,895 6,382 6,737 6,924 6,924 6,737 6,382 5,895 5,319 4,698 4,074 3,475 2,924 2,431 2,002 1,636 1,328 1,072 862 690 551 114,000 Cumulative Funding Cumulative Obligation Cumulative Outlay 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 551 0 0 1,242 0 0 2,103 0 0 3,175 0 0 4,503 0 0 6,139 0 0 8,141 0 0 10,573 0 0 13,497 0 0 16,972 0 0 21,046 0 0 25,744 0 0 31,063 0 0 36,957 0 0 43,339 0 0 50,076 0 0 57,000 0 0 63,924 0 0 70,661 0 0 77,043 0 0 82,937 0 0 88,256 0 0 92,954 0 0 97,028 0 0 100,503 0 0 103,427 0 0 105,859 0 0 107,861 0 0 109,497 0 0 110,825 0 0 111,897 0 0 112,758 0 0 113,449 0 0 114,000 278 === page 287 === Oct 2026 Jan 2030 Nov 2029 Dec 2029 Sep 2029 Oct 2029 40,000 Aug 2029 60,000 Jun 2029 Jul 2029 Apr 2029 May 2029 Feb 2029 Mar 2029 Jan 2029 Nov 2028 Dec 2028 Sep 2028 Oct 2028 Aug 2028 Jun 2028 Jul 2028 Apr 2028 May 2028 Feb 2028 Mar 2028 Jan 2028 Nov 2027 Dec 2027 Sep 2027 Oct 2027 Aug 2027 Jun 2027 Jul 2027 Apr 2027 May 2027 Feb 2027 Mar 2027 Project: Program Year: Jan 2027 Nov 2026 Dec 2026 Cumulative WIP Curve 91st Cyber Operations Center 2027 120,000 Cumulative Funding vs Obligation vs Outlay 100,000 80,000 Cumulative Funding Cumulative Obligation Cumulative Outlay 20,000 0 279 === page 288 === 1. COMPONENT 2. DATE (YYYYMMDD) FY 2027 AIR FORCE MILITARY CONSTRUCTION PROGRAM 3. INSTALLATION AND LOCATION 20260326 4. COMMAND HILL AIR FORCE BASE, UTAH 5. AREA CONTRUCTION COST INDEX AIR FORCE MATERIEL COMMAND 1.03 6. PERSONNEL (1) PERMANENT (2) STUDENTS (3) SUPPORTED OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN (4) TOTAL a. AS OF 30-Sep-25 648 3,447 12,417 0 0 0.00 169 1,239 0 17,920 b. END FY 30-Sep-30 659 3,485 12,169 0 0 0 169 1,237 0 17,719 7. INVENTORY DATA ($000) 962,068 12,658,826.00 861,000.00 0.00 0.00 747,327.00 4,756,400.00 19,023,553.00 a. TOTAL ACREAGE b. INVENTORY TOTAL AS OF 30-Sep-25 c. AUTHORIZATION NOT YET IN INVENTORY d. AUTHORIZATION REQUESTED IN THIS PROGRAM e. AUTHORIZATION INCLUDED IN FOLLOWING PROGRAM f. PLANNED IN NEXT THREE PROGRAM YEARS g. REMAINING DEFICIENCY h. GRAND TOTAL 8. PROJECTS REQUESTED IN THIS PROGRAM a. CATEGORY (1) CODE 211-116 211-116 (2) PROJECT TITLE F-35 Maintenance Facility, Ph 1, Inc T-7A Depot Maintenance Complex, Inc (3) SCOPE c. DESIGN STATUS b. COST ($000) (1) START (2) COMPLETE 28,709 SM 100,000 04/22 05/23 28,038SM 72,000 05/22 05/23 9. FUTURE PROJECTS 211-254 F-16 Emergency Power Unit Overhaul Facility (4,183 SM/$92,859) 211-172 F-35 Radar Cross Section Test Facility (7,565 SM/$115,000) 211-152 F-35 Canopy Repair Facility (7,256 SM/$59,000) 211-116 F-35 Maintenance Facility, Phase 2 (26,515 SM/$266,000) 211-152 F-35 Composite Repair & Training Fac, Ph 2 (20,100 SM/$200,000) 211-116 F-35 Maintenance Facility, Phase 1, Inc (28,709 SM/$87,500) 310-924 Radiation Research Facility (4,645 SM/$126,000) 10. MISSION OR MAJOR FUNCTIONS Hill Air Force Base is home to Air Force Materiel Command's 75th Air Base Wing, host wing, providing installation support for the Ogden Air Logistics Complex, Air Force Life Cycle Management Center, Air Force Nuclear Weapons Center, Air Force active duty 388th Fighter Wing (F-35A) and Reserve 419th Fighter Wing with more than 50 mission partners. Air Force Life Cycle Management Center provides the latest in command and control and information systems for various weapons platforms including the F-16, F-35, HH-60, E-3 Airborne Warning and Control System and E-8 Joint Surveillance Target Attack Radar System; an Air Force Research Laboratory research site location for the space vehicles directorate; an air base group and recruiting group. The installation has support responsibility for the operation of the Utah Test and Training Range. 11. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES N/A DD FORM 1390, JUL 1999 PREVIOUS EDITION IS OBSOLETE. 280 === page 289 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE HILL AIR FORCE BASE UTAH F-35 MAINTENANCE FACILITY, PHASE 1, INC 2 5. PROGRAM ELEMENT 6. CATEGORY CODE 27142F 211-116 7. PROJECT NUMBER KSRM163011 8. PROJECT COST ($000) AUTH: 0 APPR: 100,000 9. COST ESTIMATES ITEM UM QUANTITY UNIT COST COST($000) PRIMARY FACILITIES 189,381 HANGAR, MAINTENANCE DEPOT (211-116) SM 28,709 6,431 (184,628) CYBERSECURITY OF FACILITY-RELATED CONTROL SYS LS (4,753) SUPPORTING FACILITIES 26,238 UTILITIES LS (7,166) SITE PREPARATION LS (5,090) SITE IMPROVEMENTS LS (13,782) PRIVATIZED UTILITIES SERVICE AND CONNECTION LS (200) SUBTOTAL 215,619 CONTINGENCY (5.00%) 10,781 TOTAL CONTRACT COST 226,400 SUPERVISION, INSPECTION AND OVERHEAD (6.50%) 14,716 DESIGN/BUILD - DESIGN COST (4.00% OF SUBTOTAL) 8,625 TOTAL REQUEST 249,741 TOTAL REQUEST (ROUNDED) 250,000 EQUIPMENT FROM OTHER APPROPRIATIONS (NON-ADD) (43,700) 10. DESCRIPTION OF PROPOSED CONSTRUCTION Construct a multi-dock medium bay fighter aircraft maintenance hangar with parts storage/equipment areas, back shop, and administrative areas. Project scope includes composite aircraft corrosion control capability to include one paint bay and one de-paint bay. The proposed facility will have reinforced concrete footings, foundation, floor slab, structural steel frame, insulated walls, insulated roof, lightning protection, fire detection/suppression, and intrusion detection. The project will include pavements, site improvements, communication support, utilities and all required supporting facilities for a complete and usable facility to fulfill mission requirements. Facilities will be designed as permanent construction in accordance with the Department of War Unified Facilities Criteria 1-200-01, General Building requirements. This project will comply with Department of War antiterrorism/force protection requirements per Unified Facilities Criteria 4-010-01. Air Conditioning: 500 Tons 11. REQ: 28,709 SM ADQT: 0 SUBSTD: 0 PROJECT: F-35 Maintenance Facility, Phase 1 REQUIREMENT: A hangar facility is needed to accommodate the maintenance, modification, remanufacturing, and replacement of composite parts for the new fleet of F-35 fighter aircraft which began arriving at Hill AFB in 2015 to undergo depot repair of modification. The proposed facility will provide space for routine scheduled maintenance, specialized modification, and incident repair on the F-35 fighter aircraft. This project is the first of three phases and builds 40% of the required repair docks needed for the final expected end-force, allowing for adjustments in DD FORM 1391, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 281 === page 290 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE HILL AIR FORCE BASE UTAH F-35 MAINTENANCE FACILITY, PHASE 1, INC 2 5. PROGRAM ELEMENT 6. CATEGORY CODE 27142F 211-116 7. PROJECT NUMBER KSRM163011 8. PROJECT COST ($000) AUTH: 0 APPR: 100,000 the last two phases for changes in end-force. This is not a tenant or supported service requirement. CURRENT SITUATION: The Ogden Air Logistics Complex at Hill Air Force Base maintains fighter aircraft used by the warfighter. The F-35 Lightning II Joint Strike Fighter is currently replacing the F-16 Fighting Falcon as the predominant fighter aircraft for the United States Air Force and for our allies. However, because the F-16 will remain in use worldwide for the foreseeable future, most of the current maintenance space on Hill Air Force Base will be needed to maintain the F-16. The remaining maintenance space for conventional aircraft is in use to maintain the A-10 Thunderbolt II attack aircraft and the C-130 Hercules cargo aircraft. Both of which will also remain in the Air Force inventory for years to come. Currently there are fourteen (14) F-35 aircraft at Hill Air Force Base that require modification to their airframes. This is being accomplished wherever space can be found on a piecemeal basis. As the number of F-35s in the Air Force inventory increases, surplus maintenance space at Hill Air Force Base will become less available. The only maintenance hangar at Hill Air Force Base dedicated exclusively to repairing and maintaining composite aircraft is overcrowded with F22 Raptor fighter aircraft workload. It is not able to support obligated F-35 workload, or the future workload of an expected fleet of over 2,400 F-35 aircraft. The lack of space is compounded by the fact that composite aircraft maintenance processes must be separated from conventional processes because of the metal shavings produced with conventional aircraft maintenance. If these metal shavings find their way into composite aircraft components, then the low observable radar quality of an F-35 is ruined. Beyond FY 2020, more and more F-35A (Air Force), F35B (Navy) and F-35C (Marine) aircraft will be arriving at Hill Air Force Base for depot repair of modification each year. By 2030, the annual average workload is expected to be sixty-four (64) aircraft. In order to maintain a high level of F-35 availability, a hangar facility dedicated exclusively for F-35 workload is needed. IMPACT IF NOT PROVIDED: Without the proposed facility, Hill AFB will lack the necessary resources to meet the demand of advanced composite maintenance, modification, remanufacturing, and component parts replacement pertaining to the F-35 fighter aircraft. Hill AFB will be forced to attempt to meet its contractual obligations using inadequate facilities. Costs for modifying and maintaining the F-35 will increase. The risk of contaminating low observable composites with metal shavings in shared facilities with conventional aircraft workloads poses an unreasonable hazard and will compel the Air Force to contract the needed depot repair of modification work with the manufacturer at a higher cost than could be done in-house with the proper facilities. ADDITIONAL: This project meets the criteria/scope specified in Air Force Manual 32-1084 Standard Facility Requirements. A Waiver to an Economic Analysis has been approved for this project. This design shall conform to criteria established in the Air DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 282 === page 291 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE HILL AIR FORCE BASE UTAH F-35 MAINTENANCE FACILITY, PHASE 1, INC 2 5. PROGRAM ELEMENT 6. CATEGORY CODE 27142F 211-116 7. PROJECT NUMBER KSRM163011 8. PROJECT COST ($000) AUTH: 0 APPR: 100,000 Force Corporate Facilities Standards, the Installation Facilities Standards, but will not employ a standard facility design because there is no Air Force standard facility design for this project, and there is no applicable standard design from United States Army Corps of Engineers. Sustainable principles, to include lifecycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with Unified Facility Criteria 1200-02, High Performance and Sustainable Building Requirements. This includes preparation of a life-cycle cost analysis for energy consuming systems, renewable energy generating systems, whenever life-cycle cost effective is selected as the reason any requirement of Unified Facility Criteria 1-200-02 is partially compliant or not applicable. This project does not fall within or partly within the 100-year flood plain. Facility is sited in accordance with the Installation Development Plan and is within a compatible land use area. Companion/concurrent project includes F35 East Campus Infrastructure at Hill Air Force Base. The construction growth offset is 309,021 square feet. 75 Wing Base Civil Engineer: (801) 777-7505 HANGAR, MAINTENANCE DEPOT: 28,709 SM = 309,021 Square Feet JOINT USE CERTIFICATION: This facility can be used by other components on an "as available" basis; however, the scope of the project is based on Air Force requirements. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 283 === page 292 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE HILL AIR FORCE BASE UTAH F-35 MAINTENANCE FACILITY, PHASE 1, INC 2 5. PROGRAM ELEMENT 12. 6. CATEGORY CODE 7. PROJECT NUMBER 8. PROJECT COST ($000) 27142F 211-116 KSRM163011 AUTH: 0 SUPPLEMENTAL DATA: A. Estimated Execution Data: (1) Acquisition Strategy: Design-Build (2) Design Data (a) Design or Request for Proposal(RFP) Started: (b) Percent of Design Completed as of SEP 2025: (c) Percent of Design Completed as of JAN 2026: (d) Design or RFP Complete: (e) Total Design Cost ($000): (f) Energy Study and/or Life Cycle Cost Analysis (g) Standard or Definitive Design Used? (3) Construction Data: (a) Contract Award: (b) Construction Start: (c) Construction Complete: APPR: 100,000 APR/2022 35% 35% MAY/2023 37,500 YES NO APR/2026 SEP/2026 APR/2029 B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) FURNITURE FIXTURES & EQUIPMENT 3080 2029 43,700 Auth of Approp $(000) 22,000 100,000 128,000 250,000 Appropriation $(000) 22,000 100,000 128,000 250,000 C. Authorization and Appropriation Summary: FY2026 Enacted FY2027 Budget Request Future Request Total DD FORM 1391C, JUL 1999 Authorization $(000) 250,000 0 0 250,000 PREVIOUS EDITION IS OBSOLETE PAGE NO. 284 === page 293 === MILCON Work-in-Place (WIP) Curve – Automated Spend Plan Project Information Project Title Installation Program Year (FY) Project # F-35 Maintenance Facility, Phase 1, Inc Hill Air Force Base 2026 KSRM163011 Financial Inputs & Derived Amounts ($000) Programmed Amount (PA) SIOH Rate Contingency Rate SIOH Amount Contingency Amount Construction (PA less SIOH & Cont) Total Increments 250,000 6.5% 5.0% 16,250 12,500 221,250 3 Key Dates (Calculated) Begin Date (FY Start) Award Date (Assumed) Complete Date (Award + POP; set to 1st of month) Award Month (1st of month) Complete Month (1st of month) Period of Performance Oct 1, 2025 Apr 1, 2026 Apr 1, 2029 Apr 1, 2026 Apr 1, 2029 1100 Funding & Obligation Increments ($000) Increment Amount ($000) Funding Date Jan 1, 2026 Oct 1, 2026 Oct 1, 2027 Increment 1 Increment 2 Increment 3 22,000 100,000 128,000 Total Funding 250,000 Check vs PA Obligation Date Apr 1, 2026 Jan 1, 2027 Jan 1, 2028 0 Outlay Curve Controls (Adjust if needed) Outlay Curve Steepness (k) Normalized Logistic Base (t=0) Normalized Logistic Top (t=1) Total Outlay ($000) (assumed = PA) 9.0 0.010986943 0.989013057 250,000 285 === page 294 === Monthly Cash Flow (Automated from Spend Plan) Month Oct 2025 Nov 2025 Dec 2025 Jan 2026 Feb 2026 Mar 2026 Apr 2026 May 2026 Jun 2026 Jul 2026 Aug 2026 Sep 2026 Oct 2026 Nov 2026 Dec 2026 Jan 2027 Feb 2027 Mar 2027 Apr 2027 May 2027 Jun 2027 Jul 2027 Aug 2027 Sep 2027 Oct 2027 Nov 2027 Dec 2027 Jan 2028 Feb 2028 Mar 2028 Apr 2028 May 2028 Jun 2028 Jul 2028 Aug 2028 Sep 2028 Oct 2028 Nov 2028 Dec 2028 Jan 2029 Feb 2029 Mar 2029 Apr 2029 TOTAL Funding ($000) 0 0 0 22,000 0 0 0 0 0 0 0 0 100,000 0 0 0 0 0 0 0 0 0 0 0 128,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 250,000 Obligation ($000) 0 0 0 0 0 0 22,000 0 0 0 0 0 0 0 0 100,000 0 0 0 0 0 0 0 0 0 0 0 128,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 250,000 Outlay ($000) 0 0 0 0 0 0 763 966 1,221 1,540 1,937 2,427 3,027 3,754 4,621 5,638 6,806 8,110 9,515 10,963 12,371 13,635 14,645 15,299 15,525 15,299 14,645 13,635 12,371 10,963 9,515 8,110 6,806 5,638 4,621 3,754 3,027 2,427 1,937 1,540 1,221 966 763 250,000 Cumulative Funding Cumulative Obligation Cumulative Outlay 0 0 0 0 0 0 0 0 0 22,000 0 0 22,000 0 0 22,000 0 0 22,000 22,000 763 22,000 22,000 1,729 22,000 22,000 2,950 22,000 22,000 4,490 22,000 22,000 6,427 22,000 22,000 8,855 122,000 22,000 11,882 122,000 22,000 15,635 122,000 22,000 20,256 122,000 122,000 25,895 122,000 122,000 32,701 122,000 122,000 40,811 122,000 122,000 50,326 122,000 122,000 61,289 122,000 122,000 73,659 122,000 122,000 87,294 122,000 122,000 101,939 122,000 122,000 117,237 250,000 122,000 132,763 250,000 122,000 148,061 250,000 122,000 162,706 250,000 250,000 176,341 250,000 250,000 188,711 250,000 250,000 199,674 250,000 250,000 209,189 250,000 250,000 217,299 250,000 250,000 224,105 250,000 250,000 229,744 250,000 250,000 234,365 250,000 250,000 238,118 250,000 250,000 241,145 250,000 250,000 243,573 250,000 250,000 245,510 250,000 250,000 247,050 250,000 250,000 248,271 250,000 250,000 249,237 250,000 250,000 250,000 286 === page 295 === Cumulative WIP Curve Project: Program Year: F-35 Maintenance Facility, Phase 1, Inc 2026 Cumulative Funding vs Obligation vs Outlay 300,000 250,000 200,000 150,000 Cumulative Funding Cumulative Obligation 100,000 Cumulative Outlay 50,000 0 Oct Dec Feb Apr Jun Aug Oct Dec Feb Apr Jun Aug Oct Dec Feb Apr Jun Aug Oct Dec Feb Apr 2025 2025 2026 2026 2026 2026 2026 2026 2027 2027 2027 2027 2027 2027 2028 2028 2028 2028 2028 2028 2029 2029 287 === page 296 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE HILL AIR FORCE BASE UTAH T-7A DEPOT MAINTENANCE COMPLEX, INC 3 5. PROGRAM ELEMENT 6. CATEGORY CODE 84701F 211-116 7. PROJECT NUMBER KSRM183007 8. PROJECT COST ($000) AUTH: 0 APPR: 72,000 9. COST ESTIMATES ITEM UM QUANTITY UNIT COST COST($000) PRIMARY FACILITIES 205,587 HANGAR, MAINTENANCE DEPOT (211-116) SM 28,038 6,815 (191,079) SHOP, AIRCRAFT GENERAL PURPOSE (211-152) SM 1,124 8,435 (9,481) CYBERSECURITY OF FACILITY-RELATED CONTROL SYS LS (5,027) SUPPORTING FACILITIES 17,073 UTILITIES LS (5,659) SITE PREPARATION LS (2,082) SITE IMPROVEMENTS LS (9,082) PRIVATIZED UTILITIES SERVICE AND CONNECTION LS (250) SUBTOTAL 222,660 CONTINGENCY (5.00%) 11,133 TOTAL CONTRACT COST 233,793 SUPERVISION, INSPECTION AND OVERHEAD (6.50%) 15,197 DESIGN/BUILD - DESIGN COST (4.00% OF SUBTOTAL) 8,906 TOTAL REQUEST 257,896 TOTAL REQUEST (ROUNDED) 258,000 EQUIPMENT FROM OTHER APPROPRIATIONS (NON-ADD) (31,876) 10. DESCRIPTION OF PROPOSED CONSTRUCTION Construct a two-story hangar maintenance facility and a one-story egress facility for depot-level repairs for the new T-7 advanced pilot trainer campus. The large hangar maintenance facility will be located south of the existing F-22 facilities on the east side of the base adjacent to Foulois Road. The egress facility will be located east of Foulois Road across from the T-7 maintenance facility. Major functional components for the maintenance facility include 16 maintenance docks; engine storage and repair; equipment storage; blast booths and blast prep areas; paint booths and paint prep areas; air filtration system; fuel dock; pre-flight testing; harness, fabrication cell, hydraulics, machine, parts, stencil, and transportation shops; life support; material inventory control; hazardous waste storage; software integration lab; showers and locker rooms; administrative office space; and shipping & receiving dock. Major functional components for the egress facility include canopy storage and repair for 16 canopies, seat storage and repair for 32 seats, staging and storage, common area, and office space. The project will include utilities, pavements, parking, site preparation, site improvements and all necessary supporting facilities for two complete and usable facility. Facilities will be designed as permanent construction in accordance with the Department of War Unified Facilities Criteria 1-200-01, General Building requirements. This project will comply with Department of War antiterrorism/force protection requirements per Unified Facility Criteria 4-010-01. Air Conditioning: 500 Tons 11. REQ: 28,038 SM DD FORM 1391, JUL 1999 ADQT: 0 PREVIOUS EDITION IS OBSOLETE SUBSTD: 0 PAGE NO. 288 === page 297 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE HILL AIR FORCE BASE UTAH T-7A DEPOT MAINTENANCE COMPLEX, INC 3 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 8. PROJECT COST ($000) 84701F 211-116 KSRM183007 AUTH: 0 APPR: 72,000 PROJECT: Construct a two-story hangar maintenance facility with administration area and a one-story egress facility for the new T-7 advanced pilot trainer campus. REQUIREMENT: Provide a depot maintenance hangar and egress facility for support of the new T-7 advanced pilot trainer aircraft. Currently no facilities on Hill AFB can support the incoming T-7 workload. The intent is for a 250 person maintenance crew to support maintenance functions for a 351 aircraft program with an Aircraft Initial Operating Capability by 2024. The Initial Operating Capability of T-7 Advanced Pilot Trainer Depot-Level Maintenance and Modification Facilities are required by 2028. The aircraft Full Operational Capability is anticipated to be 2034. This is not a tenant or supported service requirement. CURRENT SITUATION: The Air Force will replace the T-38 Talon undergraduate pilot trainer with the T-7 advanced pilot trainer for 5th generation aircraft. Hill AFB will perform depotlevel maintenance on the aircraft. All existing maintenance space on Hill AFB is currently occupied due to unexpected life extensions of the A-10 and F-16 workload and increasing F-35 workload necessitates a separate advanced pilot trainer campus. IMPACT IF NOT PROVIDED: Hill AFB will not be able to perform depot-level maintenance on the Air Force's new advanced pilot trainer for 5th generation aircraft. The T-7 advanced pilot trainer workload will have to be performed by contract, moved to another location, or existing A-10/F-16/F-22/F-35 workloads will have to be move to another location, all of which are cost prohibitive. Should the A-10/F-16 workload be moved, this would provide additional hangar space for advanced pilot trainer work. ADDITIONAL: This project meets the criteria/scope in Department of the Air Force Manual 321084, Standard Facility Requirements. A Waiver to an Economic Analysis has been approved for this project. The project will comply with all applicable Department of War, Air Force, and base design standards. In addition, local materials and construction techniques shall be used where cost effective. This design shall conform to criteria established in the Air Force Corporate Facilities Standards, the Installation Facilities Standards, but will not employ a standard facility design because there is no Air Force standard facility design for this project, and there is no applicable standard design from United States Army Corps of Engineers. Sustainable principles, to include life-cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with Unified Facility Criteria 1-200-02, High Performance and Sustainable Building Requirements. This includes preparation of a life-cycle cost analysis for energy consuming systems, renewable energy generating systems, whenever life-cycle cost effective is selected as the reason any requirement of Unified Facility Criteria 1-200-02 is partially compliant or not applicable. Facility is sited in accordance with the Installation Development Plan and is DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 289 === page 298 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE HILL AIR FORCE BASE UTAH T-7A DEPOT MAINTENANCE COMPLEX, INC 3 5. PROGRAM ELEMENT 6. CATEGORY CODE 84701F 211-116 7. PROJECT NUMBER KSRM183007 8. PROJECT COST ($000) AUTH: 0 APPR: 72,000 within a compatible land use area. This project does not fall within or partly within the 100-year flood plain. The construction growth offset for this requirement is 313,897 square feet. 75 Wing Base Civil Engineer: (801) 777-7505 HANGAR, MAINTENANCE DEPOT: 28,038 SM = 301,798 Square Feet; SHOP, AIRCRAFT GENERAL PURPOSE: 1,124 SM = 12,099 Square Feet. JOINT USE CERTIFICATION: This facility can be used by other components on an "as available" basis; however, the scope of the project is based on Air Force requirements. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 290 === page 299 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE HILL AIR FORCE BASE UTAH T-7A DEPOT MAINTENANCE COMPLEX, INC 3 5. PROGRAM ELEMENT 12. 6. CATEGORY CODE 7. PROJECT NUMBER 8. PROJECT COST ($000) 84701F 211-116 KSRM183007 AUTH: 0 SUPPLEMENTAL DATA: A. Estimated Execution Data: (1) Acquisition Strategy: Design-Build (2) Design Data (a) Design or Request for Proposal(RFP) Started: (b) Percent of Design Completed as of SEP 2025: (c) Percent of Design Completed as of JAN 2026: (d) Design or RFP Complete: (e) Total Design Cost ($000): (f) Energy Study and/or Life Cycle Cost Analysis (g) Standard or Definitive Design Used? (3) Construction Data: (a) Contract Award: (b) Construction Start: (c) Construction Complete: APPR: 72,000 MAY/2022 35% 35% MAY/2023 38,700 YES NO SEP/2025 DEC/2025 OCT/2028 B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) FURNITURE FIXTURES & EQUIPMENT 3010 2028 31,876 Auth of Approp $(000) 50,000 113,000 13,000 72,000 258,000 Appropriation $(000) 50,000 123,000 13,000 72,000 258,000 C. Authorization and Appropriation Summary: FY2025 Enacted FY2026 Enacted FY2026 OBBB FY2027 BUDGET REQUEST Total DD FORM 1391C, JUL 1999 Authorization $(000) 258,000 0 0 0 258,000 PREVIOUS EDITION IS OBSOLETE PAGE NO. 291 === page 300 === MILCON Work-in-Place (WIP) Curve – Automated Spend Plan Project Information Project Title Installation Program Year (FY) Project # T-7A DEPOT MAINTENANCE COMPLEX, INC Hill Air Force Base 2025 KSRM183007 Financial Inputs & Derived Amounts ($000) Programmed Amount (PA) SIOH Rate Contingency Rate SIOH Amount Contingency Amount Construction (PA less SIOH & Cont) Total Increments 258,000 6.5% 5.0% 16,770 12,900 228,330 3 Key Dates (Calculated) Begin Date (FY Start) Award Date (Assumed) Complete Date (Award + POP; set to 1st of month) Award Month (1st of month) Complete Month (1st of month) Period of Performance Oct 1, 2024 Sep 1, 2025 Sep 1, 2028 Sep 1, 2025 Sep 1, 2028 1100 Funding & Obligation Increments ($000) Increment Amount ($000) Funding Date Jan 1, 2025 Oct 1, 2025 Oct 1, 2026 Increment 1 Increment 2 Increment 3 50,000 136,000 72,000 Total Funding 258,000 Check vs PA Obligation Date Apr 1, 2025 Jan 1, 2026 Jan 1, 2027 0 Outlay Curve Controls (Adjust if needed) Outlay Curve Steepness (k) Normalized Logistic Base (t=0) Normalized Logistic Top (t=1) Total Outlay ($000) (assumed = PA) 8.0 0.01798621 0.98201379 258,000 292 === page 301 === Monthly Cash Flow (Automated from Spend Plan) Month Oct 2024 Nov 2024 Dec 2024 Jan 2025 Feb 2025 Mar 2025 Apr 2025 May 2025 Jun 2025 Jul 2025 Aug 2025 Sep 2025 Oct 2025 Nov 2025 Dec 2025 Jan 2026 Feb 2026 Mar 2026 Apr 2026 May 2026 Jun 2026 Jul 2026 Aug 2026 Sep 2026 Oct 2026 Nov 2026 Dec 2026 Jan 2027 Feb 2027 Mar 2027 Apr 2027 May 2027 Jun 2027 Jul 2027 Aug 2027 Sep 2027 Oct 2027 Nov 2027 Dec 2027 Jan 2028 Feb 2028 Mar 2028 Apr 2028 TOTAL Funding ($000) 0 0 0 50,000 0 0 0 0 0 0 0 0 136,000 0 0 0 0 0 0 0 0 0 0 0 72,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 258,000 Obligation ($000) 0 0 0 0 0 0 50,000 0 0 0 0 0 0 0 0 136,000 0 0 0 0 0 0 0 0 0 0 0 72,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 258,000 Outlay ($000) 0 0 0 0 0 0 0 0 0 0 0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Cumulative Funding Cumulative Obligation Cumulative Outlay 0 0 0 0 0 0 0 0 0 50,000 0 0 50,000 0 0 50,000 0 0 50,000 50,000 0 50,000 50,000 0 50,000 50,000 0 50,000 50,000 0 50,000 50,000 0 50,000 50,000 #N/A 186,000 50,000 #N/A 186,000 50,000 #N/A 186,000 50,000 #N/A 186,000 186,000 #N/A 186,000 186,000 #N/A 186,000 186,000 #N/A 186,000 186,000 #N/A 186,000 186,000 #N/A 186,000 186,000 #N/A 186,000 186,000 #N/A 186,000 186,000 #N/A 186,000 186,000 #N/A 258,000 186,000 #N/A 258,000 186,000 #N/A 258,000 186,000 #N/A 258,000 258,000 #N/A 258,000 258,000 #N/A 258,000 258,000 #N/A 258,000 258,000 #N/A 258,000 258,000 #N/A 258,000 258,000 #N/A 258,000 258,000 #N/A 258,000 258,000 #N/A 258,000 258,000 #N/A 258,000 258,000 #N/A 258,000 258,000 #N/A 258,000 258,000 #N/A 258,000 258,000 #N/A 258,000 258,000 #N/A 258,000 258,000 #N/A 258,000 258,000 #N/A #N/A 293 === page 302 === Cumulative WIP Curve Project: Program Year: T-7A DEPOT MAINTENANCE COMPLEX, INC 2025 Cumulative Funding vs Obligation vs Outlay 300,000 250,000 200,000 150,000 Cumulative Funding Cumulative Obligation 100,000 Cumulative Outlay 50,000 0 Oct Dec Feb Apr Jun Aug Oct Dec Feb Apr Jun Aug Oct Dec Feb Apr Jun Aug Oct Dec Feb Apr 2024 2024 2025 2025 2025 2025 2025 2025 2026 2026 2026 2026 2026 2026 2027 2027 2027 2027 2027 2027 2028 2028 294 === page 303 === 1. COMPONENT FY AIR FORCE 2027 2. DATE (Y Y Y Y MMDD) MILITARY CONSTRUCTION PROGRAM 3. INSTALLATION AND LOCATION 4. COMMAND Joint Base Langley - Eustis, Virginia AIR COMBAT COMMAND 20260326 5. AREA CONTRUCTION COST INDEX 1.00 6. PERSONNEL (1) PERMANENT (2) STUDENTS (3) SUPPORTED OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN a. AS OF 30 Sep 25 b. END FY (4) TOTAL 1,345 6,651 2,731 370 0 0 366 1,495 60 13,018 1,345 6,658 2,667 370 0 0 364 1,491 60 12,955 7. INVENTORY DATA ($000) 12,083 11,117,560.00 0.00 49,000.00 0.00 151,000.00 14,466,000.00 25,783,560.00 a. TOTAL ACREAGE b. INVENTORY TOTAL AS OF 25 Feb 26 c. AUTHORIZATION NOT YET IN INVENTORY d. AUTHORIZATION REQUESTED IN THIS PROGRAM e. AUTHORIZATION INCLUDED IN FOLLOWING PROGRAM f. PLANNED IN NEXT THREE PROGRAM YEARS g. REMAINING DEFICIENCY h. GRAND TOTAL 8. PROJ ECTS REQUESTED IN THIS PROGRAM a. CATEGORY (1) CODE 211-179 (2) PROJ ECT TITLE Fuel System Maintenance Dock (3) SCOPE 2,760 b. COST ($000) 49,000 c. DESIGN STATUS (1) START (2) COMPLETE 05/17 02/23 9. FUTURE PROJ ECTS 131-111 Targeting ISR Critical Comms Data Center (8,101 SM/$151,000) 10. MISSION OR MAJ OR FUNCTIONS JBLE-Langley, 633 ABW is an Air Force-lead mission support wing. The installation also hosts the 480th Intelligence Surveillance & Reconnaissance Wing, the 1st Fighter Wing, the 363d Intelligence Surveillance & Reconnaissance Wing, 192d Wing, and headquarters of the Air Combat Command. 11. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES N/A DD FORM 1390, JUL 1999 PREVIOUS EDITION IS OBSOLETE. Adobe295 Professional 8.0 === page 304 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE JOINT BASE LANGLEY-EUSTIS VIRGINIA FUEL SYSTEM MAINTENANCE DOCK 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211F 211-179 MUHJ253000 8. PROJECT COST ($000) 49,000 9. COST ESTIMATES ITEM UM QUANTITY UNIT COST COST($000) PRIMARY FACILITIES 35,626 FUEL SYSTEM MAINTENANCE DOCK (211-179) SM 2,760 12,300 (33,948) LIQUID OXYGEN STORAGE (442-258) SM 408 3,500 (1,428) CYBERSECURITY OF FACILITY-RELATED CONTROL LS (250) SUPPORTING FACILITIES 8,371 UTILITIES LS (3,450) SITE PREPARATION LS (500) ROADS, SIDEWALKS, AND PARKING LS (1,500) SITE IMPROVEMENTS LS (300) COMMUNICATIONS LS (700) DEMOLITION SM 408 1,768 (721) PASSIVE FORCE PROTECTION MEASURES LS (600) PFAS REMEDIATION LS (600) SUBTOTAL 43,997 2,200 CONTINGENCY (5.00%) TOTAL CONTRACT COST 46,197 SUPERVISION, INSPECTION AND OVERHEAD (6.50%) 3,003 TOTAL REQUEST 49,200 TOTAL REQUEST (ROUNDED) 49,000 EQUIPMENT FROM OTHER APPROPRIATIONS (NON-ADD) (149) 10. DESCRIPTION OF PROPOSED CONSTRUCTION Construct steel hangar, to include special foundation pilings, standing seam metal roof and interior finishes. The new hangar includes all communications, utilities, site improvements, pavements, electrical, static-grounded floor, plumbing, heating, air conditioning, compressed air systems, fire protection/suppression system, security system, mechanical air ventilation systems, drainage trenches, fuel spill capture system, compacted fill above the 100-year flood plain, special foundation ten (10) feet above high mean sea level, and associated supporting work necessary to make a complete and useable facility. Construct Liquid Oxygen Storage facility to include concrete foundations, overhead structure, security fencing with lockable gates, electrical, lighting, grounding points, paved vehicle access, and security system as necessary. Relocate and connect government furnished Liquid Oxygen Storage tanks and office/storage structure. Relocate flight line security fencing as necessary to establish new Liquid Oxygen Storage facility site. The heating, ventilation, and air conditioning system, exhaust wall and door for this type facility shall be designed and constructed per Virginia Air Quality guidelines. Facilities must be able to withstand seismic and wind effects as prescribed in applicable codes and design guides. Facilities will be designed as permanent construction in accordance with the Department of War Unified Facilities Criteria 1-200-01, General Building Requirements. This project will comply with Department of War antiterrorism/force protection requirements in Unified Facilities Criteria 4-010-01, Minimum Antiterrorism Standards for Building. Facilities will be designed to a minimum life of 40 years in accordance with DoW's Unified Facilities Criteria (UFC 1-200-02) including energy efficiencies, building envelope and integrated building systems performance. Facilities will be designed as permanent construction in accordance with DD FORM 1391, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 296 === page 305 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE JOINT BASE LANGLEY-EUSTIS VIRGINIA FUEL SYSTEM MAINTENANCE DOCK 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211F 211-179 8. PROJECT COST ($000) MUHJ253000 49,000 Department of War Unified Facilities Criteria 1-200-01, General Building requirements. This project will comply with Department of War antiterrorism/ force protection requirements per Unified Facilities Criteria 4-010-01. Air Conditioning: 10 Tons 11. REQ: 2,760 SM ADQT: 0 SUBSTD: 0 PROJECT: Construct a fuel cell hangar, designed to properly accommodate two F-22A aircraft with adjoining support spaces to meet facility requirements in Unified Facility Criteria 4-211-01, Aircraft Maintenance Hangar, outlined in Technical Order 1-1-3, Chapter 3, para 3.2.2, and requirements dictated by Air Force Manual 32-1084. The installation has a requirement of at least four fuel cell bays based on workload record and primary assigned aircraft. The project requests construction of two additional bays (2,760 SM) and continued use of existing capacity in Building 373. The new facility will comply with all applicable Unified Facility Criteria and all current Engineering Technical Letters. Facility support areas will include separate shower/restroom/locker facilities for male and female personnel, a separate dispatch area with ventilation controls, two supervisor offices, a break/training room, mobility equipment storage and a separate storage area for tools and equipment. Facility must be large enough to allow concurrent maintenance operations and provide safe maneuvering space for two F-22A aircraft. Construct a Liquid Oxygen Storage facility (408 SM). Demolish the existing Liquid Oxygen Storage facility (Building 786). This is not a tenant or supported service requirement. REQUIREMENT: JBLE-Langley currently does not have adequate fuel cell capacity/facilities to accommodate planned F-22/T-38 force structure. CURRENT SITUATION: In 2019, Headquarter Air Combat Command authorized the temporary move of F-22A aircraft from the 95th Fighter Squadron at Tyndall Air Force Base to JBLE-Langley due to the damaging impacts of Hurricane Michael, which greatly increased JBLELangley's total F-22A footprint. Also, Secretary of the Air Force Strategic Basing Division released a May 2019 memo that identified JBLE-Langley as the Preferred Alternative to take permanent distribution of the seven 95 Fighter Squadron aircraft. Additionally, the same office released a separate March 2019 memo identifying JBLE-Langley as the Air Force's single candidate base and reasonable alternative to permanently station the 43d Fighter Training Unit from Tyndall Air Force Base. Site Activation Task Force identified the fuel cell requirement increased to a total of four bays based on the projected workload from the additional F-22A and T-38 force structure. Headquarter USAF provided a demolition waiver to retain Building 373 to ensure sufficient maintenance dock capacity for the increased F-22A JBLE-Langley footprint In addition, the Air Force is currently investing more Operation & Maintenance funds in Building 373 to correct facility deficiencies associated with ventilation/breathable air systems, DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 297 === page 306 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE JOINT BASE LANGLEY-EUSTIS VIRGINIA FUEL SYSTEM MAINTENANCE DOCK 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211F 211-179 8. PROJECT COST ($000) MUHJ253000 49,000 locker rooms, fire protection and other efficiency requirements. IMPACT IF NOT PROVIDED: The reliability and safety of fuel systems maintenance for the F-22A will continue to decline and jeopardize the 1st Fighter Wing's ability to carry out its mission in an effective, safe and timely manner. Continuously increased maintenance demands for critical onboard systems in these existing conditions will threaten the wing's ability to ensure on-time delivery of mission-ready F-22A aircraft. ADDITIONAL: This project meets applicable criteria/scope specified in Air Force Manual 321084, Facility Requirements. This design shall conform to criteria established in the Air Force Corporate Facilities Standards and the Installation Facilities Standards, but will not employ a standard facility design because there is no Air Force standard facility for this project and there is no applicable standard design from U.S Army Corps of Engineers. Provide required mitigation measures outlined in relevant State Historic Preservation Office agreements or cited in concurrent National Environment Policy Act documents as appropriate. An Economic Analysis was performed in 2015 which recommended New Construction as the only option that will meet the 1st Fighter Wing's fuel systems maintenance requirements. Sustainable principles, to include life cycle cost effective practices, will be integrated into the design, development, and construction of the project in accordance with UFC 1-200-02, High Performance and Sustainable Building Requirements. This includes preparation of a life-cycle cost analysis for energy consuming systems, renewable energy generating systems, or whenever lifecycle cost effective is selected as the reason any requirement of Unified Facilities Criteria 1-200-02 is partially compliant or not applicable. This project falls within the 100-year flood plain. The risk will be mitigated by constructing the facility and any flood susceptible facilities above the 100-year flood level. The facility and any flood susceptible utilities will be constructed a minimum of 2 feet above the 100-year flood elevation. Facility is sited in accordance with the Installation Development Plan and is within a compatible land use area. Supporting facility costs exceed 25% of primary facility cost due to the earthwork, pavement access, and compacted fill to meet 100-year flood plain requirements along with sanitary and stormwater management requirements within a constrained site. The construction growth offset for this requirement is 29,708 square feet. Base Civil Engineer: (757) 764-2025 Fuel System Maintenance Dock: 2,760 SM = 29,708 SF Liquid Oxygen Storage: 408 SM = 4,392 SF Demolition: 408 SM = 4,392 SF JIONT USE CERTIFICATION: This facility can be used by other components on an "as available" basis; however, the scope of the project is based on Air Force requirements. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 298 === page 307 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE JOINT BASE LANGLEY-EUSTIS VIRGINIA FUEL SYSTEM MAINTENANCE DOCK 5. PROGRAM ELEMENT 7. PROJECT NUMBER 12. 6. CATEGORY CODE 8. PROJECT COST ($000) 91211F 211-179 MUHJ253000 SUPPLEMENTAL DATA: A. Estimated Execution Data: (1) Acquisition Strategy: Design-Bid-Build (2) Design Data (a) Design or Request for Proposal(RFP) Started: (b) Percent of Design Completed as of SEP 2025: (c) Percent of Design Completed as of JAN 2026: (d) Design or RFP Complete: (e) Total Design Cost ($000): (f) Energy Study and/or Life Cycle Cost Analysis (g) Standard or Definitive Design Used? (3) Construction Data: (a) Contract Award: (b) Construction Start: (c) Construction Complete: 49,000 100% 100% FEB/2023 4,320 YES NO MAR/2027 JUN/2027 JUL/2029 B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) Furniture Fixtures & Equipment DD FORM 1391C, JUL 1999 3400 PREVIOUS EDITION IS OBSOLETE 2024 149 PAGE NO. 299 === page 308 === 1. COMPONENT 2. DATE (YYYYMMDD) FY 2027 AIR FORCE MILITARY CONSTRUCTION PROGRAM 3. INSTALLATION AND LOCATION 4. COMMAND FE WARREN AIR FORCE BASE, WYOMING 6. PERSONNEL 5. AREA CONTRUCTION COST INDEX AIR FORCE GLOBAL STRIKE COMMAND (1) PERMANENT (2) STUDENTS 20260326 1.02 (3) SUPPORTED OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN (4) TOTAL a. AS OF 30-Sep-25 495 2,600 658 0 0 0.00 48 187 10 3,998 b. END FY 30-Sep-30 495 2,829 661 0 0 0 48 187 10 4,230 7. INVENTORY DATA ($000) 8,330 8,536,032.00 1,842,000.00 171,000.00 0.00 379,728.00 215,070.00 11,143,830.00 a. TOTAL ACREAGE b. INVENTORY TOTAL AS OF 30-Sep-25 c. AUTHORIZATION NOT YET IN INVENTORY d. AUTHORIZATION REQUESTED IN THIS PROGRAM e. AUTHORIZATION INCLUDED IN FOLLOWING PROGRAM f. PLANNED IN NEXT THREE PROGRAM YEARS g. REMAINING DEFICIENCY h. GRAND TOTAL 8. PROJECTS REQUESTED IN THIS PROGRAM a. CATEGORY (1) CODE (2) PROJECT TITLE (3) SCOPE b. COST ($000) c. DESIGN STATUS (1) START (2) COMPLETE 610-243 GBSD Operations Group Facility 6,353 SM 171,000 01/25 07/26 135-583 GBSD Utility Corridor, Inc 2,511 KM 461,158 07/23 08/26 9. FUTURE PROJECTS a. Included in Following Program (FY28) 135-583 GBSD Utility Corridor, Inc 4 ( 2,511 KM / $376,000) b. Planned Next Three Years (FY29, FY30, FY31) FY29 - 135-583 GBSD Utility Corridor, Inc 5 ( 2,511 KM / $101,800) FY31 - 149-512 GBSD Launch Facilities, Inc ( TBD / $364,728 ) FY31 - 215-582 Sentinel CMF Battery Storage Facility ( TBD / $15,000) R&M Unfunded Requirements: Unavailable 10. MISSION OR MAJOR FUNCTIONS Francis. E. Warren Air Force Base is home to the 90th Missile Wing and Headquarters, 20th Air Force of Air Force Global Strike command. The mission of the 90th MW is to defend America with the world's premier combat ready Intercontinental Ballistic Missile force. The 90thMW operates 150 Minuteman III ICBMs on full alert and maintains the missile fields across a 12,600-square-mile area in Wyoming, Nebraska, and Colorado. The wing also operates 9 UH-1N Huey helicopters that perform nuclear convoy security and missile site support. 11. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES N/A DD FORM 1390, JUL 1999 PREVIOUS EDITION IS OBSOLETE. 300 === page 309 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA MARCH 2026 AIR FORCE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE F.E. WARREN AIR FORCE BASE WYOMING GBSD UTILITY CORRIDOR, INC 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 11233F 135-583 GHLN244125 8. PROJECT COST ($000) AUTH: 0 APPR: 461,158 9. COST ESTIMATES ITEM UM QUANTITY UNIT COST COST($000) PRIMARY FACILITIES 787,512 TELEPHONE DUCT FACILITY (135-583) KM 2,511 313,625 (787,512) SUPPORTING FACILITIES 290,000 SITE PREPARATION LS (15,000) SITE IMPROVEMENTS LS (7,500) COMMUNICATIONS LS (267,500) SUBTOTAL 1,077,512 CONTINGENCY (5.00%) 53,876 TOTAL CONTRACT COST 1,131,388 SUPERVISION, INSPECTION AND OVERHEAD (6.50%) 73,540 DESIGN/BUILD - DESIGN COST (4.00% OF SUBTOTAL) 43,100 TOTAL REQUEST 1,248,028 TOTAL REQUEST (ROUNDED) 1,248,000 EQUIPMENT FROM OTHER APPROPRIATIONS (NON-ADD) (0) 10. DESCRIPTION OF PROPOSED CONSTRUCTION Construct Utility Corridor for connecting the Sentinel Missile Field Launch Facilities and Launch Centers at F.E. Warren Air Force Base. Project to include trenching, installation of conduits, communication lines, construction of pull vaults and manholes, and boring under roadways, rivers, railways, etc. and the purchase and installation of the communications media. Facilities will be designed as permanent construction in accordance with Department of War Unified Facilities Criteria 1-200-01, General Building requirements. This project will comply with Department of War antiterrorism/ force protection requirements per Unified Facilities Criteria 4-010-01. 11. REQ: 2,511 KM ADQT: 0 SUBSTD: 0 PROJECT: Construct a Sentinel Utility Corridor. REQUIREMENT: The Sentinel Ground Based Strategic Deterrent Intercontinental Ballistic Missile system requires new utility and communication routes and connections to meet Weapon System criteria. This is not a tenant or support service requirement. CURRENT SITUATION: The current Intercontinental Ballistic Missile Minuteman III does not meet the requirements for the utility connections that are specific to Sentinel Ground Based Strategic Deterrent. IMPACT IF NOT PROVIDED: The Sentinel Ground Based Strategic Deterrent deployment schedule and functionality will not be met without the utilities and communication connections completed prior to the completion of Launch Facility conversions and Launch Center constructions required for this program. DD FORM 1391, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 301 === page 310 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA MARCH 2026 AIR FORCE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE F.E. WARREN AIR FORCE BASE WYOMING GBSD UTILITY CORRIDOR, INC 5. PROGRAM ELEMENT 7. PROJECT NUMBER 6. CATEGORY CODE 8. PROJECT COST ($000) 11233F 135-583 GHLN244125 AUTH: 0 APPR: 461,158 ADDITIONAL: This project meets applicable criteria/scope specified in Department of the Air Force Manual 32-1084, Standard Facilities Requirements. This design shall conform to criteria established in the Air Force Corporate Facilities Standards, the Installation Facilities Standards, but will not employ a standard facility design because there is no Air Force standard facility design for this project and there is no applicable standard design from Air Force Civil Engineer Center. A waiver to an Economic analysis has been approved for this project. Sustainable principles, to include life-cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with Unified Facilities Criteria 1-200-02. This includes preparation of a life-cycle cost analysis for energy consuming systems, renewable energy generating systems, whenever life-cycle cost effective is selected as a reason any requirement of Unified Facilities Criteria 1-200-02 is partially compliant or not applicable. This project falls partially within several 100-year flood plains. The risk will be mitigated by constructing the Utility Corridor with water intrusion/control measure included within the design. Facility is sited in accordance with the Installation Development Plan and is within a compatible land use area. The Sentinel Land Acquisition is a concurrent project and started in FY25. Supporting Facilities cost exceeds 25% of the Primary Facilities cost due to the cost of communication fiber to support the requirement. There is no construction growth offset for this requirement. 90th Missile Wing Base Civil Engineer: (307) 481-3600 Telephone Duct Facility: 2,511 kilometers = 1,560 miles. JOINT USE CERTIFICATION: Mission Requirements, operational considerations, and location are incompatible with use by other components. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 302 === page 311 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA MARCH 2026 AIR FORCE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE F.E. WARREN AIR FORCE BASE WYOMING GBSD UTILITY CORRIDOR, INC 5. PROGRAM ELEMENT 7. PROJECT NUMBER 12. 6. CATEGORY CODE 8. PROJECT COST ($000) 11233F 135-583 GHLN244125 AUTH: 0 SUPPLEMENTAL DATA: A. Estimated Execution Data: (1) Acquisition Strategy: Design-Build (2) Design Data (a) Design or Request for Proposal(RFP) Started: (b) Percent of Design Completed as of SEP 2025: (c) Percent of Design Completed as of JAN 2026: (d) Design or RFP Complete: (e) Total Design Cost ($000): (f) Energy Study and/or Life Cycle Cost Analysis (g) Standard or Definitive Design Used? (3) Construction Data: (a) Contract Award: (b) Construction Start: (c) Construction Complete: APPR: 461,158 JUL/2023 10% 15% Aug/2026 54,274 NO NO SEP/2026 APR/2027 SEP/2029 B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) NONE C. Authorization and Appropriation Summary: FY2025 Enacted FY2026 Enacted FY2027 Budget Request Future Request Total DD FORM 1391C, JUL 1999 Authorization $(000) 1,248,000 0 0 0 1,248,000 Auth of Approp PREVIOUS EDITION IS OBSOLETE $(000) 70,000 130,000 461,158 586,842 1,248,000 Appropriation $(000) 70,000 130,000 461,158 586,842 1,248,000 PAGE NO. 303 === page 312 === Spend Plan Project Title: Installation: Program Year Project # CAO: . .________.__ FE Warren AFB, WY 2027 GHLN244125 Financials PA ($000) Initial Contract SIOH SIOH / Month Other (Contingency) Other / Month I 6.5% I 5.0% I Schedule Award Complete POP Months I I _____.I I 1,248,000 - 1-Sep-26 1-Sep-29 ,.