=== page 1 === [OCR text: machine-read from a scanned page; the PDF governs] OFFICE OF THE UNDER SECRETARY OF DEFENSE 1100 DEFENSE PENTAGON WASHINGTON, DC 20301-1100 DEC 19 2025 COMPTROLLER The Honorable John Carter Chairman Subcommittee on Military Construction, Veterans Affairs, and Related Agencies Committee on Appropriations U.S. House of Representatives Washington, DC 20515 Dear Mr. Chairman: The purpose of this letter is to provide the committee a revision to the justification enclosed with the request for approval of the reprogramming of funds dated and submitted to Congress on October 6, 2025. The request to the committee for approval of the project and amount shown below remains the same. The enclosed justification includes an alternative source since the original sources are no longer available. # Service/Agency/Installation Project Program Request ($) Army 1 Military Ocean Terminal Containerized Ammunition 2025 27,809,000 Concord, CA Holding Facilities A similar letter is being sent to the Chair of the Senate Subcommittee on Military Construction, Veterans Affairs, and Related Agencies. Thank you for your continued support. funk L ules W. Hurst III Performing the Duties of the Under Secretary of Defense (Comptroller)/Chief Financial Officer Enclosures: As stated cc: The Honorable Debbie Wasserman Schultz Ranking Member The Honorable John Boozman === page 2 === [OCR text: machine-read from a scanned page; the PDF governs] OFFICE OF THE UNDER SECRETARY OF DEFENSE 1100 DEFENSE PENTAGON WASHINGTON, DC 20301-1100 COMPTROLLER DEC 19 2005 Chairman Subcommittee on Military Construction, Veterans Affairs, and Related Agencies Committee on Appropriations United States Senate Washington, DC 20510 Dear Mr. Chairman: The purpose of this letter is to provide the committee a revision to the justification enclosed with the request for approval of the reprogramming of funds dated and submitted to Congress on October 6, 2025. The request to the committee for approval of the project and amount shown below remains the same. The enclosed justification includes an alternative source since the original sources are no longer available. # Service/Agency/Installation Project Program Request ($) Army 1 Military Ocean Terminal Containerized Ammunition 2025 27,809,000 Concord, CA Holding Facilities A similar letter is being sent to the Chair of the House Subcommittee on Military Construction, Veterans Affairs, and Related Agencies. Thank you for your continued support. Komp ules W. Hurst III Performing the Duties of the Under Secretary of Defense (Comptroller)/Chief Financial Officer Enclosures: As stated ce: The Honorable Jon Ossoff Ranking Member === page 3 === [OCR text: machine-read from a scanned page; the PDF governs] Requested Date of Congressional Action: November $2025 January 19, 2026” Military Construction, Army Reprogramming Request Installation: Military Ocean Terminal Concord, California Project: Containerized Ammunition Holding Facilities Authorization: | National Defense Authorization Act (NDAA) for Fiscal Year (FY) 2025, Public Law (P.L.) 118-159 Estimated Cost ($000): Previously Appropriated 68,000 Previously Reprogrammed 0 Requested Reprogramming 27,809 Total Estimated Cost 95,809 Project Description: This project will construct a containerized ammunition holding area with 5.5 million pounds Net Explosive Weight (NEW) capacity. The project includes eleven (11) new containerized ammunition holding facilities, with an ammunition storage pad, protective barrier, and other supporting facilities to comply with DoD explosive safety standards. There are three existing holding pads which require new barriers to maximize storage. Justification: An additional $27.809 million is required to award 100% of the project scope. The cost increase is attributable to electrical design changes which add reliability and redundancy, addition of street lighting to support mandatory night operations, estimating omissions in mobilization and supporting communications network infrastructure. Labor costs have increased due to limited skilled labor. Material costs have increased due to inflationary pressures. A 10 U.S.C. §2853 cost variation notification dated August 18, 2025, was submitted to the congressional committees. " Previous Congressional action date was November 8, 2025, date shift to accommodate revision. Page 1 of Request #1 === page 4 === [OCR text: machine-read from a scanned page; the PDF governs] Source of Funds: Savings from the following projects will fund this requirement: Location/Project dounsan At Base-Re u 1 ‘al Vehiel Hanger” Stuttgart GY Commissary EY, Fort Wainwright, AK Physical Fitness Facility” Fort Gordon, GA Cyber Instructional Facility (Classrooms) Detroit Arsenal, MI Ground Transportation Equipment Building Total: (Dollars in Thousands) Current Fiscal Amount Working Year Appropriated Estimate 2h22 S300 33365 2922 68500 2 2023 73,546 60,389 2024 219,913? 187,363” 2024 72,000 66.888 4 10 U.S.C. §2853 dated March 1, 2024, was submitted to the congressional committees. Proposed Reprogramming 44,000 3,000 3,809 19,000 5,000 27,809 2/ The Cyber Instructional Facility (Classrooms) was appropriated $163.0 million in FY 2024 and Congress approved a reprogramming $56.9 million in FY 2025. ¥4 10 U.S.C. 2853 dated October 21, 2025, was submitted to the congressional committees. Page 2 of Request #1