=== page 1 === [OCR text: machine-read from a scanned page; the PDF governs] OFFICE OF THE UNDER SECRETARY OF WAR 1100 DEFENSE PENTAGON WASHINGTON, DC 20301-1100 BEC 18 RH COMPTROLLER The Honorable John Carter Chairman Subcommittee on Military Construction, Veterans Affairs, and Related Agencies Committee on Appropriations U.S. House of Representatives Washington, DC 20515 Dear Mr. Chairman: The purpose of this letter is to request committee approval of the proposed reprogramming of funds for the projects and amounts shown below. Detailed justifications for the projects are enclosed. # = Service/Agency/Installation Project Program Request ($) Army 1 Fort Campbell, KY National Guard Readiness 2025 16,100,000 Center DLA 2 Marine Corps Mountain Fuel Facilities 2025 1,612,000 Warfare Training Center, CA A similar letter is being sent to the Chair of the Senate Subcommittee on Military Construction, Veterans Affairs, and Related Agencies. Thank you for your continued support of Defense programs. le Wort Jules W. Hurst III Performing the Duties of the Under Secretary of War (Comptroller)/Chief Financial Officer Enclosure: As stated CG: The Honorable Debbie Wasserman Schultz Ranking Member === page 2 === [OCR text: machine-read from a scanned page; the PDF governs] OFFICE OF THE UNDER SECRETARY OF WAR 1100 DEFENSE PENTAGON WASHINGTON, DC 20301-1100 DEC 1S 2025 COMPTROLLER The Honorable John Boozman Chairman Subcommittee on Military Construction, Veterans Affairs, and Related Agencies Committee on Appropriations United States Senate Washington, DC 20510 Dear Mr. Chairman: The purpose of this letter is to request committee approval of the proposed reprogramming of funds for the projects and amounts shown below. Detailed justifications for the projects are enclosed. # Service/Agency/Installation Project Program Request ($) Army 1 Fort Campbell, KY National Guard Readiness 2025 16,100,000 Center DLA 2 Marine Corps Mountain Fuel Facilities 2025 1,612,000 Warfare Training Center, CA A similar letter is being sent to the Chair of the House Subcommittee on Military Construction, Veterans Affairs, and Related Agencies. Thank you for your continued support of Defense programs. V/ fol Jules W. Hurst Ill Performing the Duties of the Under Secretary of War (Comptroller)/Chief Financial Officer Enclosure: As stated [oxen The Honorable Jon Ossoff Ranking Member === page 3 === [OCR text: machine-read from a scanned page; the PDF governs] Requested Date of Congressional Action: January 22, 2026 Military Construction, Army National Guard Reprogramming Request Installation: Fort Campbell, Kentucky Project: National Guard Readiness Center Authorization: Servicemember Quality of Life Improvement and National Defense Authorization Act (NDAA) for Fiscal Year (FY) 2025, Public Law (P.L.) 118- Estimated Cost ($000): Previously Appropriated 0 Previously Reprogrammed 0 Requested Reprogramming 16,100” Total Estimated Cost 16,100 ”/ Project was authorized appropriations in the FY25 NDAA, but no funds were appropriated. Project Description: A specially designed National Guard Readiness Center that will be designed to meet Industry Standards as well as all local, State, and Federal building codes and as per P.L. 90-480. Construction will include all utility services, information systems, fire detection and alarm systems, roads, walks, curbs, gutters, storm drainage, parking areas and site improvements. Justification: This project was authorized for $18.0 million in the Servicemember Quality of Life Improvement and National Defense Authorization Act for FY 2025, P.L. 118-159. The $16.1 million is required to fully fund the project. Project was not funded with appropriated funds in FY 2025 and requires an above threshold reprogramming. Page 1 of Request #1 === page 4 === [OCR text: machine-read from a scanned page; the PDF governs] Source of Funds: Savings from the following projects will fund this requirement: (Dollars in Thousands) Current Fiscal Amount Working Proposed Location/Project Year Appropriated Estimate Reprogramming Kapolei, HI National Guard Readiness Center 2023 34,800 29,810 4,990 Addition Hermiston, OR Collective Training, 2023 14,243 11,143 3,100 Unaccompanied Housing, Open- Bay Viroqua, WI National Guard Readiness Center 2024 18,200 16,390 1,810 Jerome, ID National Guard Vehicle 2024 17,000 15,800 1,200 Maintenance Shop Southaven, MS /t 2 National Guard Readiness Center 2025 11,000 0” 5,000 Total: 16,100 '’/ The National Guard Readiness Center at Southaven MS was incrementally appropriated $22.0 million in Fiscal Year 2024 (and remains unchanged) and $11.0 million in Fiscal Year 2025 Army spend plan for a total of $33.0 million. ” 4 10 USC 2853 dated November 3, 2025 was submitted to Congress. Page 2 of Request #1 === page 5 === [OCR text: machine-read from a scanned page; the PDF governs] Congressional Action Needed by: January 22, 2026 Military Construction, Defense-Wide (Defense Logistics Agency) Reprogramming Request Installation: Marine Corps Mountain Warfare Training Center, Bridgeport, CA Project: Fuel Facilities Authorization: National Defense Authorization Act (NDAA) for Fiscal Year (FY) 2025, Public Law (P. L.) 118-52 Estimated Cost ($000): Previously Appropriated 19,300 Previously Reprogrammed 4,800 Requested Reprogramming 1,612 Total Estimated Cost 25,712 '/ Below Threshold reprogramming completed in June 2025 Project Description: Construct a new operations building with a laboratory which includes offices, mechanical and electrical infrastructure, plumbing, HVAC, communications, and work necessary for a working fuel operations facility. The new fuel distribution facility will include fuel storage tanks, product recovery tank, truck fill stand, and offload station along with site piping, filter separators, and all other necessary equipment. Piping will also connect to new flightline fuel dispensing cabinets. Canopies to protect equipment in this harsh environment are also included. Justification: An additional $1.612 million is needed to provide a complete and useable project that meets mission requirements. The cost increase is due to a combination of a design change and market uncertainty from tariff impacts. Design refinements resulted in an increase in the length of fuel piping based on a changed site layout to accommodate safety requirements and stand-off distances. Contractors indicated tariff uncertainty increased their bids to mitigate potential cost risks. A 10 U.S.C. §2853 cost variation notification dated August 11, 2025, was submitted to Congress. Page 1 of Request #2 === page 6 === [OCR text: machine-read from a scanned page; the PDF governs] Source of Funds: Savings from the following projects will fund this requirement: (Dollars in Thousands) Current . Fiscal Amount Working Proposed Location/Project Year Appropriated Estimate Reprogramming Yokota Air Base, Jp Vv ; on Bulk Storage Tanks Phase 1 2023 38,100 21,280 1,612 1,612 Total "The Bulk Storage Tanks Phase | at Yokota Air Base, Japan was incrementally appropriated $55.0 million in Fiscal Year 2020 and $38.1 million in FY 2023 for a total of $93.1 million. 24 10 U.S.C. §2853 cost variation notification dated August 28, 2023, was submitted to the congressional committee. Page 2 of Request #2