___ 1096 36.0 !/ Fund 1-Oct-24 31-Jan-25 1-Oct-25 1-Oct-26 1-Oct-27 1-Oct-28 1-Sep-29 J Obligate I ;, 1-Sep-26 1-Oct-26 1-Nov-26 1-Nov-27 1-Nov-28 1-Sep-29 Fund mmm-yr Oct-24 Jan-25 Oct-25 Oct-26 Oct-27 Oct-28 Sep-29 Instructions and Notes This spreadsheet is designed to help the user develop a WIP Curve for inclusion with a project 1391. The user only needs to know the project cost and schedule. Edit The Green Fields ONLY 1 2 3 4 5 6 7 8 1,108,536 81,120 2,704 58,344 1,945 I Chart Begin 1st Increment 2nd Increment 3rd Increment 4th Increment 5th Increment End Total 25-Mar-26 Sentinel (GBSD) Utility Corridor, Inc - 9 - 10 11 Obligate mmm-yr Months 0 Sep-26 1 Oct-26 1 Nov-26 12 Nov-27 12 Nov-28 10 Sep-29 0 36 Enter the Project Title, Location, and Project number Enter the Date this WIP Curve is being updated Enter the Project PA Enter the SIOH required by the agent (6.5% for USACE FY24 and beyond) Enter the contingency percentage plus other amounts withheld by the Agent Enter the projected project Award Date ( usually 1 Apr of the Execution FY) Enter the Project Complete Date (Usually Award plus ~1000 days) Enter the Chart Begin Date ( first day of the Program Year: 1-Oct-XX) ( Use "Short Date" format Enter the Dates anticipate to receive each increment of funding (usually March of the Program year, and Oct for subsequent increments) Enter the Dates anticipated to Award the contract and obligate increments (usually 1 Oct for increments after initial award.) Enter the Value of each increment IIncrement + 70,000 130,000 461,158 293,421 293,421 1,248,000 Obligate 62,178 115,473 409,624 260,631 260,631 1,108,536 SIOH 4,550 8,450 29,975 19,072 19,072 81,120 Other 3,273 6,078 21,559 13,717 13,717 58,344 304 === page 313 === Spend Plan CAO: 25-Mar-26 Sentinel (GBSD) Utility Corridor, Inc Project Title: Installation: Program Year Project # Notes FE Warren AFB, WY 2027 GHLN244125 All Cost in thousands Chart Begin Oct-24 Month Oct-24 Nov-24 Dec-24 Jan-25 Feb-25 Mar-25 Apr-25 May-25 Jun-25 Jul-25 Aug-25 Sep-25 Oct-25 Nov-25 Dec-25 Jan-26 Feb-26 Mar-26 Apr-26 May-26 Jun-26 Jul-26 Aug-26 Sep-26 Oct-26 Nov-26 Dec-26 Jan-27 Feb-27 Mar-27 Apr-27 May-27 Jun-27 Jul-27 Aug-27 Sep-27 Oct-27 Nov-27 Dec-27 Jan-28 Feb-28 Mar-28 Apr-28 May-28 Jun-28 Jul-28 Aug-28 Sep-28 Oct-28 Nov-28 Dec-28 Jan-29 Feb-29 Mar-29 Apr-29 May-29 Jun-29 Jul-29 Aug-29 Sep-29 FUNDING (note 1) Enacted 70,000 130,000 461,158 293,421 293,421 - OBLIGATION (note 2-3) Cumulative Obligated Cumulative 70,000 70,000 70,000 70,000 70,000 70,000 70,000 70,000 70,000 200,000 200,000 200,000 200,000 200,000 200,000 200,000 200,000 200,000 200,000 200,000 200,000 661,158 661,158 661,158 661,158 661,158 661,158 661,158 661,158 661,158 661,158 661,158 661,158 954,579 954,579 954,579 954,579 954,579 954,579 954,579 954,579 954,579 954,579 954,579 954,579 1,248,000 1,248,000 1,248,000 1,248,000 1,248,000 1,248,000 1,248,000 1,248,000 1,248,000 1,248,000 1,248,000 1,248,000 62,177 120,122 414,272 4,649 4,649 4,649 4,649 4,649 4,649 4,649 4,649 4,649 4,649 4,649 265,280 4,649 4,649 4,649 4,649 4,649 4,649 4,649 4,649 4,649 4,649 4,649 265,280 4,649 4,649 4,649 4,649 - 62,177 182,299 596,571 601,220 605,869 610,518 615,166 619,815 624,464 629,113 633,762 638,410 643,059 647,708 912,988 917,637 922,286 926,934 931,583 936,232 940,881 945,530 950,178 954,827 959,476 964,125 1,229,405 1,234,054 1,238,702 1,243,351 1,248,000 1,248,000 1,248,000 1,248,000 1,248,000 1,248,000 1,248,000 Note 1: Assumes initial appropriation is enacted by Congress Jan FY 2026 Note 2: Assumes funds are available for obligation by 31 January of the execution year and by 31 October for subsequent years. Note 3: Assumes ALL project funds (contract, SIOH, contingency, etc) are obligated NLT 6 months prior to project end Note 4 Assumes contract award in Sept 2026 and contract completion Sept 29; duration 36 months. Note 5 Assumes Agent will retain 1% of project obligations for a final payment OUTLAYS (note 4-5) Monthly 70,000 11,895 13,863 16,013 18,330 20,794 23,377 26,046 28,760 31,471 34,129 36,679 39,067 41,237 43,137 44,720 45,945 46,780 47,204 47,204 46,780 45,945 44,720 43,137 41,237 39,067 36,679 34,129 31,471 28,760 26,046 23,377 20,794 18,330 16,013 13,863 51,004 Cumulative 70,000 81,895 95,758 111,771 130,101 150,894 174,272 200,318 229,077 260,548 294,677 331,357 370,424 411,660 454,797 499,517 545,462 592,242 639,445 686,649 733,429 779,374 824,094 867,230 908,467 947,534 984,214 1,018,343 1,049,814 1,078,573 1,104,619 1,127,997 1,148,790 1,167,120 1,183,133 1,196,996 1,248,000 - 130,318 439,445 443,461 305 === page 314 === GBSD Utility Corridors, FE Warren AFB, WY $1,400,000 $1,200,000 $800,000 $600,000 , $400,000 , , , , Funding Obligation Outlays $200,000 Jul-29 Apr-29 Jan-29 Oct-28 Jul-28 Apr-28 Jan-28 Oct-27 Jul-27 Apr-27 Jan-27 Oct-26 Jul-26 Apr-26 Jan-26 Oct-25 Jul-25 Apr-25 Jan-25 $0 Oct-24 Dollars in (000) $1,000,000 306 === page 315 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA MARCH 2026 AIR FORCE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE F.E. WARREN AIR FORCE BASE WYOMING GBSD OPERATIONS GROUP FACILITY 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 11233F 610-243 8. PROJECT COST ($000) GHLN274779 171,000 9. COST ESTIMATES ITEM UM QUANTITY UNIT COST COST($000) PRIMARY FACILITIES 137,106 HEADQUARTERS, GROUP (610-243) SM 6,353 14,721 (93,523) WAREHOUSE SUPPLY AND EQUIPMENT BASE (442-758) SM 4,251 8,874 (37,723) ICD 705 PREMIUM LS (5,178) CYBERSECURITY OF FACILITY-RELATED CONTROL SYS LS (682) SUPPORTING FACILITIES 12,588 UTILITIES LS (4,001) PRIVATIZED UTILITIES SERVICE AND CONNECTION LS (904) SITE IMPROVEMENTS LS (2,737) ROADS, SIDEWALKS, AND PARKING LS (3,286) COMMUNICATIONS LS (490) GENERATOR KW 800 1,463 (1,170) SUBTOTAL 149,694 CONTINGENCY (5.00%) 7,485 TOTAL CONTRACT COST 157,179 SUPERVISION, INSPECTION AND OVERHEAD (6.50%) 10,217 DESIGN DURING CONSTRUCTION 3,930 TOTAL REQUEST 171,326 TOTAL REQUEST (ROUNDED) 171,000 EQUIPMENT FROM OTHER APPROPRIATIONS (NON-ADD) (8,374) 10. DESCRIPTION OF PROPOSED CONSTRUCTION Construct a Sentinel Operations Group facility that delivers office and collaboration space to the Wing's Operations Group and Missile Squadrons, provides critical secure space conforming to Intelligence Community Directive 705 for specific functions, and integrates Missile Alert Facility Food Operations, Missile Alert Facility Supply, and linen exchange at a single location for operational efficiency. Construction consists of conventional steel reinforced concrete footings, foundation, and floor slabs, with insulated precast concrete walls and insulated roofs for both multi-story planning and operations areas and adjoining ground-level areas for Missile Alert Facility Food Operations, Missile Alert Facility Supply, linen exchange, a mission-specific training kitchen, and enclosed area for receiving and dispatch in support of movements to the dispersed missile field. Construction of this facility includes facility electrical, mechanical, water, sewer, fire and lighting protection systems, security systems, and secure internet protocol router/non-secure internet protocol router communications systems. Overall site improvements include clearing, grubbing, grading, minor demolition, drainage, utility and communications connections, plus access paving, parking, and walkways as applicable. The facility will be designed as permanent construction in accordance with Department of War Unified Facilities Criteria 1-200-01, General Building requirements. This project will comply with Department of War antiterrorism/ force protection requirements per Unified Facilities Criteria 4-010-01. Air Conditioning: 110 tons 11. REQ: 6,353 SM DD FORM 1391, JUL 1999 ADQT: 0 PREVIOUS EDITION IS OBSOLETE SUBSTD: 0 PAGE NO. 307 === page 316 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA MARCH 2026 AIR FORCE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE F.E. WARREN AIR FORCE BASE WYOMING GBSD OPERATIONS GROUP FACILITY 5. PROGRAM ELEMENT 7. PROJECT NUMBER 6. CATEGORY CODE 11233F 610-243 GHLN274779 PROJECT: Construct Sentinel Operations Group Facility 8. PROJECT COST ($000) 171,000 REQUIREMENT: This project consolidates planning and operations, enhances span of control, facilitates interaction, collaboration, and efficiency in conducting day-to-day activities, and contributes to airman retention while demonstrating the nation's continued commitment to strategic deterrence. This is not a tenant or supported service requirement. CURRENT SITUATION: The current Minuteman III Intercontinental Ballistic Missile system will remain operational during transition to the new Sentinel Intercontinental Ballistic Missile system and existing facilities will neither be available nor satisfy the specific facility requirements of the new Sentinel Intercontinental Ballistic Missile system. Some existing facilities are substandard, provide inefficient utilization, or have aging, obsolete systems. Additionally, activities are spread across multiple facilities which makes coordinated workflow difficult, complicates or hinders operations, and can result in delay to resupply support of the missile field. IMPACT IF NOT PROVIDED: This project is mission-critical to the transition from the Minuteman III to the Sentinel weapons system at F.E. Warren Air Force Base. Without a consolidated facility, providing secure mission planning and operations space, and areas for the efficient receipt, storage, assembly and dispatch of support to the missile field, the deployment of the Sentinel weapons system vital to the defense and security of the United States is jeopardized. ADDITIONAL: This project meets applicable criteria/scope specified in Department of the Air Force Manual 32-1084, Standard Facility Requirements and the design conforms to criteria established in the Air Force Corporate Facilities Standards and the Installation Facilities Standards. However, as the Sentinel missile system is a new weapons system, there are no existing standard Air Force facility designs. Consequently, this project uses facility designs specifically developed by the Air Force Nuclear Weapons Center in coordination with Air Force Global Strike Command and the Air Force Civil Engineer Center for the Sentinel deployment at F.E. Warren Air Force Base to achieve commonality across the enterprise. A Waiver to an Economic Analysis has been approved for this project. Sustainable principles, to include life-cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with Unified Facilities Criteria 1-200-02, High Performance and Sustainable Building Requirements. This includes preparation of a life-cycle cost analysis for energy consuming systems, renewable energy generating systems, or whenever life-cycle cost effective is selected as the reason any requirement of Unified Facilities Criteria 1-200-02 is partially compliant or not applicable. This project does not fall within or partly within the 100-year floodplain. Facility is sited in accordance with the DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 308 === page 317 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA MARCH 2026 AIR FORCE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE F.E. WARREN AIR FORCE BASE WYOMING GBSD OPERATIONS GROUP FACILITY 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 11233F 610-243 8. PROJECT COST ($000) GHLN274779 171,000 Installation Development Plan and is within a compatible land use area. The construction growth offset for this requirement is 114,140 square feet. Privatized Utility Connection Fee for power (High West Energy) for medium voltage service to facility transformer. Site lighting will be included in the utility base bid costs, with transfer to the Civil Engineer Squadron at the end of the project. Post turnover, the Civil Engineer Squadron will transfer to the private utility. Fee payment will be made by funds transfer from the Air Force Civil Engineer Center to the Base Civil Engineer Squadron, with cost on the project tracked under 'Other project costs' in the DA CWE. Privatized Water and Sewer fees payable to Board of Public Utilities will be made by funds transfer from the Air Force Civil Engineer Center to the Base Civil Engineer Squadron, with cost on the project tracked under 'Other project costs' in the DA CWE. Base Civil Engineer Phone: 307-630-9950 Headquarters, Group: 6,353 SM = 68,383 Square Feet; Warehouse Supply and Equipment Base: 4,251 SM = 45,757 Square Feet. JOINT USE CERTIFICATION: Mission Requirements, operational considerations, and location are incompatible with use by other components. Facility Condition Index: This is not a recapitalization project. No Facility Condition Index data exists for this facility type. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 309 === page 318 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA MARCH 2026 AIR FORCE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE F.E. WARREN AIR FORCE BASE WYOMING GBSD OPERATIONS GROUP FACILITY 5. PROGRAM ELEMENT 7. PROJECT NUMBER 12. 6. CATEGORY CODE 8. PROJECT COST ($000) 11233F 610-243 GHLN274779 SUPPLEMENTAL DATA: A. Estimated Execution Data: (1) Acquisition Strategy: Design-Bid-Build (2) Design Data (a) Design or Request for Proposal(RFP) Started: (b) Percent of Design Completed as of SEP 2025: (c) Percent of Design Completed as of JAN 2026: (d) Design or RFP Complete: (e) Total Design Cost ($000): (f) Energy Study and/or Life Cycle Cost Analysis (g) Standard or Definitive Design Used? (3) Construction Data: (a) Contract Award: (b) Construction Start: (c) Construction Complete: 171,000 JAN/2025 35% 35% JUL/2026 4,600 YES NO APR/2027 JUN/2027 MAR/2031 B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) FURNITURE, FIXTURES, & EQUIPME SECURITY EQUIPMENT UPS EQUIPMENT AUDIO VISUAL EQUIPMENT SITE SECURITY SURVEILLANCE DD FORM 1391C, JUL 1999 3080 3080 3400 3080 3080 PREVIOUS EDITION IS OBSOLETE 2031 2031 2031 2031 2027 2,028 1,560 212 1,092 3,482 PAGE NO. 310 === page 319 === Spend Plan Project Title: Installation: Program Year Project # CAO: 25-Mar-26 Operations Group Facility Instructions and Notes This spreadsheet is designed to help the user develop a WIP Curve for inclusion with a project 1391. The user only needs to know the project cost and schedule. Edit The Green Fields ONLY FE Warren AFB, WY 2027 GHLN274779 _ _ _ _ _ _1 1 Financials PA ($000) Initial Contract SIOH SIOH / Month Other (Contingency) Other / Month I 6.5% I 5.0% I Schedule Award Complete POP Months 171,000 151,891 11,115 271 7,994 195 ~ I I 1-Apr-27 I<---1-Mar-31 I+--1430 47.0 I Chart Begin 1st Increment 2nd Increment 3rd Increment 4th Increment 5th Increment End Total 1 2 3 4 5 6 7 8 iI Fund 1-Oct-26 1-Jan-27 Obligate ,,I t 1-Apr-27 1-Mar-31 1-Mar-31 Fund mmm-yr ~ 9 10 11 Obligate mmm-yr Months Oct-26 0 Jan-27 Apr-27 47 0 0 0 0 Mar-31 Mar-31 0 47 Enter the Project Title, Location, and Project number Enter the Date this WIP Curve is being updated Enter the Project PA Enter the SIOH required by the agent (6.5% for USACE FY24 and beyond) Enter the contingency percentage plus other amounts withheld by the Agent Enter the projected project Award Date ( usually 1 Apr of the Execution FY) Enter the Project Complete Date (Usually Award plus ~1000 days, use the 1st of a month) Enter the Chart Begin Date ( first day of the Program Year: 1-Oct-XX) ( Use "Short Date" format.) Enter the Dates anticipate to receive each increment of funding (usually January of the Program year, and Oct for subsequent increments) Enter the Dates anticipated to Award the contract ( usually 1 Apr of the Program year and obligate increments (usually 1 Oct for increments after initial award.) Enter the Value of each increment (If the project is less than $250M enter the PA as 1st Increment) Increment ,I. 171,000 171,000 Obligate 151,891 151,891 SIOH 11,115 11,115 Other 7,994 7,994 311 === page 320 === Spend Plan CAO: Project Title: Installation: Program Year Project # 25-Mar-26 Operations Group Facility Notes FE Warren AFB, WY 2027 GHLN274779 Assumes initial appropriation is enacted by Note 1: Congress Jan FY 2027. Assumes funds are available for obligation by 31 January of the execution year and by Note 2: 31 October for subsequent years. All Cost in thousands Chart Begin Oct-26 Month Oct-26 Nov-26 Dec-26 Jan-27 Feb-27 Mar-27 Apr-27 May-27 Jun-27 Jul-27 Aug-27 Sep-27 Oct-27 Nov-27 Dec-27 Jan-28 Feb-28 Mar-28 Apr-28 May-28 Jun-28 Jul-28 Aug-28 Sep-28 Oct-28 Nov-28 Dec-28 Jan-29 Feb-29 Mar-29 Apr-29 May-29 Jun-29 Jul-29 Aug-29 Sep-29 Oct-29 Nov-29 Dec-29 Jan-30 Feb-30 Mar-30 Apr-30 May-30 Jun-30 Jul-30 Aug-30 Sep-30 Oct-30 Nov-30 Dec-30 Jan-31 Feb-31 Mar-31 FUNDING (note 1) Enacted 171,000 - OBLIGATION (note 2-3) Cumulative Obligated Cumulative 171,000 171,000 171,000 171,000 171,000 171,000 171,000 171,000 171,000 171,000 171,000 171,000 171,000 171,000 171,000 171,000 171,000 171,000 171,000 171,000 171,000 171,000 171,000 171,000 171,000 171,000 171,000 171,000 171,000 171,000 171,000 171,000 171,000 171,000 171,000 171,000 171,000 171,000 171,000 171,000 171,000 171,000 171,000 171,000 171,000 171,000 171,000 171,000 171,000 171,000 171,000 151,891 407 407 407 407 407 407 407 407 407 407 407 407 407 407 407 407 407 407 407 407 407 407 407 407 407 407 407 407 407 407 407 407 407 407 407 407 407 407 407 407 407 407 407 407 407 407 407 151,891 152,297 152,704 153,110 153,517 153,924 154,330 154,737 155,143 155,550 155,956 156,363 156,770 157,176 157,583 157,989 158,396 158,802 159,209 159,616 160,022 160,429 160,835 161,242 161,648 162,055 162,462 162,868 163,275 163,681 164,088 164,494 164,901 165,308 165,714 166,121 166,527 166,934 167,340 167,747 168,154 168,560 168,967 169,373 169,780 170,186 170,593 171,000 OUTLAYS (note 4-5) Monthly 875 1,089 1,340 1,630 1,958 2,325 2,728 3,164 3,626 4,106 4,596 5,083 5,555 6,000 6,404 6,754 7,040 7,252 7,382 7,426 7,382 7,252 7,040 6,754 6,404 6,000 5,555 5,083 4,596 4,106 3,626 3,164 2,728 2,625 1,958 1,630 1,340 1,089 875 694 545 422 323 245 183 135 2,914 Cumulative 875 1,964 3,304 4,934 6,892 9,217 11,945 15,109 18,735 22,841 27,437 32,519 38,074 44,074 50,477 57,232 64,272 71,524 78,906 86,332 93,714 100,966 108,007 114,761 121,165 127,164 132,719 137,802 142,397 146,504 150,129 153,293 156,022 158,647 160,605 162,234 163,574 164,663 165,538 166,233 166,777 167,199 167,523 167,767 167,950 168,086 171,000 Assumes ALL project funds (contract, SIOH, contingency, etc) are obligated NLT 6 Note 3: months prior to project end Assumes contract award in Apr 2027 and contract completion Mar 31 duration 47 Note 4 months. Assumes Agent will retain 1% of project Note 5 obligations for a final payment 312 === page 321 === Operations Group Facility, FE Warren AFB, WY - - ------- I I .I I I I I I I I , , , , . , , ,, .' , - - . -- Funding - Obligation -- Outlays Feb-31 Dec-30 Oct-30 Aug-30 Apr-30 Jun-30 Apr-29 7 Feb-29 Feb-27 Dec-26 Apr-27 I $0 ,,. ...... ,,. ...... ,,. ,,. ,, , ,, , ,, Jun-28 Aug-28 I Aug-27 Oct-27 $20,000 Dec-27 I Feb-28 $40,000 Apr-28 $60,000 , , , Oct-28 $80,000 ,, , Dec-28 - Jun-27 $100,000 I Oct-26 Dollars in (000) $120,000 ,, ., ,,. Feb-30 $140,000 , ,,. Oct-29 ,I Dec-29 $160,000 - ________ -------- ,,. ,,. ...... ,,. Jun-29 Aug-29 $180,000 313 === page 322 === Tab - OUTSIDE THE UNITED STATES === page 323 === 1. COMPONENT FY Air Force 3. INSTALLATION AND LOCATION 4. COMMAND CHABELLEY AIRFIELD, DJIBOUTI, AFRICA HQ USAFE-AFAFRICA/A4C 6. PERSONNEL 2. DATE (Y Y Y Y MMDD) MILITARY CONSTRUCTION PROGRAM 27 20260326 5. AREA CONTRUCTION COST INDEX 1.31 (1) PERMANENT (2) STUDENTS (3) SUPPORTED OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN a. AS OF 30-Sep-25 b. END FY (4) TOTAL 12 341 0 0 0 0 0 0 0 353 12 341 0 0 0 0 0 0 0 353 7. INVENTORY DATA ($000) 585 114,160.00 8,690.00 27,000.00 0.00 0.00 88,500.00 238,350.00 a. TOTAL ACREAGE b. INVENTORY TOTAL AS OF 30-Sep-25 c. AUTHORIZATION NOT YET IN INVENTORY d. AUTHORIZATION REQUESTED IN THIS PROGRAM e. AUTHORIZATION INCLUDED IN FOLLOWING PROGRAM f. PLANNED IN NEXT THREE PROGRAM YEARS g. REMAINING DEFICIENCY h. GRAND TOTAL 8. PROJ ECTS REQUESTED IN THIS PROGRAM a. CATEGORY (1) CODE 811-145 (2) PROJ ECT TITLE POWER PLANT AND ELECTRICAL DISTRIBUTION (3) SCOPE 4800 KW b. COST ($000) 27,000 c. DESIGN STATUS (1) START (2) COMPLETE 08/01/24 04/26 9. FUTURE PROJ ECTS Chabelley Airfield has a number of projects that are expected to be completed in the near future, including CADJ 24-1009 - LSA Expansion, CADJ 24-0008 - Construct Joint Medical Aid Station, CADJ 24-0004 - Construct DFAC, CADJ 24-1022 - Construct MWR Facility, CADJ 24-1026 - Construct Permanent Mx Hangar, CADJ 24-0012 - Construct Water Distribution Network, CADJ 24-1014 - Extend the Fenceline, CADJ 24-1016 - Repair Apron and Taxiway, CADJ 24-1017 - Repair Main ECP 10. MISSION OR MAJ OR FUNCTIONS USAFRICOM has directed U.S. Air Forces Africa (AFAFRICA) to provide infrastructure to bed down aircraft operations in East Africa. The Air Force has been designated lead service for Base Operations Support-Integrator (BOS-I) for Chabelley Airfield, Djibouti. Chabelley Airfield supports the sortie generation of ISR aircraft and other mission support functions that support OEF-HOA, OPERATION OCTAVE SHIELD. and OPERATION PROSPERITY GUARDIAN. 11. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES There are no current outstanding pollution or safety deficiencies DD FORM 1390, JUL 1999 PREVIOUS EDITION IS OBSOLETE. Adobe314 Professional 8.0 === page 324 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA MAR 2026 AIR FORCE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE CHABELLEY AIRFIELD, DJIBOUTI CHABELLEY POWER PLANT AND PRIMARY DIST 5. PROGRAM ELEMENT 6. CATEGORY CODE 91211F 811-145 7. PROJECT NUMBER CADJ210001 8. PROJECT COST ($000) 27,000 9. COST ESTIMATES ITEM UM QUANTITY UNIT COST COST($000) PRIMARY FACILITIES 18,744 ELECTRIC POWER GENERATION PLANT (ELECTRIC KW 4,800 2,823 (13,550) (811-145) PRIMARY DISTRIBUTION LINE UNDERGROUND (812LM 3,672 1,290 (4,737) 225) (457) CYBERSECURITY OF FACILITY-RELATED CONTROL LS SUPPORTING FACILITIES 4,113 SITE ELECTRICAL IMPROVEMENTS LS (3,855) SITE IMPROVEMENTS LS (75) SITE PREPARATION LS (183) SUBTOTAL 22,857 CONTINGENCY (5.00%) 1,143 TOTAL CONTRACT COST 24,000 SUPERVISION, INSPECTION AND OVERHEAD (9.00%) 2,160 POST CONSTRUCTION AWARD SERVICES 555 TOTAL REQUEST 26,715 TOTAL REQUEST (ROUNDED) 27,000 EQUIPMENT FROM OTHER APPROPRIATIONS (NON-ADD) (0) 10. DESCRIPTION OF PROPOSED CONSTRUCTION This project will construct an electric power generation plant, primary distribution system, and ancillary power generation units. The electric power plant is composed of six 800 kilowatt skid mounted generators, two fuel storage tanks, a fuel polishing system, and a steel framed metal canopy over a concrete slab. The power plant will include a pad mounted sectionalizing switch at the end of each loop. The primary distribution system will include substation switchgear with a paralleling and programmable logic controller system to start and stop generators as programed. The primary distribution system is composed of approximately 3,672 linear meters of direct buried underground distribution line with concrete encased duct bank at roadway crossings, weather enclosed secondary distribution centers, and primary distribution panels. The electric power generation includes concrete secondary containment at perimeter spot generation locations and photovoltaic panels with batteries for a primary source of power. The power plant and electric switching stations will include the appropriate lightning protection. This project includes all site preparation, generators, and the demolition of 4,000 linear meters of existing/redundant power distribution lines, the existing power plant fuel distribution system, and return all equipment that has exceeded its useful life through the Defense Reutilization Management Office Defense Logistics Agency Disposition Services process. This project is authorized generators, per Air Force Manual 32-1062. Facilities will be designed and constructed as semi-permanent construction in accordance with the Department of War Unified Facilities Criteria 1-200-01, General Building Requirements, and Unified Facilities Criteria 1-201-01, Non-Permanent Department of War Facilities in Support of Military Operations. This project will comply with Department of War Antiterrorism/Force Protection requirements per Unified Facilities Criteria 4-010-01. DD FORM 1391, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 315 === page 325 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA MAR 2026 AIR FORCE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE CHABELLEY AIRFIELD, DJIBOUTI CHABELLEY POWER PLANT AND PRIMARY DIST 5. PROGRAM ELEMENT 6. CATEGORY CODE 91211F 811-145 7. PROJECT NUMBER 8. PROJECT COST ($000) CADJ210001 27,000 Air Conditioning: 0 Tons 11. REQ: 4,800 kW ADQT: 0 SUBSTD: 0 PROJECT: Construct Power Plant and Electrical Distribution System REQUIREMENT: A new Power Generation Plant at Chabelley Airfield is required to support growing mission sets in support of Operation Enduring Freedom - Horn of Africa for combating militant Islamism and defeating piracy. A larger power distribution capacity is required to enable more launch and recovery elements, base defense, and communications systems to be installed. Increased capacity will reduce the individual power generators (spot generation), increase efficiencies, and provide redundancy in the event of power failures to critical Intelligence, Surveillance, and Reconnaissance systems. United States Africa Command has directed United States Air Forces Africa to provide infrastructure to bed down aircraft operations in East Africa. The Air Force has been designated lead service for Base Operations Support-Integrator for Chabelley Airfield, Djibouti. Currently, Chabelley Airfield is the only location in East Africa from which armed Intelligence, Surveillance, and Reconnaissance assets are authorized to operate. This project supports Lines of Effort within United States Africa Command's Theatre Posture Plan and meets the intent for semi-permanent and enduring construction according to Joint Publication 3-34, Joint Engineer Operations. Providing reliable and appropriately sized power generation and distribution systems are required to eliminate the vulnerabilities created by the existing and inconsistent power generation plant. The Air Force does not currently have permission to complete work outside of our land-use agreement and the current design has a small portion of primary distribution line that crosses through Djiboutian and French areas within Chabelley Airfield. This is not a tenant or supported service requirement. CURRENT SITUATION: The existing power generation plant consists of four 300 KW generators, a primary switching station, and approximately 4,000 linear meters of direct bury/expeditionary power distribution lines. Two of the four generators are in poor condition. One generator is non-operational and in need of a complete overhaul. The second generator is in poor condition but operational for emergency situations or during brief maintenance sessions on the other generators. That leaves only two reliable generators to power all of Chabelley Airfield, which does not provide the required resiliency and redundancy to support 24-hour Intelligence, Surveillance, and Reconnaissance operations. In order to meet current peak load demands on Chabelley Airfield, 2 generators must be running. Performing routine maintenance is difficult since 2 generators are required to meet peak load demands. This creates temporary power interruptions during extended maintenance periods in which reliance on spot generation is required to meet the peak load demands. Spot generation is limited and there is not enough capacity for current peak load demands, putting the mission at risk. Additionally, the direct bury cable doesn't have adequate depth and protection which creates risk to DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 316 === page 326 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA MAR 2026 AIR FORCE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE CHABELLEY AIRFIELD, DJIBOUTI CHABELLEY POWER PLANT AND PRIMARY DIST 5. PROGRAM ELEMENT 6. CATEGORY CODE 91211F 811-145 7. PROJECT NUMBER CADJ210001 8. PROJECT COST ($000) 27,000 mission, life, health and safety if struck by equipment. IMPACT IF NOT PROVIDED: The unreliable power production and distribution capacity at Chabelley Airfield will continue to be a significant risk for the critical Intelligence, Surveillance, and Reconnaissance aircraft launch and recovery systems. The temporary power interruptions will continue to threaten the communications systems that are critical to command and control, Intelligence, Surveillance, and Reconnaissance facilities, and base defense operations, reducing the bases resiliency. If a reliable power grid is not provided, these vulnerabilities will continue to exist. Additionally, the installation will be limited to growth as the existing power plant is at maximum capacity with no opportunities to expand with the current configuration. ADDITIONAL: This project meets applicable criteria/scope specified in Air Force Manual 321084, Standard Facility Requirements. Additionally, project will comply with Unified Facilities Criteria 3-550-01-Exterior Electrical Power Distribution, Unified Facilities Criteria 3-560-01-Electrical Safety, National Fire Protection Association 70-National Electrical Code and the International Building Code, Chapter 27, Electrical, Section 2702. This design shall conform to criteria established in the Air Force Corporate Facilities Standards, but will not employ a standard facility design because there is no Air Force standard facility design for this project, and there is no applicable standard design from Air Force Civil Engineer Center. New construction is the only option that will meet operational requirements. An economic analysis waiver is being processed. Sustainable principles, to include life-cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with Unified Facilities Criteria 1-200-02. This includes preparation of a life-cycle cost analysis for energy consuming systems, renewable energy generating systems, whenever life-cycle cost effective is selected as the reason any requirement of Unified Facilities Criteria 1-200-02 is partially compliant or not applicable. This project does not fall within or partly within the 100-year flood plain. Facility will be sited in accordance with the Installation Development Plan and is within a compatible land use area. No construction growth offset is required for this project. 776 EABS Base Civil Engineer: 311-824-9695 PRIMARY DISTRIBUTION LINE UNDERGROUND: 3,672 Linear Meter = 12,047 Linear Foot JOINT USE CERTIFICATION: These facilities can be used by other United States components on an "as available" basis; however, the scope of this project is based on Air Force requirements. The physical footprint of the expansion is within the area designated for the United States and in accordance with host nation agreement. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 317 === page 327 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA MAR 2026 AIR FORCE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE CHABELLEY AIRFIELD, DJIBOUTI CHABELLEY POWER PLANT AND PRIMARY DIST 5. PROGRAM ELEMENT 6. CATEGORY CODE 91211F 811-145 7. PROJECT NUMBER CADJ210001 8. PROJECT COST ($000) 27,000 Facility Condition Index: This is not a recapitalization project. No Facility Condition Index data exists for this facility type. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 318 === page 328 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA MAR 2026 AIR FORCE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE CHABELLEY AIRFIELD, DJIBOUTI CHABELLEY POWER PLANT AND PRIMARY DIST 5. PROGRAM ELEMENT 12. 6. CATEGORY CODE 7. PROJECT NUMBER 8. PROJECT COST ($000) 91211F 811-145 CADJ210001 SUPPLEMENTAL DATA: A. Estimated Execution Data: (1) Acquisition Strategy: Design-Bid-Build (2) Design Data (a) Design or Request for Proposal(RFP) Started: (b) Percent of Design Completed as of SEP 2025: (c) Percent of Design Completed as of JAN 2026: (d) Design or RFP Complete: (e) Total Design Cost ($000): (f) Energy Study and/or Life Cycle Cost Analysis (g) Standard or Definitive Design Used? (3) Construction Data: (a) Contract Award: (b) Construction Start: (c) Construction Complete: DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE 27,000 AUG/2024 100% 100% APR/2026 2,790 YES NO JAN/2027 APR/2027 OCT/2029 PAGE NO. 319 === page 329 === 1. COMPONENT 2. DATE (YYYYMMDD) FY 2027 BBBBBB MILITARY CONSTRUCTION PROGRAM AIR FORCE 3. INSTALLATION AND LOCATION 4. COMMAND YAP INTERNATIONAL AIRPORT, FEDERATED STATES OF MICRONESIA PACIFIC AIR FORCES 6. PERSONNEL (1) PERMANENT 20260318 5. AREA CONTRUCTION COST INDEX Not Available (2) STUDENTS (3) SUPPORTED (4) TOTAL OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN a. AS OF 30-Sep-25 0 0 0 0 0 0 0 0 0 0 b. END FY 30-Sep-31 0 0 0 0 0 0 0 0 0 0 7. INVENTORY DATA ($000) 0.00 0.00 400,314.00 0.00 0.00 1,158,900.00 0.00 1,559,214.00 a. TOTAL ACREAGE b. INVENTORY TOTAL AS OF 18-Mar-26 c. AUTHORIZATION NOT YET IN INVENTORY d. AUTHORIZATION REQUESTED IN THIS PROGRAM e. AUTHORIZATION INCLUDED IN FOLLOWING PROGRAM f. PLANNED IN NEXT THREE PROGRAM YEARS g. REMAINING DEFICIENCY h. GRAND TOTAL 8. PROJECTS REQUESTED IN THIS PROGRAM (1) CODE a. CATEGORY (2) PROJECT TITLE 111-111 PDI: RUNWAY EXTENSION, INC 2 (3) SCOPE b. COST ($000) (1) START c. DESIGN STATUS (2) COMPLETE 49,518 SM 190,000 06/22 10/24 9. FUTURE PROJECTS 111111 PDI: RUNWAY EXTENSION, (49,518 SM, $338,000) 112211 PDI: AIRCRAFT PARKING APRON AND TAXIWAY, (79,943 SM, $820,900) 10.MISSION OR MAJOR FUNCTIONS Yap and the Federated States of Micronesia are strategically located in the western Pacific and provide assured access through the Compact of Free Association with the United States. Yap International Airport is located in the south-central portion of the main island of Yap and will be used as an important divert location for aircraft transiting Pacific Air Forces and United States Indo-Pacific Command area of responsibility. 11. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES None. DD FORM 1390, JUL 1999 320 PREVIOUS EDITION IS OBSOLETE. === page 330 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE YAP INTERNATIONAL AIRPORT FEDERATED STATES OF MICRONESIA PDI: RUNWAY EXTENSION, INC 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211F 111-111 YAAD229010 8. PROJECT COST ($000) AUTH: 0 APPR: 27,000 9. COST ESTIMATES 1.0000 U. S. DOLLAR/US$ ITEM UM QUANTITY UNIT COST COST($000) PRIMARY FACILITIES 71,301 RUNWAY (111-111) SM 49,518 922 (45,656) SHOULDER, PAVED (116-642) SM 23,307 513 (11,956) LIGHTING, RUNWAY (136-664) LM 6,294 1,833 (11,537) FENCE BOUNDARY (872-245) LM 3,523 540 (1,902) CYBERSECURITY OF FACILITY-RELATED CONTROL SYS LS (250) SUPPORTING FACILITIES 278,472 SITE PREPARATION LS (113,592) SITE IMPROVEMENTS LS (6,563) UTILITIES LS (16,528) ENVIRONMENTAL/CONSERVATION IMPACT MITIGATI LS (21,314) SHIPPING AND SPECIAL LOGISTICAL CONSIDERAT LS (29,113) MOBILIZATION AND MAN CAMP LS (40,296) MUNITIONS AND EXPLOSIVES OF CONCERN LS (43,474) STORM DRAINAGE LS (7,591) SUBTOTAL 349,773 17,489 CONTINGENCY (5.00%) TOTAL CONTRACT COST 367,262 SUPERVISION, INSPECTION AND OVERHEAD (7.30%) 26,810 TOTAL REQUEST 394,072 TOTAL REQUEST (ROUNDED) 394,000 EQUIPMENT FROM OTHER APPROPRIATIONS (NON-ADD) (0) 10. DESCRIPTION OF PROPOSED CONSTRUCTION This project constructs an extension to the runway in both directions. This project will include site preparation, runway pavement extensions and turn around areas, paved shoulders, runway pavement markings and signs, airfield lighting for the full length of the runway, navigational aids, stormwater controls, utilities, and other improvements for a complete and usable project. Extensive site preparation is required for this project including site clearing, green waste management, excavation, grading, excess materials disposal, temporary erosion and sediment control, and removal and mitigation of Munitions and Explosives of Concern. An allowance for natural and cultural resources impact mitigation and allowances for a worker camp and mobilization and shipping to the remote location is included in supporting facilities. The project includes security fencing with high double outrigger and barbed wire. Facilities will be designed as permanent construction in accordance with Department of War Unified Facilities Criteria 1-200-01, General Building requirements. This project will comply with Department of War antiterrorism/ force protection requirements per Unified Facilities Criteria 4-010-01. 11. REQ: 49,518 SM ADQT: 0 SUBSTD: 0 PROJECT: Pacific Deterrence Initiative (PDI): Runway Extension DD FORM 1391, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 321 === page 331 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE YAP INTERNATIONAL AIRPORT FEDERATED STATES OF MICRONESIA PDI: RUNWAY EXTENSION, INC 5. PROGRAM ELEMENT 7. PROJECT NUMBER 6. CATEGORY CODE 8. PROJECT COST ($000) 91211F 111-111 YAAD229010 AUTH: 0 APPR: 27,000 REQUIREMENT: The United States Air Force proposes to construct facilities and infrastructure in the Federated States of Micronesia in support of Headquarters United States IndoPacific Command requirements for aircraft divert, exercises, and humanitarian assistance and disaster relief. In addition, this construction project fully supports the 2019 National Defense Strategy for the Pacific Area of Responsibility. The strategic intent is to support and conduct current, emerging, and future United States Air Force training activities, and to ensure the capability to meet mission requirements in the event that access to other western Pacific locations is limited or denied. Development of Yap Airport is essential because there are very few divert or contingency airfields available as potential United States defense sites in the region. An adequate and safe runway is required to accommodate larger aircrafts to land and take-off in support of training, operations and humanitarian mission at the Yap airport. The extended runway is required to enable increased capacity of the runway by allowing larger aircraft to land and take-off quickly and safely. This increased capacity supports provisions for a command-and-control capable infrastructure for multi-service forces in the rapid establishment of operational capabilities in various locations. An additional project is planned for this location that would add capacity for aircraft parking and improve access to the runway. This is not a tenant or supported service requirement. CURRENT SITUATION: Yap and the Federated States of Micronesia are strategically located in the western Pacific and provide assured access through the Compact of Free Association with the United States. Yap International Airport is located in the south-central portion of the main island of Yap and operates a single parking apron and small terminal designed for commercial aircraft. Yap Airport is capable of being an important divert location for aircraft transiting the Indo-Pacific area; however, the runway is too short to adequately support military aircraft operations and lacks other critical required facilities such as aircraft arresting systems capabilities. Existing runway is not adequate to accommodate expanded mission and cannot adequately support the safe landing and takeoff for United States Navy aircraft at this location. Existing length of runway is only designed to the current aircraft operating at this location. There is no available data to substantiate the structural integrity and capacity of the existing asphalt pavement of runway. IMPACT IF NOT PROVIDED: Without the runway extension, some United States Air Force and other sister service aircraft will not be able to safely land at Yap International Airport and the location cannot be utilized as a practical divert location. Yap's strategic location is vital to Indo-Pacific Command/United States Pacific Air Force emerging/future missions/activities and for aircraft to effectively respond to natural disaster/humanitarian relief efforts in the area. ADDITIONAL: This project meets applicable criteria/scope specified in Air Force Manual 32DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 322 === page 332 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE YAP INTERNATIONAL AIRPORT FEDERATED STATES OF MICRONESIA PDI: RUNWAY EXTENSION, INC 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211F 111-111 YAAD229010 8. PROJECT COST ($000) AUTH: 0 APPR: 27,000 1084, Facility Requirements. This design shall conform to criteria established in the Air Force Corporate Facilities Standards, the Installation Facilities Standards (if applicable), but will not employ a standard facility design because there is no Air Force standard facility design for this project, and there is no applicable standard design from Naval Facilities Engineering Command. A Waiver to an Economic Analysis was approved for this project. Sustainable principles, to include life-cycle cost-effective practices, will be integrated into the design, development, and construction of the project to the extent it is compatible with Host Nation requirements. This may include preparation of a life-cycle cost analysis for energy consuming systems, renewable energy generating systems. This project does not fall within or partly within the 100-year flood plain. This project is not eligible for host nation funding. Supporting facilities exceed 25% of the primary facility costs due to extensive site improvement (i.e. earthwork and grading), munitions and explosives of concern, utility requirements, and worker camp and other logistical needs. No construction growth offset is required for this project. Base Civil Engineer equivalent: 808-449-3810 (in Hawaii). Runway: 49,518 SM = 533,007 Square Feet; Shoulders, Paved: 23,307 SM = 250,874 Square Feet; Lighting, Runway: 6,294 LM = 20,650 Linear Feet; Fence, Boundary: 3,523 LM = 11,558 Linear Feet. FOREIGN CURRENCY BUDGET RATE USED: The Federated States of Micronesia uses United States currency; no conversion is needed. JOINT USE CERTIFICATION: This facility is programmed for joint use with United States Army, Marine Corps, Navy, and Space Force; however, it is fully funded by the Air Force. The cost estimate for this project varies from the DoW Pricing Guide due to special project details identified during the Planning Charrette, the design process, and the application of parametric cost estimating tools. The Pricing Guide does not provide pricing for this type of facility and does not address the supply chain challenges of construction in this remote island nor area cost factors. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 323 === page 333 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE YAP INTERNATIONAL AIRPORT FEDERATED STATES OF MICRONESIA PDI: RUNWAY EXTENSION, INC 5. PROGRAM ELEMENT 7. PROJECT NUMBER 12. 6. CATEGORY CODE 8. PROJECT COST ($000) 91211F 111-111 YAAD229010 AUTH: 0 SUPPLEMENTAL DATA: A. Estimated Execution Data: (1) Acquisition Strategy: Design-Bid-Build (2) Design Data (a) Design or Request for Proposal(RFP) Started: (b) Percent of Design Completed as of SEP 2025: (c) Percent of Design Completed as of JAN 2026: (d) Design or RFP Complete: (e) Total Design Cost ($000): (f) Energy Study and/or Life Cycle Cost Analysis (g) Standard or Definitive Design Used? (3) Construction Data: (a) Contract Award: (b) Construction Start: (c) Construction Complete: APPR: 27,000 JUN/2022 95% 100% OCT/2025 36,000 YES NO APR/2027 JUN/2027 JAN/2032 C. Authorization and Appropriation Summary: FY 2025 Enacted FY 2027 Budget Request Future Request Total DD FORM 1391C, JUL 1999 Authorization $(000) 400,314 0 0 400,314 Auth of Approp $(000) 96,000 27,000 277,314 400,314 PREVIOUS EDITION IS OBSOLETE Appropriation $(000) 96,000 27,000 277,314 400,314 PAGE NO. 324 === page 334 === Spend Plan Project Title: Installation: Program Year Project # CAO: I I 9.0% I I 5.0% I Schedule Award Complete POP Months I I 400,314 346,072 36,028 706 18,214 357 30-Apr-27 26-Jan-32 1732 57.0 I Chart Begin 1st Increment FY25 2nd Increment FY27 3rd Increment FY28 4th Increment FY29 5th Increment FY30 End Total Instructions and Notes This spreadsheet is designed to help the user develop a WIP Curve for inclusion with a project 1391. The user only needs to know the project cost and schedule. Edit The Green Fields ONLY Yap Intl Airport 2025 YAAD229010 Financials PA ($000) Initial Contract SIOH SIOH / Month Other (Contingency) Other / Month 23-Mar-26 PDI: RUNWAY EXTENSION (YAP) Inc !/ Fund 1-Oct-24 31-Jan-25 1-Oct-26 1-Oct-27 1-Oct-28 1-Oct-29 26-Jan-32 J Obligate I 'I' 30-Apr-27 30-Apr-27 31-Jan-28 31-Jan-29 31-Jan-30 26-Jan-32 ~ 1 2 3 4 5 6 7 8 9 - Fund mmm-yr Obligate mmmyr Oct-24 Jan-25 Oct-26 Oct-27 Oct-28 Oct-29 Jan-32 Apr-27 Apr-27 Jan-28 Jan-29 Jan-30 Jan-32 10 11 Months 0 21 9 24 -21 24 0 57 Enter the Project Title, Location, and Project number Enter the Date this WIP Curve is being updated Enter the Project PA Enter the SIOH required by the agent (6.5% for USACE FY24 and beyond) Enter the contingency percentage plus other amounts withheld by the Agent Enter the projected project Award Date ( usually 1 Apr of the Execution FY) Enter the Project Complete Date (Usually Award plus ~1000 days, use the 1st of a month) Enter the Chart Begin Date ( first day of the Program Year: 1-Oct-XX) ( Use "Short Date" format.) Enter the Dates anticipate to receive each increment of funding (usually January of the Program year, and Oct for subsequent increments) Enter the Dates anticipated to Award the contract ( usually 1 Apr of the Program year and obligate increments (usually 1 Oct for increments after initial award.) Enter the Value of each increment (If the project is less than $250M enter the PA as 1st Increment) .I Increment 96,000 27,000 180,000 60,000 37,314 400,314 Obligate 82,992 23,342 155,610 51,870 32,258 346,071 SIOH 8,640 2,430 16,200 5,400 3,358 36,028 Other 4,368 1,229 8,190 2,730 1,698 18,214 325 === page 335 === Spend Plan CAO: Project Title: Installation: Program Year Project # I 23-Mar-26 PDI: RUNWAY EXTENSION (YAP) Inc Notes Shift Yap Intl Airport 2025 YAAD229010 Assumes initial appropriation is enacted by Note 1: Congress Jan FY 2025. Curve I I Assumes funds are available for obligation by 31 January of the execution year and by 31 Note 2: October for subsequent years. All Cost in thousands FUNDING (note 1) Chart Begin Oct-24 I I Month Oct-24 Nov-24 Dec-24 Jan-25 Feb-25 Mar-25 Apr-25 May-25 Jun-25 Jul-25 Aug-25 Sep-25 Oct-25 Nov-25 Dec-25 Jan-26 Feb-26 Mar-26 Apr-26 May-26 Jun-26 Jul-26 Aug-26 Sep-26 Oct-26 Nov-26 Dec-26 Jan-27 Feb-27 Mar-27 Apr-27 May-27 Jun-27 Jul-27 Aug-27 Sep-27 Oct-27 Nov-27 Dec-27 Jan-28 Feb-28 Mar-28 Apr-28 May-28 Jun-28 Jul-28 Aug-28 Sep-28 Oct-28 Nov-28 Dec-28 Jan-29 Feb-29 Mar-29 Apr-29 May-29 Jun-29 Jul-29 Aug-29 Sep-29 Oct-29 Nov-29 Dec-29 Jan-30 Feb-30 Mar-30 Apr-30 May-30 Jun-30 Jul-30 Aug-30 Sep-30 Oct-30 Nov-30 Dec-30 Jan-31 Feb-31 Mar-31 Apr-31 May-31 Jun-31 Jul-31 Aug-31 Sep-31 Oct-31 Nov-31 Dec-31 Jan-32 I Enacted 96,000 27,000 180,000 60,000 37,314 - I OBLIGATION (note 2-3) Cumulative 96,000 96,000 96,000 96,000 96,000 96,000 96,000 96,000 96,000 96,000 96,000 96,000 96,000 96,000 96,000 96,000 96,000 96,000 96,000 96,000 96,000 123,000 123,000 123,000 123,000 123,000 123,000 123,000 123,000 123,000 123,000 123,000 123,000 303,000 303,000 303,000 303,000 303,000 303,000 303,000 303,000 303,000 303,000 303,000 303,000 363,000 363,000 363,000 363,000 363,000 363,000 363,000 363,000 363,000 363,000 363,000 363,000 400,314 400,314 400,314 400,314 400,314 400,314 400,314 400,314 400,314 400,314 400,314 400,314 400,314 400,314 400,314 400,314 400,314 400,314 400,314 400,314 400,314 400,314 400,314 400,314 400,314 400,314 400,314 400,314 I Obligated 106,334 1,064 1,064 1,064 1,064 1,064 1,064 1,064 1,064 156,674 1,064 1,064 1,064 1,064 1,064 1,064 1,064 1,064 1,064 1,064 1,064 52,934 1,064 1,064 1,064 1,064 1,064 1,064 1,064 1,064 1,064 1,064 1,064 33,322 1,064 1,064 1,064 1,064 1,064 1,064 1,064 1,064 1,064 1,064 1,064 1,064 1,064 1,064 1,064 1,064 1,064 1,064 - I Cumulative 106,334 107,397 108,461 109,524 110,588 111,651 112,715 113,779 114,842 271,516 272,579 273,643 274,706 275,770 276,834 277,897 278,961 280,024 281,088 282,151 283,215 336,149 337,212 338,276 339,339 340,403 341,466 342,530 343,594 344,657 345,721 346,784 347,848 381,169 382,233 383,297 384,360 385,424 386,487 387,551 388,614 389,678 390,742 391,805 392,869 393,932 394,996 396,059 397,123 398,187 399,250 400,314 400,314 400,314 400,314 400,314 400,314 400,314 I Monthly 60,900 4,500 4,950 5,445 5,990 6,589 7,248 7,973 8,770 9,647 10,612 11,673 12,840 14,124 15,536 17,090 18,799 16,919 15,227 13,704 12,334 11,101 8,881 7,993 7,194 6,475 5,828 5,245 4,721 4,249 3,824 3,442 3,098 2,788 2,509 2,258 2,032 2,032 2,032 2,032 2,032 2,032 2,032 2,032 2,032 2,032 2,032 2,032 2,032 2,032 2,032 2,032 2,032 2,032 2,032 1,230 I Shift Adjusts distribu Curve adjusts for bel - Magnitude $ 99% Outlay $ Total Outlay $ Mean Std Dev OUTLAYS (note 4-5) 0 1.0000 400,314 Chart Factor (aka Pr 396,311 (assume Agent wihth 4,950 Total Distribution 2 1 Using Std Dev Outlay Dist Cumulative 60,900 65,400 70,350 75,795 81,785 88,374 95,622 103,595 112,365 122,012 132,624 144,297 157,137 171,261 186,797 203,887 222,686 239,605 254,832 268,536 280,870 291,971 300,852 308,845 316,039 322,514 328,342 333,587 338,308 342,557 346,381 349,823 352,921 355,709 358,218 360,476 362,508 364,540 366,572 368,604 370,636 372,668 374,700 376,732 378,764 380,796 382,828 384,860 386,892 388,924 390,956 392,988 395,020 397,052 399,084 400,314 I Assumes ALL project funds (contract, SIOH, contingency, etc) are obligated NLT 6 months Note 3: prior to project end Month # Assumes contract award in April 2027 and contract completion January 2032; duration Note 4 57 months. Assumes Agent will retain 1% of project Note 5 obligations for a final payment 195,971 400,314 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 Standard Dist Monthly Amount Cumulative Stan Dist Outlay 60,900 4,500 4,950 5,445 5,990 6,589 7,248 7,973 8,770 9,647 10,612 11,673 12,840 14,124 15,536 17,090 18,799 16,919 15,227 13,704 12,334 11,101 8,881 7,993 7,194 6,475 5,828 5,245 4,721 4,249 3,824 3,442 3,098 2,788 2,509 2,258 2,032 2,032 2,032 2,032 2,032 2,032 2,032 2,032 2,032 2,032 2,032 2,032 2,032 2,032 2,032 2,032 2,032 2,032 2,032 1,230 60,900 65,400 70,350 75,795 81,785 88,374 95,622 103,595 112,365 122,012 132,624 144,297 157,137 171,261 186,797 203,887 222,686 239,605 254,832 268,536 280,870 291,971 300,852 308,845 316,039 322,514 328,342 333,587 338,308 342,557 346,381 349,823 352,921 355,709 358,218 360,476 362,508 364,540 366,572 368,604 370,636 372,668 374,700 376,732 378,764 380,796 382,828 384,860 386,892 388,924 390,956 392,988 395,020 397,052 399,084 400,314 400,314 326 === page 336 === PDI: RUNWAY EXTENSION (YAP) Inc $450,000 $400,000 $350,000 I $250,000 -- -,,' , J ,,, --- I I I I I $200,000 $150,000 Funding $100,000 Obligation Outlays $50,000 I: Oct-31 Jun-31 Feb-31 Oct-30 Jun-30 Feb-30 Oct-29 Jun-29 Feb-29 Oct-28 Jun-28 Feb-28 Oct-27 Jun-27 Feb-27 Oct-26 Jun-26 Feb-26 Oct-25 Jun-25 Feb-25 $0 Oct-24 Dollars in (000) $300,000 -- -------- ---r ------ 327 === page 337 === 1. COMPONENT 2. DATE (YYYYMMDD) FY 2027 BBBBBB MILITARY CONSTRUCTION PROGRAM AIR FORCE 3. INSTALLATION AND LOCATION 4. COMMAND KADENA AIR BASE, JAPAN PACIFIC AIR FORCE 6. PERSONNEL (1) PERMANENT 20260319 5. AREA CONTRUCTION COST INDEX 1.85 (2) STUDENTS (3) SUPPORTED (4) TOTAL OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN a. AS OF 30-Sep-25 747 5,939 2,417 0 1 0 8 15 831 9,958 b. END FY 30-Sep-31 785 6,374 2,426 0 1 0 8 15 831 10,440 7. INVENTORY DATA ($000) 16,023.00 35,259,241.84 4,750,000.00 99,000.00 0.00 452,000.00 0.00 40,560,241.84 a. TOTAL ACREAGE b. INVENTORY TOTAL AS OF 19-Mar-26 c. AUTHORIZATION NOT YET IN INVENTORY d. AUTHORIZATION REQUESTED IN THIS PROGRAM e. AUTHORIZATION INCLUDED IN FOLLOWING PROGRAM f. PLANNED IN NEXT THREE PROGRAM YEARS g. REMAINING DEFICIENCY h. GRAND TOTAL 8. PROJECTS REQUESTED IN THIS PROGRAM a. CATEGORY (2) PROJECT TITLE (1) CODE 131-111 Theater Strategic Communications Hub (3) SCOPE b. COST ($000) (1) START c. DESIGN STATUS 4,698 SM 99,000 07/25 (2) COMPLETE 9. FUTURE PROJECTS 730773 442758 813231 211179 141784 Chapel Center (2,333 SM, $53,000) Aircraft Parts Storage North (4,668 SM, $88,000) Electrical Substation and Distribution Line (2,183 SM, 15,000) Fuel Systems Maintenance Dock (3,417 SM 96,000) Aerial Port Complex (17,932 SM 200,000) 10.MISSION OR MAJOR FUNCTIONS Operating from the largest U.S. installation in the Asia-Pacific region, the 18th Wing defends U.S. and Japanese mutual interests by providing a responsive staging and operational air base with integrated, deployable, forward-based air power. Strategy used to employ this mission centers around 83 aircraft comprised of tactical fighter squadrons with F-15 aircraft, tanker squadron with KC-135 aircraft, aerospace rescue and recovery squadron with HH-60W aircraft, AWACS squadron with E-3 aircraft, JSTARS squadron with E-8 aircraft, and recon squadron with RC-135 aircraft. Partner units include the 353rd Special Operations Wing with MC-130J aircraft and 733rd Air Mobility Squadron with transient C-130 and C-5 aircraft. 11. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES None. DD FORM 1390, JUL 1999 328 PREVIOUS EDITION IS OBSOLETE. === page 338 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE KADENA AIR BASE JAPAN THEATER STRATEGIC COMMUNICATIONS HUB 5. PROGRAM ELEMENT 6. CATEGORY CODE 91211F 131-111 7. PROJECT NUMBER 8. PROJECT COST ($000) LXEZ193439 99,000 9. COST ESTIMATES 150.4415 YEN/US$ ITEM UM QUANTITY UNIT COST COST($000) PRIMARY FACILITIES 62,316 TELECOMMUNICATIONS FACILITY (131-111) SM 4,698 12,901 (60,609) CYBERSECURITY OF FACILITY-RELATED CONTROL SYS LS (1,707) SUPPORTING FACILITIES 25,485 UTILITIES LS (5,569) ROADS, SIDEWALKS, AND PARKING LS (1,877) SITE IMPROVEMENTS LS (2,808) COMMUNICATIONS LS (3,083) DEMOLITION SM 5,088 1,024 (5,210) GENERATOR KW 1,600 1,166 (1,866) PASSIVE FORCE PROTECTION MEASURES LS (950) ARCHEOLOGICAL MONITORING/ENV MITIGATION LS (269) SPECIAL DRILLED PIER FOUNDATION LS (3,853) SUBTOTAL 87,801 CONTINGENCY (5.00%) 4,390 TOTAL CONTRACT COST 92,191 SUPERVISION, INSPECTION AND OVERHEAD (7.30%) 6,730 TOTAL REQUEST 98,921 TOTAL REQUEST (ROUNDED) 99,000 EQUIPMENT FROM OTHER APPROPRIATIONS (NON-ADD) (3,827) 10. DESCRIPTION OF PROPOSED CONSTRUCTION Construct a Consolidated Communications Facility to support theater communications for PACOM/PACAF with administrative and communications hub component. The facility consists of a single-story structure and a basement floor to be designed as a hardened facility. The structure will be made of reinforced concrete walls, floor, and roof slabs. Supporting facilities include utilities, site improvements, pavements, communications, fencing, exterior lighting, special foundations, generator, environmental mitigation, archeological monitoring, and demolition work. A generator is authorized according to Air Force Instruction 32-1062. The project demolishes buildings 400 (3,528 SM), 402 (186 SM), and 404 (1,374 SM) (Total: 5,088 SM). Facilities will be designed as permanent construction in accordance with Department of War Unified Facilities Criteria 1-200-01, General Building requirements. This project will comply with Department of War antiterrorism/ force protection requirements per Unified Facilities Criteria 4-010-01. Demolish 3 buildings at Kadena Air Base, JA (5,088 Total m2). Air Conditioning: 126 Tons 11. REQ: 14,191 SM ADQT: 2,714 SM SUBSTD: 6,536 SM PROJECT: Theater Strategic Communications Hub REQUIREMENT: An adequately sized and configured Consolidated Communications Facility is required for the 18th Communications Squadron at Kadena Air Base. This facility will provide space for the communications hub and administrative functions DD FORM 1391, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 329 === page 339 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE KADENA AIR BASE JAPAN THEATER STRATEGIC COMMUNICATIONS HUB 5. PROGRAM ELEMENT 6. CATEGORY CODE 91211F 131-111 7. PROJECT NUMBER LXEZ193439 8. PROJECT COST ($000) 99,000 required to support the communications node. The communications hub includes tech control, secure communications, and associated cabling and infrastructure. A back-up generator and uninterruptable power supply is required for system resiliency. The communications hub and controlled areas will be located in the basement for increased protection and administration functions located at ground level. Administrative spaces are required for the 18th Communications Squadron Command Section, Operations Flight, Plans and Resources Flight, Quality Assurance, and Defense Information Systems Agency (DISA). The facility is the communications node for Kadena Air Base, providing voice and data communications for the 18th Wing and its partner units. The 18th Wing, the Air Forces largest combat support Wing, provides premier counter air, air refueling, command and control, and combat search and rescue from a strategic forward base, while also strengthening regional alliances through joint, bilateral, and multilateral engagement and ambassadorship. The 18th Communications Squadron is the second largest communications squadron in the Air Force. The telecommunications facility maintains and operates mission networks, satellite systems, radios, telephone systems, and joint circuit infrastructure in support of the 18th Wing and PACOM/PACAF theater communications missions. This is not a tenant or supported service requirement. CURRENT SITUATION: Building 400, the existing communications facility, is a 75-year-old facility that was constructed in 1951. It has numerous documented deficiencies including the heating, ventilation and air conditioning system, electrical system, and the concrete structure. The Base Safety office has assigned a Risk Assessment Code (RAC) 1 due to these deficiencies. Over the course of 24 months, 4 major power outages, totaling 163 hours of network downtime/degradation, have been associated with electrical and mechanical systems, and cost $575K to repair/reconstitute services. A total of 92 work orders has been opened for additional issues. Additionally, work on building 400 systems has required 66 visits and 1,471 manhours from Civil Engineering. Building 400 has had several recent cases of ceiling spalls dropping concrete pieces into occupied areas increasing safety concerns for personnel and communications equipment. A major renovation project to bring it up to standards would require relocation of all communications equipment which would disable much of Kadena Air Bases Non-secure Internet Protocol (NIPR) and Secure Internet Protocol (SIPR) connectivity. The last major renovation project accomplished in building 400 was installation of heating, ventilation, and air conditioning system in 2009. IMPACT IF NOT PROVIDED: Building 400 provides a path for all communications on Kadena Air Base and 72 percent of all off-island joint Department of War communications. The majority of all joint Department of War communications internal to Okinawa will also pass through building 400. Failure of support facilities (HVAC, electrical, grounding, and generator) seriously degrades command and control capabilities for 16 Department of War installations and approximately 23,000 joint warfighters on Okinawa, thereby, significantly limiting the United States DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 330 === page 340 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE KADENA AIR BASE JAPAN THEATER STRATEGIC COMMUNICATIONS HUB 5. PROGRAM ELEMENT 6. CATEGORY CODE 91211F 131-111 7. PROJECT NUMBER LXEZ193439 8. PROJECT COST ($000) 99,000 efforts to engage regional threats and defend Okinawa across all domains (land, sea, air, space, and cyber). The existing facility will not have the capability to support the communications missions that directly support PACOM/PACAFs theater stability and positioning for contingency objectives. ADDITIONAL: This project meets applicable criteria/scope specified in Department of the Air Force Manual 32-1084, Standard Facility Requirements. This design shall conform to criteria established in the Air Force Corporate Facilities Standards, the Installation Facilities Standards, but will not employ a standard facility design because there is no Air Force standard facility design for this project, and there is no applicable standard design from AFCEC All reasonable alternatives were considered during the development of this project to include status quo, add/alter, and new construction. and new construction. An approved Economic Analysis determined new construction as the only viable option to meet this requirement. Sustainable principles, to include life-cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with Unified Facilities Criteria 1-200-02, High Performance and Sustainable Building Requirements. This includes preparation of a life-cycle cost analysis for energy consuming systems, renewable energy generating systems, or whenever life-cycle cost effective is selected as the reason any requirement of Unified Facilities Criteria 1-200-02 is partially compliant or not applicable. This project does not fall within or partly within the 100-year floodplain. This project is eligible for host nation funding; however, the US Forces Command states the project has extremely little chance of being funded in the foreseeable future. Facility is sited in accordance with the Installation Development Plan and is within a compatible land use area. Facility is sited in accordance with the Installation Development Plan and is within a compatible land use area. Supporting Facilities exceed 25% of the Primary Facilities total due to the requirement for special foundations, existence of lead-based paint and asbestos in the facilities to be demolished, and the Government of Japan requirement to accomplish archeological monitoring on the construction site. The construction growth offset for this requirement is -390 square feet. JOINT USE CERTIFICATION: Mission Requirements, operational considerations, and location are incompatible with use by other components. Facility Condition Index: 79 DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 331 === page 341 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE KADENA AIR BASE JAPAN THEATER STRATEGIC COMMUNICATIONS HUB 5. PROGRAM ELEMENT 12. 6. CATEGORY CODE 7. PROJECT NUMBER 8. PROJECT COST ($000) 91211F 131-111 LXEZ193439 SUPPLEMENTAL DATA: A. Estimated Execution Data: (1) Acquisition Strategy: Design-Bid-Build (2) Design Data (a) Design or Request for Proposal(RFP) Started: (b) Percent of Design Completed as of SEP 2025: (c) Percent of Design Completed as of JAN 2026: (d) Design or RFP Complete: (e) Total Design Cost ($000): (f) Energy Study and/or Life Cycle Cost Analysis (g) Standard or Definitive Design Used? (3) Construction Data: (a) Contract Award: (b) Construction Start: (c) Construction Complete: 99,000 AUG/2025 15% 35% SEP/2026 14,850 YES NO OCT/2026 JAN/2028 DEC/2029 B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) Furniture, Fixtures, & Comm Eq DD FORM 1391C, JUL 1999 3400 PREVIOUS EDITION IS OBSOLETE 2029 3,827 PAGE NO. 332 === page 342 === MILCON Work-in-Progress (WIP) Curve – Automated Spend Plan Project Information Project Title Installation Program Year (FY) Project # THEATER STRATEGIC COMMUNICATIONS HUB Kadena AB, Japan 2027 LXEZ193439 Financial Inputs & Derived Amounts ($000) Programmed Amount (PA) SIOH Rate Contingency Rate SIOH Amount Contingency Amount Construction (PA less SIOH & Cont) Total Increments Key Dates (Calculated) Begin Date (FY Start) Award Date (Assumed) Complete Date (Award + POP; set to 1st of month) Award Month (1st of month) Complete Month (1st of month) Period of Performance Funding & Obligation Increments ($000) Increment 1 Increment Total Funding Outlay Curve Controls (Adjust if needed) Outlay Curve Steepness (k) Normalized Logistic Base (t=0) Normalized Logistic Top (t=1) Total Outlay ($000) (assumed = PA) 99,000 7.3% 5.0% 7,227 4,950 86,823 1 Oct 1, 2026 Apr 1, 2027 Mar 1, 2029 Apr 1, 2027 Mar 1, 2029 730 Amount ($000) 99,000 Funding Date Jan 1, 2027 99,000 Check vs PA Obligation Date Apr 1, 2027 0 8.0 0.01798621 0.98201379 99,000 333 === page 343 === Monthly Cash Flow (Automated from Spend Plan) Project: Month Oct 2026 Nov 2026 Dec 2026 Jan 2027 Feb 2027 Mar 2027 Apr 2027 May 2027 Jun 2027 Jul 2027 Aug 2027 Sep 2027 Oct 2027 Nov 2027 Dec 2027 Jan 2028 Feb 2028 Mar 2028 Apr 2028 May 2028 Jun 2028 Jul 2028 Aug 2028 Sep 2028 Oct 2028 Nov 2028 Dec 2028 Jan 2029 Feb 2029 Mar 2029 TOTAL THEATER STRATEGIC COMMUNICATIONS HUB Funding ($000) Obligation ($000) Outlay ($000) Cumulative Funding Cumulative Obligation Cumulative Outlay 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 99,000 0 0 99,000 0 0 0 0 0 99,000 0 0 0 0 0 99,000 0 0 0 99,000 713 99,000 99,000 713 0 0 978 99,000 99,000 1,690 0 0 1,333 99,000 99,000 3,023 0 0 1,802 99,000 99,000 4,825 0 0 2,406 99,000 99,000 7,231 0 0 3,163 99,000 99,000 10,394 0 0 4,073 99,000 99,000 14,468 0 0 5,108 99,000 99,000 19,576 0 0 6,196 99,000 99,000 25,772 0 0 7,220 99,000 99,000 32,991 0 0 8,029 99,000 99,000 41,021 0 0 8,479 99,000 99,000 49,500 0 0 8,479 99,000 99,000 57,979 0 0 8,029 99,000 99,000 66,009 0 0 7,220 99,000 99,000 73,228 0 0 6,196 99,000 99,000 79,424 0 0 5,108 99,000 99,000 84,532 0 0 4,073 99,000 99,000 88,606 0 0 3,163 99,000 99,000 91,769 0 0 2,406 99,000 99,000 94,175 0 0 1,802 99,000 99,000 95,977 0 0 1,333 99,000 99,000 97,310 0 0 978 99,000 99,000 98,287 0 0 713 99,000 99,000 99,000 99,000 99,000 99,000 334 === page 344 === Mar 2029 Feb 2029 Jan 2029 40,000 Dec 2028 60,000 Nov 2028 Oct 2028 Sep 2028 Aug 2028 Jul 2028 Jun 2028 May 2028 Apr 2028 Mar 2028 Feb 2028 Jan 2028 Dec 2027 Nov 2027 Oct 2027 Sep 2027 Aug 2027 Jul 2027 Jun 2027 May 2027 Apr 2027 Mar 2027 Feb 2027 Jan 2027 Project: Program Year: Dec 2026 Nov 2026 Oct 2026 Cumulative WIP Curve THEATER STRATEGIC COMMUNICATIONS HUB 2027 Cumulative Funding vs Obligation vs Outlay 120,000 100,000 80,000 Cumulative Funding Cumulative Obligation Cumulative Outlay 20,000 0 335 === page 345 === 1. COMPONENT FY AIR FORCE 2027 2. DATE (Y Y Y Y MMDD) MILITARY CONSTRUCTION PROGRAM 20260326 3. INSTALLATION AND LOCATION 4. COMMAND MORON AIR BASE, SPAIN UNITED STATES AIR FORCES IN EUROPE 5. AREA CONTRUCTION COST INDEX 1.04 6. PERSONNEL (1) PERMANENT (2) STUDENTS (3) SUPPORTED OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN a. AS OF 30-SEP-25 b. END FY (4) TOTAL 10 135 324 0 0 0 30 268 30 797 10 135 324 0 0 0 30 268 30 797 7. INVENTORY DATA ($000) 3,433 1,594,212.00 55,000.00 75,500.00 0.00 0.00 95,100.00 1,819,812.00 a. TOTAL ACREAGE b. INVENTORY TOTAL AS OF 30-SEP-25 c. AUTHORIZATION NOT YET IN INVENTORY d. AUTHORIZATION REQUESTED IN THIS PROGRAM e. AUTHORIZATION INCLUDED IN FOLLOWING PROGRAM f. PLANNED IN NEXT THREE PROGRAM YEARS g. REMAINING DEFICIENCY h. GRAND TOTAL 8. PROJ ECTS REQUESTED IN THIS PROGRAM a. CATEGORY (1) CODE 113-321 (2) PROJ ECT TITLE COMBAT PARKING APRON (3) SCOPE 122,965 SM b. COST ($000) 75,500 c. DESIGN STATUS (1) START (2) COMPLETE 03/23 08/26 9. FUTURE PROJ ECTS N/A 10. MISSION OR MAJ OR FUNCTIONS The Mission of Moron Air Base is to provide expeditionary combat support and expandable forward operating base to support transient/bed-down of aircraft operations; to provide the staging of aircraft and personnel in support of US and NATO plans, exercises and contingency operations; and to provide Base Operating Support to tenant units. 11. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES N/A DD FORM 1390, JUL 1999 PREVIOUS EDITION IS OBSOLETE. Adobe336 Professional 8.0 === page 346 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA MARCH 2026 AIR FORCE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE MORON AIR BASE SPAIN COMBAT PARKING APRON 5. PROGRAM ELEMENT 6. CATEGORY CODE 91211F 113-321 7. PROJECT NUMBER 8. PROJECT COST ($000) 75,500 QUUG211016 9. COST ESTIMATES 0.9303 EURO/US$ ITEM UM QUANTITY UNIT COST COST($000) PRIMARY FACILITIES 42,040 320 APRON (113-321) SM 122,965 (39,372 4418 BASE ENGINEER STORAGE SHED (219-947) SM 372 (1,643) CYBERSECURITY OF FACILITY-RELATED CONTROL SYS LS (1,025) SUPPORTING FACILITIES 22,557 PAVEMENTS LS (1,208) UTILITIES LS (15,625) SITE IMPROVEMENTS LS (4,744) GENERATOR KW 150 633 (95) (884) DEMOLITION SM 372 2,376 SUBTOTAL 64,827 CONTINGENCY (5.00%) 3,230 TOTAL CONTRACT COST 67,827 4,951 SUPERVISION, INSPECTION AND OVERHEAD (7.30%) POST CONSTRUCTION AWARD SERVICES 2,718 TOTAL REQUEST 75,496 TOTAL REQUEST (ROUNDED) 75,500 EQUIPMENT FROM OTHER APPROPRIATIONS (NON-ADD) (1,200) 10. DESCRIPTION OF PROPOSED CONSTRUCTION Construct apron addition for parking strategic bomber aircraft. Demolish Base Civil Engineer Storage Shed 1222 (372 SM) and open-storage yard that are within footprint of new apron; reconstruct shed and yard at alternate site. Pavements include apron shoulders and access road. Utilities include aviation fuel dispensing system with hydrant pits, pipeline, and pumps; water supply system; storm sewer system; electrical distribution lines; and apron tower lights with backup generators. Site improvements include site preparation, landscaping, and jet blast deflectors. Facilities will be designed as permanent construction in accordance with Department of War Unified Facilities Criteria 1-200-01, General Building requirements. This project will comply with Department of War antiterrorism/ force protection requirements per Unified Facilities Criteria 4-010-01. 11. REQ: 122,965 SM ADQT: 0 SM SUBSTD: 0 PROJECT: COMBAT AIRCRAFT PARKING APRON REQUIREMENT: This project is required to enhance readiness capabilities at Moron Air Base, Spain. A key enabler for training and combat operations is substantial infrastructure, promoting a quick response and positioning of forces within prescribed response times. The expanded Strategic Bomber Aircraft parking apron will increase Moron Air Base's ability to meet future mission requirements. This project maximizes airfield capability, readiness, and safety operations. This project is required to directly improve airfield presence and bolster airfield capability and readiness supporting bilateral and multilateral exercises and training with allied partners. This will reduce time to launch and recover DD FORM 1391, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 337 === page 347 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA MARCH 2026 AIR FORCE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE MORON AIR BASE SPAIN COMBAT PARKING APRON 5. PROGRAM ELEMENT 6. CATEGORY CODE 91211F 113-321 7. PROJECT NUMBER 8. PROJECT COST ($000) QUUG211016 75,500 aircraft during peak operations. CURRENT SITUATION: Moron Air Base has a large apron that allows for significant variation in nonexplosive transient aircraft parking arrangements to support a wide array of operations for the United State Air Force, United States Marine Corps, and Spanish Air Force. The current apron is not capable of supporting any loaded strategic bombers due to limiting factors associated with unrelated facilities violating inhabited building safety arcs. IMPACT IF NOT PROVIDED: Adequate airfield infrastructure will not be available to the DoW or its allied partners, and personnel, aircraft, and resources will lack key facilities and infrastructure to support expanded airfield operations for training and contingency environments. This limitation will impede sortie generation and flying schedules, directly limiting airfield presence and impairing airfield capability and readiness. Therefore, responsiveness for bilateral and multilateral exercises and training missions would be compromised, directly limiting theater presence and impairing mission capability, readiness, and contingency support. ADDITIONAL: This project meets applicable criteria/scope specified in Department of the Air Force Manual 32-1084, Standard Facility Requirements. This design shall conform to criteria established in the Air Force Corporate Facilities Standards but will not employ a standard facility design because there is no Air Force standard facility design for this project, and there is no applicable standard design from Air Force Civil Engineer Center A Waiver to an Economic Analysis has been approved for this project. Sustainable principles, to include life-cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with Unified Facility Criteria 1-200-02, High Performance and Sustainable Building Requirements. This project does not fall within or partly within the 100-year floodplain. Facility is sited in accordance with the Installation Development Plan and is within a compatible land use area. Supporting Facilities exceed 25% of the Primary Facilities total due to the aviation fuel dispensing system. No construction growth offset is required for this project. 496th Air Base Squadron Civil Engineer: +34-955-848-604 Apron (113-321): 122,965 SM = 147,065 Square Yards Base Engineer Storage Shed (219-947): 372 SM = 4,004 Square Feet Demolition: 372 SM = 4,004 Square Feet Foreign Currency Budget Rate Used: 0.9303 EUR = 1.0000 USD JOINT USE CERTIFICATION: This facility can be used by other components on an "as available" basis; however, the scope of the project is based on Air Force requirements. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 338 === page 348 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA MARCH 2026 AIR FORCE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE MORON AIR BASE SPAIN COMBAT PARKING APRON 5. PROGRAM ELEMENT 12. 6. CATEGORY CODE 7. PROJECT NUMBER 8. PROJECT COST ($000) 91211F 113-321 QUUG211016 SUPPLEMENTAL DATA: A. Estimated Execution Data: (1) Acquisition Strategy: Design-Bid-Build (2) Design Data (a) Design or Request for Proposal(RFP) Started: (b) Percent of Design Completed as of SEP 2025: (c) Percent of Design Completed as of JAN 2026: (d) Design or RFP Complete: (e) Total Design Cost ($000): (f) Energy Study and/or Life Cycle Cost Analysis (g) Standard or Definitive Design Used? (3) Construction Data: (a) Contract Award: (b) Construction Start: (c) Construction Complete: 75,500 MAR/2023 35% 65% AUG/2026 4,100 NO NO MAY/2027 JUN/2027 APR/2030 B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) Pantographs DD FORM 1391C, JUL 1999 3080 PREVIOUS EDITION IS OBSOLETE 2028 1,200 PAGE NO. 339 === page 349 === 1. COMPONENT 2. DATE (YYYYMMDD) FY 2027 BBBBBB MILITARY CONSTRUCTION PROGRAM AIR FORCE 3. INSTALLATION AND LOCATION 4. COMMAND EARECKSON AS WAKE ISLAND AIRFIELD SITE 1 PACIFIC AIR FORCE 6. PERSONNEL (1) PERMANENT 20260326 5. AREA CONTRUCTION COST INDEX 4.72 (2) STUDENTS (3) SUPPORTED OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN (4) TOTAL a. AS OF 30-Sep-25 1 2 0 0 0 0 0 0 55 58 b. END FY 30-Sep-31 1 2 0 0 0 0 0 0 55 58 7. INVENTORY DATA ($000) 2,600.00 3,458,044.00 0.00 335,000.00 343,000.00 61,000.00 0.00 4,197,044.00 a. TOTAL ACREAGE b. INVENTORY TOTAL AS OF 05-Mar-26 c. AUTHORIZATION NOT YET IN INVENTORY d. AUTHORIZATION REQUESTED IN THIS PROGRAM e. AUTHORIZATION INCLUDED IN FOLLOWING PROGRAM f. PLANNED IN NEXT THREE PROGRAM YEARS g. REMAINING DEFICIENCY h. GRAND TOTAL 8. PROJECTS REQUESTED IN THIS PROGRAM (1) CODE a. CATEGORY (2) PROJECT TITLE 113-321 PDI: AIRCRAFT PARKING APRON (WAKE) PHASE 1, INC (3) SCOPE b. COST ($000) (1) START c. DESIGN STATUS (2) COMPLETE 53,000 SM 129,000 11/2023 10/2025 9. FUTURE PROJECTS 113-321 PDI: AIRCRAFT PARKING APRON (WAKE) PHASE 1, INC (53,000 SM / $206,000) 141-784 PDI: NEW BASE OPERATIONS FACILITY (3029 SM/ $198,000) R&M Unfunded Requirements: Not available. 10.MISSION OR MAJOR FUNCTIONS Wake Island is a vital strategic link in the Pacific region and serves as a trans-Pacific refueling stop for military aircraft. Several Department of War agencies also maintain programs and assets on the island; the Missile Defense Agency runs a set of launch sites and storage facilities for equipment such as the Army's Terminal High Altitude Area Defense missile launchers, the Defense Threat Reduction Agency monitors for atmospheric and seismic evidence of nuclear launch tests, and the National Oceanic and Atmospheric Agency monitors tidal patterns and sea levels. 11. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES N/A DD FORM 1390, JUL 1999 340 PREVIOUS EDITION IS OBSOLETE. === page 350 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA MARCH 2026 AIR FORCE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE WAKE ISLAND AIRFIELD SITE 1 WAKE ISLAND PDI: AIRCRAFT PARK. APRON (WAKE) PHASE 1, INC 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211F 113-321 YGFZ220002PA 8. PROJECT COST ($000) AUTH: 335,000 APPR: 129,000 9. COST ESTIMATES 1.0000 U.S. DOLLAR/US$ ITEM UM QUANTITY UNIT COST COST($000) PRIMARY FACILITIES 133,377 APRON (113-321) SM 53,000 1,924 (101,972) SHOULDER, PAVED (116-642) SM 5,800 1,397 (8,103) FIRE CRASH/RESCUE STATION (130-142) SM 1,113 19,844 (22,086) EMERGENCY ELECTRIC POWER GENERATION PLANT KW 200 4,680 (936) (811-147) CYBERSECURITY OF FACILITY-RELATED CONTROL SYS LS (280) SUPPORTING FACILITIES 156,678 SPECIAL CONSTRUCTION FEATURES LS (40,768) UTILITIES LS (11,130) SITE PREPARATION LS (15,101) ROADS, SIDEWALKS, AND PARKING LS (11,142) SITE IMPROVEMENTS LS (34,134) COMMUNICATIONS LS (2,944) DEMOLITION SM 1,900 4,081 (7,753) GENERATOR KW 200 2,416 (483) LOGISTIC SUPPORT COST LS (31,882) OMSI LS (1,342) SUBTOTAL 290,055 CONTINGENCY (5.00%) 14,503 TOTAL CONTRACT COST 304,558 SUPERVISION, INSPECTION AND OVERHEAD (9.00%) 27,410 DESIGN DURING CONSTRUCTION 2,766 TOTAL REQUEST 334,734 TOTAL REQUEST (ROUNDED) 335,000 EQUIPMENT FROM OTHER APPROPRIATIONS (NON-ADD) (975) 10. DESCRIPTION OF PROPOSED CONSTRUCTION Construct an aircraft parking apron with associated taxiways and shoulders to increase aircraft parking capacity and support operational flying missions at Wake Island. The project includes a portland cement concrete parking apron with portland cement concrete shoulders capable of supporting four C-17 aircraft, all subgrade and subbase work, drainage, airfield lighting, grounding, mooring, marking, fencing, ramp area lighting and other necessary airfield support. Construct a new Fire Crash Rescue Station at Wake Island, consisting of maintenance and apparatus bays and training and administrative areas. The facility incorporates economical design and construction methods to enable the installation's mission. The construction includes a one-story structure with shallow continuous and individual spread footings, cast-in place concrete load bearing walls and floor slabs. The roof consists of reinforced cast-in place concrete. The facility also includes ventilation and air conditioning system, electrical, communication, a backup generator and uninterruptable power supply for system redundancy, mass notification system, fire suppression and alarm systems. Supporting facilities include all utilities; site preparation to include removal of existing pavement, removal of portions of the existing hydrant fuel system, existing vegetation, and obsolete utilities; pavements to include road relocations DD FORM 1391, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 341 === page 351 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE WAKE ISLAND AIRFIELD SITE 1 WAKE ISLAND PDI: AIRCRAFT PARKING APRON (WAKE) PHASE 1, INC 1 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211F 113-321 YGFZ220002PA 8. PROJECT COST ($000) AUTH: 335,000 APPR: 129,000 as required; site improvements; communications infrastructure; demolition; special construction features which include Munitions and Explosives of Concern / Explosives Safety Submission; Petroleum, Oil & Lubricants Aircraft Fueling and Hydrant Systems, including a hydrant loop and fuel hydrants at each parking position; a Man Camp; and other necessary supporting work to make a complete and usable facility. This project is authorized a generator, per AFI 32-1062. The project will demolish Building 1520 (33 Square Meters), Building 1522 (933 Square Meters), Building 130 (854 Square Meters), Building 201 (69 Square Meters), and Building 202 (19 Square Meters) totaling 1,908 Square Meters. Facilities will be designed as permanent construction in accordance with Department of War Unified Facilities Criteria 1-200-01. This project will comply with Department of War antiterrorism/force protection requirements per Unified Facilities Criteria 4-010-01. Air Conditioning: 75 Tons 11. REQ: 53,000 SM ADQT: 0 SUBSTD: 1,908 SM PROJECT: Expand Bravo North Apron, Phase 1 REQUIREMENT: A new permanent, adequately configured aircraft parking apron is required on Wake Island to expand aircraft parking and operating capacity. The requirement is based on Pacific Air Forces and joint services operational planning needs for the region to support planned missions and contingency operations. This project is required to improve the mission capability at Wake Island and support a wide range and variety of aircraft of all services. To ensure maximum flexibility, the accommodation of eight C-17s was used as the planning aircraft requirements. The parking apron and shoulder will be constructed in two phases. Half of the aircraft parking expansion will be constructed as part of this phase (Phase 1) and will accommodate four of the eight C-17s. The remaining four will be accommodated in a later phase (Phase 2). The construction of the apron results in the displacement of several facilities and site features including Base Civil Engineering Services, the Fuels Operations Office, Fuel Truck Parking, Fillstands, and the existing Fire Crash Rescue Station. The Fire Crash Rescue Station is required to be replaced as part of this project (Phase 1). The Base Civil Engineering Services including Carpentry/Paint Shop and Heating, Ventilation, and Air Conditioning/Electrical Shop, the Fuels Operations Office, Fillstands and Fuel Truck Parking will be replaced as part of Phase 2. Wake Island is a vital strategic link in the Pacific region and serves as a trans-Pacific refueling stop for military aircraft. Several DoW agencies also maintain programs and assets on the island; the Missile Defense Agency runs a set of launch sites and storage facilities for equipment such as the Army's Terminal High Altitude Area Defense missile launchers, the Defense Threat Reduction Agency monitors for atmospheric and seismic evidence of nuclear launch tests, and the National Oceanic and Atmospheric Agency monitors tidal patterns and sea levels. This is not a tenant or supported service requirement. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 342 === page 352 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE WAKE ISLAND AIRFIELD SITE 1 WAKE ISLAND PDI: AIRCRAFT PARKING APRON (WAKE) PHASE 1, INC 1 5. PROGRAM ELEMENT 7. PROJECT NUMBER 6. CATEGORY CODE 8. PROJECT COST ($000) AUTH: 335,000 91211F 113-321 YGFZ220002PA APPR: 129,000 CURRENT SITUATION: The project site is located north of the current airfield parking aprons (Alpha and Bravo) in an area that was a former aircraft parking apron that has since been converted to industrial and storage uses. The existing aircraft parking aprons are not sized to accommodate the capacity increase required for United States IndoPacific Command, Pacific Air Forces, and joint services operational planning needs for the region. Alpha and Bravo aprons are utilized at full capacity and scheduling of increased transient exercises cannot be deconflicted to maintain status quo. IMPACT IF NOT PROVIDED: If not provided, United States Indo-Pacific Command and Pacific Air Forces will not be able to increase operational flying missions in the region to support exercises, planned missions and contingency requirements. ADDITIONAL: This project meets applicable criteria/scope specified in Air Force Manual 321084, Facility Requirements and Unified Facilities Criteria 4-730-10, Fire Stations, the Fire Station Space Program Interactive Worksheet, and United States Air Force Civil Engineer Center Facilities Dynamic Prototypes Design for Fire Station. This design shall conform to criteria established in the Air Force Corporate Facilities Standards, the Installation Facilities Standards, and all applicable federal and host nation requirements, but will not employ a standard facility design because there is no Air Force standard facility design for a Fire Station. A preliminary analysis of reasonable alternatives for accomplishing this project (status quo, renovation, addition/alteration, new construction) indicated that new construction is the most cost-effective option to meet mission requirements. Sustainable principles, to include life-cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with Unified Facility Criteria 1-200-02. This includes preparation of a life-cycle cost analysis for energy consuming systems, renewable energy generating systems, whenever life-cycle cost effective is selected as the reason any requirement of Unified Facility Criteria 1-200-02 is partially compliant or not applicable. This project does not fall within or partly within the 100-year flood plain. This facility is sited in accordance with the Installation Development Plan and is within a compatible land use area. Supporting facilities cost exceeds 25% of the primary facilities because several special construction elements were required, such as a Petroleum Oil & Lubricants Aircraft Fueling System, Petroleum Oil & Lubricants Hydrant System, Munitions and Explosives of Concern / Explosives Safety Submission, a Man Camp to cover housing for workers during construction, extensive heavy-duty pavement for access roads, extensive building and site demolition to prepare for the apron expansion, and extensive demolition of existing pavements. No construction growth offset is required for this project. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 343 === page 353 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE WAKE ISLAND AIRFIELD SITE 1 WAKE ISLAND PDI: AIRCRAFT PARKING APRON (WAKE) PHASE 1, INC 1 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211F 113-321 YGFZ220002PA 8. PROJECT COST ($000) AUTH: 335,000 APPR: 129,000 APRON: 53,000 Square Meter = 570,487 Square Feet; SHOULDER, PAVED: 5,800 Square Meter = 62,431 Square Feet; FIRE CRASH/RESCUE STATION: 1,113 Square Meter = 11,980 Square Feet; DEMOLITION: 1,908 Square Meter = 20,538 Square Feet. JOINT USE CERTIFICATION: These facilities can be used by other components on an "as available" basis; however, the scope of the project is based on Air Force requirements. Facility Condition Index: This is not a recapitalization project. Condition Index data exists for this facility type. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE No Facility PAGE NO. 344 === page 354 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE WAKE ISLAND AIRFIELD SITE 1 WAKE ISLAND PDI: AIRCRAFT PARKING APRON (WAKE) PHASE 1, INC 1 5. PROGRAM ELEMENT 7. PROJECT NUMBER 12. 6. CATEGORY CODE 8. PROJECT COST ($000) AUTH: 335,000 91211F 113-321 YGFZ220002PA APPR: 129,000 SUPPLEMENTAL DATA: A. Estimated Execution Data: (1) Acquisition Strategy: Design-Bid-Build (2) Design Data (a) Design or Request for Proposal(RFP) Started: NOV/2023 (b) Percent of Design Completed as of SEP 2025: 65% (c) Percent of Design Completed as of JAN 2026: 100% (d) Design or RFP Complete: OCT/2025 (e) Total Design Cost ($000): 24,750 (f) Energy Study and/or Life Cycle Cost Analysis YES (g) Standard or Definitive Design Used? NO (3) Construction Data: (a) Contract Award: MAR/2027 (b) Construction Start: MAY/2027 (c) Construction Complete: JUN/2030 B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) Furnishings, Fixtures, and Equ Casework, Built-in Equipment Communication Equipment Fire Station Support Equipment 3400 3400 3400 3080 2028 2028 2028 2028 185 150 140 500 Auth of Approp $(000) 129,000 206,000 335,000 Appropriation $(000) 129,000 206,000 335,000 C. Authorization and Appropriation Summary: FY 2027 BUDGET REQUEST FUTURE REQUEST Total DD FORM 1391C, JUL 1999 Authorization $(000) 335,000 0 335,000 PREVIOUS EDITION IS OBSOLETE PAGE NO. 345 === page 355 === Spend Plan CAO: Project Title: Installation: Program Year Project # PDI: Aircraft Parking Apron (Wake) Phase 1, Inc I 9.0% I 5.0% I Schedule Award Complete POP Months I I 335,000 289,608 30,150 914 15,243 462 11-Mar-27 11-Jun-30 1188 39.0 I Chart Begin 1st Increment 2nd Increment 3rd Increment 4th Increment 5th Increment End Total Instructions and Notes This spreadsheet is designed to help the user develop a WIP Curve for inclusion with a project 1391. The user only needs to know the project cost and schedule. Edit The Green Fields ONLY Wake Island, USA 2027 YGFZ220002PA Financials PA ($000) Initial Contract SIOH SIOH / Month Other (Contingency) Other / Month 25-Mar-26 !/ Fund 1-Oct-26 1-Jan-27 1-Oct-27 1-Oct-28 Obligate I Fund mmm-yr 9 - 10 11 Obligate mmm-yr 1-Feb-28 1-Feb-29 Oct-26 Jan-27 Oct-27 Oct-28 May-27 Feb-28 Feb-29 11-Jun-30 Jun-30 Jun-30 J 11-May-27'I' 11-Jun-30 ~ 1 2 3 4 5 6 7 8 Months 0 9 12 16 0 0 0 37 Enter the Project Title, Location, and Project number Enter the Date this WIP Curve is being updated Enter the Project PA Enter the SIOH required by the agent (6.5% for USACE FY24 and beyond) Enter the contingency percentage plus other amounts withheld by the Agent Enter the projected project Award Date ( usually 1 Apr of the Execution FY) Enter the Project Complete Date (Usually Award plus ~1000 days, use the 1st of a month) Enter the Chart Begin Date ( first day of the Program Year: 1-Oct-XX) ( Use "Short Date" format.) Enter the Dates anticipate to receive each increment of funding (usually January of the Program year, and Oct for subsequent increments) Enter the Dates anticipated to Award the contract ( usually 1 Apr of the Program year and obligate increments (usually 1 Oct for increments after initial award.) Enter the Value of each increment (If the project is less than $250M enter the PA as 1st Increment) .I Increment 129,000 145,000 61,000 335,000 Obligate 111,521 125,353 52,735 289,608 SIOH 11,610 13,050 5,490 30,150 Other 5,870 6,598 2,776 15,243 346 === page 356 === Spend Plan CAO: Project Title: Installation: Program Year Project # 25-Mar-26 PDI: Aircraft Parking Apron (Wake) Ph Notes Wake Island, USA 2027 YGFZ220002PA Assumes initial appropriation is enacted by Note 1: Congress Jan FY 2027. Assumes funds are available for obligation by 31 January of the execution year and by Note 2: 31 October for subsequent years. All Cost in thousands Chart Begin Oct-26 Month Oct-26 Nov-26 Dec-26 Jan-27 Feb-27 Mar-27 Apr-27 May-27 Jun-27 Jul-27 Aug-27 Sep-27 Oct-27 Nov-27 Dec-27 Jan-28 Feb-28 Mar-28 Apr-28 May-28 Jun-28 Jul-28 Aug-28 Sep-28 Oct-28 Nov-28 Dec-28 Jan-29 Feb-29 Mar-29 Apr-29 May-29 Jun-29 FUNDING (note 1) Enacted 129,000 145,000 61,000 - OBLIGATION (note 2-3) Cumulative Obligated Cumulative 129,000 129,000 129,000 129,000 129,000 129,000 129,000 129,000 129,000 274,000 274,000 274,000 274,000 274,000 274,000 274,000 274,000 274,000 274,000 274,000 274,000 335,000 335,000 335,000 335,000 335,000 335,000 335,000 335,000 335,000 1,376 112,896 1,376 1,376 1,376 1,376 1,376 1,376 1,376 1,376 126,728 1,376 1,376 1,376 1,376 1,376 1,376 1,376 1,376 1,376 1,376 1,376 54,110 1,376 1,376 1,376 1,376 1,376 114,272 115,647 117,023 118,398 119,774 121,149 122,525 123,900 125,276 252,004 253,379 254,755 256,130 257,506 258,881 260,257 261,633 263,008 264,384 265,759 267,135 321,245 322,620 323,996 325,371 326,747 OUTLAYS (note 4-5) Monthly 50,250 4,500 5,500 6,500 7,500 8,500 9,500 10,500 11,500 12,500 13,500 13,500 13,500 13,500 13,500 13,500 13,500 12,150 10,935 9,842 8,858 7,972 7,175 6,458 6,458 Cumulative 50,250 54,750 60,250 66,750 74,250 82,750 92,250 102,750 114,250 126,750 140,250 153,750 167,250 180,750 194,250 207,750 221,250 233,400 244,335 254,177 263,035 271,007 278,182 284,640 291,098 Assumes ALL project funds (contract, SIOH, contingency, etc) are obligated NLT 6 Note 3: months prior to project end Assumes contract award in May 2027 and contract completion November 2030; Note 4 duration 42 months. Assumes Agent will retain 1% of project Note 5 obligations for a final payment 347 === page 357 === PDI: Aircraft Parking Apron Phase 1, Wake Island $400,000 $350,000 --- --- --- ------ --- ---.... I .... .... --- --- --- --- --- ---, . $250,000 , $200,000 I , ,, $150,000 ..J --- --- --- --- , , , $100,000 ,,' ,' Funding Obligation I Outlays $50,000 I I II Jun-30 Apr-30 Feb-30 Dec-29 Oct-29 Aug-29 Jun-29 Apr-29 Feb-29 Dec-28 Oct-28 Aug-28 Jun-28 Apr-28 Feb-28 Dec-27 Oct-27 Aug-27 Jun-27 Apr-27 Feb-27 Dec-26 $0 Oct-26 Dollars in (000) $300,000 348 === page 358 === Tab - DESIGN === page 359 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE WORLDWIDE UNSPECIFIED VARIOUS LOCATIONS DESIGN 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211F 961-000 MARCH 2026 8. PROJECT COST ($000) PAYZ270002 1,820,607 9. COST ESTIMATES 1.0000 U.S. DOLLAR/US$ ITEM PRIMARY FACILITIES DESIGN (27110F) DESIGN (91211F) DESIGN (11233F) DESIGN (72207F) DESIGN (32021F) DESIGN (41221F) DESIGN (64015F) Total from Continuation page(s) SUPPORTING FACILITIES SUBTOTAL CONTINGENCY (0.00%) TOTAL CONTRACT COST SUPERVISION, INSPECTION AND OVERHEAD (0.00%) TOTAL REQUEST TOTAL REQUEST (ROUNDED) EQUIPMENT FROM OTHER APPROPRIATIONS (NON-ADD) 10. DESCRIPTION OF PROPOSED CONSTRUCTION N/A 11. REQ: 0 ADQT: UM QUANTITY COST($000) 1,820,607 (751,990) (403,319) (316,800) (160,929) (40,700) (27,644) (26,000) (93,225) LS LS LS LS LS LS LS 0 UNIT COST 1,820,607 0 1,820,607 0 1,820,607 1,820,607 (0) SUBSTD: 0 PROJECT: As required REQUIREMENT: These design funds are required to complete the design of facilities for the FY 2028 Military Construction Program, initiate design of facilities for the FY 2029 Military Construction Program, and accomplish designs for major and complex technical projects with long lead-times to be included in subsequent Military Construction programs. These funds may be used for value engineering and for support of the design and construction management of projects that are funded by foreign governments and for design of classified and special programs. The funds may also be used for developing the Tri-Services Cost Estimating Guide and Unified Facilities Criteria. DD FORM 1391, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 349 === page 360 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE WORLDWIDE UNSPECIFIED VARIOUS LOCATIONS DESIGN 5. PROGRAM ELEMENT 7. PROJECT NUMBER 6. CATEGORY CODE 91211F 961-000 9. COST ESTIMATES (CONTINUED) ITEM PRIMARY FACILITIES (CONTINUED) DESIGN (84701F) DESIGN (27147F) DESIGN (64183F) DESIGN (64033F) DESIGN (12110F) DESIGN (27142F) DD FORM 1391C, JUL 1999 MARCH 2026 8. PROJECT COST ($000) PAYZ270002 UM 1,820,607 QUANTITY UNIT COST COST ($000) Total (26,000) (18,000) (17,380) (15,000) (12,800) (4,045) 93,225 LS LS LS LS LS LS PREVIOUS EDITION IS OBSOLETE PAGE NO. 350 === page 361 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA SPACE FORCE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE WORLDWIDE UNSPECIFIED VARIOUS LOCATIONS DESIGN 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211S 961-000 MARCH 2026 8. PROJECT COST ($000) PAYZ270010 670,005 9. COST ESTIMATES 1.0000 U.S. DOLLAR/US$ ITEM PRIMARY FACILITIES DESIGN (961-000) SUPPORTING FACILITIES SUBTOTAL CONTINGENCY (0.00%) TOTAL CONTRACT COST SUPERVISION, INSPECTION AND OVERHEAD (0.00%) TOTAL REQUEST TOTAL REQUEST (ROUNDED) EQUIPMENT FROM OTHER APPROPRIATIONS (NON-ADD) 10. DESCRIPTION OF PROPOSED CONSTRUCTION N/A 11. REQ: 0 ADQT: UM QUANTITY COST($000) 670,005 (670,005) LS 0 UNIT COST 670,005 0 670,005 0 670,005 670,005 (0) SUBSTD: 0 PROJECT: As required REQUIREMENT: These design funds are required to complete the design of facilities for the U.S. Space Force FY 2028 Military Construction Program, initiate design of facilities for the FY 2029 Military Construction Program, and accomplish planning and design for major and complex technical projects with long lead-times to be included in subsequent Military Construction programs. These funds may be used for value engineering and for support of the design and construction management of projects that are funded by foreign governments and for design of classified and special programs. The funds may also be used for developing the Tri-Services Cost Estimating Guide and Unified Facilities Criteria. DD FORM 1391, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 351 === page 362 === Tab - UNSPECIFIED MINOR MILITARY CONSTRUCTION === page 363 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE WORLDWIDE UNSPECIFIED VARIOUS LOCATIONS UNSPECIFIED MINOR MILITARY CONSTRUCTION 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211F 962-000 8. PROJECT COST ($000) PAYZ270003 234,210 9. COST ESTIMATES 1.0000 U.S. Dollar/US$ ITEM PRIMARY FACILITIES UNSPECIFIED MINOR MILITARY CONSTRUCTION (91211F) UNSPECIFIED MINOR MILITARY CONSTRUCTION (84701F) SUPPORTING FACILITIES SUBTOTAL CONTINGENCY (0.00%) TOTAL CONTRACT COST SUPERVISION, INSPECTION AND OVERHEAD (0.00%) TOTAL REQUEST TOTAL REQUEST (ROUNDED) EQUIPMENT FROM OTHER APPROPRIATIONS (NON-ADD) 10. DESCRIPTION OF PROPOSED CONSTRUCTION Unspecified Minor Military Construction 11. REQ: 0 ADQT: UM QUANTITY UNIT COST COST($000) LS 234,210 (207,360) LS (26,850) 0 234,210 0 234,210 0 234,210 234,210 (0) SUBSTD: 0 PROJECT: As required REQUIREMENT: Minor construction projects authorized by 10 U.S. Code 2805 are military construction projects with an estimated funded cost of more than $4,000,000 and equal or less than $9,000,000 (plus applicable area cost factor). This authority provides a means of accomplishing projects that are not identified but which are anticipated to arise during FY 2027. Included would be projects to support new mission requirements, new equipment, and other essential support to US Air Force missions. The 91211F PEC includes tranches for OACs 18 ($80M), 67 ($12.9M), and 74 ($114.46M). DD FORM 1391, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 352 === page 364 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE WORLDWIDE UNSPECIFIED VARIOUS LOCATIONS UNSPECIFIED MINOR MILITARY CONSTRUCTION 5. PROGRAM ELEMENT 7. PROJECT NUMBER 12. 6. CATEGORY CODE 8. PROJECT COST ($000) 91211F 962-000 PAYZ270003 SUPPLEMENTAL DATA: A. Estimated Execution Data: (1) Acquisition Strategy: (2) Design Data (a) Design or Request for Proposal(RFP) Started: (b) Percent of Design Completed as of SEP 2025: (c) Percent of Design Completed as of JAN 2026: (d) Design or RFP Complete: (e) Total Design Cost ($000): (f) Energy Study and/or Life Cycle Cost Analysis (g) Standard or Definitive Design Used? (3) Construction Data: (a) Contract Award: (b) Construction Start: (c) Construction Complete: DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE 234,210 0% 0% 0 NO NO PAGE NO. 353 === page 365 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA SPACE FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE WORLDWIDE UNSPECIFIED VARIOUS LOCATIONS UNSPECIFIED MINOR MILITARY CONSTRUCTION 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211S 962-000 8. PROJECT COST ($000) PAYZ270011 81,600 9. COST ESTIMATES 1.0000 U.S. Dollar/US$ ITEM PRIMARY FACILITIES UNSPECIFIED MINOR MILITARY CONSTRUCTION (962000) SUPPORTING FACILITIES SUBTOTAL CONTINGENCY (0.00%) TOTAL CONTRACT COST SUPERVISION, INSPECTION AND OVERHEAD (0.00%) TOTAL REQUEST TOTAL REQUEST (ROUNDED) EQUIPMENT FROM OTHER APPROPRIATIONS (NON-ADD) 10. DESCRIPTION OF PROPOSED CONSTRUCTION Unspecified Minor Military Construction 11. REQ: 0 ADQT: UM QUANTITY COST($000) 81,600 (81,600) LS 0 UNIT COST 81,600 0 81,600 0 81,600 81,600 (0) SUBSTD: 0 PROJECT: As required REQUIREMENT: Minor construction projects authorized by 10 U.S. Code 2805 are military construction projects with an estimated funded cost of more than $4,000,000 and equal or less than $9,000,000 (plus applicable area cost factor). This authority provides a means of accomplishing projects that are not identified but which are anticipated to arise during FY 2027. Included would be projects to support new mission requirements, new equipment, and other essential support to US Space Force missions. DD FORM 1391, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 354 === page 366 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA SPACE FORCE MARCH 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE WORLDWIDE UNSPECIFIED VARIOUS LOCATIONS UNSPECIFIED MINOR MILITARY CONSTRUCTION 5. PROGRAM ELEMENT 7. PROJECT NUMBER 12. 6. CATEGORY CODE 8. PROJECT COST ($000) 91211S 962-000 PAYZ270011 SUPPLEMENTAL DATA: A. Estimated Execution Data: (1) Acquisition Strategy: (2) Design Data (a) Design or Request for Proposal(RFP) Started: (b) Percent of Design Completed as of SEP 2025: (c) Percent of Design Completed as of JAN 2026: (d) Design or RFP Complete: (e) Total Design Cost ($000): (f) Energy Study and/or Life Cycle Cost Analysis (g) Standard or Definitive Design Used? (3) Construction Data: (a) Contract Award: (b) Construction Start: (c) Construction Complete: DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE 81,600 0% 0% 0 NO NO PAGE NO. 355 === page 367 === Tab - RDT&E MILITARY CONSTRUCTION PROGRAM === page 368 === Department of the Air Force Research and Development (RDT&E) Military Construction Program Fiscal Year (FY) 2027 Budget Estimates Justification Data Submitted to Congress Apr 2026 356 === page 369 === THIS PAGE INTENTIONALLY LEFT BLANK 357 === page 370 === DEPARTMENT OF THE AIR FORCE FISCAL YEAR 2027 RESEARCH AND DEVELOPMENT(RDT&E) REQUEST TABLE OF CONTENTS ITEM PAGE NUMBER 1. TABLE OF CONTENTS 358 2. PROGRAM SUMMARY 360 3. INDEX (LIST OF PROJECTS) 362 4. MILITARY CONSTRUCTION PROJECTS 363 358 === page 371 === THIS PAGE INTENTIONALLY LEFT BLANK 359 === page 372 === DEPARTMENT OF THE AIR FORCE FISCAL YEAR 2027 RESEARCH AND DEVELOPMENT(RDT&E) PROGRAM SUMMARY PROGRAM SUMMARY AUTHORIZATION REQUEST ($000s) APPROPRIATION REQUEST ($000s) Military Construction Major Construction Total Military Construction 87,800 0 87,800 0 360 === page 373 === THIS PAGE INTENTIONALLY LEFT BLANK 361 === page 374 === DEPARTMENT OF THE AIR FORCE MILITARY CONSTRUCTION PROGRAM FISCAL YEAR 2027 INDEX - RESEARCH AND DEVELOPMENT (RDT&E) (DOLLARS IN THOUSANDS) STATE / COUNTRY INSTALLATION PROJECT FLORIDA Eglin JADC2 and ABMS Test Facility AUTHORIZATION REQUEST APPROPRIATION REQUEST Eglin TOTAL: FLORIDA TOTAL: 87,800 87,800 87,800 0 0 0 RESEARCH AND DEVELOPMENT (RDT&E) TOTAL: 87,800 0 362 === page 375 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE EGLIN AIR FORCE BASE FLORIDA JADC2 AND ABMS TEST FACILITY 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211F 311-171 MARCH 2026 8. PROJECT COST ($000) 87,800 FTFA193202 9. COST ESTIMATES ITEM UM QUANTITY UNIT COST COST($000) PRIMARY FACILITIES 55,998 AIRCRAFT RESEARCH LABORATORY (311-171) SM 6,934 6,994 (48,500) ICD 705 PREMIUM LS (6,633) CYBERSECURITY OF FACILITY-RELATED CONTROL SYS LS (865) 22,570 SUPPORTING FACILITIES SITE IMPROVEMENTS LS (3,260) SITE PREPARATION LS (1,350) UTILITIES LS (6,996) DEMOLITION SM 6,041 285 (1,722) GENERATOR kW 2,600 3,554 (9,242) SUBTOTAL 78,568 CONTINGENCY (5.00%) 3,928 TOTAL CONTRACT COST 82,496 SUPERVISION, INSPECTION AND OVERHEAD (6.50%) 5,362 DESIGN DURING CONSTRUCTION 786 TOTAL REQUEST 87,858 TOTAL REQUEST (ROUNDED) 87,800 EQUIPMENT FROM OTHER APPROPRIATIONS (NON-ADD) (7,625) 10. DESCRIPTION OF PROPOSED CONSTRUCTION Construct a multi-level controlled-space facility to support the Department of Air Force's (DAF) Battle Network Air Force Joint All-Domain Command and Control, Air Battle Management Systems (JADC2/ABMS). The facility will be a sprinkler-equipped facility consisting of a reinforced concrete foundation, structural steel framed, split-faced concrete masonry block and sloped standing seam metal roof. Project provides all utilities, site improvements, parking, fire detection and protection, heating/ventilation/air conditioning, secure communications, landscaping, emergency generator capabilities, and all necessary supporting work for a complete and usable facility. Sensitive and/or Special Access Program spaces shall comply with the Intelligence Community Directive 705 criteria and standards. Per AFI 321060, a generator authorization request will be submitted for approval by AFCEC/CF. The project will demolish building 0018 (6,401 SM) (Total: 6,401 SM). Facilities will be designed as permanent construction in accordance with Department of War Unified Facilities Criteria 1-200-01, General Building requirements. This project will comply with Department of War antiterrorism/force protection requirements per Unified Facilities Criteria 4-010-01. Air Conditioning: 100 Tons 11. REQ: 6,934 SM ADQT: 0 SUBSTD: 6,041 SM PROJECT: Construct a Joint All-Domain Command and Control (JADC2) and Advanced Battle Management System (ABMS) Test Facility. REQUIREMENT: The challenges posed by a re-emergence of long-term strategic competition with China and Russia, the new DAF Air Force Battle Joint All-Domain Command and DD FORM 1391, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 363 === page 376 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE EGLIN AIR FORCE BASE FLORIDA JADC2 AND ABMS TEST FACILITY 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211F 311-171 FTFA193202 MARCH 2026 8. PROJECT COST ($000) 87,800 Control (JADC2) mission, enabled by Advanced Battle Management System (ABMS) capabilities will allow any sensor to provide data to any shooter from any service, ally or partner from/to any domain in any situation to achieve effects against any target. Conflicts will be decided by the side with an information advantage. The US must be prepared to respond to relevant information with high velocity decision-making capabilities and capable of creating complex, simultaneous dilemmas for our adversary. JADC2/ABMS requires advanced technologies including artificial intelligence, machine learning, machine-to-machine communications, big data fusion and analytics to provide seamless, dynamic and continuous integration of capabilities generating effects in and from air, space, land, sea and cyber domains. Air Force Joint All-Domain Command and Control, Air Battle Management Systems testing including weapons and software development, integration, fielding and sustainment, requires a multi-level secure environment as well as laboratory space to all aspects of these areas. Unit activities require the facility to be sited and constructed near the current 96th Cyberspace Test Group facilities. This is not a tenant or supported service requirement. CURRENT SITUATION: The 96 Cyberspace Test Group (CTG) occupies multiple locations on EAFB to include buildings 85, 90, 73, multiple mobile container offices near B85, a temporary facility (B15159), and partial office space in other facilities. Secure lab space and conference space are borrowed and scheduled when available, limiting the level of capacity needed. Tests are performed away from campus due to lack of capability in occupied facilities. The 96 CTG has seen 10% growth each year with an expected continued trend. The 96 CTG has been designated the Air Force's Center of Excellence for cybersecurity testing and evaluation. New systems driven by the National Defense Strategy emphasize new concepts of Air Force Joint All-Domain Command and Control, Air Battle Management Command and Control. Integration of multiple sensors with significant advances in technology and operating at high security levels drives high security labs for testing systems of systems. These facilities need to be in a close vicinity/campus environment to leverage functional integration with concurrent cybersecurity testing. IMPACT IF NOT PROVIDED: The Air Force Test Center mission to conduct Developmental Test and Evaluation of air, space and cyberspace systems, and provide timely, objective and accurate information to acquisition decision makers will be diminished. There will be a direct negative impact to the warfighter's need to maintain Command, Control, Communications, Computer, Intelligence, Surveillance, and Reconnaissance, Cybersecurity, and information superiority while minimizing risks to fielding warfighter weapons systems. Current facilities and labs are not available to the level required for these new and ever advancing capabilities and the personnel needed to test and evaluate them. Splintering these tests, laboratories, and personnel between different buildings or difference bases/test sites is not cost effective and more importantly, will impact the warfighting capabilities of the Air Force and the Department of War in this new and quickly changing arena by limiting the available resources and assets as well as limiting the synergy derived from testing in a campus atmosphere, where other test laboratories and DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 364 === page 377 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE EGLIN AIR FORCE BASE FLORIDA JADC2 AND ABMS TEST FACILITY 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211F 311-171 FTFA193202 MARCH 2026 8. PROJECT COST ($000) 87,800 facilities can be leveraged. Eglin's current network bandwidth is insufficient to conduct the full range of JADC2/ABMS experimentation and testing and will lead to significant mission degradation if not addressed. Expansion of facilities, test labs and personnel are required to provide the necessary foundation to rapidly support game-changing technological advances for both software and cybersecurity test and evaluation and to enable current investments in facilities. Ultimately the 96 Cyberspace Test Group will be limited in supporting and executing advanced high security testing, and development of advanced Air Force Joint All-Domain Command and Control and Air Battle Management Systems. Directly supports DAF Reoptimization for Global Power Competition (GPC) element "Develop Capabilities" through "Operationally Focused ABMS" (AF OI #2) and "Moving Target Engagement" (AF OI #3). ADDITIONAL: This project will be funded and executed using RDT&E (3600) funds under Title 10 USC 2805: Unspecified minor construction (g) Defense Laboratory Modernization Program" (D) A Department of War research, development, test, and evaluation facility that is not designated as a science and technology reinvention laboratory but nonetheless is involved with developmental test and evaluation. This facility will serve as a Center of Excellence, bringing all weapons cybersecurity expertise into a unified environment including expertise from academic, industrial, and other federal agencies including NSA, Homeland Security as well Florida University. This facility will also benefit other Services contributions to CJADC2 including the Army's Project Convergence and Navy's Project Overmatch, which require an environment to develop and enhance land and maritime operations through the integration with air and space domains. All reasonable alternatives were considered during the development of this project to include status quo, add/alter, rental/ lease, and new construction. New construction is the only viable option to meet this requirement. Sustainable principles, to include life-cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with Unified Facilities Criteria 1-200-02, High Performance and Sustainable Building Requirements. This includes preparation of a life-cycle cost analysis for energy consuming systems, renewable energy generating systems, or whenever life-cycle cost effective is selected as the reason any requirement of Unified Facilities Criteria 1-200-02 is partially compliant or not applicable. This project does not fall within or partly within the 100-year floodplain. Facility is sited in accordance with the Installation Development Plan and is within a compatible land use area. Supporting Facilities exceed 25% of the Primary Facilities total due to the inclusion of an emergency generator. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 365 === page 378 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE EGLIN AIR FORCE BASE FLORIDA JADC2 AND ABMS TEST FACILITY 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 91211F 311-171 MARCH 2026 8. PROJECT COST ($000) FTFA193202 87,800 96 Wing Base Civil Engineer: DSN 872-2876 (ext. 200). AIRCRAFT RESEARCH LABORATORY: 6,934 square meters = 74,634 square feet. Demolition: 6,041 square meters = 65,0024 square feet. JOINT USE CERTIFICATION: This facility can be used by other components on an "as available" basis; however, the scope of the project is based on Air Force requirements. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 366 === page 379 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE EGLIN AIR FORCE BASE FLORIDA JADC2 AND ABMS TEST FACILITY 5. PROGRAM ELEMENT 7. PROJECT NUMBER 12. 6. CATEGORY CODE MARCH 2026 8. PROJECT COST ($000) 91211F 311-171 FTFA193202 SUPPLEMENTAL DATA: A. Estimated Execution Data: (1) Acquisition Strategy: Design-Bid-Build (2) Design Data (a) Design or Request for Proposal(RFP) Started: (b) Percent of Design Completed as of SEP 2025: (c) Percent of Design Completed as of JAN 2026: (d) Design or RFP Complete: (e) Total Design Cost ($000): (f) Energy Study and/or Life Cycle Cost Analysis (g) Standard or Definitive Design Used? (3) Construction Data: (a) Contract Award: (b) Construction Start: (c) Construction Complete: 87,800 DEC/2024 35% 65% JUL/2026 5,800 YES NO OCT/2027 JAN/2028 JAN/2030 B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) Communications / Data Electronic Security System Furniture, Fixtures, & Equipme Laboratory Equipment Uninterrupted Power Supply DD FORM 1391C, JUL 1999 RDTE RDTE RDTE RDTE RDTE PREVIOUS EDITION IS OBSOLETE 2027 2028 2028 2028 2027 500 500 1,000 5,000 625 PAGE NO. 367 === page 380 === Tab - HOST NATION FUNDED CONSTRUCTION === page 381 === Department of the Air Force Host Nation Funded Military Construction Program Fiscal Year (FY) 2027 Budget Estimates Justification Data Submitted to Congress Aug 2025 368 === page 382 === DEPARTMENT OF THE AIR FORCE HOST NATION MILITARY CONSTRUCTION PROGRAM CALENDAR YEAR 2027 TABLE OF CONTENTS ITEM ---- PAGE NUMBER 1. TABLE OF CONTENTS 369 2. PROGRAM SUMMARY 371 3. INDEX (LIST OF PROJECTS) 373 4. MILITARY CONSTRUCTION PROJECTS 374 369 === page 383 === THIS PAGE INTENTIONALLY LEFT BLANK 370 === page 384 === DEPARTMENT OF THE AIR FORCE HOST NATION MILITARY CONSTRUCTION PROGRAM CALENDAR YEAR 2027 PROGRAM SUMMARY Authorization Request ($000s) Military Construction Major Construction 213,000 Total Military Construction 213,000 Strategic Narrative: The enclosed justification book represents the United States Air Forces Korea (USFK) Republic of Korea and United State European Command (EUCOM) Host Nation Funded Construction program for calendar year 2026. Although the justification book may appear to be a list of individual projects, these projects were developed in coordination between both countries to form an overall consolidated program to meet priorities and Theater Infrastructure Master Plan – Armistice objectives. These projects have been through a detailed scoring and prioritization process with involvement of the component commanders and represent the most critical and urgent operational requirements. 371 === page 385 === THIS PAGE INTENTIONALLY LEFT BLANK 372 === page 386 === DEPARTMENT OF THE AIR FORCE HOST NATION MILITARY CONSTRUCTION PROGRAM CALENDAR YEAR 2027 INDEX (DOLLARS IN THOUSANDS) STATE/COUNTRY REPUBLIC OF KOREA INSTALLATION Osan Air Base PROJECT Consolidated Aircraft Maintenance Facility, Ph 1 Upgrade Electrical Distribution East, Ph 2 Osan Air Base TOTAL: REPUBLIC OF KOREA TOTAL: COST ($000) 78,000 103,000 181,000 181,000 REPUBLIC OF POLAND Wroclaw Air Base Dormitory and Multi-Use Support Building Wroclaw Air Base TOTAL: REPUBLIC OF POLAND TOTAL: 32,000 32,000 32,000 HOST NATION FUNDED CONSTRUCTION TOTAL: 213,000 373 === page 387 === 1 . COMPONENT : REPUBLIC OF KOREA FUNDED CONSTRUCTION (ROKFC) AIR FORCE 16 Jul y 20 25 4 . PROJECT TITLE: 3 . I NSTALLATION AND LOCATION : CONSOLIDATED AIRCRAFT MAINTENANCE FACILITY , PHASE 1 OSAN AIR BASE , KOREA 5 . PROGRAM ELEMENT : 2 . DATE: N/A 8 .PROJECT COST($000) 7 . PROJECT NUMBER: 6 . CATEGORY CODE : 211-159 78,000 F28R600 9 . COST ESTIMATES: I TEM U/M QTY UNI T COST COST ($000) PRIMARY FACILI TY 54 , 464 AIRCRAFT CORROSION CONTROL , #1 (211-159) SM 2 , 560 6 , 912 (17 , 696) AIRCRAFT CORROSION CONTROL , #2 (211 - 159 ) SM 2 , 192 7 , 047 (15,4 47) AIRCRAFT CORROSION CONTROL , #3 (211-159 ) SM 2,816 6 , 506 ( 18 , 322) CYBERSECURITY LS (3,000) SUPPORTING FACILITIES 14 , 114 PAVEMENTS LS (1,352) SITE IMPROVEMENTS LS (2,673) WATER , SEWER, GAS LS (663) STORM DRAINAGE LS ( 450) ELECTRICAL WORK LS (5,447) COMMUNICATIONS LS ( 161) SPECIAL FOUNDATIONS LS (2 , 475) DEMOLITION SM 4,506 198 ( 8 94 ) ESTIMATED CONTRACT COST 68 , 578 CONTINGENCY (5%) 3 , 429 SUBTOTAL 72 , 0 0 7 SUPERVISION , INSPECTION & OVERHEAD - 8 . 1% 5,833 TOTAL REQUEST 77 , 8 4 0 TOTAL REQUEST (ROUNDED) 78 , 0 0 0 EQUIPMENT FROM OTHER APPROPRIATIONS 1 , 000 10 . DESCRIPTION OF PROPOSED CONSTRUCTION : Utilize host - nation funding to construct a new Consolidated Aircraft Maintenance Facility in the Bravo Diamond at Osan Air Base, Korea , utilizing conventiona l design and construction methods . The complex will consolidate the current l y scattered functions of 51 Maintenance Squadron ( 51MXS ) , 51 Maintenance Group (51 MXG) , and 51 Operations Support Squadron ( 51OSS ) . Phase 1 of t his project wi l l construct three of five buildings with outdoor covered storage/wor k areas : MX Shop Faci l ity #1 includes command and senior leadership offices , aircraft structural maintenance shop , and aircraft hydraulic shop . Command and senior leadership offices require Collective Protection System (CPS) . Facil i ty #2 includes metals technology shop , electrical & environmental systems shop . Facility #3 includes avionics & electronic warfare shop and aircraft wheel & tire shop. Each facility contains offices , meeting rooms , brea k rooms , restrooms with showers and locker rooms , warehouse supply and equipment storage, Hazardous Material ( HAZMAT ) storage , utilities rooms , etc . Each facility will be built using steel framed structure with beams and have 1 st f l oor structural concrete slab with pile foundation . DD FORM 1391 , . JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE . 1 374 === page 388 === AIR FORCE 16 July 2025 4. PROJECT TITLE : 3. INSTALLATION AND LOCATION : CONSOLIDATED AIRCRAFT MAINTENANCE FACILITY , PHASE 1 OSAN AIR BASE , KOREA 5. PROGRAM ELEMENT: 2 . DATE : REPUBLIC OF KOREA FUNDED CONSTRUCTION (ROKFC) 1. COMPONENT : 6 . CATEGORY CODE: 8.PROJECT COST($000) 7 . PROJECT NUMBER: N/A 211-159 78 , 000 F28R600 The project site is located below 100-year fl o odplain a nd has experienced flooding in severe rainfalls in monsoon season in the recent years . The project includes site improvement to elevate the entire site approximately 1 . 5 meters to alleviate the flooding is s ue . The site work also i n cludes surface parking for GOVs and POVs , infrastructure for electric vehicle charging stations (15% of GOV parking spots) , cover ed bicycle racks , roads , pavement, and sidewalks , necessary utilities , communications support infrastructure , and all supporting work to provide a complete and usable f acility . The facility will be designed as permanent construction in accordance with applicable Department of Defense (DOD)Unified Facilities Criteria (UFC) 1- 200-01 General Building Requirements and 1 - 200-02 High Performance and Sustainable Building Requirements , Air Force , and base design standards . The project will use local materials and construction techniques where cost effective while complying with applicable regulations . The facility must also be able to withstand wind loads and seismic effects as prescribed in applicable codes and design gu i des . Thi s project will comply wi th DOD anti-terrorism/force protection requirements pe r UFC 4-010 - 01 Antiterrorism Standards for Buildings . This project fulfills Uni ted States (US ) requirements only and will be designed and constructed for United States (US) exclusive use . This project will i nclude demol i tion of exi sting bui l dings : B1606 , 1613 , 1622 , 1623 , 1624 , 162 5 , 1611 , and 1738 . Total demolition : 4 , 506 SM Ai r Conditioning : 347 Tons 11 . REQUIREMENT : REQ : 7 , 568 SM ADQT : 0 SM SUBSTD : 4 , 506 SM PROJECT : Consolidated Aircraft Maintenance Facility , PHl (Current Mission) . REQU I REMENT : This project is required to provide a modern , adequately sized , properly configured aircraft maintenance facility . The new facility will serve as the Squadron Headquarter Building f or the 51 Maintenance Squadron (MXS) to house functions including Commander and Senior Leadership offices as well as the Commander Support Staff offices . Maintenance Management offices (to include Director of Operations , Lead Produ ction Superintendent , and Production Superintendents) will also be located in the facility , as will the leadership of 3 fl i ghts (Maintenance Flight , Avionics Flight , and Fabrication Flight) with subordinate sections including structural maintenance , hydraulics , metals technology , electrical & environmental , avionics , a nd aircraft wheel & tire shops . The facility should be designed for field level non- destructive inspection of aircraft components . Aircraft Structural Maintenance shop provides on and off equipment - local manufacture and repair of parts , panels, tubing systems , structural fatigue repair , and corrosion control operations . Metals Technology performs maintenance and evaluations for the flight line , back shops , DD FORM 1391 , JUL 1999 2 PREVIOUS EDITION IS OBSOLETE PAGE . 375 === page 389 === 1 . COMPONENT : REPUBLIC OF KOREA FUNDED CONSTRUCTION (ROKFC) AIR FORCE 16 July 2025 4 . PROJECT TITLE : 3 . INSTALLATION AND LOCATION : CONSOLIDATED AIRCRAFT MAINTENANCE FACILITY , PHASE 1 OSAN AIR BASE , KOREA 5 . PROGRAM ELEMENT: 2 . DATE : 6 . CATEGORY CODE : 7 . PROJECT NUMBER : 8 . PROJECT COST ($000 ) N/A 211 - 159 78,000 F28R600 and phased aircraft. The facilities must meet Korea Environmental Governing Standards (KEGS). The capabilities of the sections range from 51 combat coded aircraft to transient services for neighboring forces in defense of the Republic of Korea . Furthermore , these facilities will directly enable the 51 MXS mission of supporting sustainment and generation of the 51st Fighter Wing ' s fleet of F-16 aircraft , as well as occasional maintenance support for U-2 aircraft. CURRENT SITUATION : Currently , the Aircraft Maintenance Squadron ' s administration and shop facilities operate from substandard buildings scattered around the base . Most facilities were built between late 1950s and early 1970s and have far exceeded their life expectancy . The . facility conditions and g e ographical dispersion adversely impact operational efficiency and degrade mission capability . The aged facilities are unable to provide sufficient capabilities such as power source requirements and HVAC capabilities. The biggest deficiencies wit h the facilities are the HVAC capabilities for maintenance shop functions and persistent, pervasive leaks from the ce i lings . Most facilities garnered a failed condition rating under 55 for HVAC system and has caused 2 , 125 work requests since 2019 totaling $ 1 17K in materials and 15 , 778 labor hours . Every summer , the air conditioning system function correctly fo r a few weeks out of the season . All aircraft maintenance work centers have temperature - sensi tive equi pment , and/or equipment & materials sensitive to moisture/humidity , while some work centers have strict requirements for equipment and material storage. These critical equipment and material items can become compromised due to the heat , humidity , and moisture exposure stemming from current facility deficiencies, causing undue additional hours of clean- up and corrosion prevention as well as a requirement to field portable A/C uni t s and dehumidifiers . These portable units tax an a lready unreliable and insufficient facility power infrastructure , and the facility main circuit breaker has been tripped multiple times due to constant usage of these portable units . The current maintenance facility , B1707 , has a back-up generator , however , transfer switch is inope rable leaving no backup emergency power capability . Also , B1707 ' s fire suppression system is inoperable , presenting safety hazards in case of a fire . The project requires a CPS facility because the Squadron Command team and Unit Control Center (UCC) will be based out of this faci lity which the current building lacks . The UCC serv es as the focal point for disseminating emergency notifications to the entire squadron . IMPACT IF NOT PROVIDED: This project provides mission readiness required to "fight tonight" and '' start the fight ". If this project is not funded , assigned working personnel will continue to be subjected to an unacceptable work environment , possible life safety hazard , and risk to the timeliness of mission execution . DD FORM 1391 , JUL 1999 3 PREVIOUS EDI TION I S OBSOLETE PAGE. 376 === page 390 === REPUBLIC OF KOREA FUNDED CONSTRUCTION (ROKFC) 1. COMPONENT : AIR FORCE CONSOLIDATED AIRCRAFT MAINTENANCE FACILITY , PHASE 1 OSAN AIR BASE , KOREA 6. CATEGORY CODE: N/A 16 Jul y 2025 4 . PROJECT T ITLE: 3 . INSTALLATION AND LOCATI ON : 5 . PROGRAM ELEMENT : 2 . DATE: 211-159 7 . PROJECT NUMBER : 8 . PROJECT COST( $ 000) 78 , 000 F28R600 ADDITIONAL : A. JOINT USE CERTIFICATE : No portion of this facility is intended for Republic of Korea personnel exclusive or primary use. B. HOST NATION : This project is located on an enduring installat ion which wi l l be retained by United States Forces Korea (USFK) for the foreseeable future. c . PHYSICAL SECURITY : This project has been coordinated with the instal l ation physical security plan , and all physical security measures are included . D. ANTI TERRORISM/FORCE PROTECTION : All of the 21 Building Standards for Antiterrorism/Force Protections (AT/FP) will apply to this project, incl uding a Mass Notification System, and site measures, which are outlined in Unified Facilities Criteria (UFC) 4-010-01 . All faci l ities will meet current Unified Facilities Criteria (UFC) 4- 010-01 standards for bui l dings and site. Major Antiterrorism/For ce Protections (AT/FP ) building features wi l l include design for progressive collapse and blast resistant windows and an _Emergency Air Distribution Shutoff, ensuring any roof access prevents anyone from entering t he building by utilizing locking mechanism, and caged ladders that can be locked to prevent access . E . SUSTAINABLE DESIGN AND DEVELOPMENT (SDD) : Sustainable pr i nciples shall be integrated into the design , development, and construction of this project . This facility shall be designed to achieve energy consumption levels t hat are at least 30 percent below the levels established i n the current version of the ASHRAE Standard 90 . 1 or the International Energy Conservation Code , as appropriate . All equipment going into this facility must be Energy Star rated or on the Federal Energy Manageme nt Program ( FEMP ) approved list . All utilities shall be metered using advanced meters as def i ned by Federal Energy Management Program (FEMP). F . Full fire protection is required by regulation and UFC 3 - 600-01 to incl ude a fire alarm/suppression system; mass notification system (MNS ) as required by UFC 4- 010 - 01 ; access contro l systems ; and connection to the utility monitor i ng control system (UMCS ) . Fire Alarm panels shall i nclude zone modul e cards that can support 16 zones . These additional zones are required to transmit exact location data to the fire alarm computer located at the fire department emergency communication c e nter through the use of a building transmitter instal l ed meeting the building design . G. This project meets applicab l e criteria/scope specified i n Air Force Manua l 32-1 0 84 , Facility Requirements . This design sha ll conform to criter i a established in the Air Force Corporate Facilit i es St andards and t h e I nstallat i on Facilities Standards but will not employ a standard facili t y design becau se there is no Air Force standard facility design for this project , and there is no DD FORM 1 391 , JUL 1999 4 PREVIOUS EDIT I ON IS OBSOLETE PAGE . 377 === page 391 === REPUBLIC OF KOREA FUNDED CONSTRUCTION (ROKFC) 1. COMPONENT: AIR FORCE 4. PROJECT TITLE: 3. INSTALLATION AND LOCATION: OSAN AIR BASE, KOREA 5. PROGRAM ELEMENT: 6. CATEGORY CODE: 2. DATE: 16 July 2025 CONSOLIDATED AIRCRAFT MAINTENANCE FACILITY, PHASE 1 7. PROJECT NUMBER: 8.PROJECT COST($000) 78,000 211-159 N/A F28R600 applicable standard design from the Air Force Civil Engineer Center. The design must comply with Osan Air Base's Installation Planning Standards. H. Comprehensive interior design package for the Architectural & Engineering (AE) firm to complete as required by Unified Facilities Criteria 3-120-10. I. No portion of this facility is intended for Republic of Korea personnel exclusive or primary use. J. Flood Plain Statement: This project falls within the 100-year flood plain. The risk will be mitigated by constructing the facility and any flood­ susceptible utilities above the 100-year flood level. The facility and any flood-susceptible utilities will be constructed above the 100-year flood elevation. K. Facility is sited in accordance with the Installation Development Plan and is within a compatible land use area. L. 51st Fighter Wing Base Civil Engineer: 011-82-31-661-4312. M. Consolidated Aircraft Maintenance Facility: 7,568 Square Meter = 81,457 Square Feet. Demolition: 4,506 Square Meter = 48,502 Square Feet I concur with the above statements. DD FORM 1391, JUL 1999 5 PREVIOUS EDITION IS OBSOLETE PAGE. 378 === page 392 === 2 . DATE : REPUBLIC OF KOREA FUNDED CONSTRUCTION (ROKFC) 1. COMPONENT: AIR FORCE CONSOLIDATED AIRCRAFT MAINTENANCE FACILITY , PHASE 1 OSAN AIR BASE , KOREA 5 . PROGRAM ELEMENT: 16 July 2025 4. PROJECT TITLE: 3 . INSTALLATION AND LOCATION : 6 . CATEGORY CODE : N/A 8 . PROJECT COST($000) 7 . PROJECT NUMBER: 211 - 159 78 , 000 F28R600 12 . SUPPLEMENTAL DATA : a. Estimated Design Data : (1) Status : Design - Bid-Build (a) Type of Design Oct 2025 (b) Date Design Started (c) Parametric Cost Estimates used to develop costs YES (d) Percent Complete 15 (e) Date 35 % Designed TBD (f) Date Design Complete TBD (g) Energy Study/Life -Cycle analysis was/will be performed YES (2) Basis : (a) Standard or Definitive Design - YES (b) Where Design Was Most Recently Used - N/A (3) Total Cost (c) = (a) + (b) or (d) + (e) : ($000) (a) Production of Plans and Specifications TBD (b) All other Design Costs TBD (c) Total TBD (d) Contract TBD (e) In - house TBD (4) Construction Contract Award Sep 2026 (5) Construction Start Oct 2026 (6) Construction Completion Sep 2029 b . Equipment associated with this project provided from other appropriations : Fiscal Year Procuring Appropriated Cost Equipment Nomenclature Appropriation or Requested ( $000) Furniture , Fixture & Equip 3080 2029 500 Communication Equipment 3080 2029 500 c . Explosive Safety Quantity - Distance (Q- D) Siting : YES Department of Defense Explosive Safety Board (DDESB) : Required d . Facilities and Areas Sub-Committee (FASC) Task : DD FORM 1391 , JUL 1999 N/A PREVIOUS EDITION IS OBSOLETE PAGE . 6 379 === page 393 === REPUBLIC OF KOREA FUNDED CONSTRUCTION (ROKFC) 1. COMPONENT: AIR FORCE 4. PROJECT TITLE: 3. INSTALLATION AND LOCATION: N/A 16 July 2025 CONSOLIDATED AIRCRAFT MAINTENANCE FACILITY, PHASE 1 OSAN AIR BASE, KOREA 5. PROGRAM ELEMENT: 2. DATE: 7. PROJECT NUMBER: 6. CATEGORY CODE: 211-159 F28R600 8.PROJECT COST($000) 78,000 Location Map Project Location '\ / DD FORM 1391, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE. 380 === page 394 === REPUBLIC OF KOREA FUNDED CONSTRUCTION (ROKFC) 1. COMPONENT : AIR FORCE CONSOLIDATED AI RCRAFT MAINTENANCE FAC I LITY , PHASE 1 OSAN AIR BASE, KOREA 7 . PROJECT NUMBER: 6 . CATEGORY CODE : N/A 16 July 2 0 25 4 . PROJECT TITLE : 3 . INSTALLATION AND LOCATION: 5 . PROGRAM ELEMENT: 2. DATE : 211-159 8 . PROJECT COST ($000) 78 , 000 F28R600 Utility Map A.lily ....,. ·== Ur.ii ..;:::,r.::::=, [ I] { Comm. System Electrica l System Natural Gas System Water System Sewer System Storm System DD FORM 1391 , JUL 1999 8 PREVIOUS EDITION IS OBSOLETE - PAGE. 381 === page 395 === REPUBLIC OF KOREA FUNDED CONSTRUCTION (ROKFC) 1 . COMPONENT : AIR FORCE CONSOLIDATED AI RCRAFT MAINTENANCE FACILITY , PHASE 1 OSAN AIR BASE, KOREA 7 •. PROJECT NUMBER : 6 . CATEGORY CODE : N/A 16 July 2025 4 . PROJECT TITLE : 3 . INSTALLATION AND LOCATION : 5 . PROGRAM ELEMENT : 2 . DATE : 211 - 1 5 9 8 . PROJECT COST($000 ) 78 , 000 F28R6 0 0 COST ESTIMATES U/M ITEM QUANTITY UNIT COST Primary Facilities COST $54,464 ,202 Aircraft Engine I and R Shop SM 2 , 560 $6 , 912 . 36 $17,695,634 FOUNDATIONS SM 2 , 560 $1 , 144 . 50 $2 , 929 , 929 SUPERSTRUCTURE SM 2 , 560 $1 , 148 . 54 $2 , 94 0 , 264 EXTERIOR ENCLOSURE SM 2 , 560 $687 . 19 $1 , 759 , 200 ROOFING SM 2 , 560 $364 . 34 $932 , 70 3 INTERIOR CONSTRUCTION SM 2 , 560 $407 . 3 0 $1 , 042 , 682 INTERIOR FINISHES SM 2 , 560 $558 . 5 3 $1 , 429 , 828 PLUMBING SM 2 , 560 $ 288 . 18 $ 737 , 750 HVAC SM 2 , 560 $7 48 . 67 $1 , 916 , 591 FIRE PROTECTION SM 2 , 560 $377 . 25 $ 965 , 773 ELECTRICAL SM 2 , 560 $ 1 , 18.7 . 86 $ 3 , 040 , 915 SM 2 , 192 $7 , 046 . 92 $15,446 ,842 FOUNDATIONS SM 2 , 192 $1 , 144 . 53 $2 , 508 , 802 SUPERSTRUCTURE SM 2 , 192 $1 , 148 . 43 $ 2 , 5 1 7 , 352 EXTERIOR ENCLOSURE SM 2 , 192 $717 . 52 $1 , 572 , 797 ROOFING SM 2 , 192 $364 . 55 $ 799 , 084 I NTERIOR CONSTRUCTION SM 2 , 192 $448 . 07 $ 982 , 165 INTERIOR FINISHES SM 2 , 192 $602 . 41 $1 , 320 , 485 CONVEYING SM 2 , 192 $4 . 81 $10 , 549 PLUMBING SM 2 , 192 $ 265 . 22 $ 581 , 359 HVAC SM 2 , 192 $845 . 80 $1 , 853 , 987 FI RE PROTECTION SM 2 , 192 $379 . 19 $831 , 180 ELECTRICAL SM 2 , 192 $1 , 126 . 41 $2 , 469 , 082 SM 2 , 816 $6 , 506 . 29 $18,321,725 FOUNDATIONS SM 2 , 816 $1 , 144 . 51 $3 , 222 , 940 SUPERSTRUCTURE SM 2 , 816 $1 , 148 . 61 $3 , 234 , 477 EXTERIOR ENCLOSURE SM 2 , 816 $637 . 85 $1 , 796 , 199 Aircraft Engine I and R Shop Aircraft Engine I and R Shop DD FORM 1391 , JUL 199 9 PREVIOUS EDITION IS OBSOLETE PAGE. 9 382 === page 396 === AIR FORCE CONSOLIDATED AIRCRAFT MAINTENANCE FACI LITY, PHASE 1 OSAN AIR BASE, KOREA 7 . PROJECT NUMBER : 6 . CATEGORY CODE : 2 11 - 159 N/A 16 July 2025 4 . PROJECT TITLE : 3 . INSTALLATION AND LOCATION : 5 . PROGRAM ELEMENT : 2 . DATE : REPUBLIC OF KOREA FUNDED CONSTRUCTION (ROKFC) 1. COMPONENT : 8 . PROJECT COST ($000) 7 8 , 000 F28 R60 0 ROOFING SM 2 , 816 $364 . 23 $1 , 025 , 679 INTERIOR CONSTRUCTION SM 2 , 816 $330 . 98 $932 , 029 INTERIOR FINISHES SM 2 , 816 $463 . 75 $1 , 305 , 911 CONVEYING SM 2 , 816 $3 . 24 $9 , 125 PLUMBING SM 2 , 816 $268 . 59 $756 , 356 HVAC SM 2 , 816 $641.46 $1 , 806 , 346 FIRE PROTECTION SM 2 , 816 $376 . 64 $1 , 060 , 618 ELECTRICAL SM 2 , 816 $1 , 126 . 44 $3 , 172 , 045 LS 1.00 $3 , 000 , 000 $3,000 , 000 CYBERSECURITY $14,113 , 756 Supporting Facilities Building Demolition SM 4 , 506 $314 . 29 $893 , 800 Comparative Supporting Facilities LS 1 . 00 $13 , 219 , 956 $13 , 219 , 956 PAVEMENTS LS 1 . 00 $1 , 351 , 600 $1 , 351 , 600 SITE IMPROVEMENTS LS 1. 00 $2 , 672 , 680 $2 , 672 , 680 WATER, SEWER , GAS LS 1 . 00 $662 , 720 $662 , 720 STORM DRAINAGE LS 1 . 00 $450 , 170 $450 , 1 70 ELECTRICAL WORK LS 1 . 00 $5 , 446 , 730 $5 , 446 , 730 COMMUNICATIONS SUPPORT LS 1 . 00 $161 , 320 $161 , 320 SPECIAL FOUNDATION LS 1.00 $2 , 474 , 736 $2 , 47 4 , 736 ESTIMATED CONTRACT COST $68,577,958 CONTINGENCY (5 %) $3 , 428 , 898 SUBTOTAL 72 , 006 , 855 SIOH (8 . 1 %) $ 5 , 832 , 555 TOTAL REQUEST $77,839,411 DD FORM 13 9 1 , JUL 1999 10 PREVI OUS EDI TION I S OBSOLETE PAGE . 383 === page 397 === 1 . COMPONENT: REPUBLIC OF KOREA FUNDED CONSTRUCTION (ROKFC) AIR FORCE 2 . DATE : 16 JUL 2025 3 . INSTALLATION AND LOCATION : 4 . PROJECT TITLE : OSAN AIR BASE , KOREA UPGRADE ELECTRICAL DISTRIBUTION EAST, PH2 5 . PROGRAM ELEMENT: N/A 8 . PROJECT COST($000) 7 . PROJECT NUMBER : 6. CATEGORY CODE : 812-225 103 , 000 Fl 7R720 9 . COST ESTIMATES : I TEM PRIMARY FACILITY PRIMARY DISTRIBUTION LINE UG (812 - 225) SECONDARY DISTRIBUTION LINE UG (812-226) SCADA COMMUNICATIONS SYSTEM CYBERSECURITY SUPPORTING FACILITIES PAVEMENTS SITE IMPROVEMENTS UTILITIES COMMUNICATIONS SUPPORT SECURITY LIGHTING FIBER OPTIC CABLING TEMPORARY INFRASTRUCTURE IN CONSTRUCTION REMOVAL OF ELECTRICAL AND CATV SYSTEMS U/M QTY LM LM LS LS 15 , 785 1 , 428 UNIT COST COST ($000) 3 , 637 4 , 284 LS LS LS LS LS LS LS LS 73 , 41 7 (57 , 407) ( 6,118) (9,723) ( 1 69) 17 ,0 96 (1 , 106) (1 , 025) (4,071) (317) (3 , 626) (3 , 983) (594) (2 , 374) ESTIMATED CONTRACT COST 90, 513 CONTINGENCY (5%) 4 , 526 SUBTOTAL 95 , 039 SUPERVISION , I NSPECTION & OVERHEAD - 8 . 1% 7 , 698 TOTAL REQUEST 102,737 TOTAL REQUEST (ROUNDED) 103 , 000 EQUIPMENT FROM OTHER APPROPRIATIONS 1 , 000 10. DESCRIPTION OF PROPOSED CONSTRUCTION: Utilize host- nation funding to add/alter Osan Air Base (AB) ' s existing overhead electrical distribution system with an underground distribution system on the south east portion of base . This project will demolish an existing overhead primary and secondary electrical distribution system . The project wi ll include underground primary and secondary electrical lines, loop connectibn of all feeders at substation #2 wi th substation #3 , replacement of aged transformers, replacement o f aged or air insulated switches with high fire - point fluid insulated switches , modification of existing Supervisory Control And Data Acquisition ( SCADA) system and connecting all field swi tches and transformers to SCADA, necessary repair of existing substation , various utility work , security street lighting , bike shed , installation of new fiber optic cabling to replace existing pole-mounted cable television fiber lines , transportation of excess soil to separate location on installation, remediation of asbestos cement conduit lines, concrete ducts and manhole installation , shoring and dewatering of underground infrastructure , site improvements , pavements , communications infrastructure and all necessary supporting work to deliver a complete and usable electrical distribution system . The system should be compatible with DD FORM 1391 , JUL 1999 PREVI OUS ED I TION I S OBSOLETE PAGE. 1 384 === page 398 === 1 . COMPONENT: REPUBLIC OF KOREA FUNDED CONSTRUCTION (ROKFC) AIR FORCE 2 . DATE : 16 JUL 2025 3. INSTALLATION AND LOCATION : 4 . PROJECT TITLE : OSAN AIR BASE , KOREA UPGRADE ELECTRICAL DISTRIBUTION EAST , PH2 5 . PROGRAM ELEMENT: 6 . CATEGORY CODE : 8.PROJECT COST(S000 ) 7. PROJECT NUMBER : N/A 812-225 103 , 000 Fl7R720 applicable Department of Defense (DoD), Air Force , and base design standards . In addition , local materials and construction techniques shall be u sed where cost effective . The facility must also be able to withstand wind loads and seismic effects as prescribed in applicable codes and design guides . Sustainable principles , to include life-cycle cost-effective practices , will be integrated into the design , development , and construction of the project in accordance with Unified Facilities Criteria (UFC) 1-200 - 02 . This includes preparation of a lifecycle cost analysis (LCCA) for energy consuming systems , renewable energy generating systems , whenever life - cycle cost effective (LCCE) is selected as the reason any requirement of Unified Facilities Criteria (UFC) 1-200-02 is partially compliant or not applicable . Facilities will be designed as permanent construction in accordance with the Department of Defense Unified Facilities Criteria 1 - 200 - 01 , General Building requirements . This project will comply with Department of Defense Antiterrorism/Force Protection requirements per Unified Facilities Criteria 4-010- 01 . 11 . REQUIREMENT: REQ : 17 , 213 LM ADQT : 0 SM SUBSTD : 14 , 000 LM PROJECT : Upgrade Electrical Distribution System in East Area , Ph2 (Current Mission) . REQUIREMENT : This project is required to provide a reliable , safe , and resilient power system with Supervisory Control and Data Acquisition System (SCADA) to support base and force sustainment . Addition/alteration of the base electrical distribution system by replacing existing overhead lines to underground lines including necessary repairs and updating drainage in conjunction with providing new underground utilities will power existing Fighter Wing , Mission Support Group, Civil Engineer , Force Support , Security Forces , and other community support missions . An underground distribution system requires less maintenance, is more reliable , and is storm resistant which make s it more resilient during armistice or contingency operations . Dormitories , schools , squadron facilities, and electrically operated equipment have been newly constructed or insta lled on Osan Air Base (AB) over several decades . However, the base electrical distribution system was not concurrently upgraded , thus leaving the overall system total ly inadequate for Air Component Command ' s Command and Control and ability to sustain personnel and base support operations . CURRENT SITUATION : The electrical system must be improved in order to ensure resilient and reliable power for essential peninsula - wide combat capabilities . Unscheduled power outages due to deteriorating distribution systems are routine at Osan AB . Between 2014 and 2019 , there were 160 work orders submitted for the east side of the electrical distribution system , 64 of which were unscheduled power outages . Emergency repairs were provided by the Civil Engineer Squadron at a total of 3 , 131 man- hours , 45 overtime hours , and an expense of $369 , 200 for the DD FORM 1391 , JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE . 2 385 === page 399 === 1 . COMPONENT: REPUBLIC OF KOREA FUNDED CONSTRUCTION (ROKFC) AIR FORCE 2. DATE : 1 6 JUL 2025 3. INSTALLATION AND LOCATI ON : 4 . PROJECT TITLE : OSAN AIR BASE , KOREA UPGRADE ELECTRICAL DISTRIBUTION EAST, PH2 5 . PROGRAM ELEMENT : 6 . CATEGORY CODE : 7 . PROJECT NUMBER: 8.PROJECT COST ($000) N/A 812 - 225 Fl7R720 103,000 procurement of parts . 2020-2021 had 32 unscheduled power outages and 2022 has had 12 between J a nuary and April . Each year the number of outages continues to increase. This increase in annual outages is directly attributable to the deteriorated condition of the overhead electrical distribution system and points towards increasingly unreliable service. Outages last a significant amount of time and affect large areas. These outages cause fires , degrade mission capability , and create unsafe conditions for personnel . No major repairs have been made with the exception of piecemeal upgrades and routine maintenance . Existing above ground system poles , hardware , and lines are over 30 years of age , parts are obsolete , and t he system is beyond its intended service life . In addition to system age , system design and weather events are also major contributing factors that cause frequent outages . During severe winter months , the switches freeze and become inoperable . Overhead lines and associated equipment attracts birds , which nest on the energized wires , contributing to power outages. These outages severely affect the ability of the power system to provide reliable and resilient power for operations at Osan Air Base (AB). These outages also cause fire , degrade "Fight tonight" readiness capability , and create unsafe conditions for personnel. IMPACT IF NOT PROVIDED : The existing electrical system will continue to operate below acceptabl e l evels for system protection and reliability . The existing e l ectr i cal distribution system will continue to deteriorate such that the system may fail , resulting in a longer power outage affecting portions of the base. The effectiveness and efficiency for base sustainment capabilities will be significantly degraded . Phase 2 supports the 7th Air Force headquarters , the 51st Fighter Wing headquarters and emergency operations center , the base communications hub , and the medical complex, affecting Osan Air Base ' s ability to "Fight Tonight ." A reliable electrical system is key for the base personnel to defend the freedom of 50 million people. Without a full re-capitalization , smal l repair efforts at critical nodes are our only recourse . For example , $800 , 000 was spent to replace a bare copper wire with insulated and to replace aged electrical distribution equipment in 2 0 22 and another $500 , 000 is planned for 2023 to replace 5 switches and repair 2 poles . These efforts do not address sys t em- wide degradation and are only stopgap measures . This project is essential to . provide the adequate infrastructures for manning projections impacted by Tour Normalization . Tour Normalization aims to increase operational efficienc i es ; however , the current capacity of critical functions is insufficient to accommodate this growth . Therefore , it is imperative to enhance infrastructure to ensure mission success and accommodate the increased personnel . ADDITIONAL : A. JOINT USE CERTIFICATE : For United States (US ) exclusive use b u t can be used on an "as available" basis ; however, the scope of the project is based on Air Force requirements. This facility will be available for use by the other components . DD FORM 1391, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE . 3 386 === page 400 === REPUBLIC OF KOREA FUNDED CONSTRUCTION (ROKFC) 1 . COMPONENT : AIR FORCE 3 . INSTALLATION AND LOCATION : OSAN AIR BASE, KOREA 5 . PROGRAM ELEMENT : 6 . CATEGORY CODE : 2 . DATE : 16 JUL 2025 4 . PROJECT TITLE : UPGRADE ELECTRICAL DISTRIBUTION EAST , PH2 7 . PROJECT NUMBER: 8 .PROJECT COST{$000) 103 , 000 812-225 Fl7R720 N/A B . HOST NATION : This project is located on an enduring installation which will be retained by United States Forces Korea (USFK) for the foreseeable future . The possibility of Host Nation funding has been addressed to support this requirement. C. PHYSICAL SECURITY: This project has been coordinated with the insta lla tion physical security plan, and all physical security measures are included . D. ANTI TERRORISM/FORCE PROTECTION: All of the 21 Building Standards for Antiterrorism/Force Protections (AT/FP) will apply to this project , including a Mass Notification System, and site measures , which are outlined in Unified Facilities Criteria (UFC) 4- 010-01 . All facilities will meet current Unified Facilities Criteria (UFC) 4-010-01 standards for buildings and site . Major Antiterrorism/Force Protections (AT/FP) building features will include design for progressive collapse and blast resistant windows and an Emergency Air Distribution Shutoff , ensuring any roof access prevents anyone from entering the building by utilizing locking mechanism , and caged ladders that can be locked to prevent access . E . SUSTAINABLE DESIGN AND DEVELOPMENT (SDD) : Sustainable principles shall be i nteg rated into the design , development , and construction of this project . This facility shall be designed to achieve energy consumption levels that are at least 30 percent below the levels established in the current version of the ASHRAE Standard 90 . 1 or the International Energy Conservation Code , as appropriate. All equipment going into this facility must be Energy Star rated or on the Federal Energy Management Program (FEMP) approved list . All ut i lities shall be metered using advanced meters as defined by Federal Energy Management Program (FEMP) . Ful l fire protection is required by regulation and Unified Facilities Criteria (UFC) 3-6 00-01 to include a fire alarm/suppression system; mass notificat ion system (MNS) as required by Unified Facilities Criteria (UFC) 4010-01 ; access control systems ; and connection to the utility monitoring control system (UMCS) . Fire Alarm panels shall include zone module cards that can support 16 zones . These additional zones are requ i red to transmi t exact location data to the computerized D-21 Monaco fire alarm computer l ocated at the fire department communication center through the use of a BT - XM building transmi tter installed at the building design. F. G. This project meets applicable cri teria/scope specified in Air Force Manual 32 - 1084 , Facility Requirements . This design shall conform to criteria established in the Air Force Corporate Facilities Standards, the Installation Facilities Standards, but will not employ a standard facility design because there is no Air Force standard facility design for this project , and there is no applicable standard design from Air Force Civil Eng i neer Center . The design must comply with Osan Air Base (AB) ' Installation Planning Standards . PAGE . 4 PREVIOUS EDITION IS OBSOLETE DD FORM 1391 , JUL 1999 387 === page 401 === REPUBLIC OF KOREA FUNDED CONSTRUCTION (ROKFC) 1. COMPONENT: AIR FORCE 3. INSTALLATION AND LOCATION: 4. PROJECT TITLE: 6. CATEGORY CODE: N/A 16 JUL 2025 UPGRADE ELECTRICAL DISTRIBUTION EAST, PH2 OSAN AIR BASE, KOREA 5. PROGRAM ELEMENT: 2. DATE: 812-225 8.PROJECT COST($000) 7. PROJECT NUMBER: 103,000 F17R720 H. Comprehensive interior design package for the Architectural & Engineer (AE) firm to complete as required by Unified Facilities Criteria (UFC) 3-120-10. I. No portion of this facility is intended for Republic of Korea personnel exclusive or primary use. J. Flood Plain Statement: This project does not fall within or partly within the 100-year flood plain. K. Facility is sited in accordance with the Installation Development Plan and is within a compatible land use area. L. The supporting facilities' costs exceed 25% of the primary facilities' costs due to extensive utilities, security lighting, CATV cables and communication runs, as well as associated site work by installing underground electrical duct banks including spoils, concrete, excavation and backfilling. M. 51st Fighter Wing Base Civil Engineer: 011-82-31-661-4312. N. Add/alter electrical distribution system: 17,213 Linear Meter= 56,473 Linear Feet. I concur with the above statements. , DD FORM 1391, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE. 5 388 === page 402 === 2 . DATE: REPUBLIC OF KOREA FUNDED CONSTRUCTION (ROKFC) 1 . COMPONENT : AIR FORCE 3 . INSTALLATION AND LOCATI ON : 4 . PROJECT TITLE: UPGRADE ELECTRICAL DISTRIBUTION EAST , PH2 OSAN AIR BASE , KOREA 5 . PROGRAM ELEMENT: 1 6 J UL 2 0 2 5 6 . CATEGORY CODE : 103 , 000 Fl 7R720 812 - 225 N/A 8 . PROJECT COST ($000 ) 7 . PROJECT NUMBER : 12. SUPPLEMENTAL DATA: a . Estimated Design Data : (1) Status : Design - Bid-Build (a) Type of Design Apr 2023 (b) Date Des ign Started (c) Parametric Cost Estimates used to develop costs YES (d) Percent Complete 15% (e) Date 35% Designed TBD (f) Date Design Complete TBD (g) Energy Study/Life- Cycle analysis was/will be performed YES (2) Basis : (a) Standard or Definitive Design - YES (b) Where Design Was Most Recently Used - N/A (3) Total Cost (c) = (a) + (b) or (d) + (e) ($000) : (a) Production of Plans and Specifications TBD (b) All other Design Costs TBD (C) Total TBD (d ) Contract TBD (e ) In- house TBD ( 4) Construction Contract Award Jul 2027 ( 5) Construction Start Sep 2027 ( 6 ) Construction Completion Sep 2030 b. Equipment associated with this project provided from other appropriations: Fiscal Year Cost Appropriated Procuring. ($000) or Requested Appropriation Equipment Nomenclature 1 , 000 2029 3080 Communication Equipment c . Explosive Safety Quantity- Distance (Q- D) Siting: N/A Department of Defense . Explosive Safety Board ( DDESB ) : N/A d. Facilities and Areas Sub-Committee (FASC ) Task : DD FORM 1391 , JUL 1999 N/A PREVIOUS EDITI ON IS OBSOLETE PAGE . 6 389 === page 403 === 1. COMPONENT: AIR FORCE 3. INSTALLATION AND LOCATION: REPUBLIC OF KOREA FUNDED CONSTRUCTION (ROKFC) N/A 16 JUI;, 2025 4. PROJECT TITLE: UPGRADE ELECTRICAL DISTRIBUTION EAST, PH2 OSAN AIR BASE, KOREA 5. PROGRAM ELEMENT: 2. DATE: 8.PROJECT COST($000) 7. PROJECT NUMBER: 6. CATEGORY CODE: 812-225 103,000 Fl7R720 Location Map v -��-� � ·_ K;���u: - PHASE 2 \ I DD FORM 1391, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE. 7 390 === page 404 === 2 . DATE : REPUBLIC OF KOREA FUNDED CONSTRUCTION (ROKFC) 1 . COMPONENT : AIR FORCE 16 JUL 2025 3 . INSTALLATION AND LOCATION : 4 . PROJECT TITLE : OSAN AIR BASE, KOREA UPGRADE ELECTRI CAL DI STRI BUTION EAST , PH2 5 . PROGRAM ELEMENT : N/A 8 . PROJECT COST($000) 7 . PROJECT NUMBER : 6 . CATEGORY CODE : 81 2- 225 1 0 3 , 000 Fl7R7 2 0 COST BREAKDOWN ITEM U/M QUANTITY UNIT COST COST PRIMARY FACILITY $73,417,421 PRIMARY DISTRIBUTION LINE UG (812-225) FEEDER " B" LM 15 , 785 $3 , 637 $57,406 , 742 LS 1.00 $13 , 330 , 238 $13 , 330 , 238 FEEDER " C" LS 1 . 00 $8 , 253 , 508 $8 , 253 , 508 FEEDER " D" LS 1 . 00 $5 , 738 , 060 $5 , 738 , 060 FEEDER " E" LS 1.00 $8 , 813 , 808 $8 , 813 , 808 FEEDER " G" LS 1. 00 $6 , 436 , 869 $ 6 , 436 , 869 FEEDER " H" LS 1 . 00 $10 , 939 , 615 $10 , 939 , 615 TRANSPORTATION FOR ELECTRICAL MATERIAL SHOP DRAWING LS 1. 00 $ 573 , 557 $573 , 557 LS 1.00 $ 480 , 503 $480 , 503 TRAFFIC CONTROL FEE LS 1.00 $ 90 1, 967 $901 , 967 TESTING AND INSPECTION LS 1.00 $1 , 893 , 566 $1 , 893 , 566 CHANNEL BRIDGE LS 1.00 $45 , 051 $45 , 051 LM 1 , 428 $4 , 284 $6,118 , 052 LS 1.00 $4 , 774 , 117 $4 , 774 , 117 LS 1.00 $1 , 343 , 935 $1 , 343 , 935 SCADA COMMUNICATIONS SYSTEM LS 1.00 $9 , 723 , 304 $9,723,304 DUCT BANK FOR SCADA COMMUNICATION SYSTEM EQUIPMENT LS 1.00 $1 , 941 , 863 $1 , 941 , 863 LS 1.00 $7 , 032 , 040 $7 , 032 , 040 1.00 $749 , 401 $749 , 401 1.00 $169 , 323 $169,323 SECONDARY DISTRIBUTION LINE UG ( 812 - 226) EV INFRASTRUCTURE SECONDARY POWER SETUP AND ENGINEERING CYBERSECURITY LS SUPPORTING FACILITIES $17,095,711 PAVEMENTS LS 1.00 $1 , 106 , 231 $1 , 106 , 231 SITE IMPROVEMENTS LS 1.00 $1 , 025 , 194 $1 , 025 , 194 UTILITIES LS 1.00 $4 , 071 , 197 $4 , 071 , 197 COMMUNICATIONS SUPPORT LS 1.00 $316 , 892 $316 , 892 DD FORM 13 9 1 , JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE . 8 391 === page 405 === REPUBLIC OF KOREA FUNDED CONSTRUCTION (ROKFC) 1 . COMPONENT : AIR FORCE 2 . DATE : 16 JUL 2025 3 . INSTALLATION AND LOCATION : 4. PROJECT TITLE: OSAN AIR BASE , KOREA UPGRADE ELECTRICAL DISTRIBUTION EAST , PH2 5 . PROGRAM ELEMENT : N/A 8 . PROJECT COST($000) 7 . PROJECT NUMBER: 6 . CATEGORY CODE : SECURITY LIGHTING 812-22 5 LS 1.00 Fl 7R720 $3 , 625 , 786 103 ,0 0 0 $3 , 625 , 786 FIBER OPTIC CABLING LS 1.00 $3 , 982 , 759 $3 , 982 , 759 TEMPORARY INFRASTRUCTURE IN CONSTRUCTION REMOVAL OF ELECTRICAL AND CATV SYSTEMS LS 1.00 $593 , 865 $593 , 865 LS 1.00 $2 , 373 , 787 $2 , 373 , 787 ESTIMATED CONTRACT COST $90,513 ,132 CONTINGENCY ( 5 %) $4 , 525 , 657 SUBTOTAL $95,038,789 SIOH (8 . 1 %) $7 , 698 , 159 TOTAL REQUEST DD FORM 1391 , $102,737, 1 59 JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE . 9 392 === page 406 === 1. COMPONENT Dowództwo USAFE CY2022 POLAND-PROVIDED INFRASTRUCTURE PROJECT DATA Dane dotyczące projektu infrastruktury zapewnianej przcz Polskę 3. INSTALLATION AND LOCATION Jednostka wojskowa oraz lokalizacja Wrocław Airport, Poland (WRO) 5. PROGRAM ELEMENT Element programu XXXXXX 9. COST ITEM Pozycja 6. CATEGORY CODE Kategoria Projektu 721-312 ESTIMATES Kosztorysy 4. PROJECT TITLE Nazwa projektu Dormitory and Multi-Use Support Building 7. PROJECT NUMBER Numer Projektu WRO-1110-PL U/M Miara PRIMARY FACILITIES (721-312) Glówny Obiekt DORMITORY (721-312) Akademik 2. DATE data 2023-06-16 I REPORT CONTROL SYMBOL PPI 8. PROJECT COST ($000) Całkowity koszt projektu 32,000 QUANTITY Ilość UNIT COST I Koszt ($) I COST Koszt ($000) 23,587 SM 3,259 3,086.07 (10,057) FITNESS (740-674) SM 1,298 3,086.07 (4,004) ARMORY (171-141) magazyn broni SM 609 3,086.07 (1,878) SM 577 3,086.07 (1,779) SM 525 3,086.07 (1,621) SM 516 3,086.07 (1,594) SM 364 3,086.07 (1,122) SM 167 3,086.07 (515) LS 2.0% - (451) CLUB (740-316) klub MEDICAL (550-147) medyczny ADMINISTRATION (610-127) Administracja POST OFFICE (730-443) poczta BDOC (730-835) ATFP MEASURES (2%) środki ATFP CYBERSECURITY SYSTEMS ALLOWANCE ICD 705 PREMIUM LS 2.5% (564) - SUPPORTING FACILITIES Obiekty wspierające DEMOLITION rozbiórka SITE IMPROVEMENTS ulepszenia strony ENVIRONMENTAL MITIGATION łagodzenie środowiska PAVEMENTS chodniki UTILITIES narzędzia SUBTOTAL suma częściowa CONTINGENCY (5.0%)przypadkowość TOTAL CONTRACT COST całkowity koszt umowy SUPERVISION, INSPECTION AND OVERHEAD (7.3%) nadzór, inspekcje i koszty ogólne 5,214 LS (26) LS (367) LS (949) LS LS (30) (3,841) 28,801 1,440 30,241 2,208 TOTAL REQUEST całkowita prośba 32,448 TOTAL REQUEST (ROUNDED) całkowita prośba (bułczasty) 32,000 OTHER RELATED EQUIPMENT inne powiązane urządzenia 2,363 10. DESCRIPTION OF PROPOSED CONSTRUCTION DESCRIPTION: Construct a four-story airman dormitory to house unaccompanied personnel and also accommodate administrative functions, armories, medical and dental exam rooms, and fitness center. Construction will consists of a concrete foundation and slab-on-grade with composite slabs for the upper three levels. The building utilizes a structural steel frame with sloped framing to accommodate the low-slope roofs and hip roofs. The low-slope roof assembly includes metal deck, rigid insulation and a single-ply membrane roof. The hip roof assembly metal deck, rigid insulation and shingle or tile roofing. The exterior wall assembly includes coldformed steel framing, sheathing, rigid insulation and exterior sheathing clad in brick masonry at the base and stucco. Components include fire protection and 393 === page 407 === 1. COMPONENT Dowództwo USAFE CY2022 POLAND-PROVIDED INFRASTRUCTURE PROJECT DATA Dane dotyczące projektu infrastruktury zapewnianej przcz Polskę 3. INSTALLATION AND LOCATION Jednostka wojskowa oraz lokalizacja Wrocław Airport, Poland (WRO) 5. PROGRAM ELEMENT Element programu XXXXXX 6. CATEGORY CODE Kategoria Projektu 721-312 2. DATE data 2023-06-16 4. PROJECT TITLE Nazwa projektu Dormitory and Multi-Use Support Building 7. PROJECT NUMBER Numer Projektu WRO-1110-PL REPORT CONTROL SYMBOL PPI 8. PROJECT COST ($000) Całkowity koszt projektu 32,000 detection, lighting, heating, power and all other work necessary to make this a complete and usable facility. Supporting facilities include an extension of utilities to service the new facility. Low Impact Development Best Management Practices (LID-BMPs) and sustainability and energy enhancement. Cyber Security Measures will be incorporated into this project. Sustainability/Energy measures will be provided. Facilities will be designed to a minimum life of 40 years in accordance with DoW's Unified Facilities Criteria (UFC 1-200-02) including energy efficiencies, building envelope and integrated building systems performance. Supporting facilities include utility connections, security lighting, area lightning protection, storm drainage, and site improvements. 11. REQUIREMENT PROJECT: Construct a Dormitory and Multi-Use Support Building at Wrocław Airport (New Mission) REQUIREMENT: The Dormitory and Multi-Use Support Building (which includes laundry, medical and dental clinic space, administrative offices, post office, BDOC, armories, and a fitness center requirements) is required by the United States Air Force in Europe-Air Forces Africa (USAFEAFAFRICA) missions to support the Polish Provided Infrastructure (PPI) initiative. PPI represents a key tool for the implementation of the Enhanced Defense Cooperation Agreement (EDCA) between the United States of America (U.S.) and the Republic of Poland signed in Warsaw on August 15, 2020 and entered into force November 13, 2020. It serves as a critical guide to define both U.S. and Polish defense mission, facility, and infrastructure needs. This project is required to provide lodging and support for APOD operations and the enduring personnel at Wrocław Airport as part of PPI. The combined facility includes space for dormitory rooms (in 2 and 3 person rooms), administrative offices, a post office, medical and dental spaces, fitness and recreational spaces, security forces operations center and two armories in a single building on four levels. The ground floor contains the BDOC (Security Forces operations), two separate armories, post office, and general administrative space. A small space is unassigned and available for future growth (and can accommodate a bulk laundry drop-off/pick-up area). The second level (first floor) contains retail space, medical and dental spaces, and fitness and recreational areas. The third and fourth level (second and third floor) contains dormitory rooms, day rooms, and self-service laundry space. Building circulation space is provided throughout to support internal horizontal and vertical circulation. CURRENT SITUATION: Wrocław Airport (WRO) is a commercial airport the offers 20 flights per day to main hubs throughout Europe. The 8th Airlift Base of the Polish Air Force is currently located on property east of the main WRO operational area. The Contingency Response Group (CRG) is the operational unit of the Polish Air Force that utilizes the military footprint. This unit is responsible for processing and maneuvering both personnel and cargo to a variety of locations throughout the Area of Responsibility (AOR). The CRG also provides aircraft, airfield security, and air traffic combat controller capabilities. There are two hangars within the Polish Air Force property that are used for cargo staging and marshalling and currently Apron 1 is utilized for the parking of Polish and United States Air Force cargo aircraft. No available facilities exist to accommodate dormitory and laundry space for enduring personnel. No space exists to accommodate administrative offices, medical and dental facilities, fitness center, or armories on the installation for additional U.S. personnel assigned to the APOD mission. IMPACT IF NOT PROVIDED: If the Dormitory and Multi-Use Support Building is not provided, the required support facilities will not be available for use by enduring forces assigned to the APOD mission. As a result, operational missions will be limited or delayed. The APOD mission at Wrocław AB cannot function without this project, which has been combined to reduce the overall footprint on the existing Polish Cantonment area. 394 === page 408 === 1. COMPONENT Dowództwo USAFE CY2022 POLAND-PROVIDED INFRASTRUCTURE PROJECT DATA Dane dotyczące projektu infrastruktury zapewnianej przcz Polskę 3. INSTALLATION AND LOCATION Jednostka wojskowa oraz lokalizacja Wrocław Airport, Poland (WRO) 5. PROGRAM ELEMENT Element programu XXXXXX 6. CATEGORY CODE Kategoria Projektu 721-312 2. DATE data 2023-06-16 4. PROJECT TITLE Nazwa projektu Dormitory and Multi-Use Support Building 7. PROJECT NUMBER Numer Projektu WRO-1110-PL REPORT CONTROL SYMBOL PPI 8. PROJECT COST ($000) Całkowity koszt projektu 32,000 ADDITIONAL: This project meets the scope/criteria specified in Air Force Manual 32-1084, Facility Requirements Unified Facility Criteria 3-260-01 Airfield & Heliport Planning & Design, Unified Facility Criteria 3-260-02 Pavement Design for Airfields, United States Air Force in Europe & Air Force in Africa 32-1007 Airfield and Heliport Planning and Design, and NATO Bi-SC Directive 085-005 NATO Criteria and Standards for Airfields, as applicable. This project has been coordinated with the installation physical security plan, and all physical security measures are included. All required antiterrorism protection measures are included. A parametric cost estimate based upon project engineering design was used to develop this budget estimate. STANDARD DESIGN: The facilities included in the design shall conform to criteria established in the Air Force Corporate Facilities Standards (AFCFS), the Installation Facilities Standards (IFS) in coordination with the Host Nation. ECONOMIC ANALYSIS (EA) STATEMEN: Sustainable principles, to include life-cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with Unified Facility Criteria 1-200-02 the Energy Policy Act 2005, Executive Orders 13123 and 13423, 10 United States Code (USC) 2802 (c), and other applicable laws and Executive orders. This includes the preparation of a life-cycle cost analysis (LCCA) for energy consuming systems, renewable energy generating systems, or when life cycle cost effective (LCCE) is selected as the reason any requirement of Unified Facility Criteria 1-200-02 is partially compliant or not applicable. NATO STATEMENT: NATO eligibility for this project has not yet been established. FYDP STATEMENT: NA MASTER PLAN STATEMENT: Facility is sited in accordance with current Lask Air Base plans and is within a compatible land use area. JOINT USE CERTIFICATION: These facilities can be used by other components on an “as available” basis; however, the scope of the project is based on United States Air Force requirements. NATO SECURITY INVESTMENT: As the Host Nation, Poland should submit to the NATO Office of Resources (NOR) the Prefinancing Statement (PFS) for the project to be included in Capability Package CP3A0019. This project is partially eligible for funding within an established NATO infrastructure category for common funding and has the potential for reimbursement (partially or whole) from NATO Security Investment Program (NSIP) funds. 395 396 === page 409 === 1. COMPONENT Dowództwo USAFE CY2022 POLAND-PROVIDED INFRASTRUCTURE PROJECT DATA Dane dotyczące projektu infrastruktury zapewnianej przcz Polskę 3. INSTALLATION AND LOCATION Jednostka wojskowa oraz lokalizacja Wrocław Airport, Poland (WRO) 5. PROGRAM ELEMENT Element programu XXXXXX 6. CATEGORY CODE Kategoria Projektu 721-312 2. DATE data 2023-06-16 4. PROJECT TITLE Nazwa projektu Dormitory and Multi-Use Support Building 7. PROJECT NUMBER Numer Projektu WRO-1110-PL REPORT CONTROL SYMBOL PPI 8. PROJECT COST ($000) Całkowity koszt projektu 32,000 12. SUPPLEMENTAL DATA DANE UZUPEŁNIAJĄCE PLANNING AND DESIGN DATA (ESTIMATE) / Dane konstrukcyjne (1) Status / Stan: (a) Type of Design / rodzaj Design-Bid-Build / Projekt-Bid-Budowa projektu (b) Date Design Started / Data Rozpoczęcia 01 AUG / SIERPIEŃ 25 Projektowania (c) Parametric Cost Estimates Used to develop costs / Parametryczne szacunki kosztów stosowane do YES / TAK opracowania kosztów (d) Percent Complete as of 01 JAN 2023 / Procent 0% ukończenia na dzień 1 stycznia 2023 r. (e) Date 35% Designed / Data projektu 35% 01 DEC / GRUDZIEŃ 25 (f) Date Design Complete / Data ukończenia projektu (g) Energy Study/Life-Cycle analysis was/will be performed / Badanie energetyczne/analiza cyklu życia zostało/zostanie przeprowadzone (2) Basis / Podstawa: (a) Standard or Definitive Design / Standardowy lub ostateczny projekt (b) Where Design Was Most Recently Used Gdzie projekt był ostatnio używany 01 JUN / CZERWIEC 26 YES / TAK NO / NIE N/A / nie dotyczy 396 397 === page 410 === 1. COMPONENT Dowództwo USAFE CY2022 POLAND-PROVIDED INFRASTRUCTURE PROJECT DATA Dane dotyczące projektu infrastruktury zapewnianej przcz Polskę 3. INSTALLATION AND LOCATION Jednostka wojskowa oraz lokalizacja Wrocław Airport, Poland (WRO) 5. PROGRAM ELEMENT Element programu XXXXXX 6. CATEGORY CODE Kategoria Projektu 721-312 2. DATE data 2023-06-16 4. PROJECT TITLE Nazwa projektu Dormitory and Multi-Use Support Building 7. PROJECT NUMBER Numer Projektu WRO-1110-PL REPORT CONTROL SYMBOL PPI 8. PROJECT COST ($000) Całkowity koszt projektu 32,000 (3) Total Cost / Całkowity koszt (c) = (a) + (b) or (d) + (e) (a) Production of Plans and Specifications / Tworzenie planów i specyfikacji (6%) (b) All Other Design Costs / Wszystkie inne koszty projektowania (3%) (c) Total / Razem ($2,970) 1,980 990 2,970 (d) Contract / Umowa (7.5%) 2,475 (e) In-house / Wewnętrzna (1.5%) 495 (4) Construction Contract Award / Nagroda Kontraktu Budowlanego (5) Construction Start / Rozpoczęcie budowy 26 OCT / PAŹDZIERNIK 26 DEC / GRUDZIEŃ (6) Construction Completion / Zakończenie budowy 30 FEB / LUTY b. Equipment associated with this project / Sprzęt związany z tym projektem: EQUIPMENT NOMENCLATURE / NAZWA URZĄDZEŃ FISCAL YEAR APPROPRIATED OR REQUESTED / ROK PODATKOWY PRZYZNANE LUB PROSZĘ COST / KOSZT ($000) FURNITURE FIXTURES & EQUIPMENT / MEBLE I WYPOSAŻENIE 2027 $2,363 2027 TBD COMMUNICATION EQUIPMENT / SPRZĘT KOMUNIKACYJNY OTHER / INNY N/A 0 397 === page 411 === Tab - UNACCOMPANIED HOUSING PRIVATIZATION === page 412 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST Exhibit UH-6 Military Housing Privatization Initiative (MHPI) - Unaccompanied Housing Privatization Approved by OSD & OMB4 Actual/Current Plan8 Funding Source(s)7 Privatization Date1 TBD MHPI Project Name2 Edwards Air Force Base (AFB) MHPI Unaccompanied Housing Apartments Project Grand Totals14 Installation/ State3 Edwards AFB, California No. Units Conveyed5 No. End State Units6 Amount ($M)7a Budget Year(s)7b 0 142 $0.00 N/A 0 142 $0 Funding Source(s)12 Type of Funds7c Source Project Name7d N/A N/A No. Units Conveyed9 No. End State Units10 Total No. Units in Current Inventory11 Amount ($M)12 Budget Year(s)12 Type of Funds12 Source Project Name12 MHPI Authorities13 0 142 0 $0.00 N/A N/A N/A 5 0 142 0 $0 398 April 2026 === page 413 === Tab - FAMILY HOUSING === page 414 === Department of the Air Force Military Family Housing Fiscal Year (FY) 2027 Budget Estimates Justification Data Submitted to Congress April 2026 === page 415 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST This Page Intentionally Left Blank. i === page 416 === Tab - CONTENTS === page 417 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST TABLE OF CONTENTS MILITARY FAMILY HOUSING ................................................................................................................................. 1 FINANCIAL SUMMARY ............................................................................................................................................ 3 FH-11 Inventory and Condition of Government-Owned, Family Housing Units ............................................ 5 FH-11 Transitional Gvt-Owned FH Units ....................................................................................................... 9 FH-8 Air Force Inadequate Family Housing Units Eliminated in FY 2025 ................................................... 11 AUTHORIZATION LANGUAGE .............................................................................................................................. 15 APPROPRIATION LANGUAGE ............................................................................................................................... 17 NEW CONSTRUCTION ............................................................................................................................................. 19 CONSTRUCTION IMPROVEMENTS....................................................................................................................... 33 Purpose and Scope ......................................................................................................................................... 33 DD Form 1391 ............................................................................................................................................... 34 MANDATORY CONSTRUCTION IMPROVEMENTS ............................................................................................ 47 DESIGN....................................................................................................................................................................... 59 MANDATORY DESIGN ............................................................................................................................................ 61 OPERATIONS, UTILITIES AND MAINTENANCE SUMMARY ........................................................................... 63 Purpose and Scope ......................................................................................................................................... 63 Inventory and Funding Summary (FH-2) ...................................................................................................... 65 Summary Historic Housing ........................................................................................................................... 69 Family Housing Operations and Maintenance Reprogramming Actions ....................................................... 70 MANAGEMENT EXHIBIT OP-5 .............................................................................................................................. 71 SERVICES EXHIBIT OP-5 ........................................................................................................................................ 73 FURNISHINGS EXHIBIT OP-5 ................................................................................................................................. 75 MISCELLANEOUS EXHIBIT OP-5 .......................................................................................................................... 77 UTILITIES EXHIBIT OP-5 ........................................................................................................................................ 79 Family Housing Summary of Utilities Detail................................................................................................. 80 MAINTENANCE EXHIBIT OP-5 .............................................................................................................................. 81 Anticipated Operations, Maintenance and Repair Expenditures Exceeding $35,000 per Unit (FH-5) ........................ 83 Privatized GFOQ Operations, Maintenance and Repair Costs Exceeding $50,000 (FH-12)........................................ 85 REIMBURSEMENTS EXHIBIT OP-5 ....................................................................................................................... 87 LEASING .................................................................................................................................................................... 89 Purpose and Scope ......................................................................................................................................... 89 EXHIBIT OP-5.............................................................................................................................................. 91 Analysis of Leased Units Exhibit (FH-4)....................................................................................................... 92 Analysis of High Cost Leased Units (FH-4) .................................................................................................. 93 FAMILY HOUSING PRIVATIZATION .................................................................................................................... 95 Housing Privatization Exhibit OP-5............................................................................................................... 97 Family Housing Privatization Comparison Exhibit (FH-6)............................................................................ 98 FOREIGN CURRENCY EXCHANGE DATA (PB-18) ........................................................................................... 104 ii === page 418 === This Page Intentionally Left Blank. === page 419 === Tab - FAMILY HOUSING NARRATIVE === page 420 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST MILITARY FAMILY HOUSING Program ($ in Thousands) $609,779 $633,995 $10,000 $643,995 FY 2027 Budget Request FY 2026 Budget Request FY 2026 Enactment* FY 2026 Appropriation NARRATIVE SUMMARY * Funds provided by Congress in FY 2026 for additional Family Housing Management and Privatization are one year appropriated funds. This Military Family Housing budget request reflects the Air Force's commitment to ensure military personnel and their families have access to quality housing facilities and services. The Air Force relies on the local community to support military family housing needs. When community housing is unavailable or inadequate, the AF provides military family housing to support this requirement. We construct, replace, improve, or repair and maintain military family housing to meet contemporary standards. The Air Force created the Family Housing Master Plan (FHMP) as the strategic planning and programming investment tool for government-owned, leased and privatized military family housing. This request funds the AF FHMP recommendations to sustain, improve and divest military family housing overseas, support privatized family housing, and lease family housing when necessary and fiscally appropriate. Consistent with AF FHMP priorities, this budget provides a program that supports daily operations and the maintenance and repair of assets to sustain and prevent deterioration of our inventory. The operations, maintenance and leasing accounts predominantly support "must pay" requirements. These costs include service contracts, lease contracts, utilities, and essential maintenance to operate the units and contract funding to correct life safety, health, and facility preservation issues that cannot wait for family housing construction funding. MAJOR FACTORS In accordance with 10 USC 2837, the Department of the Air Force plans to conduct the following Housing Requirements and Market Analysis in FY 2027: United States Air Force Academy, CO; Arnold AFB, TN; Buckley SFB, CO; Calier AFB, ND; Hill AFB, UT; Keesler AFB, MS; Kunsan AB, Republic of Korea; Minot AFB, ND; Misawa AB, Republic of Japan; Mountain Home AFB, ID; Peterson SFP, CO; Schriever AFB, CO; Scott AFB, IL; Whiteman AFB, KS; Wright -Patterson, OH. We respectfully request full support for the Air Force family housing needs presented herein. April 2026 1 === page 421 === This Page Intentionally Left Blank. === page 422 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST FINANCIAL SUMMARY AUTHORIZATION FOR APPROPRIATION REQUESTED FOR FY 2027: ($000) FUNDING REQUEST FOR FY 2027 Construction $24,104 Construction Improvements $193,064 Planning and Design $25,854 Appropriation Request: Construction $243,022 Operations, Utilities, and Maintenance $320,607 Operating Expenses $108,981 Utilities $51,097 Maintenance $160,529 Housing Privatization $40,627 Leasing - Worldwide $5,523 Appropriation Request: O&M, Leasing, Housing Privatization $366,757 Appropriation Request $609,779 Reimbursement Request $2,500 FY 2027 FAMILY HOUSING REQUEST $612,279 April 2026 3 === page 423 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST EXECUTIVE SUMMARY: Table 1: Funding Overview FY 2025 ($K) FY 2026 ($K) FY 2027 ($K) $221,549 $274,230 $243,022 $336,250 $369,765 $366,756 $557,799 $643,995 $609,778 Family Housing Construction, Air Force Family Housing Operation & Maintenance, Air Force Subtotal $0 $0 $236,000 $0 $0 $454,767 $0 $0 $690,767 Total $557,799 $643,995 $1,300,545 Discretionary Family Housing Construction, Air Force Family Housing Operation & Maintenance, Air Force Subtotal Mandatory Table 2: Detailed Mandatory Breakout Appropriation BLI Family Housing Construction, Air Force Family Housing Construction, Air Force Family Housing Construction, Air Force Family Housing Operation & Maintenance, Air Force Total Reconciliation Bin Title FY 2025 ($K) FY 2026 ($K) FY 2027 ($K) QKKA274002 Warrior Ethos $0 $0 $60,000 ZNRE254301 Warrior Ethos 0 0 $76,000 PAYZ714FNA Warrior Ethos 0 0 $100,000 8000000745 Warrior Ethos $0 $0 $454,767 $0 $0 $690,767 MANDATORY FUNDING JUSTIFICATION: The FY 2027 request for Military Family Housing includes $609,778 thousand of discretionary and $690,767 thousand of mandatory for a total of $1,300,545 thousand. The mandatory funds will remedy current Air Force inadequate housing by: 1) providing $454,767,000 to Family Housing O&M and resolve critical issues for 375 inadequate units; and 2) providing $236,000,000 to Family Housing Construction and resolve critical issues for 208 inadequate units. April 2026 4 === page 424 === DEPARTMENT OF THE AIR FORCE FH-11 Inventory and Condition of Government-Owned, Family Housing Units (Number of Dwelling Units in Inventory) Fiscal Year 2027 Worldwide FY 2025 Beginning of FY Adequate Inventory Total BCI - 90% to 100% BCI - 80% to 89% Beginning of FY Inadequate Inventory Total BCI - 60% to 79% BCI - 59% or less Beginning of FY Total Inventory Number of Units- Worldwide FY 2026 8,172 7,598 1,192 1,175 6,980 6,423 7,099 7,561 6,176 6,633 923 928 15,271 15,159 FY 2027 7,114 1,043 6,071 7,005 6,363 642 14,119 Percent Adequate - Beginning of FY Inventory 54% 50% 50% Inadequate Inventory Reduced Through: Construction (FHCON) Maintenance & Repair (FHO&M) Privatization Demolition/Divestiture/Diversion/Conversion Funded by Host Nation Additional Inadequate Units Identified Adequate Inventory Changes: Construction (FHCON) Maintenance & Repair (FHO&M) Privatization Demolition/Divestiture/Diversion/Conversion Funded by Host Nation Additional Inadequate Units Identified 462 (51) (53) 0 (52) 0 618 (574) 53 53 0 (62) 0 (618) (556) (102) (70) 0 (902) 0 518 (484) 102 70 0 (138) 0 (518) 608 (44) 0 0 (6) 0 658 (390) 44 0 0 0 224 (658) End of FY Adequate Inventory Total BCI - 90% to 100% BCI - 80% to 89% End of FY Inadequate Inventory Total BCI - 60% to 79% BCI - 59% or less End of FY Total Inventory 7,598 1,175 6,423 7,561 6,633 928 15,159 7,114 1,043 6,071 7,005 6,363 642 14,119 6,724 1,260 5,464 7,613 6,910 703 14,337 Percent Adequate - End of FY Inventory 50% 50% 47% DoW Performance Goal - At least 90% BCI 0 0 0 NOTES: 1 - Building Condition Index (BCI) is a general measure of the physical condition of the facility. 2 - Assessment data, and investment, sustainment, and divestiture strategy for the worldwide AF government-owned inventory is based on the installation level Housing Community Profiles (HCPs), the Japan Investment Strategy (JIS), and the Family Housing Master Plan (FHMP). The FHMP incorporates scores and investment planning decisions based on nine HCPs finalized over the last four years. Five HCPs are in progress (1 in Japan and 4 in USAFE); and one will begin in the spring of 2026. 3 - Divestiture is planned for 1,846 units between FY25 and FY31, with the majority of these units at Okinawa (782 units), which includes 340 Camp Kinser units divested in FY26 to be turned over to the USMC, 154 Camp Lester units in FY26 as a planned land return area, SACO divestiture of 208 units, and surplus divestiture of 79 units. In addition, divestiture is planned at Misawa (468 units) including 328 units in FY26, KMC (336 units), and at eight additional installations (260 units). 4 - Units with BCI scores <60 are planned for divestiture or replacement, with the majority of the units located at Okinawa. 5 - A large number of units built between 2005 and 2009 that are projected to have scores < 80BCI around the 20-25 year mark and a large number of units that were renovated between 2010-2015 that are projected to have scores < 80BCI around the 15-20 year mark. 6 - Additionally, surplus inventory at Okinawa is identified for divestiture of ~900 units is identified in FY32 – FY41; this is tied to agreements on land returns associated with the Government of Japan (GOJ). April 2026 5 === page 425 === DEPARTMENT OF THE AIR FORCE FH-11 Inventory and Condition of Government-Owned, Family Housing Units (Number of Dwelling Units in Inventory) Fiscal Year 2027 UNITED STATES (CONUS plus Hawaii and Alaska) Beginning of FY Adequate Inventory Total BCI - 90% to 100% BCI - 80% to 89% Beginning of FY Inadequate Inventory Total BCI - 60% to 79% BCI - 59% and below Beginning of FY Total Inventory 31 31 0 75 15 60 106 Number of Units- U.S. FY 2026 31 31 0 75 15 60 106 Percent Adequate - Beginning of FY Inventory 29% 29% 32% 0 0 0 0 0 0 0 0 0 0 0 0 0 0 (10) 0 0 0 (10) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 31 31 0 75 15 60 106 31 31 0 65 5 60 96 31 31 0 65 5 60 96 FY 2025 Inadequate Inventory Reduced Through: Construction (FHCON) Maintenance & Repair (FHO&M) Privatization Demolition/Divestiture/Diversion/Conversion Funded by Host Nation Additional Inadequate Units Identified Adequate Inventory Changes: Construction (FHCON) Maintenance & Repair (FHO&M) Privatization Demolition/Divestiture/Diversion/Conversion Funded by Host Nation Additional Inadequate Units Identified End of FY Adequate Inventory Total BCI - 90% to 100% BCI - 80% to 89% End of FY Inadequate Inventory Total BCI - 60% to 79% BCI - 59% and below End of FY Total Inventory FY 2027 31 31 0 65 5 60 96 Percent Adequate - End of FY Inventory 29% 32% 32% NOTES: 1 - Building Condition Index (BCI) is a general measure of the physical condition of the facility. 2 - Wright Patterson - the FHMP identifies an FHCON projects for Key and Essential (K&E) at 29 historic units in FY20, which is reflected in the FY25 condition ratings. This project is currently under construction. Demolition of 10 surplus units was initially identified in FY22; however, due to the delay in the FHCON project, divestiture has been moved to FY26 for the installation to use these 4-BR units as the swing space during the FHCON project. Divestiture of the remaining 40 surplus units is shown in FY28, FY30, and FY32 in order to finalize requirements with the State Historic Preservation Officer (SHPO). 3 - United States Air Force Academy (USAFA) - the inventory includes two General Officer Quarters (GOQs) in the government-owned inventory; one is identified for an FHCON new construction project in FY24 the other as and FHCON project in FY29. Execution to be finalized with appropriate approvals. 4 - Eglin - nine units were identified for divestiture in FY21. Four units are brought back into the MFH inventory in FY23 due to delays in execution; divestiture plan is being evaluated and identified in FY28. April 2026 6 === page 426 === DEPARTMENT OF THE AIR FORCE FH-11 Inventory and Condition of Government-Owned, Family Housing Units (Number of Dwelling Units in Inventory) Fiscal Year 2027 FOREIGN (includes U.S. Territories) FY 2025 Beginning of FY Adequate Inventory Total BCI - 90% to 100% BCI - 80% to 89% Beginning of FY Inadequate Inventory Total BCI - 60% to 79% BCI - 59% and below Beginning of FY Total Inventory Number of Units- Foreign FY 2026 8,141 7,567 1,161 1,144 6,980 6,423 7,024 7,486 6,161 6,618 863 868 15,165 15,053 FY 2027 7,083 1,012 6,071 6,940 6,358 582 14,023 Percent Adequate - Beginning of FY Inventory 54% 50% 51% Inadequate Inventory Reduced Through: Construction (FHCON) Maintenance & Repair (FHO&M) Privatization Demolition/Divestiture/Diversion/Conversion Funded by Host Nation Additional Inadequate Units Identified Adequate Inventory Changes: Construction (FHCON) Maintenance & Repair (FHO&M) Privatization Demolition/Divestiture/Diversion/Conversion Funded by Host Nation Additional Inadequate Units Identified 462 (51) (53) 0 (52) 0 618 (574) 53 53 0 (62) 0 (618) (546) (102) (70) 0 (892) 0 518 (484) 102 70 0 (138) 0 (518) 608 (44) 0 0 (6) 0 658 (390) 44 0 0 0 224 (658) End of FY Adequate Inventory Total BCI - 90% to 100% BCI - 80% to 89% End of FY Inadequate Inventory Total BCI - 60% to 79% BCI - 59% and below End of FY Total Inventory 7,567 1,144 6,423 7,486 6,618 868 15,053 7,083 1,012 6,071 6,940 6,358 582 14,023 6,693 1,229 5,464 7,548 6,905 643 14,241 Percent Adequate - End of FY Inventory 50% 51% 47% NOTES: 1 - Building Condition Index (BCI) is a general measure of the physical condition of the facility. 2 - Assessment data, and investment, sustainment, and divestiture strategy for the worldwide AF government-owned inventory is based on the installation level Housing Community Profiles (HCPs), the Japan Investment Strategy (JIS), and the Family Housing Master Plan (FHMP). The FHMP incorporates scores and investment planning decisions based on nine HCPs finalized over the last four years. Five HCPs are in progress (1 in Japan and 4 in USAFE); and one will begin in the spring of 2026. 3 - Divestiture is planned for 1,802 units between FY25 and FY31, with the majority of these units at Okinawa (782 units), which includes 340 Camp Kinser units divested in FY26 to be turned over to the USMC, 154 Camp Lester units in FY26 as a planned land return area, SACO divestiture of 208 units, and surplus divestiture of 79 units. In addition, divestiture is planned at Misawa (468 units) including 328 units in FY26, KMC (336 units), and at eight additional installations (260 units). 4 - Units with BCI scores <60 are planned for divestiture or replacement, with the majority of the units located at Okinawa. 5 - A large number of units built between 2005 and 2009 that are projected to have scores < 80BCI around the 20-25 year mark and a large number of units that were renovated between 2010-2015 that are projected to have scores < 80BCI around the 15-20 year mark. 6 - Additionally, surplus inventory at Okinawa is identified for divestiture of ~900 units identified in FY32 – FY41 tied to agreements on land returns associated with the Government of Japan (GOJ). April 2026 7 === page 427 === This Page Intentionally Left Blank. === page 428 === DEPARTMENT OF THE AIR FORCE FH-11 Inventory and Condition of Government-Owned, Family Housing Units (Number of Dwelling Units in Inventory) Fiscal Year 2027 Transitional Beginning of FY Adequate Inventory Total BCI - 90% to 100% BCI - 80% to 89% Beginning of FY Inadequate Inventory Total BCI - 60% to 79% BCI - 59% or less Beginning of FY Total Inventory Percent Adequate - Beginning of FY Inventory FY 2025 0 0 0 39 39 0 39 0% FY 2026 0 0 0 39 39 0 39 0% FY 2027 0 0 0 25 25 0 25 0% Inadequate Inventory Reduced Through: Construction (FHCON) Maintenance & Repair (FHO&M) Privatization Demolition/Divestiture/Diversion/Conversion Funded by Host Nation Additional Inadequate Identified Adequate Inventory Changes: Privatization Demolition/Divestiture/Diversion/Conversion Additional Inadequate Identified 0 0 0 0 0 0 0 0 0 0 0 (14) 0 0 0 ( (14)) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 End of FY Adequate Inventory Total BCI - 90% to 100% BCI - 80% to 89% End of FY Inadequate Inventory Total BCI - 60% to 79% BCI - 59% or less End of FY Total Inventory 0 0 0 39 39 0 39 0 0 0 25 25 0 25 0 0 0 25 25 0 25 Percent Adequate - End of FY Inventory 0% 0% 0% NOTES: 1 - The definition of transitional family housing (FH) are units that are at enduring and non-enduring sites 1) as a result of organizational deactivations, consolidation (e.g. Europe Infrastructure Consolidation (EIC), etc.) and relocation efforts; 2) where FH units have been identified by the Services as surplus and not currently occupied; and 3) in both cases, the Service has planned, documented, funded and/or announced the divestiture, demolition, or transfer of these units in the Future Years Defense Program (FYDP). 2. The European Infrastructure Consolidation (EIC) decisions have impacted manpower requirements for bases in England. The 2022 Housing Requirements and Market Analysis (HRMA) for RAF Fairford identified a decrease due to the EIC decisions. There is now a 62 unit surplus. - There are 39 units identified as transitional based on the current HCP. -- In FY26, 14 units are identified to be removed: --- 6 units are planned for divestiture. --- 8 units are being removed from the transitional inventory that had a minor renovation project completed, in order to occupy these units until the FHCON projects are executed; therefore, the units do not meet the transitional requirement numbers per definition 3 on note 1. -- In FY29, the remaining 25 transitional units are identified as being divested. - The remaining surplus units are occupied and planned for use as swing space during renovations of the required units. The surplus swing space units are identified to be removed after the FHCON project is complete, therefore these units are not included in the transitional numbers per definition number 3 (Note 1). 3 - Building Condition Index (BCI) is a general measure of the physical condition of the facility. April 2026 9 === page 429 === DEPARTMENT OF THE AIR FORCE FH-11 Inventory and Condition of Government-Owned, Family Housing Units (Number of Dwelling Units in Inventory) Fiscal Year 2027 Transitional Unit Details by Location State/Country Installation N/E² Change in Transitional Units Condition (FCI)³ Explanation FY 2025 FY 2025 Transitional Unit Changes 0 FY 2026 United Kingdom RAF Fairford FY 2026 Transitional Unit Changes N (14) 3 Manpower and housing requirements have been reduced as identified the 2022 Draft HRMA due to the EIC decisions. See Note 2 for more details. (14) FY 2027 FY 2027 Transitional Unit Changes 0 Total (39) NOTES: 1 - The definition of transitional family housing (FH) are units that are at enduring and non-enduring sites 1) as a result of organizational deactivations, consolidation (e.g. Europe Infrastructure Consolidation (EIC), etc.) and relocation efforts; 2) where FH units have been identified by the Services as surplus and not currently occupied; and 3) in both cases, the Service has planned, documented, funded and/or announced the divestiture, demolition, or transfer of these units in the Future Years Defense Program (FYDP). 2. The European Infrastructure Consolidation (EIC) decisions have impacted manpower requirements for bases in England. The 2022 Housing Requirements and Market Analysis (HRMA) for RAF Fairford identified a decrease due to the EIC decisions. There is now a 62 unit surplus. - There are 39 units identified as transitional based on the current HCP. -- In FY26, 14 units are identified to be removed: --- 6 units are planned for divestiture. --- 8 units are being removed from the transitional inventory that had a minor renovation project completed, in order to occupy these units until the FHCON projects are executed; therefore, the units do not meet the transitional requirement numbers per definition 3 on note 1. -- In FY29, the remaining 25 transitional units are identified as being divested. - The remaining surplus units are occupied and planned for use as swing space during renovations of the required units. The surplus swing space units are identified to be removed after the FHCON project is complete, therefore these units are not included in the transitional numbers per definition number 3 (Note 1). 3 - Building Condition Index (BCI) is a general measure of the physical condition of the facility. April 2026 10 === page 430 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST FH-8 Air Force Inadequate Family Housing Units Eliminated in FY 2025 MAJCOM Project Type Base Units at Beginning of FY 2025 Additional Inadequate Units Identified PACAF Condition Adjustment PACAF Condition Adjustment PACAF Condition Adjustment PACAF Condition Adjustment USAFE Condition Adjustment USAFE Condition Adjustment PACAF Condition Adjustment USAFE Condition Adjustment USAFE Condition Adjustment Okinawa Misawa Osan Yokota KMC Moron RAF Alconbury RAF Croughton RAF Lakenheath FY 2025 Family Housing Construction, Improvement, and O&M Projects to Eliminate Inadequate Units PACAF FHCON Yokota (improvement) PACAF FHO&M Misawa (improvement) RAF Croughton PACAF FHO&M (improvement) RAF Lakenheath PACAF FHO&M (improvement) Privatization Projects Executed Units Demolished/Divested FY 2025 PACAF Divestiture PACAF Divestiture USAFE Divestiture Okinawa Yokota RAF Croughton Units Added to Family Housing Deficit USAFE Deficit Construction KMC Host Nation Construction projects Units at End of FY 2025 NOTES: 1. 2. 3. Total Inventory Minus Leased & Privatized Total Inadequate Inventory 15,271 7,099 0 0 0 0 0 0 0 0 0 0 618 375 20 2 184 4 15 5 11 2 0 0 0 0 0 0 0 0 0 0 0 0 0 (104) (51) (17) 104 51 17 0 (12) 12 0 (24) 24 0 0 0 (114) (1) (17) (96) (52) (1) (17) (34) 52 1 17 34 0 0 0 2 2 0 0 0 0 0 0 0 15,159 7,561 156 Total Inadequate Addressed Condition adjustments reflect projected degradation based on the latest HCP assessments. Family Housing Military Construction (FHCON) and Family Housing Operations and Maintenance (FHO&M) investments are based on the HCP and Family Housing Master Plan (FHMP) and includes FHCON improvement of 51 units at Yokota, West and North neighborhoods, built in the 1990s; FHO&M improvement of 17 units at Misawa Main Neighborhood built in 1993; FHO&M improvement of 12 units at Royal Air Force Croughton built in 1968 and last renovated in 2005; and FHO&M improvement of 24 units at RAF Lakenheath in the Feltwell Portal Close neighborhood built in 1951 and last renovated in 1998. Divestiture is based on Family Housing Master Plan for the divestiture of surplus units with input from the installations and AFIMSC Detachments. April 2026 11 === page 431 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST FH-8 Air Force Inadequate Family Housing Units Eliminated in FY 2026 Total Inventory Minus Leased & Privatized Total Inadequate Inventory 15,159 7,561 0 0 0 0 0 0 0 518 29 325 124 23 5 3 0 0 0 0 0 0 0 0 9 0 0 0 0 0 (172) (68) (34) (70) 172 68 34 70 0 0 0 (1,040) (10) (328) (902) (10) (208) 902 10 208 (194) (340) (154) (8) (6) (176) (340) (154) (8) (6) 176 340 154 8 6 Units Added to Family Housing 0 0 0 Deficit Construction 0 0 0 Host Nation Construction projects 0 0 0 14,119 7,005 1,074 MAJCOM Project Type Base Units at Beginning of FY 2026 Additional Inadequate Units Identified PACAF Condition Adjustment PACAF Condition Adjustment PACAF Condition Adjustment USAFE Condition Adjustment USAFE Condition Adjustment USAFE Condition Adjustment Misawa Okinawa Yokota KMC RAF Alconbury RAF Croughton RAF Lakenheath / RAF USAFE Condition Adjustment Mildenhall FY 2026 Family Housing Construction, Improvement, and O&M Projects to Eliminate Inadequate Units PACAF FHCON Okinawa (improvement) PACAF FHCON Yokota (improvement) PACAF FHO&M Yokota (improvement) Privatization Projects Executed Units Demolished/Divested FY 2026 AFMC Divest PACAF Divest PACAF PACAF PACAF USAFE USAFE Divest Divest Divest Divest Divest Wright-Patterson Misawa Okinawa (SACO Replacement Area) Okinawa (Camp Kinser) Okinawa (Camp Lester) Moron RAF Fairford Units at End of FY 2026 NOTES: 1. 2. 3. Total Inadequate Addressed Condition adjustments reflect projected degradation based on the latest HCP assessments. Family Housing Military Construction (FHCON) and Family Housing Operations and Maintenance (FHO&M) investments are based on the HCP and Family Housing Master Plan (FHMP) and includes FHCON improvement of 68 Okinawa tower units (tower 4511, built in 1986 and renovated in 2012 (has mechanical issues and is uninhabited at this time); FHCON improvement of 34 Yokota units in the North neighborhood built in 1994; and FHO&M improvement of 70 Yokota tower units (tower 3001, built in 1991). Divestiture is based on Family Housing Master Plan for the divestiture of surplus units with input from the installations and AFIMSC Detachments. April 2026 12 === page 432 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST FH-8 Air Force Inadequate Family Housing Units Eliminated in FY 2027 MAJCOM Project Type Base Units at Beginning of FY 2027 Additional Inadequate Units Identified PACAF Condition Adjustment PACAF Condition Adjustment PACAF Condition Adjustment PACAF Condition Adjustment USAFE Condition Adjustment USAFE Condition Adjustment USAFE USAFE Condition Adjustment Condition Adjustment Misawa Okinawa Osan Yokota KMC RAF Alconbury RAF Lakenheath / RAF Mildenhall Spangdahlem FY 2027 Family Housing Construction, Improvement, and O&M Projects to Eliminate Inadequate Units PACAF FHCON Yokota (improvement) RAF Croughton USAFE FHCON (replacement) Privatization Projects Executed Units Demolished/Divested FY 2027 USAFE Divest RAF Croughton Units Added to Family Housing Deficit Construction Host Nation Construction projects PACAF New Construction Okinawa Units at End of FY 2027 NOTES: 1. 2. 3. Total Inventory Minus Leased & Privatized Total Inadequate Inventory 14,119 7,005 0 0 0 0 0 0 0 658 32 490 1 4 97 10 0 0 0 0 0 0 0 0 0 22 2 0 0 0 0 (44) (32) 44 32 0 (12) 12 0 (6) (6) 0 (6) (6) 0 6 6 0 0 0 0 0 0 224 224 0 0 0 0 14,337 7,613 50 Total Inadequate Addressed Condition adjustments reflect projected degradation based on the latest HCP assessments. Family Housing Military Construction (FHCON) and Family Housing Operations and Maintenance (FHO&M) investments are based on the HCP and Family Housing Master Plan (FHMP) and includes: o Base FHCON: improvement of 32 Yokota units built 1998-2000 and replacement of 12 units at Croughton built in 1962 Divestiture is based on Family Housing Master Plan for the divestiture of surplus units with input from the installations and AFIMSC Detachments. April 2026 13 === page 433 === This Page Intentionally Left Blank. === page 434 === Tab - LEGISLATIVE LANGUAGE === page 435 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST AUTHORIZATION LANGUAGE SEC. 2302. FAMILY HOUSING (a) CONSTRUCTION AND ACQUISITION. Using amounts appropriated pursuant to the authorization of appropriations in Section 2303(a) and available for military family housing functions as specified in the funding table in section 4601, the Secretary of the Air Force may construct or acquire family housing units (including land acquisition and supporting facilities) at the installations or locations, in the number of units, and in the amounts set forth in the following table: Air Force: Family Housing State United Kingdom Installation RAF Croughton Units 12 Amount $24,104 (b) IMPROVEMENTS TO MILITARY FAMILY HOUSING UNITS. – Subject to section 2825 of Title 10, United States Code, and using amounts appropriated pursuant to the authorization of appropriations in Section 2303(a) and available for military family housing functions as specified in the funding table in section 4601, the Secretary of the Air Force may improve existing military family housing units in an amount not to exceed [$237,655,000] $193,064,000. (c) DESIGN. – Using amounts appropriated pursuant to the authorization of appropriations in Section 2303(a) and available for military family housing functions as specified in the funding table in section 4601, the Secretary of the Air Force may carry out architectural and engineering services and construction design activities with respect to the construction or improvement of military family housing units in an amount not to exceed [$36,575,000] $25,854,000. SEC. 2303. AUTHORIZATION OF APPROPRIATIONS, AIR FORCE (a) AUTHORIZATION OF APPROPRIATIONS. – Funds are hereby authorized to be appropriated for fiscal years beginning after September 30, 2026, for military construction, land acquisition, and military family housing functions of the Department of the Air Force, as specified in the funding table in section 4601. (b) LIMITATION ON TOTAL COST OF CONSTRUCTION PROJECTS. – Notwithstanding the cost variations authorized by section 2853 of title 10, United States Code, and any other cost variation authorized by law, the total cost of all projects carried out under section 2301 of this Act may not exceed the total amount authorized to be appropriated under subsection (a), as specified in the funding table in section 4601. April 2026 15 === page 436 === This Page Intentionally Left Blank. === page 437 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST APPROPRIATION LANGUAGE FAMILY HOUSING CONSTRUCTION, AIR FORCE For expenses of family housing for the Air Force for construction, including acquisition, replacement, addition, expansion, extension, and alteration, as authorized by law, [$240,903,000] $243,022,000 to remain available until September 30, 2030. FAMILY HOUSING OPERATION AND MAINTENANCE, AIR FORCE For expenses of family housing for the Air Force for operation and maintenance, including debt payment, leasing, minor construction, principal and interest charges, and insurance premiums, as authorized by law [$360,030,000] $366,756,000. April 2026 17 === page 438 === This Page Intentionally Left Blank. === page 439 === Tab - NEW CONSTRUCTION === page 440 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST NEW CONSTRUCTION Budget Request ($ in Thousands) FY 2027 Budget Request FY 2026 Budget Request $24,104 $0 Purpose and Scope This program provides for site preparation, acquisition, and construction, and initial outfitting with fixtures and integral equipment of new family housing units and associated facilities such as roads, driveways, sidewalks, and utility systems. Budget Request Summary Authorization is requested for: (1) Replacement of twelve K&E MFH units at RAF Croughton, ($24,104,000) in FY2027. Activity Activity Total Mission No. of Units 12 RAF Croughton UK Current 12 April 2026 Amount ($000) $24,104 $24,104 19 === page 441 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST 1. COMPONENT 2. DATE FY 2 0 27 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE I 1 MARCH 2026 3 . INS TALLAT I ON AND LOCATION 4. RAF CROUGHTON UNITED KINGDOM 5. PROJECT TITLE REPLACE 12 K&E MFH UNITS PROGRAM EL EMENT 7. PROJECT NUMBER CATEGORY CODE I•88741F 711 - 142 1· · PROJECT COST ($000) EXSW264002 9. 24,000 COS T ES T IMATES 0.7978 POUND/US$ ITEM UM QUANTITY UNIT COST COST ($000) PRIMARY FACILITIES 12,463 12 1017728 (12,213 ) FAMILY HOUSING UNITS ( 711-142) EA CYBERSECURITY OF FACILITY - RELATED CONTROL LS (250 ) SUPPORTING FACILITIES 7,065 (3,290 ) UTILI T IES LS ROADS, SIDEWALKS, AND PARKING LS (1,821 ) SITE IMPROVEMENTS LS (1,615 ) 2,737 (339 ) SM 123 DEMOLITION 19,528 SUBTOTAL 2,072 CONTINGENCY (10 . 61%) TOTAL CONTRACT COST 21,600 1,577 SUPERVISION, INSPECTION AND OVERHEAD ( 7. 30%) 927 DESIGN/BUILD - DESIGN COST (4.00%OF SUBTOTAL) TOTAL REQUEST 24,104 TOTAL REQUEST (ROUNDED) 24,000 EQUIPMENT FROM OTHER APPROPRIATIONS (NON-ADD ) (93 ) 10. DESCRIPTION OF PROPOSED CONSTRUCTION Replace 18 (constructed 1962, renovated 2005 ) military family housing units located in multi-plex buildings at Royal Air Force (RAF) Croughton, England. Work to include, but is not limited to the demolition, separation, and disposal and recycling of all building materials, including foundations and utility connections. Special construction includes masonry construction, clay tile roofs, LED lighting, etc. The project location will allow for improvements to include new trees, shrubs, site furnishings, and walking paths. The area is to include a new 12 - unit housing layout with the following housing types: 1 x E9 - 4 bed, 3 x FG0 - 3 bed, 5 x FG0 - 4 bed, 1 x JNCO - 4 bed, 1 x SNCO - 4 bed and 1 X SOQ - 4 bed at Royal Air Force Croughton, England. Facility will be designed as permanent construction in accordance with Department of Defense Unified Facilities Criteria 1-200-01. This project will comply with Department of Defense anti - terrorism I force protection requirements per Unified Facilities Criteria 4-010-01. Demolish 6 buildings at RAF Croughton, UK (2,737 Total m2) . 11 . REQ: 2,952 SM ADQT: 0 SUBSTD: 0 PROJECT : Provide 12 Key & Essential (K&E) Military Family Housing Units designed and constructed to provide adequate living quarters for military members and their families while stationed at Royal Air Force Croughton. REQUIREMENT: 12 modern, efficient housing units are required for United States Air Force military members and their dependents stationed at Royal Air Force Croughton, England for the next 20 years. Buildings 528, 529, 530, 531, 532 and 533 (18 DD FORM 1391, J UL 1999 PREVIOUS EDIT I ON IS OBSOLETE April 2026 PAGE NO . 20 === page 442 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST 1 . COMPONENT 2 . DATE FY 2 0 27 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE 3. I 1 INS TALLAT I ON AND LOCATION 4. RAF CROUGHTON UNITED KINGDOM 5. AUGUST 2025 PROJECT TITLE REPLACE 12 K&E MFH UNITS PROGRAM ELEMENT 6. CATEGORY CODE 88741F 1 711 - 142 7. PROJECT NUMBER 1· · PROJECT COST ($000) EXSW264002 24,000 units total), built in 1962, are to be demo l ished and replaced with: one E-9 4bedroom single family unit, one SOQ 4 - bedroom single family unit, three FGO 3 bedroom single family units, five FGO 4-bedroom single family units, and one SNCO/JNCO 4-bedroom duplex unit (12 units total). All replacement units will meet current housing standards and life safety codes and programmed in accordance with the Housing Community Profile (HCP) and Family Housing Master Plan (FHMP). The new design will complement current townhouses located on base and provide a modern kitchen, living room, family room, bedrooms, Ensuite shower room for master bedroom (not JNCO and SNCO housing units), a family bathroom housing a bath with above shower configuration and twin sinks. In addition, each housing unit is to provide ample interior and exterior storage space . The basic neighborhood enhancement will include updated landscaping, new playgrounds, and Gazebos. In addition, new landscaping and playgrounds are to be installed where the six Temporary Lodging Facilities (TLF) (500 , 501, and 502) are planned for demolition and is to include additional parking spaces. This requirement is not driven by a tenant or supported service . CURRENT SITUATION : The existing Key & Essential housing units currently reside at an off-base location approximately 10 miles away from Royal Air Force Croughton. These units are intended for divestiture; due to their Anti - Terrorism and Force Protection (AT FP ) concerns and inadequacies for the Key & Essential personnel . This project will replace 18 on-base existing housing units constructed in 1962 and renovated in 2005. These 50 plus year old housing units have not received any major upgrades in over 17 years and are showing the effects of time and heavy use. The roofs, walls, foundations, and exterior pavements require major repairs or replacement due to the effect of age, and the environment. IMPACT IF NOT PROVIDED: Without this project, three critical issues will persist: Escalating Financial Impact. Repair costs will continue to increase through inefficient , reactive maintenance and repair programs. Housing units will deteriorate at an accelerated rate, compounding future repair expenses . The USAF will bear increasing operational, maintenance, and repair costs with ever diminishing returns. Degraded Personnel Welfare. Key & Essential personnel and their families will experience ongoing disruptions from facility and utility system failures . Quality of Life (QoL) standards will remain substandard, potentially affecting productivity and morale of the Key & Essential personnel. Living conditions will continue to decline rather than improve. Security Compliance Gaps. Current housing fails to meet Anti-Terrorism/Force Protection (ATFP) requirements . Key & Essential personnel will remain in facilities that do not provide adequate security standards . Regulatory compliance DD FORM 1391C, JUL 1999 PREVIOUS EDIT I ON IS OBSOLETE April 2026 PAGE NO . 21 === page 443 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST 1 . COMPONENT 2 . DATE FY 2 0 27 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE 3. I 1 INS TALLAT I ON AND LOCATION 4. RAF CROUGHTON UNITED KINGDOM 5. AUGUST 2025 PROJECT TITLE REPLACE 12 K&E MFH UNITS PROGRAM ELEMENT 6. CATEGORY CODE 88741F 1 711 - 142 7. PROJECT NUMBER 1· · PROJECT COST ($000) EXSW264002 24,000 deficiencies will persist, creating potential vulnerabilities. The cumulative effect creates a cycle where deteriorating conditions drive higher costs while failing to address fundamental habitability and security requirements. ADDITIONAL: This project meets applicable criteria/scope specified in Department of the Air Force Manual 32 - 1084, Standard Facility Requirements. This design shall conform to criteria established in the Air Force Corporate Facilities Standards, the Installation Facilities St andards, and shall employ the standard facility design used at Royal Air Force Lakenheath's Liberty Village . Sustainable principles, to include life - cycle cost - effective practices, will be integrated into the design, development, and construction of the project in accordance with Unified Facilities Criteria 1-200-02, High Performance and Sustainable Building Requirements . This includes preparation of a life - cycle cost analysis for energy consuming systems, renewable energy generating systems, or whenever life-cycle cost effective is selected as the reason any requirement of Unified Facilities Cr i teria 1 - 200 - 02 is partially compliant or not applicable . This project does not fall within or partly within the 100-year floodplain. This project was included in the Fiscal Year 2027 future years' defense plan in Fiscal Year FY 2026. Facility is sited in accordance with the Installation Development Plan and is within a compatible land use area. This project meets the criteria specified in the Air Force Family Housing Guide for planning, programming, design, and construction, and will be designed based on the current Housing Community Profile (HCP ) . An approved Economic Analysis determined new construction as the only viable option to meet this requirement. Based on the net present values and benefits of the respective alternatives, new construction was found to be the most cost effective over the life of the project. Since this is replacement hou sing, there will be no increase in the student population or impact on the ability of the local school district to support base dependents. The cost to improve the unit is 79% o f t h e r ep l acement cost. Growth Offset No construction growth offset is requ ired for this pro j ect. 7.3% Supervision, Inspection, and Overhead (SIOH) is being programmed for : Defense Infrastructure Organization (2.5%), and Air Force Installation and Mission Support Center (AFIMSC ) (4 . 8% ) . DD FORM 1391C, JUL 1999 PREVIOUS EDIT I ON IS OBSOLETE April 2026 PAGE NO . 22 === page 444 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST 1 . COMPONENT 2 . DATE FY 2 0 27 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE 3. I 1 INS TALLAT I ON AND LOCATION 4. RAF CROUGHTON UNITED KINGDOM 5. AUGUST 2025 PROJECT TITLE REPLACE 12 K&E MFH UNITS PROGRAM ELEMENT 6. CATEGORY CODE 88741F 1 711 - 142 7. PROJECT NUMBER EXSW264002 1· · PROJECT COST ($000) 24,000 Demolition: 2736.74 SM= 29,458 Square Feet FOREIGN CURRENCY BUDGET RATE USED : FY25 exchange rate used to convert GBP - DOLLAR at exchange rate of 0.7978. JOINT USE CERTIFICATION : Mission Requirements, operational considerations, and location are incompatible with use by other components. NATO SECURITY INVESTMENT: This project is not within an established NATO infrastru cture category of common funding nor is it expected to become eligible in the foreseeable future. DD FORM 1391C, JUL 1999 PREVIOUS EDIT I ON IS OBSOLETE April 2026 PAGE NO . 23 === page 445 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST 1. 2 . DATE COMPONENT FY 2 0 27 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE 3. I 1 INS TALLAT I ON AND LOCATION 4. RAF CROUGHTON UNITED KINGDOM 5. PROGRAM EL EMENT 12. AUGUST 2025 PROJECT TIT LE REPLACE 12 K&E MFH UNITS 6. CATEGORY CODE 7. PROJECT NUMBER 1·· COST ($000) PROJECT 88741F 711 - 142 EXSW264002 1 SUPPLEMENTAL DATA : A. Estimated Execu t i on Data : (1) Acquisition Strategy: Design - Bui l d (2) Design Data (a ) Design or Request for Proposal (RFP) Started: (b ) Percent of Design Completed as of SEP 2025: (c) Percent of Design Completed as of JAN 2026: (d) Design or RFP Comp l ete: (e ) Total Design Cost ($000 ) : ( f ) Energy Study and/or Life Cycle Cost Analysis (g ) Standard or Definitive Design Used? ( 3) Construction Data: (a) Contract Award: (b ) Construction Start : (c ) Construction Complete: 24,000 APR/2024 35% 35% APR/2027 1,654 YES YES APR/2027 MAY/2027 JAN/2029 B. Equipment associated with this project which will be provided from other appropriations : Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($0 0 0) Kitchen Appliances Comm Requirements DD FORM 1391C, JUL 1999 3080 3400 PREVIOUS EDIT I ON IS OBSOLETE April 2026 2029 2029 58 35 PAGE NO . 24 === page 446 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST E:x1st1ng Si ta Layout April 2026 25 === page 447 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST JNCO House Type Layout Wfll.erstrYe ◄ m• 0 °""' 19m' ~ mJ~ [] ,,_ April 2026 26 === page 448 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST SNCO House Type Layout bd 0mg 17m' ew,, 2Jm' 0 0 0 8 April 2026 27 === page 449 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST 4 Bed SOQ House Type Layout ID w ' ' / / ' / ,,, ,,, April 2026 / / / ' ' ' 28 === page 450 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST 4 Bed FGO House Type Layout ~ 9 ID ID F~ w '""" ,_ 0 '"'e"" ,-----------, w '\ / '\ / '\ / / '\ '\ / X / / / / / April 2026 '\ '\ '\ '\ '\ 29 === page 451 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST 3 Bed FGO House Type Layout ~ 0 ID ~ er.;:~ ~ "" ""' rn E-""' b_ __ _d \ / \ / \ .. .....,, ~ / \ / \ / X / / / / / April 2026 \ \ \ \ \ 30 === page 452 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST 4 Bed E9 House Type Layout [D ,..., ID ISrrf w .-----------, m \ / \ / \ / \ / \ / \ / \ / \/ /\ I I / / I / / April 2026 \ \ \ \ \ \ \ 31 === page 453 === This Page Intentionally Left Blank. === page 454 === Tab - CONSTRUCTION IMPROVEMENTS === page 455 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST Construction Improvements CONSTRUCTION IMPROVEMENTS Budget Request ($ in Thousands) FY 2027 Budget Request FY 2026 Budget Request $193,064 $237,655 Purpose and Scope The Air Force is expected to have approximately 14,119 owned units at the end of FY2027. The average age of housing units in the Air Force’s inventory is close to 42 years. The Air Force developed the "whole house" revitalization concept for construction improvement projects. Whole house is the combination of required maintenance and repair together with improvements to bring the unit to contemporary standards. In addition, we are looking beyond the house to the entire housing area in our comprehensive plan. Our "whole neighborhood" concept includes the development of supporting housing infrastructure requirements, neighborhood vehicular and pedestrian circulation concepts to consider siting, density, landscaping, parking, playgrounds, recreation areas and utilities, in addition to the housing unit itself. The Air Force has gathered data on the construction improvement projects to detail past projects on these units and any future work being programmed within a three year period. This information is provided as part of this submittal. Budget Request Summary Authorization is requested for: (1) Appropriation of one MHPI Restructures at Joint Base Elmendorf AFB, Alaska in FY 2027 ($156,964). (2) Appropriation of one Improve Family Housing at Yokota AFB, Japan in FY 2027 ($36,100). (3) Appropriation of one Improve Misawa Main Tower at Misawa AFB, Japan in FY 2027 ($60,000). (4) Appropriation of one Improve East Tower at Yokota AFB, Japan in FY 2027 ($76,000). April 2026 33 === page 456 === DEPARTMENT OF THE AIR FORCE MILLITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST Construction Improvements 1. COMPONENT Air Force FY 2027 MILITARY CONSTRUCTION PROJECT DATA I 2. DATE I 3. INSTALLATION, SITE AND LOCATION 4. PROJECT TITLE Joint Base Elmendorf-Richardson JBER II MHPI Project Restructure Anchorage/AK 5 . PROGRAM ELEMENT 6 . CATEGORY CODE 7 . RPSUID/PROJECT NUMBER 88742F 8. PROJECT COST ($000) FXSBPH2502 N/A 9. COST 157 , 000 ESTIMATES ITEM U/M QTY UNIT COST Un 1,194 131. 461 COST ($000) 156,964 PRIMARY FACILITIES Privatized Housing Inventory 156 , 964 SUPPORTING FACILITIES 0 SUBTOTAL 156 , 964 TOTAL CONTRACT COST 156,964 TOTAL REQUEST 156,964 157 , 000 TOTAL REQUEST (ROUNDED) 10. Description of Proposed Work: Complete a financial restructure of the JBER II military housing privatization initiative (MHPI) project by utilizing FY27 Department of the Air Force (OAF) Budget Authority to provide a Government Equity Contribution to the JBER II MHPI project to ensure adequate funding available for sustainment needs (e . g . , roofing, Heating Ventilation and Cooling (HVAC) units , repairs , etc.) and reinvestment needs (e . g . ' unit replacements, whole-house renovations) . 11 . Requirement: 1,194 UN PROJECT : JBER II MHPI Project Restructure REQUIREMENT: From the time of project closing in 2004 when the housing was originally privatized , this project is required to provide 1 , 194 modern and efficient housing units for military members and their dependents stationed DD FORM 1391 , JUL 99 Previous editions are obsolete. April 2026 Page No. 34 === page 457 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST Construction Improvements 1 . COMPONENT Air Force FY 2027 MILITARY CONSTRUCTION PROJECT DATA I 2. DATE I 3 . INSTALLATION , SITE AND LOCATION 4 . PROJECT TITLE Joint Base Elmendorf-Richardson JBER II MHPI Project Restructure Anchorage/AK 5 . PROGRAM ELEMENT 6 . CATEGORY CODE 7 . RPSUID/PROJECT NUMBER 88742F N/A FXSBPH2502 8. PROJECT COST ($000) 157 , 000 at Joint Base Elmendorf-Richardson (Phase II) through the end of the SOyear lease term. CURRENT SITUATION : The DAF currently projects sustainment funding shortfalls of $38M over the next 10 years , including funds for HVAC, appliance repla cements , exterior maintenance , roofing, and infrastructure . Additionally , there is forecasted to be a $847M shortfall of the projected funds required for mid-term reinvestment at the project . Funding shortfalls are driven factors that are beyond the privatized housing owner ' s control , including higher sustainment and reinvestment costs due to inflation impacts and current market conditions. IMPACT IF NOT PROVIDED: Project housing at the JBER II MHPI project will continue to further deteriorate impacting the quality of life for 1,194 Airmen living on Joint Base Elmendorf-Richardson (Phase II) . Additionally , the ongoing degradation of the units could result in increased life/health/safety issues at project units. ADDITIONAL : None 12. SUPPLEMENTAL DATA: a . Restructure Schedule : (1) AFCEC review proposal/draft counter : Jul 25 (completed) (2) Ongoing negotiations w/ Project Owner : Sep 25 (3) Project Owner submit revised proposal : Oct 25 (4) DAF evaluate proposal/draft Scoring Package: Nov 25 (5) OSD/OMB Vector : Dec 25-Feb 26 (6) Ongoing Negotiations with Project Owner w/OSD Feedback : MarApr 26 (7) Final Proposal from Project Owner : May 26 (8) Draft Restructure Approval Package & Submit to OSD/OMB : Jun 26 (9) OSD/OMB Review and Approval : Jul-Sep 26 (10) Draft Restructure Amendments : Oct-Dec 26 (11) Congressional Notification/Funds Transfer: Oct 26-Jan 27 (12) Restructure Executed: Jan 27 DD FORM 1391 , JUL 99 Previous editions are obsolete . April 2026 Page No. 35 === page 458 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST Construction Improvements 1. COMPONENT 12 AIR FORCE 3. I I NSTALLATION AND LOCATION 4 . PROJECT TITLE YOKOTA AIR BASE JAPAN 5. PROGRAM ELEMENT IMPROVE FAMILY HOUSING , YOKOTA AB PAIP 10 PHASE 1 (32 UN) I CATEGORY CODE 7. PROJECT NUMBER 6 88742F DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA I PROJECT COST ($000) 8 711 - 171 ZNRE2 24302Pl 9. 36 , 000 COST ESTIMATES 145 . 7300 YEN/US$ COST ($000) ITEM UM QUANTITY UNI T COST 26 , 773 PRIMARY FACILITIES (7 11 - 171) (11 , 341) FAMILY HOUSING UNIT 2GAN EA 12 945 , 084 FAMILY HOUSING UNIT 2GA (711-171) EA 20 771 , 576 (15 , 432) SUPPORTING FACILITIES 3 , 428 (2 , 120) UTILITIES LS SITE IMPROVEMENTS LS (253) 11 , 227 (1 , 055 ) DEMOLITION SM 94 30 , 201 SUBTOTAL CONTINGENCY (10.00 %) 3 , 020 TOTAL CONTRACT COST 33 , 221 SUPERVISION , INSPECTION AND OVERHEAD (7 . 30 %) 2 , 425 TOTAL REQUEST 35 , 646 TOTAL REQUEST (ROUNDED) 36 , 000 EQUIPMENT FROM OTHER APPROPRI ATIONS (NON-ADD) ( 0) 10. DESCRIPTION OF PROPOSED CONSTRUCTION Provide whole - house modernization , renovati o n and repair of 32 fami l y housing units at Yokota Air Base . 12 units are type 2GAN , 2 - bedroom CGO units within 3 buildings ; 20 are type 2GA , 2 - bedroom JNCO units within 5 residential buildings . The work including , but is not limited to , all labor , materials , transportation , and performing all work necessary for the improvement of family housing units to meet current codes and standards . Modernize finishes in each unit ' s rooms including but not limited to , the kitchen , bathroom, living room , dining , laundry , bedrooms , family rooms and storage rooms . Replace windows with American Society for Testing and Materials F2090 window fall protection and doors and energy efficient products . Replace roof . Provide insulation in perimeter walls/roofs , and noise attenuation on in t erior walls and ceilings . Provide lifecycle replacement of interi or and exterior electrical , water , sewer , and communication systems that are sized and configured for anticipated loads . Provide each unit with hard wired smoke alarms and fire sprink l ers to meet Unified Facilities Criteria 3 - 600 - 01 . Convert mechanical systems to unit-level heating ventilation and air conditioning and hot water heaters to provide efficient and effective heating , cooling , and humidity control . Demolish the two supporting mechanical building and all utility lines to main line ( see attach facility list) . Inspect/repair exterior and interior wall/ceiling cracks . Remove and dispose of equipment from neighborhood mechanical building . Repaint exterior walls and trash enclosures . Investigate radon system during design to ensure functionality and compliance with current code/regulations . Improvements include building additions to both 2GA and 2GAN units , designed to meet functional space standards in the Air Force Family Housing Design Guide . 2GA unit additions provide a family room and secondary dining space , while 2GAN unit additions provide a kitchen , secondary dining , living room , storage , and laundry space . Exterior modernizations for both unit types include patio/balcony expansion wit h awning covers (first floor patio for 2GA , general patio expansion for 2GAN) , addition of exterior storage , and new backyard fencing . Government Furnished Contractor Installed Appliances including transportation/installation of range , dishwasher , refrigerator , washer and dryer . Environmental work includes testing , demolition , disposal , and abatement asbestos DD FORM 1391 , JUL 1999 PREVIOUS EDITION IS OBSOLETE April 2026 PAGE NO . 36 === page 459 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST Construction Improvements 1. COMPONENT DATE AIR FORCE 3 . I FY 2027 MILITARY CONSTRUCTION PROJECT DATA INSTALLATION AND LOCATION 4 . YOKOTA AIR BASE JAPAN 5 . PROJECT TITLE IMPROVE FAMILY HOUSING , YOKOTA AB PAIP 10 PHASE 1 (32 UN) PROGRAM ELEMENT CATEGORY CODE 88742F 711 - 171 7 . PROJECT NUMBER PROJECT COST ZNRE2 24302Pl ($000) 36 , 000 containing materials , lead and other present hazmat . Replace electrical , water , and sewer service connections to main distribution lines , including replacing water meters and valves . Upgrade transformer and replace secondary feeders to unit as necessary . Site improvements including adding parking spaces in neighborhood lots , sidewalk repairs , resurface parking lot pave ment , landscaping , and all necessary supporting work to provide a complete and usable facility . Repair sidewalks and accessible ramps as required by Unified Facilities Criteria 3 - 201 - 01 . Overall facility improvement shall b e permanent construction and designed to meet current Air Force Family Housing Standards and be in accordance with Department of Defense Unified Facilities Criteria 1- 200 - 01 , Unified Facilities Criteria 4-711-01 Family Housing , Unified Facilities Criteria 3 - 600 - 01 Fire Protection Engineering f or Facilities , and other latest applicable Department of Defense UFCs . The project should comply with Department of Defense AT/FP requirements per Unified Facilities Criteria 4-010-01. 11 . REQ : 32 EA ADQT : 0 SUBSTD : 32 EA PROJECT: IMPROVE FAMILY HOUSING , YOKOTA AB PAIP 10 PHASE 1 (32 UN) REQUIREMENT: The project is required to provide safe and efficient housing for Mil i tary members and their families stationed at Yokota AB . This project is programmed in accordance with the 2017 Housing Community Profile (HCP) and Family Housing Master Plan . This is not a tenant or supporting service requirement . CURRENT SITUATION: This family housing at Yokota AB was constructed in 1998 (2GA) and 2000 (2GAN) and requires major renovation and repair to deterioration resulting from age and heavy use . The existing housing units have Facility Condition Index scores ranging from 77 to 78 and are in need of lifecycle updates to meet current life safety codes for electrical , mechanical , seismic , fire safety and energy efficiency . The housing un i ts have had no major upgrades s i nce construction , and do not meet the functional and spatial needs of today ' s families or provide a modern h ome environment . The kitchens are poorly configured with inadequate storage , cabine t space and countertop area . The plumbing and lighting fixtures are deteriorated . The units have inadequa t e family room area , secondary dining , and storage , according to the latest guidance in United States Air Force Family Housing Guide , August 2004. The electrical systems do not meet current construction codes under the National Electric Code , including missing ground fault circuit interrupter protection in bathrooms , kitchens , and exterior circuits . The fire detection systems do not meet current construction codes , under Unified Facilities Criteria 3-600 - 01 Fire Protection Engineering, and fire suppression systems do not exist . The flooring , windows , and roofing require replacement due to deterioration and abatement of asbestos and lead is required to provide a safe environment . IMPACT IF NOT PROVIDED : Without this project , Yokota Air Base ' s family housing units will continue to DD FORM 1391C , JUL 1999 PREVIOUS EDITION IS OBSOLETE April 2026 PAGE NO . 37 === page 460 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST Construction Improvements 1. COMPONENT 12 AIR FORCE 3 . I INSTALLATION AND LOCATION 4 . YOKOTA AIR BASE JAPAN 5 . PROJECT TITLE IMPROVE FAMILY HOUSING , YOKOTA AB PAIP 10 PHASE 1 (32 UN) PROGRAM ELEMENT 88742F DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA 6 . CATEGORY CODE 1 711 - 171 7 . PROJECT NUMBER PROJECT COST ZNRE224302Pl ($000) 36 , 000 deteriorate , resulting in inefficient operations , excessive maintenance and repair costs to the Air Force. The units will continue to lack the appropriate functional spaces required in the US Air Force Family Housing Guide . If the situation remains status quo , the repair of these units will continue to be accomplished in a costly and piecemeal fashion with little or no improvement in living quality , resulting in low morale . Retention problems are likely if conditions are permitted to continue , directly impacting overall mission for supporting Military members and their families while stationed at Yokota Air Base . ADDITIONAL: This project mee t s the scope/cri t eria specified in Air Force Manual 32 - 1084 , Facility Requirements and the United States Air Force Family Housing Guide , August 2004 . The overall facility improvement shall be compatible with applicable Department of Defense Air Force , and Yokota Base design standards . In addition , local materials and construction techniques shall be used where cost effective , and environmental (asbestos/ l ead) sampling , testing , remediation and all other related work are programmed into the project to provide comple t e and usable facilities . This design shall conform to criteria established in the Air Force Corporate Facilities Standards , the Installation Facilities Standards , and all applicable federal and host nation requirements , but will not employ a s t andard facility design because there is no Air Force standard facility design for these units , and there is no applicable standard design from United States Army Corps of Engineers. A preliminary ana l ysis of reasonable alternatives for accomplishing this project (status quo , renovation , addition/alteration , new construction ) indicated that renovation is the most cost- effective option to meet mission requirements . A formal economic analysis is in progress . Sustainable principles , to include life - cycle cost- effective practices , will be integrated into the design , development , and construction of the project in accordance with Unified Facility Criteria 1- 200 - 02 . This includes preparation of a life - cycle cost analysis for energy consuming systems , renewable energy generating systems , whenever life-cycle cost effective i s se l ected as the reason any requirement of Unified Facility Criteria 1 - 200 - 02 is partially compliant or not applicable . This project does not fall within or partly within the 100 - year flood plain . This facility is sited in accordance with the Installation Development Plan and is within a compatible land use area . Supporting facility costs exceed 25 % of primary facility cost due to the extensive scope in utility upgrades and replacement . This project is not eligible for Host Nati on funding . FOREIGN CURRENCY EXCHANGE RATES FY24 Budget Rate Used : YEN 139 . 1635 Base Civil Engineer : DD FORM 1391C , JUL 1999 (011) 81 - 3117 - 55 - 7215 ; DSN : 225 - 7215 PREVIOUS EDITION IS OBSOLETE April 2026 PAGE NO . 38 === page 461 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST Construction Improvements 1. COMPONENT 2 . DA TE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE 3. I NSTALLATION AND L OCATION 4 . YOKOTA AIR BASE JAPAN 5. PROGRAM ELEMENT PROJECT TITLE IMPROVE FAMILY HOUSING , YOKOTA AB PAIP 10 PHASE 1 ( 32 UN) 6 . CATEGORY CODE 7 . 8. PROJECT NUMBER PROJECT COST ($000 ) 88742F 711-171 ZNRE224302Pl SUPPLEMENTAL DATA: A . Estimated Executi on Data : (1) Acquisition Strategy : Design-B id-Build (2) Design Data (a) Design or Request f or Proposal (RFP) Start ed : (b) Percent of Design Completed as of SEP 2025 : ( c) Percen t of Design Completed as of JAN 2026 : (d ) Design or RFP Complete : (e) Total Design Cost ($000) (f) Energy Study and/ or Life Cycle Cost Analysis ( g) Standard or Definitive Design Used? (3) Construction Data : (a ) Contrac t Award : (b) Construction Start : (c ) Construction Complete : 12 . 36 , 000 NOV/2024 35 % 100 % DEC/2025 4 , 000 YES NO MAY/2027 JUL /2027 SEP/20 2 9 B . Equipment associated with this project which will be provided from other appro priations : Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) NONE Facility Listing I.J ntType/ NE"gt,borhood 81-:lg# Fae. N,1me NorthATN 1061 l06Q 1065 2GAN 2GAN 2GAN 2001 2002 2003 2GA 2GA 2GA NorthAIN NorthNea Sol-thNea South~il Sol.th Ale-ii Sol-thNea Sol-thNea NorthNea South Aleil 2004 2GA 2005 1062 2016 2GA Mechanlal Bulldre Mechanicallluilding DD FORM 1391C, JUL 1999 St,e..tll lJnrl Strl!'<'t Namo. 1061 1064 1065 2001 2002 2001 2004 2.005 An:lrews DriveAn:lrewi; Drive An:lrews Dr1w Hughes DriYe Hcighe-s Drive Hcighe<. Drive Hughes Drive Hughes Drive ronf g Townhom e Townhome M Utlplo: M U tiplell M Utiplei. MUtlple,, M Utlpl8 Crit 'fr lnl Sy e I R,;,n GO, GO, GO, GO, GO, GO, GO, GO, GO, GO, l!t >000 , ooo ,ooo ]998 ]998 ]998 ]998 ]998 ,ooo Stalci\ Ellisting EJdstlng EJdstlng EJdstlng EJd1tlng EJosting Elllstlng Elllsting Eldstlng Elllsting PREVIOUS EDITION IS OBSOLETE April 2026 81ffi Bath Gq L½ L½ L½ 77 lm pm11e(FHCON) 1121 77 77 lm pro11e ( fHCON) lmpro11e(fHCON) ]080 78 78 lmprove(FHCON ) lm pro11e(FHCON) ,m ]080 ,dequ.,J" Cradequ;,t"C l!Ci [)ec:,\ on ]080 ]080 ]080 78 78 lm prove j fHCON) lmpro11e(FHCON) 78 71 lmprove(FHCON) 1m pro11e(FHCON) m 79 1m pro11e(FHCON) ... PAGE NO . 39 === page 462 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST Construction Improvements 1. COMPONENT 2 . DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE 3. INSTALLATION AND LOCATION 4 . YOKOTA AIR BASE JAPAN 5. PROGRAM ELEMENT 88742 PROJECT TITLE IMPROVE FAMILY HOUSING , YOKOTA AB PAIP 10 PHASE 1 (32 UN) 6. CATEGORY CODE 711-17 1 7. PROJECT NUMBER 8. PROJECT COST ($000) ZNRE224302Pl 36 , 000 SITE MAP NOTTO SCALE 2GAN (\ ~ • l _?J Y()l(OTA AIR BAS£ 2GA DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE April 2026 PAGE NO . 40 === page 463 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST Construction Improvements 1. COMPONENT DATE AIR FORCE 3 . I FY 2027 MILITARY CONSTRUCTION PROJECT DATA INSTALLATION AND LOCATION 4 . YOKOTA AIR BASE JAPAN 5 . PROJECT TITLE IMPROVE FAMILY HOUSING , YOKOTA AB PAIP 10 PHASE 1 ( 32 UN) PROGRAM ELEMENT CATEGORY CODE 88742 711-171 7 . PROJECT NUMBER PROJECT COST ZNRE224302Pl ($000) 36 , 000 FLOOR PLAN - 2GAN (existing) NOTTO SCALE □~ ­ __J fl()f,1- fET CG02 EXISTING CkOSS.!o.F, ll21 N£T S.F, : I IIZII UN!T TYPE 2GAN NORnl NEIGH80RHCX)D =i 7 ~ OOSTING NET Ncr+ NET CG02 EXISTING UNIT TYPE 2GAN NORTI-1 NEIGHBORHOOD DD FORM 1391C, JUL 1999 C~S.f.: ll21 NET S.F. : IOJ'.l ~ PREVIOUS EDITION IS OBSOLETE April 2026 PAGE NO . 41 === page 464 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST Construction Improvements l . COMPONENT 2 . DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE 3. INSTALLATION AND LOCAT ION 4 . PROJECT T ITLE YOKOTA A I R BASE JAPAN I MPROVE FAMI LY HOUSI NG, YOKOTA AB PAIP 10 PHASE 1 (32 UN) 5 . PROGRAM ELEMENT 6 . CATEGORY CODE 88742 7 . PROJECT NUMBER 711 - 1 71 8. PROJECT COST ($000) ZNRE2243 02Pl 36 , 000 FLOOR PLAN - 2GAN (1!! Floor Back Expansion) NOTTO SCALE 5785 0 0 E ~ ~ 0 @ ~ ~ I KITCHEN I © 0 0 0 I SECOhOARY DINING I ® ! l>NING I ~ ! LMNGROOM j ~ [) l---DD FORM 1391C, JUL 1 999 PREVIOUS EDITI ON I S OBSOLETE April 2026 Q.OSET - NEWCONSTRUCTION EXISTING 10 REMAIN PAGE NO . 42 === page 465 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST Construction Improvements l . 2 . DATE COMPONENT FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE 3. INSTALLATION AND LOCATION 4 . PROJECT TITLE YOKOTA A I R BASE JAPAN I MPROVE FAMI LY HOUSI NG, YOKOTA AB PAIP 10 PHASE 1 (32 UN) 5 . PROGRAM ELEMENT 6 . CATEGORY CODE 88742 7 . PROJECT NUMBER 711 - 1 71 8. PROJECT COST ($000) ZNRE2243 02Pl 36 , 000 FLOOR PLAN - 2GAN (2 nd Floor Back Expansion) NOTTO SCALE Q cp 578S ID I ®-___,..._ ill C i ® ~ ~ \J c ( ( ! BEOROOM2! C ~ ~ / 1----:1_____. . ,___ DD FORM 1391C, JUL 1 999 PREVIOUS EDITI ON I S OBSOLETE April 2026 - IEWCONSTR\JCTION EXISTING TO REMAIN PAGE NO . 43 === page 466 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST Construction Improvements 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE 3. INSTALLATION AND LOCATION 4 . YOKOTA AIR BASE JAPAN 5. PROJECT TITLE IMPROVE FAMILY HOUSING , YOKOTA AB PAIP 10 PHASE 1 (32 UN) PROGRAM ELEMENT 6 . CATEGORY CODE 88742 7 . 8. PROJECT NUMBER 711 - 171 PROJECT COST ZNRE2 2 4302Pl ($000) 36 , 0 0 0 FLOOR PLAN - 2GA (existing) NnTTn <;rAI F !42 5f ~ 11·11·•11· ,__-;. 1 LV,NGIOCf,I x ,~ /. D D u-..,-11 .,l-7" EXISTTNG NET NON- NET CG0 2/JNC02 EXISTING UNIT TYPE 2GA SOUTH AREA NEIGHBORHOOD DD FORM 1391C, JUL 1999 GROSS S.F. : 1080 NETS.F.: 921 FJRST A.OOA. PREVIOUS EDITION IS OBSOLETE April 2026 ~-~ PAGE NO . 44 === page 467 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST Construction Improvements l . COMPONENT 2 . DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE 3. INSTALLATION AND LOCATION 4 . PROJECT TITLE YOKOTA A I R BASE JAPAN 5 . PROGRAM ELEMENT I MPROVE FAMI LY HOUSI NG, YOKOTA AB PAIP 10 PHASE 1 (32 UN) 6 . CATEGORY CODE 88742 7 . PROJECT NUMBER 711 - 1 71 8. PROJECT COST ($000) ZNRE2243 02Pl 36 , 000 st FLOOR PLAN - 2GA (1 Floor) NOTTO SCALE 919S S400 1S01h 1500 EXTERIOR STORAGE PER UNIT• TYPICAL LOCATIONATEt.O UNrTONLY r - NEWCON5TRUCTION EXISTING TO REMA.IN DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE April 2026 PAGE NO . 45 === page 468 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST Construction Improvements l . 2 . DATE COMPONENT FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE 3. INSTALLATION AND LOCATION 4 . PROJECT TITLE YOKOTA A I R BASE JAPAN 5 . PROGRAM ELEMENT I MPROVE FAMI LY HOUSI NG, YOKOTA AB PAIP 10 PHASE 1 (32 UN) 6 . CATEGORY CODE 88742 7 . PROJECT NUMBER 711 - 1 71 PROJECT COST ($000) ZNRE2243 02Pl nd FLOOR PLAN - 2GA (2 NOTTO SCALE cp 8. 36 , 000 Floor) 9195 ~ B >+----...-- A ,__..,.__ t - NEWCONSTRUCTION EXISTING TO REMAIN DD FORM 1391C, JUL 1 999 PREVIOUS EDITI ON I S OBSOLETE April 2026 PAGE NO . 46 === page 469 === Tab - MANDATORY === page 470 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST Construction Improvements Mandatory April 2026 47 === page 471 === This Page Intentionally Left Blank. === page 472 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST Construction Improvements 2 . DATE 1 . COMPONENT AIR FORCE FY 2027 MILITARY CONSTRUCTION PROJECT DATA I 3 . INSTALLATION AND LOCATION 4 . PROJECT TITLE : MISAWA AIR BASE JAPAN IMPROVE MISAWA MAIN TOWER, B117 (68UN) 5 . PROGRAM ELEMENT 8874 2 F 6 . CATEGORY CODE 7 . PROJECT NUMBER 711181 1 8 . PROJECT COST ($000) QKKA27400 2 60 , 000 1 9. COST ESTIMATES ITEM U/M QUANTITY UNIT COST($) COST($000) PRIMARY FACILITIES 52 , 111 FAMILY HOUSING OTHER (711-181) CYBERSECURITY OF FACILITY-RELATED CONTROL SYS SUPPORTING FACILITIES UN LS 68 747 , 650 ( 50 , 840 ) ( 1 , 271 ) 1 , 376 110 ) SITE PREPARATION LS SITE IMPROVEMENTS LS ( 68 UTILITIES LS LS ( 96 ) ENVIRONMENTAL REMEDIATION SUBTOTAL ( ( 1 , 102 ) ) (5 . 0 %) 53 , 487 2 , 674 TOTAL CONTRACT COST 56 , 162 SUPERVISION , INSPECTION AND OVERHEAD (7 . 3 %) 4 , 100 DESIGN DURING CONSTRUCTION (0 . 9% OF SUBTOTAL) TOTAL REQUEST 60 , 261 CONTINGENCY 481 TOTAL REQUEST (ROUNDED) 60 , 000 (0) EQUIPMENT FROM OTHER APPROPRIATIONS (NON-ADD) 10 . DESCRIPTION OF PROPOSED CONSTRUCTION : Provides who l e house interior and exterior modernization , renovation and repair of sixty-eight ( 68) housing units at Misawa Air Base (Junior Non-Commissioned Officer three - bedroom military family housing units) . The work includes but is not limited t o providing al l labor, materials , transportation , and performing all necessary work for the improvements of the family housing units to meet current codes and standards . Project includes housing units , corridors , janitor closets , restrooms , trash rooms , mechanical rooms , elevators , and recreation rooms . Repair roof , fascia and soffit . Repaint exterior including sealing crack . Repaint interior . Replace cei l ing panels . Replace gypsum board . Replace tiles . Replace floor coverings . Replace finishes and fixtures in kitchens and bathrooms , including caseworks and cabinets . Replace all windows , doors and frames . Windows meet American Society for Testing and Material (ASTM) F2090 window fall protection as practical as possible . Upgrade windows and doors as part of sound strategies . Project also includes l ocating and sealing all the gaps , cracks , and open seams to prevent air l eaks (and sound leaks) and regulate airflow/ improve energy efficiency , and also to meet AICUZ requirements . Replace the steam- sourced heat system with new , energy efficient heat pump heating , ventilation , and air conditioning (HVAC) system. Replace exhaust fans. Replace domestic hot water system with energy efficient system . Replace plumbing pipes and fixtures . Project provides energy management control system (EMCS) for integration with the Misawa Air Base ' s EMCS system including water and electric smart meters . Replace electrical DD FORM 1391, JUL 99 PREVIOUS EDITION IS OBSOLETE April 2026 Page No . 48 === page 473 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST Construction Improvements 1. COMPONENT AIR FORCE FY 2027 MILITARY CONSTRUCTION PROJECT DATA I 3 . INSTALLATION AND LOCATION MISAWA AIR BASE 12. DATE 4. PROJECT TITLE: IMPROVE MISAWA MAIN TOWER, B117 ( 68UN) JAPAN 5. PROGRAM ELEMENT 88742F 6 . CATEGORY CODE 1 7. PROJECT NUMBER 711181 8 . PROJECT COST ($000) QKKA274002 60 , 000 1 panels , including circuit breakers. Replace lighting fixtures and electrical systems . Replace elevators . Project will address any fire safety deficiencies . Replace smoke detectors , exit s i gns , fire a l arm and mass noti fi cation system to meet current code standards . Install fire suppression . Project will update force protection measures in accordance with current version of the Unified Facilities Criteria (UFC) 4 - 010 - 01 . Project wi l l meet Amer i cans with Disability Act (ADA) accessibility . Repair building exterior ramps , handrails , and guardra i ls . Install additi onal storage . Provide s i t e landscaping including seeding , sprigging and sodding. Repair parking lots for res idents/guests . Repair curbs , driveway , striping , barriers , traffic signage and sidewalk . Provide mechanical and electrical utility replacements . Replace transformers , cables , breakers and distribution panels . Replace e x terior lighting . Project will provide asbestos abatement , lead-based paint abatement , arsenic gypsum board abatement , and abatement of all other hazardous materials as encountered . Project wi l l provide all related civi l, architectural , structural , mechanical , electrical , and environmental work necessary for complete and usable units/buildings . Project is programmed in accordance wi th the current (2025) Housing Community Profile (HCP). The overall facility improvement shall be permanent and designed to meet the current Air Force Family Housing Standard and be in accordance with Unified Facilities Criteria 4 - 711 - 01 Family Housing , Unified Faci l ities Criteria 3 - 600 - 01 Fire Protection Engineer i ng for Facilities and other latest appl i cable Department of Defense Unified Facilities Criteria . Facility will be des i gned as permanent construction in accordance with Department of DefenseUnified Facilities Criteria 1200 - 01 . This project will comply with Department of Defense antiterror ism/force protectio n requirements per Unified Facilities Criteria 4 - 010 - 01 . Air Condi t ioning : X Tons 11 . REQUIREMENT : 68 UN ADEQUATE : 0 SUBSTANDARD : 0 PROJECT : Improve Family Housing Towe r , Building 117 (68 Units) REQUIREMENT: The project is required to provide safe and efficient housing for Military members and their families sta t ioned in Misawa Air Base. Current ly , the tower has a Building Condition Index (BCI) of 62 , indicating a poor condition that necessitates immediate attention . The tower requires lifecycle repair or replacement of degraded building systems , as well as upgrades to meet current life safety codes and standards for electrical , mechanical , fire safety , and energy efficiency. Furthermore , the project seeks to provide a comfortable and appealing living environment that aligns with the needs and expectations of Military families . This project is programmed in accordance with the 2025 Housing Community Profile (HCP) and Family Housing Master Plan . This is not a tenant or supported service requirement . DD FORM 1391, JUL 99 PREVIOUS EDITION IS OBSOLETE April 2026 Page No . 49 === page 474 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST Construction Improvements 1. COMPONENT AIR FORCE I FY 2027 MILITARY CONSTRUCTION PROJECT DATA 12. DATE 3 . INSTALLATION AND LOCATION 4. PROJECT TITLE: MISAWA AIR BASE JAPAN IMPROVE MISAWA MAIN TOWER, B117 ( 68UN) 5. PROGRAM ELEMENT 88742F CATEGORY CODE 711181 7. PROJECT NUMBER QKKA274002 18 . PROJECT COST ($000) 60 , 000 CURRENT SITUAT I ON : This project upgrades and modernizes Tower B117 which was built in 1995. This ninestory family housing high rise building consists of 68 three- bed room units. These housing un it s require major renovation and repair to correct deterioration resulting from age and heavy use . They have had no major upgrades since construction , and do not meet the needs of today ' s families , nor do they provide a modern home environment . The uni ts within this project were identified for improvement in the latest (2025 ) HCP . These housing units do not meet the needs of today ' s families as outlined in the Air Force Family Housing Design Guide (AFFHDG) . The kitchen and bathroom cabinets and fixtures are obsolete , deteriorated , and outdated . Replacement parts for several of the infrastructure systems within the units are no longer available. The e l ectrical system does n ot meet modern construction codes. Ground Fault Circuit Interrupter (GFCI) protection is not prov i ded for bathrooms , kitchens , laundry rooms , and exterior circuits . The original flooring is stained, loose , unsightly and mismatched , creating potential tripping hazards as original materials for replacement are non - ex i stent . The ex i sting heating un i ts are beyond thei r usefu l life . The housing units lack A/C and dehumidification , causing inte rior space to become hot and humid in the summer months , contributing to the growth of mold and mildew and creating potential poor indoor air quality . Misawa Air Base experiences more than 800 hours per year of wet bulb temperatures above 67 - degree F , therefore justifying the A/C and dehumidification requirement . Additionally , due to poor thermal efficiency from these all-concrete constructed facilities , energy and heat loss from each unit drives increased utility bills each year , especial l y during the winter months . Common areas have not been upgraded since construction and encumber the family quality of life . IMPACT IF NOT PROVIDED : Failure to execu t e this project will result in continued deterioration of these units , leading to escalating operations , maintenance , and repair costs for the Air Force . Without this critical investment , repairs will be performed in a reactive and piecemeal manner , incurring significant costs wi thout achieving significant improvements in living quality . ADDI TIONAL : This project mee t s t he cr iteria/ scope specified in Air Force Manual 32- 1084 , Facilities Requirements , Air Force Instruction 32- 6000 , Housing Management and Unified Facilities Criteria 4 - 711 - 01 , Family Housing . This design shall conform to criteria established in the Air Force Corpo rate Facilities Standa r ds , the Instal l ation Facilities Standards , but will not employ a standard facility design because there is no Air Force standard facility design for this project , and there DD FORM 1391, JUL 99 PREVIOUS EDITION IS OBSOLETE April 2026 Page No . 50 === page 475 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST Construction Improvements 1. COMPONENT AIR FORCE FY 2027 MILITARY CONSTRUCTION PROJECT DATA I 12. DATE 3 . INSTALLATION AND LOCATION 4. PROJECT TITLE: MISAWA AIR BASE JAPAN IMPROVE MISAWA MAIN TOWER, B117 ( 68UN) 5. PROGRAM ELEMENT 88742F 6 . CATEGORY CODE 1 711181 7. PROJECT NUMBER 8 . PROJECT COST ($000) QKKA274002 60 , 000 1 is no applicable standard design from the United States Army Corps of Engineers . All reasonable alternati ves were considered during the development of this project to include status quo , new cons t ruct ion , and renovation . Renovat ion is the only viable option to meet this requirement . A formal economic analysis is currently in progress . Sustainabl e principles , to include life - cycle cost- effective practices , will be integrated into the design , development , and construction of the project in acco r dance with Unif i ed Facilit i es Cr i teria 1 - 200 - 02 , High Performance and Sustainable Building Requirements . Th i s includes preparation of a life - cycle cost analysis for energy consuming systems , renewable energy generating systems , or when life - cycle cost effective is selected as the reason any requirement of Unified Facilities Criteria 1 - 200 - 02 is partially compliant o r not applicable . This project does not fall or partly within a 100 - year flood plain . Facilities are sited in accordance with the Insta l lation Development Plan and are within a compatible land use area . This p r oject is not eligible for Host Nation funding . Environmental Impact Analysis Process (EIAP) : The action described for this project is not a major Federal action that will significantly harm the environment and/or the resources of the foreign nation that is not involved in the action per Department of Defense Directive (DoDD) 6050.7. Therefore , in accordance with DoDD 6050 . 7 , para E2 . 2 . l . l , an environmental review or study is not required . This project was included in the Fiscal Year (2026) Future Year ' s Defense Program for Fiscal Year (2027) . FOREIGN CURRENCY BUDGET RATE FY26 BUDGET RATE USED , YEN 150 . 4415 BY - 2 , BY - 1 , and Future Unaccompanied Housing Restoration and Modernization Conducted : None Base Civil Engineer : (315) 226-3089 JOINT USE CERTIFICATION: This facility can be used by other components on an " as available 11 basis ; however , the scope of the project is based on Air Force requirements . DD FORM 1391, JUL 99 PREVIOUS EDITION IS OBSOLETE April 2026 Page No . 51 === page 476 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST Construction Improvements 1. COMPONENT AIR FORCE FY 2027 MILITARY CONSTRUCTION PROJECT DATA I 12. DATE 3 . INSTALLATION AND LOCATION 4. PROJECT TITLE: MISAWA AIR BASE JAPAN IMPROVE MISAWA MA I N TOWER, B117 (68UN) 5. PROGRAM ELEMENT 887 42F 12 . 6 . CATEGORY CODE 1 7. PROJECT NUMBER 711181 8 . PROJECT COST ($000) QKKA274002 60 , 000 1 SUPPLEMENTAL DATA: A . Estimated Execu tion Data : (1) (2) (3) Acquisition Strategy : Design-Bid-Build Design Data : (Indi cat es confidence in the design solution) (a) Des ign or Request for Proposal (RFP) Started : (b) Percentage of Design Completed as of Sep 2025 (BY- 2 ) : (c) Percentage of Design Completed as of Jan 2026 (BY-1) : (d) Design or RFP Complete: (Ready to Solicit) (e) Total Design Cost ($ 000 ): (f) Energy Study and/or Li fe - Cycle ana l ysis performed : (g) Standard or definitive design used? APR/2026 15% 15% JUL/2027 6 , 000 YES NO Construction Dat a : (a) Contract Award : (b) Construction Start : (c) Construction Complete : AUG/2029 OCT/2029 AUG/2032 B . Equipment associated with this project provided from other appropriations : Equipment Nomenclature (Examples) Procuring Appropriation Fiscal Year Appropriated or Requested Cost ($000 ) NONE DD FORM 1391, JUL 99 PREVIOUS EDITION IS OBSOLETE April 2026 Page No . 52 === page 477 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST Construction Improvements 1. COMPONENT FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE 3 . INSTALLATION AND LOCATION MISAWA AIR BASE 2. DATE 4. PROJECT TITLE: IMPROVE MISAWA MAIN TOWER, B117 ( 68UN) JAPAN 5. PROGRAM ELEMENT 7. PROJECT NUMBER 6 . CATEGORY CODE 88742F 711181 QKKA274002 8 . PROJECT COST ($000) 60 , 000 SITE MAP Bu i lding Condi tion Summary 1 ,11 I T2-3 DD FORM 1391, JUL 99 . 1995 None JNCO I 3 Fi&i&E&EiH·Ef&iEfi ~~. I PREVIOUS EDITION IS OBSOLETE April 2026 Page No . 53 === page 478 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST Construction Improvements 1. COMPONENT I DATE AIR FORCE (PACAF) 3. 12. FY 2029 PROJECT DATA INSTALLATION AND LOCATION 4. PROJECT TITLE: IMPROVE EAST TOWER 4300 (70 UN) YOKOTA AIR BASE, JAPAN 1 CATEGORY CODE 5. PROGRAM ELEMENT R&M 88746 (EEIC 53380) 16 ITEM 7. PROJECT NUMBER 8. PROJECT COST ($000) 711-171 ZNRE254301 1 9 . COST ESTIMATE UOM QTY $76,000 1 UNIT COST COST ($000) Modernization Repair (EEIC 53380) PRIMARY FACILITIES EAST TOWER 4300 3TAl-p1 (70) UN 70 928,652 57,679 SUPPORTING FACILITIES SITE IMPROVEMENTS LS 1 2,450,963 2,451 SUBTOTAL CONTINGENCY (5%) SIOH (7.3%) 67,457 3 ,373 5 ,171 TOTAL FUNDED REQUEST 76,000 TOTAL FUNDED REQUEST (ROUNDED) 76,000 FOREIGN CURRENCY FY 20 RATE: $1.00 = ¥106.4531 10. DESCRIPTION OF PROPOSED WORK: Provides general interior and exterior modernization and renovation of building 3004. Includes utility upgrades and additions to meet current standards. This will be accomplished by replacing all floor finishes (carpet in bedrooms, wood flooring in living & dining, tile at foyer, kitchen & bath), wall & ceiling finishes, and all windows with energy efficient & sound rating . Additionally, the kitchen and bathrooms will be upgraded by installing new cabinetry, tiles, fixtures & accessories in those rooms (including the powder room) and having new government furnished appliances installed. It will also be necessary to replace the plumbing; existing roofing; all interior electrical wires , conduit, light fixtures , switches & outlets; and HVAC system (with heat pump type split; condensing units piped to the roof). Additionally, an electric resistance type water heater and hard-wired smoke detectors will be installed. Replace the existing obsolete freight elevators and passenger elevators 11. REQUIREMENT: PROJECT: IMPROVE EAST TOWER 4300 (70 UN) REQUIREMENT: This project is required to provide modern and efficient housing for military members and their dependents stationed at Yokota AB. Tower 4300 must be upgraded to meet current life safety codes and to provide personnel with housing that is conducive to proper rest, relaxation , and personal well-being. All units will meet whole housing standa rds. Renovated tower will provide modern kitchen, living room, family room , bedroom and bath configuration. This project is programmed in accordance with Family Housing Master Plan. CURRENT SITUATION: This project upgrades and modernizes Tower 4300 which was constructed in 1974 and last renovated in 2004. These 70 units require major renovation and repair to correct deterioration resulting from age and heavy use. They have had no major upgrades since construction , and do not meet the needs of today's fam ilies, nor do they provide a modern home environment. Kitchens do not provide adequate storage, cabinet space or countertop area, and are not functionally arranged. Plumbing and lighting fixtures are deteriorated. The electrical systems do not meet modern construction codes. Ground fault circuit interrupter protection is not provided for bathrooms, kitchens, and exterior circuits. Flooring , windows, and roofing require replacement. IMPACT IF NOT PROVIDED: Units will continue to deteriorate resulting in increasing operations, maintenance and repair costs to the AF . Without this project repair of these units will be accomplished in a costly and piecemeal fashion with little or no improvement in living quality. Low morale and retention problems will result if conditions are permitted to continue . ADDITIONAL: This project meets the scope/criteria specified in Air Force Manual 32- 1084, Facility Requirements and the US Air Force Family Housinq Guide, Auqust 2004. The overall facility improvement shall be compatible with DD FORM 139 1, DEC 99 Previous editions are o bsolete April 2026 Page No 54 === page 479 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST Construction Improvements 1. COMPONENT I AIR FORCE (PACAF) 3. DATE FY 2029 PROJECT DATA INSTALLATION AND LOCATION 4. PROJECT TITLE: IMPROVE EAST TOWER 4300 (70 UN) YOKOTA AIR BASE, JAPAN 5. PROGRAM ELEMENT R&M 88746 (EEIC 53380) 1 CATEGORY CODE , 7. PROJECT NUMBER , 8. PROJECT COST ($000) 711-171 ZNRE254301 $76,000 applicable Department of Defense Air Force, and Yokota Base design standards. In addition, local materials and construction techniques shall be used where cost effective, and environmental (asbestos/lead) sampling, testing, remediation and all other related work are programmed into the project to provide complete and usable facilities. This design shall conform to criteria established in the Air Force Corporate Facilities Standards, the Installation Facilities Standards, and all applicable federal and host nation requirements, but will not employ a standard facility design because there is no Air Force standard facility design for these units, and there is no applicable standard design from United States Army Corps of Engineers. A preliminary analysis of reasonable alternatives for accomplishing this project (status quo, renovation , addition/alteration, new construction) indicated that renovation is the most cost-effective option to meet mission requirements. A formal economic analysis is in progress. Sustainable principles, to include life-cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with Unified Facility Criteria 1-200-02. This includes preparation of a life-cycle cost analysis for energy consuming systems, renewable energy generating systems, whenever life-cycle cost effective is selected as the reason any requirement of Unified Facility Criteria 1-200-02 is partially compliant or not applicable. This project does not fall within or partly within the 100-year flood plain. This facility is sited in accordance with the Installation Development Plan and is within a compatible land use area. Supporting facility costs exceed 25% of primary facility cost due to the extensive scope in utility upgrades and replacement. This project is not eligible for Host Nation funding. FOREIGN CURRENCY EXCHANGE RATES FY24 Budget Rate Used: YEN 139.1635 BY-2, BY-1 , and Future Unaccompanied Housing Restoration and Modernization Conducted: None Base Civil Engineer: (011) 81-3117-55-7215; DSN: 225-7215 DD FORM 1391 , DEC 99 Previous editions are obsolete April 2026 Page No 55 === page 480 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST Construction Improvements I 1. COMPONENT DATE FY 2029 PROJECT DATA AIR FORCE (PACAF) 3. INSTALLATION AND LOCATION 4. PROJECT TITLE: IMPROVE EAST TOWER 4300 (70 UN) YOKOTA AIR BASE, JAPAN 5. PROGRAM ELEMENT 16. 1 CATEGORY CODE R&M 88746 (EEIC 53380) , 7. PROJECT NUMBER , 8. PROJECT COST ($000) 711-171 ZNRE254301 $76,000 12. SUPPLEMENTAL DATA: a. Estimated Design Data: (1) Status: (a) Type of Design Design-Bid-Build (b) Date Design Started TBD (c) Parametric Cost Estimates Used to develop costs YES (d) Percent Complete as of 01 JAN 2024 TBD (e) Date 35% Designed TBD (f) TBD Date Design Complete (g) Energy study/Life-Cycle analysis was/will be performed YES (2) Basis: (a) Standard or Definitive Design TBD (b) Where Design Was Most Recently Used TBD (3) Total Cost (c) =(a)+ (b) or (d) + (e) TBD (a) Production of Plans and Specifications TBD (b) All Other Design Costs TBD (c) Total TBD (d) Contract TBD (e) In-house TBD (4) Construction Contract Award TBD (5) Construction Start TBD (6) Construction Completion TBD b. Equipment associated with this project provided from other appropriations: None DD FORM 139 1, DEC 99 Previous editions are o bsolete April 2026 Page No 56 === page 481 === DEPARTMENT OF TE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST Construction Improvements . COMPONENT 2. AIR FORCE PACAF 3. DATE FY 2029 PROJECT DATA INSTALLATION AND LOCATION 4. PROJECT TITLE: IMPROVE EAST TOWER 4300 (70 UN) YOKOTA AIR BASE, JAPAN 5. PROGRAM ELEMENT R&M 88746 (EEIC 53380) 6. CATEGORY CODE 7. PROJECT NUMBER 8. PROJECT COST ($000) 711 -171 ZNRE254301 $76,000 PICTURES TOWER 3400 3TAI-P1 (70) DD FORivf 139 1, DEC 99 Previous editions are obsolete April 2026 Page No 57 === page 482 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST Construction Improvements . COMPONENT 2. AIR FORCE PACAF 3. DATE FY 2029 PROJECT DATA INSTALLATION AND LOCATION 4. PROJECT TITLE: IMPROVE EAST TOWER 4300 (70 UN) YOKOTA AIR BASE, JAPAN 5. PROGRAM ELEMENT R&M 88746 (EEIC 53380) 6. CATEGORY CODE 7. PROJECT NUMBER 8. PROJECT COST ($000) 711 -171 ZNRE254301 $76,000 BUILDING LIST HCP PULL 2017.09 i4-M:·Hirl·+ EutTOW"u43)0( =i·BM11:filft·t-t HffWi@lil41 4300 Other 3TAl-pl 430) B Tower 1 '3■:iN,M'fiMif ii'fM·ftM:f\·M4iM3.Piii:\•M· J+i-, XI GOJ 1977 2001 EJGrtinc 3 1, M 1537 0 XI lmprOlfe (FHCON) SITE PLAN NOTTO SCALE -~-,,.-- DD FORivf 139 1, DEC 99 Previous editions are obsolete April 2026 Page No 58 === page 483 === Tab - DESIGN === page 484 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST DESIGN Budget Request ($ in Thousands) FY 2027 Budget Request FY 2026 Budget Request $25,854 $36,575 Purpose and Scope This program provides for preliminary studies to develop additional family housing facilities, on time multi-phase design, and housing community profile developments; studies for site adaptation and determination of type and design of units; and working drawings, specifications, estimates, project planning reports and final design drawings of facility housing construction projects. This includes the use of architectural and engineering services in connection with any family housing new construction or construction improvement program. Budget Request Summary ($ in Thousands) (1) Designs for future year housing programs. (2) FY 2027 Authorization and Appropriation of $125.854M to fund this effort as outlined below: • • • FY 2027 incorporates an additional $100M insert to prepare future projects. Program will support New Construction and Construction Improvement project designs in the European and Pacific regions. The data below provides a summary of the FY27 Budget Request for the planned Design Projects by regions, project descriptions, and number of units. Base FHCON P&D Funding of $25.854M supports the following projects: o Pacific Region  Okinawa – Kadena AB – Stearly Hts 2A and 2B Replacement (75 units)  Okinawa – Camp Foster – Plaza Improvement (18 units) o European Region  Spangdahlem – Stairwell Replacement (58 units) Mandatory FHCON P&D Funding of $100M supports the following projects: o Pacific Region  Yokota – East Tower 4300 (3 BR) Improvement (70 units)  Misawa – Tower 117 Improvement (68 units)  Okinawa – Kadena AB – Stearly Hts 2B Replacement (75 units)  Okinawa – Kadena AB – North Terrace 1 (US Built) Replacement (15 units)  Okinawa – Kadena AB – Stearly Hts 3B Replacement (72 units)  Okinawa – Kadena AB – North Terrace PAIP 15 Improvement (70 units)  Yokota – PAIP 11 Phase 2 (West) Improvement (64 units)  Osan – West Townes Tower 211 Improvement (112 units)  Yokota – West Townhouses Improvement (41 units) o European Region  RAF Lakenheath – Feltwell 2 - Harvard Replacement – (48 units)  KMC Vogelweh – Stairwells 1 Improvement – (48 units) April 2026 59 === page 485 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST 1. COMPONENT 12 DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE I 3. INSTALLATION AND LOCATION 4 . PROJECT TITLE WORLDW I DE UNSPEC I F I ED VARIOUS LOCATIONS 5 . PROGRAM ELEMENT FAMILY HOUSING DESIGN ( DISCRETIONARY) CATEGORY CODE I 7 . PROJECT NUMBER 6 - 88742 F PROJECT COST ($000) 18 71 1 - 000 PAYZ714FNA 26 , 000 9 . COST ESTIMATES ITEM QUANTITY UN I T COST COST ($000) UM PRIMARY FACILITIES 25 , 854 ( 25 , 854 ) FAMI LY HOUSING DESIGN (DISCRETIONARY ) LS SUPPORTING FACILITIES SUBTOTAL 25 , 854 CONTINGENCY ( 0 . 00 %) 0 25 , 85 4 TOTAL CONTRACT COST SUPERVIS I ON , INSPECT I ON AND OVERHEAD (0 . 00 %) 0 25 , 85 4 TOTAL REQUEST TOTAL REQUEST (ROUNDED ) 26 , 000 EQUIPMENT FROM OTHER APPROPRIATIONS (NON - ADD) (0 ) 10 . DESCRIPTION OF PROPOSED CONSTRUCTION Architect - enginee r services , survey , fees , etc . , in connection with advance design o f family hous i ng dwelling units and prop erties included in or proposed for the Air Force Fami l y Housing Construction Account . 11. REQ : 0 ADQT : 0 SUBSTD : 0 PROJECT : Thi s r equest i s fo r an author i zat i on and app r opr i at i on o f $25 . 854 mi ll i o n to provide des i gn costs i n connection with fam i ly housing new construction or construction improvements programs . REQUIREMENT: The funds r e que s te d are n e c e ssar y to procu r e arch i tect -e ng i nee r serv i c e s to ma ke site and utility investigations ; one - time multi - phase design , and housing community pro fi le (HCP) developments ; and f o r the preparation of design and specifications of advance plans for future year family housing programs in connec t ion wi t h any f ami ly housing new con struction or construc ti on improvemen t s programs . IMPACT IF NOT PROVIDED : The fu n ds r equested are necessary to support the development o f housing community profile planning documents and to support the new construction and construction improvement programs . Wit hou t t he reques t ed f unds , housing community profiles cannot be developed, a nd the n ew construct i on and construction i mprovement p rogram projects cannot be designed and constructed . DD FORM 1391 , J UL 1999 PREVIOUS EDITION IS OBSOLETE April 2026 PAGE NO . 60 === page 486 === Tab - DESIGN - MANDATORY === page 487 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST 1. COMPONENT 12 DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE I 3. INSTALLATION AND LOCATION 4 . PROJECT TITLE WORLDW I DE UNSPEC I F I ED VARIOUS LOCATIONS 5 . PROGRAM ELEMENT FAMILY HOUSING DESIGN (MANDATORY) CATEGORY CODE I 7 . PROJECT NUMBER 6 - 88742 F PROJECT COST ($000) 18 71 1 - 000 PAYZ714FNA 100 , 000 9 . COST ESTIMATES ITEM PRIMARY FACILITIES FAMILY HOUSING DESIGN (MANDATORY ) UM QUANTITY UN I T COST COST ($000) 100 , 000 (100 , 000 ) LS SUPPORTING FACILITIES SUBTOTAL 100 , 000 CONTINGENCY ( 0 . 00 %) 0 TOTAL CONTRACT COST 1 00 , 000 SUPERVIS I ON , INSPECT I ON AND OVERHEAD (0. 00 %) 0 1 00 , 000 TOTAL REQUEST 1 00 , 000 TOTAL REQUEST (ROUNDED ) (0 ) EQUIPMENT FROM OTHER APPROPRIATIONS (NON - ADD ) 10 . DESCRIPTION OF PROPOSED CONSTRUCTION Archite ct - e nginee r s e rvic e s , surve y , f ee s , e tc . , in conn e ction with advance design of family housing dwell i ng units and properties includ ed i n or proposed for the Air Force Fami l y Housing Construction Account . 11. REQ : 0 ADQT : 0 SUBSTD : 0 PROJECT: This request is for an authorization and appropriation of $100.000 million to provi d e design costs i n conne ction with the family hous ing const r uctio n improveme n ts program. REQUIREMENT : The funds requested are necessary to procure architect - engineer servi ces to make si t e and utility investigations ; one - time multi - phase d esign , and housing community pro fi le (HCP ) d evelopments ; a n d for t he preparat i on o f d esign and specifications o f advance plans for f utu re year family housing programs in connection with the famil y housing construction improvements program . IMPACT IF NOT PROVIDED: The funds requested are necessary to support the develop ment of housing community profile planning documents a n d to s u pport the construction improve ments program . Withou t the requested f unds , housing communi t y profiles cannot be dev eloped , an d construction improv eme nt program projects cannot b e design e d and constructed . DD FORM 1391 , J UL 1999 PREVIOUS EDITION IS OBSOLETE April 2026 PAGE NO . 61 === page 488 === This Page Intentionally Left Blank. === page 489 === Tab - OPERATION & MAINTENANCE SUMMARY === page 490 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST Operations, Utilities and Maintenance Summary (Excludes Leasing and Privatization) Budget Request ($ in Thousands) FY 2027 Budget Request FY 2026 Budget Request FY 2026 Enactment* FY 2026 Appropriated $320,607 $315,342 $5,000 $320,342 Purpose and Scope * Funds provided by Congress in FY 2026 for additional Family Housing Management are one year appropriated funds Provides operations and maintenance resources to fund property management, utilities, and maintenance of Air Force owned units. The Air Force requests essential resources to provide military families with housing either in the private market through assistance from a housing office, or by providing government housing. The Air Force's Military Family Housing Operation and Maintenance program emphasizes the following goals: * Identify suitable, affordable housing for military members. Where shortages exist, identify alternative solutions, to include privatization, new construction or leased housing. * Reduce utility consumption to increase energy efficiency and conservation. * Provide government appliances and furniture as required. * Invest wisely in maintenance and repairs to sustain the existing adequate housing inventory worldwide. The top priorities are life, safety, and health issues and divestiture of surplus housing. a. Operations. This portion of the program provides for operating expenses in the following sub-accounts: (1) Management. Includes installation-level housing management office operations. It supports the housing referral and relocation program to assist military families in locating suitable housing and implements the Fair Housing Act. Management efforts at privatized installations include duties that are inherently governmental such as asset management, housing support services, and fiscal oversight. It supports the AF Family Housing Master Plan (FHMP) planning efforts. (2) Services. Includes basic support services comprising refuse collection and disposal; fire and police protection; custodial services; entomology and pest control; and snow removal and street cleaning. Privatized units do not receive funding from this account. (3) Furnishings. Includes household appliances (primarily stoves and refrigerators) and furniture (in limited circumstances and mainly in overseas locations). It includes costs associated with procurement, management, and repairs of furnishings and appliance inventories. (4) Miscellaneous. Includes payments to other Federal agencies or foreign governments (i.e., United States Coast Guard and United Kingdom) to operate housing units occupied by military personnel. b. Utilities. Includes all purchased and base-produced heat, electricity, water, sewer, and gas commodities serving family housing. Residents purchase their own telephone, internet and cable TV service. Privatized housing units do not receive funding from this account. c. Maintenance. Privatized housing units do not receive funding from this account. April 2026 63 === page 491 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST Provides the following: (1) Maintenance/Repair of Dwellings. Includes service calls, routine maintenance and repairs, and replacement of deteriorated facility components. Housing maintenance contracts are included in these costs. (2) Exterior Utilities. Includes maintenance and repair of water, sewer, electrical, and gas lines and other utility distribution, collection, or service systems assigned to or supporting family housing areas. (3) Other Real Property. Includes maintenance of grounds, common areas, roads, parking areas, and other property for the exclusive use of family housing occupants not included above. (4) Alterations and Additions. Includes minor alterations to housing units or housing support facilities. Whole-house improvements with complex scopes are included in the construction program. Operation and Maintenance FY 2027 Budget Request Summary - Highlights The requested FY 2027 amount is $320,607,000. This amount, together with estimated reimbursements of $2,500,000 will fund the FY 2026 Operation and Maintenance program of $323,107,000. A summary of the budget request for FY 2027 is as follows ($ in thousands): Operations Request $108,981 Utility Request Maintenance Request Total Direct Request Reimbursement Total Program $51,097 $160,529 $320,607 $2,500 $323,107 April 2026 64 === page 492 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST Inventory and Funding Summary (FH-2) USAF FY 2027 PB Fiscal Year: 2027 Family Housing Operations and Maintenance, Summary Command: USAF Excludes Leased Units and Costs Exhibit: FH-2 Worldwide Summary Inventory Data (Units) FY 2025 FY 2026 FY 2027 Units in Being Beginning of Year 15,271 15,159 14,119 Units in Being at End of Year 15,159 14,119 14,337 Average Inventory for Year 15,215 14,639 14,228 96 96 96 a. Contiguous US 106 106 96 b. U.S. Overseas 0 0 0 c. Foreign 15,165 15,053 14,023 d. Worldwide 15,271 15,159 14,119 Historic Units Units Requiring FHO&M Funding Funding Requirements ($000) OPERATIONS (DIRECT) Management Services Furnishings Miscellaneous Sub-Total Direct Operations Anticipated Reimbursements Gross Obligations, Operations UTILITIES (DIRECT) Direct Utilities Utilities Anticipated Reimbursements Gross Obligations, Utilities MAINTENANCE (DIRECT) M&R Dwelling M&R Ext. Utilities M&R Other Real Property Alter & Add Sub-Total Direct Maintenance Anticipated Reimbursements Gross Obligations, Maintenance GRAND TOTAL, FHO&M - Direct Anticipated Reimbursements GRAND TOTAL, FHO&M - TOA FY 2025 Total Cost Unit Cost ($) ($000) FY 2026 Total Cost Unit Cost ($) ($000) FY 2027 Total Cost Unit Cost ($) ($000) 80,209 10,407 23,132 1,151 5,272 684 1,520 76 54,581 12,701 31,275 1,475 3,728 868 2,136 101 64,841 12,957 28,691 2,492 4,557 911 2,017 175 114,899 7,552 100,032 6,833 108,981 7,660 322 21 322 22 322 23 115,221 7,573 100,354 6,855 109,303 7,682 52,798 3,470 72,738 4,969 51,097 3,591 646 53,444 42 3,513 646 73,384 44 5,013 646 51,743 45 3,637 113,877 852 7,439 0 7,485 56 489 0 122,611 7,129 11,406 1,426 8,376 487 779 97 144,476 4,816 11,237 0 10,154 338 790 0 122,168 8,029 142,572 9,739 160,529 11,283 1,532 101 1,532 105 1,532 108 123,700 8,130 144,104 9,844 162,061 11,390 289,865 19,051 315,342 21,541 320,607 22,534 2,500 164 2,500 171 2,500 176 292,365 19,216 317,842 21,712 323,107 22,709 April 2026 65 === page 493 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST USAF FY 2027 PB Fiscal Year: 2027 Family Housing Operation and Maintenance, Summary Command: USAF Excludes Leased Units and Costs Exhibit: FH-2 Contiguous US Inventory Data (Units) FY 2025 FY 2026 Units in Being Beginning of Year 106 Units in Being at End of Year Average Inventory for Year Historic Units Funding Requirements ($000) FY 2025 Total Cost Unit Cost ($) ($000) FY 2027 106 96 106 96 96 106 101 96 96 96 96 FY 2026 Total Cost Unit Cost ($) ($000) FY 2027 Total Cost Unit Cost ($) ($000) OPERATIONS (DIRECT) Management 58,512 0 35,478 0 46,685 0 Services 163 0 111 0 130 0 Furnishings 538 0 625 0 574 0 Miscellaneous Sub-Total Direct Operations 249 0 428 0 673 0 59,462 0 36,642 0 48,062 0 0 0 0 0 0 0 59,462 0 36,642 0 48,062 0 Direct Utilities Utilities Anticipated Reimbursements 128 0 727 0 511 0 0 0 0 0 0 0 Gross Obligations, Utilities 128 0 727 0 511 0 804 0 2,452 0 2,890 0 Anticipated Reimbursements Gross Obligations, Operations UTILITIES (DIRECT) MAINTENANCE (DIRECT) M&R Dwelling M&R Ext. Utilities 0 0 0 0 0 0 M&R Other Real Property 144 0 684 0 225 0 Alter & Add Sub-Total Direct Maintenance Maintenance Anticipated Reimbursements Gross Obligations, Maintenance 0 0 71 0 0 0 948 0 3,207 0 3,115 0 0 0 0 0 0 0 948 0 3,207 0 3,115 0 60,538 0 40,576 0 51,688 0 0 0 0 0 0 0 60,538 0 40,576 0 51,688 0 GRAND TOTAL, FHO&M - Direct Anticipated Reimbursements GRAND TOTAL, FHO&M - TOA April 2026 66 === page 494 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST USAF FY 2027 PB Fiscal Year: 2027 Family Housing Operation and Maintenance, Summary Command: USAF Excludes Leased Units and Costs Exhibit: FH-2 US Overseas Inventory Data (Units) FY 2025 FY 2026 FY 2027 Units in Being Beginning of Year 0 0 0 Units in Being at End of Year 0 0 0 Average Inventory for Year 0 0 0 Historic Units 0 0 0 Funding Requirements ($000) FY 2025 Total Cost Unit Cost ($) ($000) FY 2026 Total Cost Unit Cost ($) ($000) FY 2027 Total Cost Unit Cost ($) ($000) OPERATIONS (DIRECT) Management 1,730 0 1,092 0 1,297 0 Services 0 0 0 0 0 0 Furnishings 778 0 938 0 861 0 0 0 0 0 0 0 2,508 0 2,030 0 2,158 0 0 0 0 0 0 0 2,508 0 2,030 0 2,158 0 Direct Utilities Utilities Anticipated Reimbursements 0 0 0 0 0 0 0 0 0 0 0 0 Gross Obligations, Utilities 0 0 0 0 0 0 M&R Dwelling 0 0 0 0 0 0 M&R Ext. Utilities 0 0 0 0 0 0 M&R Other Real Property 0 0 0 0 0 0 Alter & Add Sub-Total Direct Maintenance Maintenance Anticipated Reimbursements Gross Obligations, Maintenance 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2,508 0 2,030 0 2,158 0 0 0 0 0 0 0 2,508 0 2,030 0 2,158 0 Miscellaneous Sub-Total Direct Operations Anticipated Reimbursements Gross Obligations, Operations UTILITIES (DIRECT) MAINTENANCE (DIRECT) GRAND TOTAL, FHO&M - Direct Anticipated Reimbursements GRAND TOTAL, FHO&M - TOA April 2026 67 === page 495 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST USAF FY 2027 PB Fiscal Year: 2027 Family Housing Operation and Maintenance, Summary Command: USAF Excluded Leased Units and Costs Exhibit: FH-2 Foreign Inventory Data (Units) FY 2025 FY 2026 FY 2027 Units in Being Beginning of Year 15,165 15,053 14,023 Units in Being at End of Year 15,053 14,023 14,241 Average Inventory for Year 15,109 14,538 14,132 0 0 0 Historic Units Funding Requirements ($000) FY 2025 Total Cost Unit Cost ($) ($000) FY 2026 Total Cost Unit Cost ($) ($000) FY 2027 Total Cost Unit Cost ($) ($000) OPERATIONS (DIRECT) Management 19,967 1,322 18,011 1,239 16,859 1,193 Services 10,244 678 12,590 866 12,827 908 Furnishings 21,816 1,444 29,712 2,044 27,256 1,929 902 60 1,047 72 1,819 129 52,929 3,503 61,360 4,221 58,761 4,158 322 21 322 22 322 23 53,251 3,524 61,682 4,243 59,083 4,181 Direct Utilities Utilities Anticipated Reimbursements 52,670 3,486 72,011 4,953 50,586 3,580 646 43 646 44 646 46 Gross Obligations, Utilities 53,316 3,529 72,657 4,998 51,232 3,625 113,073 7,484 120,159 8,265 141,586 10,019 852 56 7,129 490 4,816 341 M&R Other Real Property 7,295 483 10,722 738 11,012 779 Alter & Add Sub-Total Direct Maintenance Maintenance Anticipated Reimbursements Gross Obligations, Maintenance 0 0 1,355 93 0 0 121,220 8,023 139,365 9,586 157,414 11,139 1,532 101 1,532 105 1,532 108 122,752 8,124 140,897 9,692 158,946 11,247 226,819 15,012 272,736 18,760 266,761 18,876 2,500 165 2,500 172 2,500 177 229,319 15,178 275,236 18,932 269,261 19,053 Miscellaneous Sub-Total Direct Operations Anticipated Reimbursements Gross Obligations, Operations UTILITIES (DIRECT) MAINTENANCE (DIRECT) M&R Dwelling M&R Ext. Utilities GRAND TOTAL, FHO&M - Direct Anticipated Reimbursements GRAND TOTAL, FHO&M - TOA April 2026 68 === page 496 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST Summary Historic Housing Summary of Historic Housing Detail 2025 1. Historic Housing Costs, Non-GOQ Data a. Number of Non-GOQ units on NHRP (Inventory) * 73 b. Improvement Costs ($000) 0 c. Maintenance and Repair Costs ($000) 966,828 d. Total Historic Maintenance, Repair, 966,828 Improvements ($000) e. Average Cost Per Unit ($000) 13,244 2. Historic Housing Costs, GOQ Data a. Number of GOQ units on NHRP (Inventory) ** 23 b. Improvement Costs ($000) *** 0 c. Maintenance and Repair Costs ($000) **** 294,302 d. Total Historic Maintenance, Repair, 294,302 Improvements ($000) e. Average Cost Per Unit ($000) 12,796 3. Total Historic Inventory & Costs (Non-GOQ & GOQ) a. Number of Non-GOQ and GOQ units on 96 NHRP (Inventory) b. Improvement Costs ($000) 0 c. Maintenance and Repair Costs ($000) 1,261,130 d. Total Historic Maintenance, Repair, Improvements ($000) 1,261,130 e. Average Cost Per Unit ($000) 13,137 Notes: 2026 2027 73 0 970,692 73 0 990,106 970,692 13,297 990,106 13,563 23 0 295,503 23 0 301,401 295,503 12,848 301,401 13,104 96 0 1,266,195 96 0 1,291,507 1,266,195 13,190 1,291,507 13,453 * Includes Eglin AFB units (4) ** The Otis House is not on the NRHP inventory but is eligible and included in this table April 2026 69 === page 497 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST Family Housing Operation and Maintenance Reprogramming Actions ($ in Thousands) as of 30 Sep 2024 FY 2025 Appropriation 49,955 Funds Reprogrammed 2,280 Percent Reprogrammed 4.56% FY 2025 End of Year 52,235 Operations Management Services Furnishings Miscellaneous 76,384 12,446 24,230 2,426 5,160 (1,200) (1,000) (240) 6.76% (9.64%) (4.13%) (9.89%) 81,544 11,246 23,230 2,186 Leasing 6,278 (600) (9.56%) 5,678 127,023 (4,400) (3.46%) 122,623 0 0 0.00% 0 Privatization 37,508 0 0.00% 37,508 Foreign Currency Total 0 336,250 0 0 0.00% 0.00% 0 336,250 Utilities Maintenance Debt April 2026 70 === page 498 === Tab - OPERATIONS === page 499 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST RECONCILIATION OF INCREASES AND DECREASES MANAGEMENT EXHIBIT OP-5 Management - The Management account supports housing operations to include management office personnel; supplies, equipment and custodial services; community liaison and housing support services; and housing information technology software and support. It supports studies such as the housing requirements and market analyses, preliminary studies, and engineering construction plans. It includes concept development, acquisition, and portfolio management supporting housing privatization. ($ in Thousands) 1. FY 2026 President's Budget Request: $54,581 2. Congressional Adjustment a. Housing Oversight $5,000 3. FY 2026 Appropriated Amount: $59,581 4. FY 2026 Current Estimate: $59,581 5. Price Growth: $1,092 a. General Inflation 2.00% $1,092 6. Program Increase: $9,168 7. Program Decrease: ($5,000) a. One-time FY 2026 Costs 1) Fiscal Year 2026 Congressional Add Housing Oversight ($5,000) 8. FY 2027 Budget Request: $64,841 Notes: Analysis of changes in Management: The FY27 program sustains the FY20 Congressional funding for additional manpower needed to enhance privatization oversight. The additional manpower positions are aligned to Air Force Installation Military Housing offices, Air Force Civil Engineer Center, and Headquarters Air Force to support inherently governmental activities of privatized housing oversight, asset management, housing support services, and fiscal oversight. A total of 218 positions (GS 7-15) were added in FY21 with 100% fill rate. The FY27 program changes are due to a program review of requirements, including funding for Housing Requirements and Market Analyses, prior years execution and changes in Civilian Personnel compensation adjustments in average work-year costs. The FY 2027 Budget Request of $64,841 represents a 18.8% increase compared to the FY2026 President's Budget Request. * Each year, Air Force uses detailed execution and cost factor analysis to update civilian compensation costs for the purpose of accurately forecasting budget estimates for the civilian workforce. The cost adjustment is a result of these cost changes as well as updated pay raise, awards and benefit assumptions). April 2026 71 === page 500 === This Page Intentionally Left Blank. === page 501 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST RECONCILIATION OF INCREASES AND DECREASES SERVICES EXHIBIT OP-5 Services Provides basic municipal-type support services such as refuse collection and disposal; fire and police protection; entomology and pest control; snow removal; street cleaning, and custodial services for governmentowned family housing units. Since private developers are responsible for municipal services, installations with privatized housing have no requirements for funding. Services at remaining government-owned housing units are based on historical obligations. ($ in Thousands) 1. FY 2026 President's Budget Request: $12,701 2. FY 2026 Appropriated Amount: $0 3. FY 2026 Current Estimate: $12,701 4. Price Growth: $254 a. General Inflation 2.00% $254 5. Program Increase: $2 6. Program Decrease: $0 7. FY 2027 Budget Request: $12,957 Notes: Analysis of changes in Services: The FY2027 Budget Request is based on a review of program requirements (e.g. adjustments in service contracts at OCONUS locations) and inflation. The FY2027 Budget Request of $12,957 represents 2% increase compared to the FY2025 President's Budget Request. April 2026 73 === page 502 === This Page Intentionally Left Blank. === page 503 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST RECONCILIATION OF INCREASES AND DECREASES FURNISHINGS EXHIBIT OP-5 Furnishings The Air Force provides furnishings support to members in overseas locations and for general officers residing in government-provided and privatized housing. This Furnishing account includes furnishing office personnel, procurement for initial issue and replacement of household equipment, domestic appliances (primarily stoves and refrigerators) and for furniture in limited circumstances. It funds the control, moving, and handling of furnishings inventories, and the maintenance and repair of such items. Privatized housing units do not receive funding with the exception for residents of general officers’ quarters. Loaner furniture is provided to military families overseas so they may occupy permanent quarters prior to the arrival of their personally-owned furniture. “Loaner kits” consisting of beds, sofas, dining tables, etc., allows members to set up their household faster while reducing the cost of temporary quarters. In addition, there are some furnishings normally built into CONUS houses that are often limited or nonexistent in foreign private rentals, such as wardrobes (clothes closets), kitchen cabinets, sideboards and appliances. These items are provided to families as required. The furnishings account funds essential furnishings at levels consistent with the needs of the Air Force. ($ in Thousands) 1. FY 2026 President's Budget Request: $31,275 2. FY 2026 Appropriated Amount: $0 3. FY 2026 Current Estimate: $31,275 4. Price Growth: $626 a. General Inflation 2.00% $626 5. Program Increase: $0 6. Program Decrease: ($3,210) 7. FY 2027 Budget Request: $28,691 Notes: Analysis of changes in Furnishings: The FY2027 requirement is based on review of program requirements, prior years' execution and inflation. The DAF has a large OCONUS requirement for families and assists with helping families to occupy permanent quarters faster. This helps to avoid higher costs in other accounts such as military allowances and other support appropriations. The FY2027 program changes are due to a program review of requirements, including inflation, prior years’ execution and changes in Civilian Personnel compensation adjustments in average work-year costs. The FY2027 Budget Request of $28,691 represents 8.3% decrease compared to the FY2026 President's Budget Request. * Each year, Air Force uses detailed execution and cost factor analysis to update civilian compensation costs for the purpose of accurately forecasting budget estimates for the civilian workforce. The cost adjustment is a result of these cost changes as well as updated pay raise, awards and benefit assumptions). April 2026 75 === page 504 === This Page Intentionally Left Blank. === page 505 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST RECONCILIATION OF INCREASES AND DECREASES MISCELLANEOUS EXHIBIT OP-5 Miscellaneous Includes payments to other Federal agencies or foreign governments (i.e. United States Coast Guard and United Kingdom) to operate housing units occupied by Air Force personnel. For locations that are U.S. government owned or controlled, funding is based on historical obligations. No funding is provided in this category for installations with privatized housing. ($ in Thousands) 1. FY 2026 President's Budget Request: $1,475 2. FY 2026 Appropriated Amount: $0 3. FY 2026 Current Estimate: $1,475 4. Price Growth: $30 a. General Inflation 2.00% $30 5. Program Increase: $987 6. Program Decrease: $0 7. FY 2027 Budget Request: $2,492 Notes: Analysis of changes in Miscellaneous: The FY2027 Budget Request is based on a review of program requirements, prior years' execution and inflation. The FY2027 Budget Request of $2,492 represents a 69% increase compared to the FY2026 President's Budget Request. Program increases are based on a program review of requirements and prior years execution. April 2026 77 === page 506 === This Page Intentionally Left Blank. === page 507 === Tab - UTILITIES === page 508 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST RECONCILIATION OF INCREASES AND DECREASES UTILITIES EXHIBIT OP-5 This program provides for all utilities consumed in government-owned family housing. This program funds electricity, natural gas, fuel oil and other purchased heating, water, sewage and waste systems. Military Family Housing residents and housing management continue to work towards meeting energy reduction goals. However, as the majority of homes become privatized, and utility cost responsibility is shifted to private developers, this becomes less of an overall government concern. Utilities Reconciliation Increases Decreases ($ in Thousands) 1. FY 2026 President's Budget Request: $72,738 2. FY 2026 Appropriated Amount: $0 3. FY 2026 Current Estimate: $72,738 4. Price Growth: $1,455 a. General Inflation 2.00% $1,455 5. Program Increase: $0 6. Program Decrease: ($23,096) 7. FY 2027 Budget Request: $51,097 Notes: Analysis of changes in Utilities: The FY2027 decrease is based on a review of program requirements, prior years' execution, inflation, energy cost changes in the Pacific Region, and international utility cost share agreements. The FY2027 Budget Request of $51,097 represents 32% decrease compared to the FY2026 President's Budget Request. April 2026 79 === page 509 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST Family Housing Summary of Utilities Detail 2025 Total Cost of Utilities ($000) 2026 2027 49,955 72,738 51,097 212,578,060 216,829,621 221,166,214 605,354,855 617,461,952 629,811,191 0 18,833 328,243 0 19,210 334,808 0 19,594 341,504 0 0 14,197 0 14,481 0 14,771 Water (Kgal) 2,585,002 2,636,702 2,689,436 Sewage (Kgal) 2,335,706 2,382,420 2,430,069 Utility Quantities Electricity (KwH) Heating Gas(CF) Fuel Oil Residuals (BBLS) Distillates (BBLS) Purchased Steam (MBTU) Heat Plants Coal Fired (MBTU) Heat Plants Other Than Gas, Oil, Coal (MBTU) Propane (BBLS) April 2026 80 === page 510 === Tab - MAINTENANCE === page 511 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST RECONCILIATION OF INCREASES AND DECREASES MAINTENANCE EXHIBIT OP-5 Maintenance provides for sustainment of family housing assets through service calls, change of occupancy rehabilitation, routine maintenance, preventive maintenance, interior and exterior painting, and major repairs. Housing condition assessments conducted for the AF FHMP substantiate that the maintenance and repair funding profile represents a balanced, fiscally constrained program, while ensuring sufficient Real Property Maintenance by Contract (RPMC) funds are available to maintain the existing adequate inventory. MFH maintenance is categorized in two types of service. The first is routine recurring work such as service calls and repairs necessary to keep a house habitable (e.g. repairing leaking faucets, replacing broken windows, or replacing furnace filters). It includes maintenance performed during change of occupancy, such as painting or carpet replacement. The second type of service is major maintenance and repair needed to fix or replace major systems and their components that are nearing the end of their useful life. Examples include restoring or replacing structural items including roofs, electrical, plumbing, heating, ventilation and air conditioning, landscaping, and complete exterior painting. No maintenance funds are provided for privatized housing units which are the responsibility of the privatization property owner. MANDATORY FUNDING JUSTIFICATION: The FY 2027 request for MFH includes $366,765 thousand of discretionary and $454,767 thousand of mandatory for a total of $821,523 thousand. The mandatory funds 9 repair projects, including design, with 7 projects addressing 375 inadequate units across installations in Japan and 2 projects addressing 73 units at Spangdahlem AB, Germany with nearly inadequate condition scores (82 BCI), and critical health and life safety replacement and repairs to elevator systems in 18 high-rise family housing towers (towers can become uninhabitable without fully functional elevators). The mandatory funds Maintenance enabling the repair of 267 inadequate homes across Okinawa (181 units), Yokota (70 units), Misawa (16 units); and demolition of 108 surplus inadequate homes across Okinawa (79 units) and Yokota (29 units). These whole-house major maintenance and repair projects include lifecycle repair/replacement of all unit level renovations: updates to kitchens and bathrooms, modernization of interior finishes, replacement of plumbing, electrical, HVAC, and fire protection and alarms. The projects address building infrastructure updates including building utilities, upgrades to electrical systems, elevators, exterior finish paint & repair, roof, site utilities and community equipment. Repair work includes bringing systems up to modern building code, and removal and disposal of hazardous materials. The mandatory funds replace elevator systems throughout 18 high-rise towers; 15 towers (1,020 units) which are nearly inadequate (83 BCI) and 3 towers (210 units) which are inadequate. This includes replacing the existing elevator system with a modern system that includes hanger rails. Repair/replace the existing hoist way doorframes and platform access portion to conform to the new elevator. Repair the elevator machine room floor to include asbestos abatement. Replace the existing power and control wiring. Replace the elevator control panel board—the panel provides the interlock function for the fire alarm system and seismic sensing device, which is tied to the base fire station. Install the emergency call and lighting system in the elevator car. The FY 2027 mandatory funds provide additional resources to expand the maintenance and repair of inadequate homes from FY 2026. April 2026 81 === page 512 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST ($ in Thousands) 1. FY 2026 President's Budget Request: $142,572 2. FY 2026 Appropriated Amount: $0 3. FY 2026 Current Estimate: $142,572 4. Price Growth: a. General Inflation $2,851 2.00% $2,851 5. Program Increase: $15,105 6. Program Decrease: $0 7. FY 2027 Budget Request: $160,528 Notes: Analysis of changes in Maintenance: The FY2027 request of program provides funding necessary to prevent deterioration of the government-owned housing inventory, routine recurring repair, and to address units with low condition ratings through maintenance and repair projects. The FY2027 Budget Request of $160,528 represents a 12.6% increase compared to the FY2026 President's Budget Request and is based on inflation, a program review of requirements and prior years’ execution. The program increase will address deferred projects and planned FY2027 major repairs to 70 units at Yokota AB, Japan, 20 homes at Misawa AB, Japan, repairs to the Yokota AB furnishing warehouse, and repairs to 18 units at Spangdahlem. April 2026 82 === page 513 === Tab - MAINTENANCE & REPAIR OVER 35K === page 514 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST GENERAL AND FLAG OFFICERS’ QUARTERS (GFOQ) Anticipated Operations, Maintenance and Repair Expenditures Exceeding $35,000 per Unit (FH-5) (Dollars in Thousands) Installation Quarters Address Year Built Size NSF Operations Cost Maintenance Cost Total OMR > $35K Cost Utility Cost Leasing Cost Historic Preservation Cost Total FH O&M Cost Significant O&M FY 2022-2026 CONUS 4411 Camp Kadena AB 1987 2,675 $1.8 $73.5 $75.3 $5.0 $0.0 $0.0 $80.3 $0.0 Courtney This project will repair the roof and exterior paint on GOQ 4411, Camp Courtney. Work includes scaffolding, surface preparation, crack and sealant repair, roof coating, exterior wall painting including surface preparation, caulking, and crack or spall repair as needed. All work shall result in a complete and usable facility. ACM and LBP testing of the roof and exterior walls in this unit was negative; therefore, no abatement is required for this project. 4445 Camp Kadena AB 1988 2,412 $1.9 $73.5 $75.4 $5.0 $0.0 $0.0 $80.3 $0.0 Courtney This project will repair the roof and exterior paint on GOQ 4445, Camp Courtney. Work includes scaffolding, surface preparation, crack and sealant repair, roof coating, exterior wall painting including surface preparation, caulking, and crack or spall repair as needed. All work shall result in a complete and usable facility. ACM and LBP testing of the roof and exterior walls in this unit was negative; therefore, no abatement is required for this project. 4404 Camp Kadena AB Courtney 1965 3,410 $1.8 $73.7 $75.5 $5.0 $0.0 $0.0 $80.4 $0.0 This project will repair the roof and exterior paint on GOQ 4404, Camp Courtney. Work includes scaffolding, surface preparation, crack and sealant repair, roof coating, exterior wall painting including surface preparation, caulking, and crack or spall repair as needed. Roof and exterior walls in this unit tested negative for ACM and LBP; however, vent pipe sealant tested positive and requires abatement under this project. All work shall result in a complete and usable facility. 6950 Otis USAFA 1929 11,553 $4.1 $60.1 $64.2 $13.3 $0.0 $0.0 $77.5 $821.5 Dr A waiver is required since normal operations and maintenance costs will exceed the $35K GOQ Operations, Maintenance and Repair (OMR) threshold. This request provides that routine reoccurring charges (e.g., service calls, grounds maintenance, preventative maintenance) can be incurred without exceeding requested authority. All costs are based on historical costs and inflated by 5.1%. The Otis House is the largest GOQ in the AF inventory and normal building, grounds and preventive maintenance requirements are increased due to the size of the unit. For years FY12 - FY16 when privatized, the Otis House average for COM, Service Orders, Grounds Maintenance and Capital Repair & Replacement was $38,812/year. Using the US Bureau of Labor Statistics CPI Inflation Calculator the $38,812/yr cost would equate to $54,395 in FY25 and then extrapolated to FY27 it would equate to $60,084. Grounds Maintenance (including April 2026 83 === page 515 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST Total Total OMR > Historic FH Significant Quarters Year Size Operations Maintenance $35K Utility Leasing O&M Preservation O&M FY Installation Cost Address Built NSF Cost Cost Cost Cost Cost Cost 2022-2026 snow removal) is estimated to be 11,616 and included in the $60,084. This waiver will ensure facility preservation and maintain the unit until a FHCON can be performed. Total GOQ Units $9.6 $280.8 $290.4 April 2026 $28.3 $0.0 $0.0 $318.5 $821.5 84 === page 516 === Tab - GFOQ OVER 50K === page 517 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST Privatized GFOQ Operations, Maintenance and Repair Costs Exceeding $50,000 (FH-12) State/Country Texas Total Installation JBSA-Randolph Quarters ID 1 Main Circle Year Built Size NSF 1931 4859 Operations Cost Maintenance and Repair Cost (Note 1) 2.3 2.3 50.7 50.7 Total FH O&M Cost (Note 2) 53.0 53.0 Notes: Costs incurred per Unit by the Private Sector Developer/Partner/Owner for Fiscal Year 2025 ($ in Thousands) (1) Total O&M cost are from FY25 Q1 GOQ cost reports (2) Maintenance & Repair includes Capital Repair & Replacement and Reinvestment Costs (3) This annual report complies with the FY 2009 National Defense Authorization Act (NDAA), amended Section 2805 requirement. April 2026 85 === page 518 === This Page Intentionally Left Blank. === page 519 === Tab - REIMBURSABLE PROGRAM === page 520 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST REIMBURSEMENT EXHIBIT OP-5 Includes collections received from rental of Air Force family housing units to foreign nationals, civilians and others. Included in the estimate are the anticipated reimbursements due to members who voluntarily separate that are authorized to live in government quarters for up to six months after separation. 1. FY 2026 President's Budget Request: 2. FY 2026 Appropriated Amount: 3. Supplementals: 4. Price Growth: 5. Functional Program Transfers: 6. Program Increases: 7. Program Decreases 8. FY 2026 Current Estimate: 9. Price Growth: a. Inflation 10. Functional Program Transfer: 11. Program Increases: 12. Program Decreases: Adjusted based on historical data 13. FY 2027 Budget Request: ($ in Thousands) $2,500 $0 $0 $0 $0 $0 $0 $2,500 0.00% $0 $0 $0 $0 $2,500 April 2026 87 === page 521 === This Page Intentionally Left Blank. === page 522 === Tab - LEASING === page 523 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST Leasing Budget Request ($ in Thousands) FY 2027 Budget Request FY 2026 Budget Request $5,523 $5,436 Purpose and Scope Leasing provides privately owned housing for assignment as government quarters at both domestic and foreign locations when the local economy and on-base housing cannot satisfy requirements. The leasing program is authorized by 10 United States Code (U.S.C.) §2828 and provides for payment of rental and operation and maintenance costs of privately owned quarters for assignment as government quarters to military families. This program includes funds needed to pay for services such as utilities and refuse collection when these services are not part of the lease agreement. The Air Force (AF) also uses the authorities in 10 U.S.C. §2834 to participate in Department of State (DoS) embassy leased housing pools. The AF continues to rely on the private sector to meet the majority of housing needs. Where the private sector rental markets and on-base housing cannot meet requirements and cost-effective alternatives do not exist, short and long-term leases are used. The AF must use the leasing program in high-cost areas to obtain adequate housing to meet critical needs and to avoid unacceptably high out-of-pocket costs for the member where government-owned housing is not available. Program Summary - Highlights Authorization is requested to fund leases and related expenses in FY 2027. The FY 2027 request for family housing leasing points is summarized as follows: FY 2025 Lease Pts Foreign: 8,988 Used FY 2026 Cost ($000) 85 Used $6,247 FY 2027 Cost ($000) 95 $5,405 Used Cost ($000) 93 $5,492 Domestic: 3,333 1 $31 1 $31 1 $31 Total: 12,321 86 $6,278 96 $5,436 94 $5,523 Foreign Leasing Congress authorized leasing in foreign countries in 10 U.S.C. §2828 as amended, which limits the number of lease points authorized and funds appropriated, and as required, through notifications prior to execution of lease agreements exceeding $1M annually. The AF strategy is to provide adequate housing for our personnel serving in other countries where military family housing is not available. Foreign leases are primarily provided at Aviano, Italy and Doha, Qatar and other countries to support the direct AF mission. The AF also provides appropriate funding support to accompanied military members and DoW civilians assigned at the DoS embassies where their housing and related services are provided by the DoS embassies under the authority of 10 U.S.C. §2834. DoS provides leased housing support through the International Cooperative Administrative Support Services (ICASS) program and requires ICASS administrative fees. April 2026 89 === page 524 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST Domestic Leasing Congress authorized domestic leasing program in 10 U.S.C. §2828 as amended, which limits the number of units authorized at any one time and specifies the maximum cost limitation. The AF supports independent duty personnel residing in high cost rental areas of which their duty locations are geographically separated and/or outside of commuting distance from the nearest military installations with governmentowned or privatized family housing. This support is provided since adequate housing is not available within member’s housing allowances. April 2026 90 === page 525 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST RECONCILIATION OF INCREASES AND DECREASES LEASING EXHIBIT OP-5 ($ in Thousands) 1. FY 2026 President's Budget Request: $5,436 2. FY 2026 Appropriated Amount: $0 3. FY 2026 Current Estimate: $5,436 4. Price Growth: a. General Inflation $109 2.00% $109 5. Program Increase: $0 6. Program Decrease: ($22) 7. FY 2027 Budget Request: $5,523 Notes The attached leasing charts reflect changes to the program by locations and type of lease. These requirements are a direct result of changes to missions, changes in accompanied requirements, and other housing needs. April 2026 91 === page 526 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST Analysis of Leased Units Exhibit (FH-4) # UNITS FY 25 LEASE MONTHS # UNITS FY 26 LEASE MONTHS CONUS-wide (AF Recruiters, ROTC staffs, & other) Unassioned 1 3,332 12 0 S31 $0 1 3,332 12 0 T OTAL DOMESTIC LEASES 3,333 12 31 3,333 12 9 1 9 3 0 3 3 4 2 1 0 0 13 0 1 1 10 2 0 3 108 48 12 108 36 0 36 36 48 24 12 0 0 156 0 12 12 120 24 0 36 $1,115 S311 $47 $542 $428 $0 $223 S47 $410 S163 $175 $0 $0 $692 $0 $65 $72 S853 S173 $0 $322 9 6 4 8 3 2 3 3 4 4 3 1 3 12 0 1 0 10 2 0 1 69 828 $5,638 1 14 1 12 168 12 16 192 LOCATION ,. COST ($000) ,. COST ($000) FY27 LEASE COST #UNITS MONTHS ~ ($000) DOMESTIC LEASES $31 $0 1 3,332 12 0 31 3,333 12 108 72 48 96 36 24 36 36 48 48 36 12 36 144 0 12 0 120 24 0 12 $680 S288 S119 $485 $203 $68 S113 S48 S268 S293 $190 $63 $200 $706 $0 S54 $0 S840 S110 $0 $47 108 48 48 96 36 12 36 36 48 24 48 24 24 144 12 12 0 108 36 12 12 $680 S235 S179 $508 $205 $44 S120 S50 $240 $204 S270 $133 $145 $710 $68 $54 $0 S790 $165 $26 $47 79 948 $4,775 9 4 4 8 3 1 3 3 4 2 4 2 2 12 1 1 0 9 3 1 1 77 924 $4,873 $73 $455 S81 1 14 1 12 168 12 $77 S494 S59 1 14 1 12 168 12 $77 $482 $60 $ 609 16 192 $ 630 16 192 $ $ $31 $0 $ 31 FOREIGN LEASES Department of State (§2834): Abu Dhabi, UAE Amman, Jordan Bangkok, Thailand Bogota, Colombia Brasilia/Rio De Janeiro, Brazil Buenos Aires, Argentina Cairo, Egypt Chiang Mai, Thailand Classified Location Copenhagen/Hellerup, Denmark Doha, Qatar Lima, Peru Madrid, Spain Mexico City/Guadalajara, Mexico Nassau, Bahamas Oslo, Norway New Dehli, India Paris, France Santiago, Chile Tbilisi, Georgia Tel Aviv, Israel DoS Subtotal 4 AF Foreign Leases (§2828): Geilenkirchen, Germany Aviano, Italy Stavanger, Norway AF Foreign Leases Subtotal $ 619 Unassigned 8,903 0 $0 8,893 0 $0 8,895 0 $0 TOTAL FOREIGN LEASES 8,988 1,020 $ 6,247 8,988 1,140 $ 5,405 8,988 1,116 $ 5,492 GRAND TO TAL FH-4 12,321 1.032 $ 6,278 12,321 1.152 $ 5.436 12,321 1,128 $ 5,523 April 2026 92 === page 527 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST Analysis of High Cost Leased Units (FH-4) (Other than Section 801) FY27 TOTAL FY25 FY26 FY27 LEASES HIGH HIGH EST HIGH HIGH EST HIGH HIGH EST PER COST COST COST COST COST COST COST COST COST LOCATION UNITS DEFINED ($000) UNITS DEFINED ($000) UNITS DEFINED ($000) DOMESTIC LEASES 0 0 $38,015 $0 0 $38,015 $0 0 $41 ,573 Sub-Total Domestic High-cost 0 0 $0 0 $0 0 1 1 $58,170 $73 1 $58,170 $77 1 $58,170 $58,170 $58,170 $58,170 LOCATION $0 $0 FOREIGN LEASES Geilenkirchen, Germany $77 Stavanger, Norway 1 1 $81 1 $59 1 Sub-Total Foreign High-cost 2 2 $154 2 $136 2 $137 GRAND TOTAL FH-4A 2 2 $154 2 $136 2 $137 April 2026 $60 93 === page 528 === This Page Intentionally Left Blank. === page 529 === Tab - FAMILY HOUSING PRIVATIZATION === page 530 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST FAMILY HOUSING PRIVATIZATION Budget Request ($ in Thousands) FY 2027 Budget Request FY 2026 Budget Request FY 2026 Enactment* FY 2026 Appropriation $40,627 $38,987 $5,000 $43,987 Purpose and Scope * Funds provided by Congress in FY 2026 for additional Privatization are one year appropriated funds. The Department of the Air Force uses the Military Housing Privatization Initiative (MHPI) program to provide quality and affordable housing to military members and their families throughout the continental United States (U.S.) plus Alaska and Hawaii at locations where adequate housing in the local community is not sufficient. The Air Force’s program consists of an end state of 52,181 privatized homes at 63 installations within 31 privatization projects. This represents 99.8% of the total on-base family housing inventory in the U.S. Completion of initial development period scope of DAF MHPI projects is delayed past the original FY19 forecast due to delayed demolition of excess units at Offutt AFB, NE and HVAC and Fenestration projects at Eglin AFB, FL and Hurlburt Field, FL. The Air Force plans to complete the Initial Development Period for 100% of the projects by the end of FY28, extended from FY19 due to environmental remediation delays and time required to accumulate funds for demolition. To date, privatization will provide the Air Force with 22,243 new homes and 12,295 renovated homes, in addition to the 17,643 homes conveyed as-is at project closings. The Air force is focused on sustaining the housing privatization program through detailed portfolio and asset management process. The Air Force remains committed to providing members and their families access to safe and adequate housing facilities and services. Program Summary The FY2027 funding request provides $40,627 portfolio oversight and management. This program funds all costs related to family housing privatization, to include civilian pay for portfolio management personnel, privatized housing resident advocates, travel, contracts for environmental assessments, financial consultant services, project construction oversight, and training. This funding ensures the Air Force maintains oversight and accountability and fulfills reporting requirements mandated in Title 10, United States Code, Section 2885. In addition, long-term project oversight is essential to ensuring the Air Force continues to receive quality housing from the privatized housing project owners. It is estimated that the Air Force will pay basic allowance for housing (BAH) under section 403 of title 37 to members living in privatized housing the amounts of $1,249,286,384 in FY2026 and $1,301,756,412 in FY 2027. The number of units of military family housing upon which these estimated payments are made is 42,661 in FY2026 and 43,168 in FY2027. The number of units of military unaccompanied housing upon which these estimated payments are made is 107 in FY2026 and 125 in FY2027. These estimates meet the reporting requirement stipulated in 10 USC 2884(b)(2). However, it must be noted that it is difficult to project the true cost of BAH allowances provided to members living in privatized housing. BAH allowances for members in privatized housing are not specifically tracked in budget or execution data, as these members receive the same allowances as those who live on the economy. BAH accounting data is available for only the various categories of payments (for instance, domestic with and without dependents, partial, overseas housing allowances, etc.). April 2026 95 === page 531 === This Page Intentionally Left Blank. === page 532 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST RECONCILIATION OF INCREASES AND DECREASES Housing Privatization Exhibit OP-5 Housing Privatization Support ($ in Thousands) 1. FY 2026 President's Budget Request: $38,987 2. Congressional Adjustment a. Housing Oversight $5,000 3. FY 2026 Appropriated Amount: $43,987 4. FY 2026 Current Estimate: $43,987 5. Price Growth: $780 a. General Inflation 2.00% $780 6. Program Decrease: ($5,000) a. One-time FY 2025 Costs 1) Fiscal Year 2025 Congressional Add Housing Oversight ($5,000) 7. Program Increase: $860 8. FY 2027 Budget Request: $40,627 Notes: Analysis of changes in Privatization: The FY2027 program continues to provide funds for MHPI Resident Advocates at installations with DAF privatized housing. The Air Force is committed to long-term project oversight to ensure program accountability and compliance. The FY2027 program changes are due to inflation, a program review of requirements, prior years’ execution and changes in Civilian Personnel compensation adjustments in average work-year costs. The FY 2027 Budget Request of $40,627 represents 4.2% increase compared to the FY2026 President's Budget Request. * Each year, Air Force uses detailed execution and cost factor analysis to update civilian compensation costs for the purpose of accurately forecasting budget estimates for the civilian workforce. The cost adjustment is a result of these cost changes as well as updated pay raise, awards and benefit assumptions). April 2026 97 === page 533 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST Family Housing Privatization Comparison Exhibit (FH-6) Approved by OSD & OMB4 Privatization Date1 MHPI Project Name2 Installation/State3 No. Units Conveyed 5 Aug-98 Sep-00 Lackland I Robins I Lackland AFB, TX (Ph I) Robins AFB, GA (Ph I) 272 670 No. End State Units6 Amount ($M)7a 420 6.200 670 Actual/Current8 Funding Source6 12.800 Sep-00 Dyess Dyess AFB, TX 0 402 16.300 Mar-01 Elmendorf I Elmendorf AFB, AK (Ph I) 584 828 23.304 Aug-02 WrightPatterson I Wright-Patterson AFB, OH (Ph I) 1,733 1,536 10.813 Apr-03 Kirtland Kirtland AFB, NM 1,783 1,078 24.221 Budget Year(s)7 b Type of Funds7c Source Project Name7d 97 Construction Lackland SIOH 96 Construction Lackland 98 Construction Robins Replace MFH Ph 4 (60) 97 Construction Dyess Construct MFH Ph 1 (70) 99 Construction Dyess-Construct MFH Ph 2 (64) 98 Construction Dyess-Construct MFH Ph 1 (70) 98 Improvement Elmendorf-Improve MFH Ph 9 (82 units) HRSO to FHIF 02 Improvement Hickam-Privatize MFH 99 Construction Wright Patterson-Replace 40 Units 02 Construction 02 Construction 99 Construction Kirtland-Replace MFH Ph 5 (37) 04 Improvement Hickam - Improve 190 MFH 02 Construction Buckley-Privatize MFH 03 Improvement Elmendorf-192 Ph 11 Improve 02 Improvement Elmendorf-Privatize MFH Travis - Replace MFH Ph 1 Mountain Home-Replace MFH 56 Units Aug-04 Buckley Buckley AFB, CO 0 351 15.619 Sep-04 Elmendorf II Elmendorf AFB, AK (Ph II) 986 1,194 41.496 Feb-05 Hickam I Hickam AFB, HI (Ph I) 1,356 1,356 4.194 02 Improvement Sep-05 Offutt Offutt AFB, NE 2,600 1,640 12.568 01 Improvement 05 Improvement Davis-Monthan, Repair MFH Ph 6 01 Improvement Hill, Privatize MFH 05 Improvement Fairchild AFB - Privatize MFH 04 Construction Dover, Repl 112 MFH Ph 3 Sep-05 Hill Hill AFB, UT 1,138 1,018 11.280 Sep-05 Dover Dover AFB, DE 1,488 980 12.425 Jan-06 Scott Scott AFB, IL 1,430 1,593 0.000 May-06 Sep-06 Nellis Nellis AFB, NV 1,278 1,178 1.827 McGuire McGuire AFB/Ft. Dix, NJ 2,364 2,083 7.569 No. Units Conveyed 9 272 0 End State Units10 Total No. Units in Current Inventory Amount ($M)12 420 420 6.161 0 11 0 Funding Source12 17.164 0 402 406 16.269 584 828 828 23.304 1,733 1,536 1,536 10.715 1,783 1,078 1,301 24.013 0 351 353 17.893 986 1,194 1,194 41.496 Hickam Privatize MFH 1,356 1,356 1,356 4.185 Offutt Privatize MFH 2,600 1,640 1,954 12.568 N/A N/A N/A 05 Improvement Holloman - Privatize MFH 02 Improvement Nellis - Privatize MFH 02 Improvement McGuire Privatize MFH April 2026 1,138 1,018 1,092 11.656 1,488 980 982 12.278 1,430 1,593 1,595 0.000 1,278 1,178 1,180 1.827 2,364 2,084 2,212 5.270 Budget Year(s)1 MHPI Authorities 2 Type of Funds12 Source Project Name12 97 Construction Lackland SIOH 96 Construction Lackland 05 FHIF 98 Construction 97 Construction 99 Construction 98 Construction 98 Improvement 02 Improvement Hickam-Privatize MFH 99 Construction Wright Patterson-Replace 40 Units 02 Construction 02 Construction 99 Construction 04 Improvement 02 Construction 03 Improvement 02 13 1, 2, 5 Wright Patterson II Robins Replace MFH Ph 4 (60) Dyess Construct MFH Ph 1 (70) Dyess-Construct MFH Ph 2 (64) Dyess-Construct MFH Ph 1 (70) Elmendorf-Improve MFH Ph 9 (82 units) HRSO to FIFH Travis - Replace MFH Ph 1 Mountain Home-Replace MFH 56 Units Kirtland-Replace MFH Ph 5 (37) Hickam - Improve 190 MFH Buckley-Privatize MFH 1, 2, 5 1 1, 5 1, 2, 5 1, 2, 5 1, 5 Improvement Elmendorf-192 Ph 11 Improve Elmendorf-Privatize MFH 1, 4, 5 02 Improvement Hickam Privatize MFH 1, 5 01 Improvement Offutt Privatize MFH 1, 5 05 Improvement Davis-Monthan, Repair MFH Ph 6 01 Improvement Hill, Privatize MFH 1, 5 05 Improvement 04 Construction Fairchild AFB - Privatize MFH Dover, Repl 112 MFH Ph 3 1, 5 1, 5 N/A N/A N/A 05 Improvement Holloman - Privatize MFH 02 Improvement Nellis - Privatize MFH 02 Improvement McGuire Privatize MFH 1, 5 1, 5 98 === page 534 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST Feb-07 AETC Group I May-07 USAFA Jul-07 Aug-07 Sep-07 ACC Group II Hickam II Tri-Group Altus AFB, OK 883 530 883 530 530 Luke AFB, AZ 690 550 690 550 550 Sheppard AFB, TX Tyndall AFB, FL 1,167 848 714 813 1,167 848 714 593 714 306 AETC Group I Total: 3,588 2,607 3,588 2,387 2,100 1,208 427 1,207 425 665 1,256 961 1,160 929 923 1,065 2,185 1,884 2,225 1,303 1,118 1,139 US Air Force Academy, CO Davis-Monthan AFB, AZ Holloman AFB, NM 1,256 929 1,009 909 ACC Group II Total: 2,265 1,838 Hickam AFB, HI (Ph II) 1,303 1,118 Los Angeles AFB, CA Peterson AFB, CO Schriever AFB, CO Tri-Group Total: Sep-07 BLB Barksdale AFB, LA Joint Base AnacostiaBolling (Bolling), MD Joint Base LangleyEustis (Langley), VA BLB Total: Oct-07 Robins II Robins AFB, GA (Ph II) Columbus AFB, MS Oct-07 Nov-07 Nov-07 AETC Group II 617 572 493 0 723 269 1,110 1,564 Sheppard Privatize 1,288 MFH 2.219 06 Improvement AF Academy Privatize 445 Units 27.922 0.000 Davis-Monthan AFB - Replace FH Ph 6 MacDill Replace FH Ph 6 Holloman, Privatize Family Housing 05 Construction 05 Construction 05 Improvement N/A N/A N/A Improvement Fort MacArthur - Improve 188 Units 06 19.950 06 Improvement Peterson, Privatize 1,132 Units 669 05 Improvement 1,430 03 Construction Eglin, 234 MFH Ph 2A Improvement Eglin - Hurlburt 213 MFH Improvement Improvement FY 05 Robins, Improve Family Housing 1,343 1,496 518 Improvement Improvement Improvement 1,090 563 04 06 05 729 3,568 6.244 15.300 3,189 207 03 10.600 453 Goodfellow AFB, TX 98 241 Laughlin AFB, TX 534 516 Maxwell AFB, AL 729 501 JBSA-Randolph, TX 397 317 Vance AFB, OK 230 229 AETC Group II Total: 2,506 2,257 Vandenberg Vandenberg AFB, CA 1,336 867 AMC East Andrews AFB, MD MacDill AFB, FL 1,480 752 887 571 AMC East Total: 2,232 1,458 05 06 05 59.000 0.000 0.000 Improvement Improvement 05 Construction 03 Construction 03 Improvement N/A N/A N/A N/A Bolling, Improve 24 Units Barksdale, Imp MFH Ph 1 Langley, Improve Electrical System Andrews-Improve 178 Units Randolph, Construct MFH Ph 1 Davis-Monthan, Repair MFH Ph 6 Hurlburt, 134 MFH Ph 2A Eglin - Hurlburt 213 MFH Improvement 617 613 617 493 0 669 242 669 242 1,110 1,524 1,528 6.244 04 Improvement 2.219 06 Improvement 27.922 0.000 Sheppard Privatize 1,288 MFH AF Academy Privatize 445 Units Davis-Monthan AFB Replace FH Ph 6 MacDill Replace FH Ph 6 Holloman, Privatize Family Housing 05 Construction 05 Construction 05 Improvement N/A N/A N/A 06 Improvement Fort MacArthur - Improve 188 Units 06 Improvement Peterson, Privatize 1,132 Units 16 Improvement 06 05 Improvement Improvement 19.945 Kadena AB, Misawa AB and Yokota AB Construction Improvement Projects Bolling, Improve 24 Units Barksdale, Imp MFH PH 1 Langley, Improve Electrical System 723 990 1,048 1,343 772 850 05 Improvement 1,496 1,430 1,430 03 Construction Eglin, 234 MFH Ph 2A 03 Improvement Eglin - Hurlburt 213 MFH Improvement 05 Improvement FHIF FY 05 Robins, Improve Family Housing 3,562 558 3,192 207 71.359 3,328 254 16.600 517 453 453 06 Improvement 98 241 241 05 Improvement 534 451 451 05 Construction 723 501 513 03 Construction 397 317 317 03 Improvement Andrews-Improve 178 Units Randolph, Construct MFH Ph 1 Davis-Monthan, Repair MFH Ph 6 Hurlburt, 134 MFH Ph 2A Eglin - Hurlburt 213 MFH Improvement 230 242 242 2,217 59.000 1, 5 1, 5 1, 5 5 3, 5 1, 5 3, 4, 5 3, 5 2,499 2,205 N/A 1,336 867 999 0.000 N/A N/A N/A 5 N/A 1,466 752 933 572 1,114 572 0.000 N/A N/A N/A 3, 5 2,218 1,505 1,686 April 2026 99 === page 535 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST Jul-08 Nov-08 AMC West Falcon Group Fairchild AFB, WA 1,055 641 04 Construction Tinker, Privatize 730 MFH 1,055 641 641 04 Construction Tinker AFB, OK 694 660 04 Improvement Sheppard, Privatize 1,288 Units 694 660 660 04 Improvement Travis AFB, CA 2,187 1,134 FHIF Funds 1,094 1,134 1,274 AMC West Total: 3,936 2,435 2,843 2,435 2,575 Hanscom AFB, MA 726 746 02 Improvement Hickam - Privatize MFH Little Rock AFB, AR 1,295 999 01 Improvement Moody MFH Privatization 01 Construction Travis - Replace 64 Units 00 Improvement Little Rock - Privatize MFH 05 Improvement Robins - Improve Family Housing 03 Improvement Keesler - Replace 117 Ph 1 03 Improvement Eglin - Hurlburt 213 MFH Improve 36.798 11 Improvement Army Funds Transferred 1, 5 23.354 07 Construction Mountain Home - Replace 457 MFH 1, 5 07 Construction Mountain Home - Replace 457 MFH Moody AFB, GA Patrick AFB, FL Falcon Group Total: Dec-08 Jun-11 Sep-11 Lackland II JBER Southern Group Lackland AFB, TX (Ph II) Western Group Northern Group 991 616 3,315 2,617 264 465 1242 1240 Arnold AFB, TN 40 Charleston AFB, SC 15.723 21.785 Improvement Hickam - Privatize MFH 726 731 731 01 Improvement Moody MFH Privatization 1,295 991 991 01 Construction Travis - Replace 64 Units 303 287 287 00 Improvement Little Rock - Privatize MFH 991 616 616 3,315 2,625 2,625 05 Improvement Robins - Improve Family Housing 03 Improvement Keesler - Replace 117 Ph 1 03 Improvement Eglin - Hurlburt 213 MFH Improve 11 Improvement Army Funds Transferred 264 465 589 1,240 1,240 22 40 22 22 478 345 478 345 599 Keesler AFB, MS 1,188 1,188 1,188 1,188 1,188 Shaw AFB, SC 681 630 679 630 633 Southern Group Total: 2,387 2,185 2,385 2,185 2,442 683 509 509 884 36.800 02 1,242 23.354 509 F.E. Warren AFB, WY 831 749 Malmstrom AFB, MT Whiteman AFB, MO Western Group Total: 1,412 920 1,116 890 Cannon AFB, NM Aug-13 256 JB ElmendorfRichardson Beale AFB, CA Mar-12 303 28.190 20.053 07 Construction Mountain Home - Replace 457 MFH 07 Construction Mountain Home - Replace 457 MFH 05 FHIF Beale 831 749 749 04 03 FHIF FHIF Beale Beale 1,168 920 1,116 890 1,116 890 4,047 3,264 3,602 3,264 3,264 763 1,038 763 1,038 1,038 Cavalier AFB, ND 14 14 14 14 14 Ellsworth AFB, SD 283 497 283 497 500 Grand Forks AFB, ND 833 547 833 547 547 Minot AFB, ND 1,746 1,606 1,746 1,440 1,440 956 844 956 844 844 4,595 4,546 4,595 4,380 4,383 Mountain Home AFB, ID Northern Group Total: 37.813 09 Improvement Kadena - Improve 614 MFH (Ph 9) Misawa - Improve 370 MFH (Ph 4) April 2026 28.190 15.723 21.618 Tinker, Privatize 730 MFH Sheppard, Privatize 1,288 Units FHIF Funds 05 FHIF Beale 20.053 04 03 FHIF FHIF Beale Beale 37.576 09 Improvement Kadena - Improve 614 MFH (Ph 9) Misawa - Improve 370 MFH (Ph 4) 1, 5 1, 5 1, 5 1, 5 1, 2, 5 100 === page 536 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST Sep-13 Sep-13 Continental Group ACC Group III 14 Grand Totals Edwards AFB, CA 741 741 741 741 741 Eglin AFB, FL 898 747 894 747 873 Eielson AFB, AK 934 898 934 898 910 Hurlburt AFB, FL 380 404 380 404 504 McConnell AFB, KS 401 364 Seymour Johnson, NC 401 364 381 708 Continental Group Total: 708 686 686 686 4,062 3,862 4,036 3,840 4,095 Dyess AFB, TX (PH II) Moody AFB, GA (PH II) 674 674 674 674 674 0 184 ACC Group III Total: 674 858 61,883 53,331 82.610 9.617 09 09 Improvement Improvement Mountain Home - Replace 457 MFH Kadena - Improve 614 MFH (Ph 9) Yokota - Improve 350 MFH (Ph 7) Misawa - Improve 370 MFH (Ph 4) Yokota - Improve 350 MFH (Ph 7) Misawa - Improve 370 MFH (Ph 4) 617.796 April 2026 0 101 101 674 775 775 59,534 52,181 54,538 80.181 09 Improvement Mountain Home - Replace 457 MFH Kadena - Improve 614 MFH (Ph 9) Yokota - Improve 350 MFH (Ph 7) Misawa - Improve 370 MFH (Ph 4) 6.315 09 Improvement Yokota - Improve 350 MFH (Ph 7) Misawa - Improve370 MFH (Ph 4) 1, 2, 5 1, 2, 5 677.896 101 === page 537 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST Notes: --1 - The date real property is transferred (land and housing units) to private ownership/developer, and when service members become entitled to receive a Basic Allowance for Housing (BAH). 2 - Provide the name of the MHPI Project given to the privatization project, including the name given to integrated/grouped projects. The MHPI project name should be consistent with the MHPI project name used in the previously approved OSD/OMB Scoring report and/or subsequent notification to Congress. 3 - List the MHPI project location by installation and state, including each installation/state incorporated into the integrated/grouped MHPI project. 4 - This section relates the previously-approved OSD/OMB project scope and funding amounts contained in the scoring package and/or subsequent Notification of Funds Transfer letters to Congress. 5 - Provide the number of family housing units to be conveyed by installation and state to the Developer, including each installation and state incorporated into the integrated/grouped MHPI project, as previously-approved in the OSD/OMB Scoring report. 6 - Provide the end state number of family housing units by installation and state to the Developer, including each installation/state incorporated into the integrated/grouped MHPI project, as previously-approved in the OSD/OMB Scoring report. 7 - Provide all of the funding source information for the MHPI project as reflected in the previously-approved OSD/OMB report and consistent with the project summary details accompanying the Notification of Transfer letter to Congress, such as: a. The amount of funds to be used for the Government's cost of the project (i.e., equity contribution, credit subsidy costs, differential lease payments, etc.). b. The fiscal year(s) of the funding sources to be used to cover the Government's cost of the MHPI project. c. The type of funds (e.g., FH New Construction, FH Construction Improvements, FH Improvement Funds) to be used to cover the Government's cost of the MHPI project. d. The project(s) that are used to source the Government's cost of the privatization project. 8 - This section relates to the Military Departments' actual and/or current plan, which might or might not be consistent with the details contained in the previously-approved OSD/OMB Scoring report and project summary to Congress for the MHPI project due to extenuating circumstances. 9 - Provide the actual and/or revised planned number of family housing units conveyed to the Developer by installation and state, including each installation/state incorporated into the integrated/grouped MHPI project. 10 - Provide the actual and/or revised, planned number of family housing end state units by installation and state, including each installation/state incorporated into the integrated/grouped MHPI project. Comments to 08/13/20 reporting: AETC Group 1 (cell K34) Approved end state rebuild at Tyndall after Hurricane Michael recovery changed from 813 to 593 units. Updated 30Mar2022: BLB: (Cells K46 and K47) Per the terms of the approved restructure, 100 "End State" units were "swapped" from Barksdale to Bolling effectively reducing the unit count at Barksdale to 990 from 1090 (cell K46) and increasing the unit count at Bolling from 672 to 772 (cell K47) with an additional 43 excess units online along with the proposal to bring an additional 21 units back on line in 2022. There are 14 other units being used as Maintenance storage facilities and will continue being used as such. The DL modification cost is noted in "12" below. 11 - Provide the total number of privatized family housing units in the inventory for each MHPI project by installation/state, including each installation/state incorporated into the integrated/grouped MHPI project, regardless if they are currently occupied or not. Kirtland increased by 1 unit due to one unit used as office/storage not accounted for on previous FH-6; ACC II-Holloman decreased by 10 over previous FH-6 which erroneously included ten units demolished in previous years; Hickam increased by 6 units at Bellows Air Force Station and 1 model unit not counted in previous FH-6; Tri-Group-Los Angeles increased by 4 for a quadplex not part of project end state but renting two units and using the other two units for storage; AMC East-Andrews decreased by 28 units erroneously counted that had been demolished in previous years; Northern Group change due to Initial Development Period (IDP) progress; Continental Group-Eglin change due to IDP progress; Continental Group-Hurlburt change due to IDP progress; Continental Group-McConnell change due to IDP progress. Comments to 08/13/20 reporting: AETC Group 1 (cell K34) Approved end state rebuild at Tyndall after Hurricane Michael recovery changed from 813 to 593 units and (cell L34) 52 units have been restored and are online for occupancy as of 31 Jul. AMC East (Cell L59) 933 was the end state; however, 2 of the Madison burn units were deleted because they were not rebuilt. Northern Group: (cell L87) 3 NDSU Units were a part of Hunt’s project back in the 90s. They were not part of the inventory until 2016. Wing leadership was living in those homes and didn’t want them to be torn down, so Hunt transferred them to BBC and BBC renovated them and includes them in the inventory now. The 3 units are SOQ’s but are classified as NDSU’s because they were transferred from 801 housing. Updates as of 08/3/2021: Hill (cell L23) total no. of units in current inventory changed from 1082 to 1090 (increased by 8 units) with 10 new units built and 2 units demolished in 2017. AETC Group 1 Tyndall AFB (cell L34) total no. units in inventory changed from 52 to 97 and (cell L35) project total changed from 1846 units to 1891 (increased by 45 units). As of 31 Dec 20, total 97 units have been rebuilt. Updated 30 Mar 2022: Robins AFB, GA (Ph I) End State Units decreased by 670 (cells E6 and K6) and Total No. Units in Current Inventory decreased by 670 (cell L6) upon divestiture from DAF MHPI portfolio on 31 Oct 2021. The DL m+A32odification is noted in "12" below. Northern Group-Minot End State Units (cell K90 and Total No. Units in Current Inventory (cell L90) changed from 1,606 to 1,440 - 166 NDSUs demolished. Updated 30 Jun 23: Dyess(cell L9) increased by 4 units due to 4 units built by the project owner during the initial development period that were not accounted for on previous FH-6; Buckley (cell L18) increased by 2 units due to 2 units built by the project owner during the initial development period that were not accounted for on previous FH-6; Hill (cell L24) increased by 2 units due to 2 units built by the project owner during the initial development period that were not accounted for on previous FH-6; Dover (cell L26) increased by 2 units due to 2 units built by the project owner during the initial development period that were not accounted for on previous FH-6; Scott (cell L28) increased by 2 units due to 2 units built by the project owner during the initial development period that were not accounted for on previous FH-6; Nellis (L29) increased by 2 units due to 2 units built by the project owner during the initial development period that were not accounted for on previous FH-6; AETC Group 1 (cell L35) 230 units have been restored after Hurricane Michael and are online for occupancy as of 30 Jun 23; Continental Group-Eglin (cell L95) change due to IDP progress; Continental Group-Hurlburt change due to IDP progress; Continental Group-Eielson (cell L96) change due to IDP progress. Updates as of 13 June 24: Kirtland (L15) 2 units removed to indicate offline Hunt maintenance units. AETC Group 1 Tyndall (L35) 306 units have been restored after Hurricane Michael and are online for occupancy as of 30 Jun 24. USAFA (L37) 4 units removed to indicate offline Hunt maintenance units. AMC West Travis (L66) 1 unit added to indicate unit coming back online. Lackland (cell L73) 24 units removed for demolition. Update 9 June 2025: Davis-Monthan (L38) decrease by 14 units demolition. Barksdale (L48) decreased by 42 due to demolition. April 2026 102 === page 538 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST 12 - Provide all the "actual and/or current" funding sources used to fund the MHPI project, which might or might not be consistent with the details contained in the previous-approved OSD/OMB Scoring report and project summary (i.e., project amount, budget year of funds, source project, appropriation) to Congress for the MHPI project due to extenuating circumstances. If possible and/or available, please provide the requested funding information by installation/state. Change to scoring reported as actual for Wright Patterson as a result of actual scoring found in historical records. Updated 30 Mar 22: (1) Robins AFB, GA (ph 1) was divested from DAF MHPI portfolio on 31 Oct 2021. The DL modification cost was $4.364 million. (2) BLB Group Loan Modification occurred in FY 2020. The modification cost was $56.059 million. (3) Robins II restructure occurred Dec 2024. $4.39 million equity investment; $2.61 million Differential Lease Payments 13 - Provide the applicable MHPI authorities in subchapter IV of Chapter 169 in title 10 U.S.C. was used and/or proposed to be used for the privatization project. Designators are as follows: 1 = 10 USC 2873 - Government Direct Loans 2 = 10 USC 2873 - Loan Guarantees 3 = 10 USC 2875 - Investments, such as DoW Equity Contributions in non-governmental entities 4 = 10 USC 2877 - Differential Lease Payments 5 = 10 USC 2878 - Conveyance or Lease of Existing Property and Facilities 14 - Totals of number of units conveyed, number of end state units, and funding amounts. April 2026 103 === page 539 === Tab - FOREIGN CURRENCY === page 540 === DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2027 BUDGET REQUEST FOREIGN CURRENCY EXCHANGE DATA (PB-18) ($ in Thousands) l.VIFH O&M Country Denmark European Comm Iceland Japan No1way Singapore South Korea Turkey United Kingdom Total FY 2025 Local Currency Krone Euro Krona Yen Krone Dollar Won Lira Pow1d Country Denmark European Comm Iceland Japan No1way Singapore South Korea Turkey United Kingdom Total $U.S. Requiring Conversion Budget Exchange Rates 6.895 0.9249 $ 136.0931 145.7323 $ 10.6839 $ 1.3517 $ 1314.2081 $ 26.7796 $ 0.7978 $ Local Currency Krone Euro Krona Yen Krone Dollar Won Lira Pound Budget Exchange Rates 137 4,688 2,799 13,393 6.895 0.9249 $ 136.0931 145.7323 $ 10.6839 $ 1.3517 $ 1314.2081 $ 26.7796 $ 0.7978 $ $ 165 5,832 3, 175 15,946 FY 2026 $U.S. Requiring Conversion Budget Exchange Rates 6,774 $ FY 2025 FY 2027 $U.S. Requiring Conversion 6.9395 0.9303 $ 137.92 150.4415 $ 10.9541 $ 1.3277 $ 1388.1554 $ 34.536 $ 0.7978 $ 5,769 $ FH COr STRUCTION FY 2026 Budget Exchange Rates 5,750 65,242 - 70,992 April 2026 $ $U.S. Requiring Conversion 6.9395 0.9303 $ 137.9200 150.4415 $ 10.9541 $ 1.3277 $ 1388.1554 $ 34.536 $ 0.7794 $ 7,916 144 7,716 4,845 20,621 $ FY 2027 $ U.S. Requiring Conversion 6.9395 0.9303 137.92 150.4415 $ 10.9541 $ 1.3277 $ 1388.1554 $ 34.536 $ 0.7978 $ Budget Exchange Rates 78, 100 - 78,100 Budget Exchange Rates $ U.S. Requiring Conversion 6.3844 0.8549 $ 124.0662 153.2542 $ 9.9903 $ 1.2878 $ 14373288 $ 42.337 $ 0.7447 $ $ 172,100 - - 24,104 196,204 104